CN210105385U - Regularization construction elevator ramp - Google Patents

Regularization construction elevator ramp Download PDF

Info

Publication number
CN210105385U
CN210105385U CN201920657919.6U CN201920657919U CN210105385U CN 210105385 U CN210105385 U CN 210105385U CN 201920657919 U CN201920657919 U CN 201920657919U CN 210105385 U CN210105385 U CN 210105385U
Authority
CN
China
Prior art keywords
steel
channel
square steel
construction elevator
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920657919.6U
Other languages
Chinese (zh)
Inventor
贾远航
李涛
薛甲伟
赵佳伟
陈俊安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920657919.6U priority Critical patent/CN210105385U/en
Application granted granted Critical
Publication of CN210105385U publication Critical patent/CN210105385U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a regularization construction elevator ramp circuit, including external frame, skeleton, decorative pattern steel sheet, the skeleton sets up inside external frame, and external frame passes through first connecting piece by the girder of horizontal setting and the stand of vertical setting and connects and form, the skeleton includes channel-section steel, square steel pipe, channel-section steel parallel welding is provided with square steel pipe on the girder in the channel-section steel, the decorative pattern steel sheet passes through the second connecting piece to be fixed on square steel pipe. The utility model is a full-sizing device, the connection between each component is connected with the I-shaped steel bolt through a steel plate, the key point lies in the size matching and the connection mode of the square steel pipe and the channel steel, and all components needing to be welded are fully welded; the utility model discloses a structural component is clear, and the size is clear and definite, and the installation is firm, safe and reliable.

Description

Regularization construction elevator ramp
Technical Field
The utility model relates to a construction field especially relates to a regularization construction elevator ramp.
Background
According to the market characteristics of the existing buildings, most of projects have basements, construction elevators can only be installed on the top plates of the basements, height differences exist between a construction elevator cage and the ground, and people and getting-on ramps need to be installed; bricklaying ramps or scaffolding ramps are used in most construction sites:
(1) laying a brick ramp: and building bricks on the slope ways at the periphery, filling sand in the middle and pouring a layer of concrete on the gravel.
(2) Scaffold ramp: a slope way is built by adopting steel pipes and fasteners, and a batten or square steel pipe is placed as a secondary ridge, and a waste template is laid on the secondary ridge.
The brick laying ramp has the defects that ① masonry wastes materials and is not environment-friendly, ② building garbage is too much after dismantling;
the scaffold ramp has the defects that ① wastes templates, steel pipes and fasteners always occupy lease fees, ② heavy load is excessive and easy to deform, ③ templates and battens are easy to break, potential safety hazards exist, and the aging impression effect of the ④ templates is reduced.
Therefore, there is a need to provide a modular construction elevator ramp to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a with low costs, simple structure, can realize that many times have enough to meet the need the use, ann tears convenient, factor of safety is high, durable, look sense effectual design construction elevator ramp.
The utility model provides a regularization construction elevator ramp, including external frame, skeleton, decorative pattern steel sheet, the skeleton sets up inside external frame, and external frame passes through first connecting piece by the girder that the level set up and the stand of vertical setting to be connected and forms, the skeleton includes channel-section steel, square steel pipe, channel-section steel parallel welding is provided with square steel pipe on the girder in the channel-section steel, the decorative pattern steel sheet passes through the second connecting piece to be fixed on square steel pipe.
Further, the top ends of the upright posts are connected with the main beam through bolts;
furthermore, the main beams are two I-shaped steel main beams which are arranged in parallel;
furthermore, one end of the channel steel is welded on the I-shaped steel girder, the other end of the channel steel extends out of the flange plate of the I-shaped steel girder and fixes one end of the square steel pipe, the interval is 400mm, and reinforcing ribs are welded between the bottom plate of the channel steel and the flange plate of the I-shaped steel girder;
furthermore, set up first bolt hole on the both sides board of channel-section steel, the both ends of square steel pipe and the both sides board contact surface correspond and set up the second bolt hole, adopt the high-strength bolt to pass first bolt hole, second bolt hole between square steel pipe and the channel-section steel and connect fixedly.
Furthermore, the internal pattern steel plate is fixedly connected to the square steel tube through a dovetail wire.
Furthermore, a paint surface layer is painted on the patterned steel plate.
The sizing construction elevator ramp provided by the utility model has the advantages of simple structure, convenient assembly and disassembly, safety, firmness, strong impression effect, material saving and high environmental protection performance; compared with the traditional steel pipe, connecting piece and masonry ramp, the construction is safer and more durable, the assembling and disassembling period after the parts are manufactured is shortened, and the long-term economic benefit is more visual.
Drawings
Fig. 1 is one of the schematic structural diagrams of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is a schematic view of a node at a in fig. 1.
Fig. 4 is a schematic view of a node at B in fig. 2.
Fig. 5 is the utility model discloses a big appearance of node under the decorative pattern steel sheet is illustrated.
Detailed Description
As shown in fig. 1, 2, 3, 4, 5, the utility model provides a this kind of regularization construction elevator ramp, including external frame, skeleton, decorative pattern steel sheet, the skeleton sets up inside external frame, and external frame passes through first connecting piece by the girder of level setting and the stand of vertical setting and connects and form, the skeleton includes channel-section steel, square steel pipe, channel-section steel parallel welding is provided with the square steel pipe in the channel-section steel on the girder, the decorative pattern steel sheet passes through the second connecting piece to be fixed on the square steel pipe.
The top end of the upright column and the main beam are connected through a bolt;
the main beam of the embodiment is two I-shaped steel main beams which are arranged in parallel;
in the embodiment, one end of channel steel is welded on an I-shaped steel girder, the other end of the channel steel extends out of an I-shaped steel girder flange plate and fixes one end of a square steel pipe, the interval is 400mm, and reinforcing ribs are welded between a channel steel bottom plate and the I-shaped steel girder flange plate;
set up first bolt hole on the both sides board of this embodiment channel-section steel, the both ends of square steel pipe and the correspondence of both sides board contact surface set up the second bolt hole, adopt the high-strength bolt to pass first bolt hole, second bolt hole between square steel pipe and the channel-section steel and connect fixedly.
The inside decorative pattern steel sheet of this embodiment passes through dovetail fixed connection on square steel pipe.
The pattern steel plate of the embodiment is painted with a paint surface layer.
The manufacturing process of this embodiment is as follows: firstly, cutting out I-shaped steel of a main beam, the size of an upright post and the size of an inclined plane by using a cutting machine according to the size specification of construction drawing, and forming a main beam frame by connecting 7 the upright post 6 and the I-shaped steel main beam 1 through a bolt; cutting 100mm long channel steel by using a cutting machine, welding long channel steel 2 on an I-steel girder 1 in a girder frame, wherein the distance between the channel steel is 400mm, knocking a square steel pipe 3 into the long channel steel 2, arranging first bolt holes 21 on two side plates of the channel steel, arranging second bolt holes at two ends of the square steel pipe corresponding to contact surfaces of the two side plates, and connecting and fixing the square steel pipe and the channel steel by adopting high-strength bolts to penetrate through the first bolt holes and the second bolt holes; reinforcing ribs 22 are welded between the channel steel bottom plate and the flange plate of the I-shaped steel girder to form an internal framework which is connected more firmly; and connecting the steel plate 4 with the pattern on the square steel pipe 3 by using the dovetail wire 5 to form a whole structure, and finally coating finish paint to form a paint layer to form the whole sizing construction elevator ramp.
The design construction elevator ramp of this embodiment forms design construction elevator ramp by I-steel, channel-section steel, square steel pipe, decorative pattern steel sheet, bolt, paint, and structural style is simple, and is safe durable, non-deformable, drops into repetitious usage once.

Claims (7)

1. The utility model provides a regularization construction elevator ramp, includes external frame, skeleton, decorative pattern steel sheet, the skeleton sets up inside external frame, its characterized in that, external frame passes through first connecting piece by the girder of horizontal setting and the stand of vertical setting and connects the formation, the skeleton includes a plurality of channel-section steels, a plurality of square steel pipes, a plurality of channel-section steels parallel fixation is on the girder, is provided with the square steel pipe in the channel-section steel, the decorative pattern steel sheet passes through the second connecting piece to be fixed on the square steel pipe.
2. The modular construction elevator ramp according to claim 1, wherein the top ends of the columns and main beams are bolted.
3. The modular construction elevator ramp according to claim 2, wherein the main beams are two i-beam main beams disposed parallel to each other.
4. The modular construction elevator ramp according to claim 3, wherein the channel steel is welded to the I-beam at one end and extends beyond the I-beam flange plate at the other end to fix one end of the square steel tube, the channel steel is arranged at equal intervals, and reinforcing ribs are welded between the channel steel bottom plate and the I-beam flange plate.
5. The elevator ramp for shaped construction according to claim 1 or 4, wherein first bolt holes are formed in two side plates of the channel steel, second bolt holes are formed in two ends of the square steel pipe and contact surfaces of the two side plates correspondingly, and the square steel pipe and the channel steel are fixedly connected through the first bolt holes and the second bolt holes by high-strength bolts.
6. The modular construction elevator ramp according to claim 5, wherein the internally textured steel plate is fixedly attached to the square steel tube by a dovetail.
7. The modular construction elevator ramp according to claim 6, wherein the textured steel plate is painted with a paint finish.
CN201920657919.6U 2019-05-08 2019-05-08 Regularization construction elevator ramp Expired - Fee Related CN210105385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920657919.6U CN210105385U (en) 2019-05-08 2019-05-08 Regularization construction elevator ramp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920657919.6U CN210105385U (en) 2019-05-08 2019-05-08 Regularization construction elevator ramp

Publications (1)

Publication Number Publication Date
CN210105385U true CN210105385U (en) 2020-02-21

Family

ID=69540451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920657919.6U Expired - Fee Related CN210105385U (en) 2019-05-08 2019-05-08 Regularization construction elevator ramp

Country Status (1)

Country Link
CN (1) CN210105385U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111422723A (en) * 2020-04-30 2020-07-17 广东蕉岭建筑工程集团有限公司 Elevator platform and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111422723A (en) * 2020-04-30 2020-07-17 广东蕉岭建筑工程集团有限公司 Elevator platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN109518988B (en) Adjustable supporting device for assembled building
CN104947792B (en) Green light steel assembling house and installation method are built in a kind of letter
CN109518989B (en) Multifunctional supporting jacking device for assembled building
CN204040464U (en) A kind of slab form supporting construction
CN105649360A (en) Integral assembling type building system and installing method
CN101139849A (en) Modular building component and on-site hoisting building method
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN201747060U (en) Assembly type formwork truss support
CN113279582A (en) Hanging construction method for overhanging and hanging type cast-in-place plate
CN210105385U (en) Regularization construction elevator ramp
CN107100265A (en) A kind of prefabricated house construction structure and its construction method
CN212897482U (en) Construction platform for high-rise building overhanging structural layer
CN211647306U (en) Floor carrier plate bearing structure with adjustable steel construction large-span
CN216840143U (en) Steel bar truss floor bearing plate with detachable aluminum bottom mold
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN104831928A (en) Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform
CN213203667U (en) Supporting structure for post-cast strip-striding temporary lane of top plate of ground depot
CN211773976U (en) Construction elevator basis is backed reinforcing apparatus
CN209837882U (en) Can have enough to meet need temporary enclosure
CN211644419U (en) Assembled tower crane overhauls platform
CN206873922U (en) A kind of dismountable steel bar truss floor support plate cheek board attachment structure of end template
CN211143319U (en) Building structure composed of beam column framework for multi-layer steel structure building
CN207110676U (en) The prefabricated enclosure wall of integral type
CN111056460A (en) Assembled tower crane maintenance platform and installation method
CN206053129U (en) A kind of light steel construction post of T-shaped

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200221

CF01 Termination of patent right due to non-payment of annual fee