CN210086960U - Fixing structure of cement tower - Google Patents

Fixing structure of cement tower Download PDF

Info

Publication number
CN210086960U
CN210086960U CN201920834332.8U CN201920834332U CN210086960U CN 210086960 U CN210086960 U CN 210086960U CN 201920834332 U CN201920834332 U CN 201920834332U CN 210086960 U CN210086960 U CN 210086960U
Authority
CN
China
Prior art keywords
tower
cement
fixing column
screw
shaft tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920834332.8U
Other languages
Chinese (zh)
Inventor
沈霖
倪昌峰
张聚杰
王顺洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongkuo Electric Power Design Consulting Co Ltd
Original Assignee
Jiangsu Zhongkuo Electric Power Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongkuo Electric Power Design Consulting Co Ltd filed Critical Jiangsu Zhongkuo Electric Power Design Consulting Co Ltd
Priority to CN201920834332.8U priority Critical patent/CN210086960U/en
Application granted granted Critical
Publication of CN210086960U publication Critical patent/CN210086960U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a fixed knot of cement shaft tower constructs. The fixed knot of cement shaft tower constructs includes the shaft tower main part, the shaft tower main part cup joints the fixed column, two slots have been seted up to the one end of fixed column, first jack, first screw have been seted up respectively to the surface of fixed column, the bottom of fixed column is equipped with two vertical bafflers, two bayonet socket, second screw have been seted up respectively to the one end of vertical baffler, the surface of fixed column is equipped with two horizontal bafflers, the inner circle of horizontal baffler is equipped with the picture peg, the top surface of picture peg is equipped with first draw-in groove, first draw-in groove with the bayonet socket block is connected, the outside of fixed column be equipped with the bolt that first screw is connected. The utility model provides a fixed knot of cement shaft tower constructs has convenient operation, uses nimble, the advantage of being convenient for improve cement shaft tower stability.

Description

Fixing structure of cement tower
Technical Field
The utility model relates to a cement shaft tower technical field especially relates to a cement shaft tower's fixed knot constructs.
Background
The cement pole tower is mainly composed of steel bars and concrete, so the cement pole tower is also called as a reinforced concrete cement electric pole tower, is mainly used as a stringing pillar in the industries of electric power, communication, railway, petroleum and the like, and has the advantages of long service life, small maintenance workload and the like, and is widely used.
When snowstorm occurs, the cement tower can be dragged after the wires bear more snow due to overlarge snowfall amount, so that the cement tower is toppled, and the life of local residents is influenced.
Therefore, there is a need to provide a new fixing structure for a concrete tower to solve the above-mentioned technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide a convenient operation, use nimble, be convenient for improve the fixed knot of cement shaft tower stability constructs.
In order to solve the technical problem, the fixing structure of the cement tower provided by the utility model comprises a tower main body, wherein the tower main body is sleeved with a fixing column, one end of the fixing column, which is far away from the tower main body, is provided with two slots, the outer surface of the fixing column is respectively provided with two first jacks and first screw holes which are communicated with the two slots, the first screw hole is positioned below the first jack, the bottom of the fixing column is provided with two longitudinal baffle plates, the top ends of the two longitudinal baffle plates are inserted into the two slots along the vertical direction, one ends of the two longitudinal baffle plates, which are positioned in the slots, are respectively provided with a bayonet and a second screw hole which correspond to the first jack and the first screw hole, the outer surface of the fixing column is provided with two transverse baffle plates, the transverse baffle plates are of a semi-circular structure, the inner ring of the transverse baffle plates is provided, the transverse blocking plate sequentially penetrates through the first insertion hole and the bayonet to enter the inside of the fixing column through the insertion plate, a first clamping groove is formed in the top surface of the insertion plate and is connected with the bayonet in a clamping mode, a bolt connected with the first screw hole is arranged outside the fixing column, and the bolt penetrates through the first screw hole and is connected with the second screw hole.
By adopting the technical scheme, the fixing column is arranged at the bottom of the tower main body, the transverse barrier plate and the longitudinal barrier plate are transversely and longitudinally arranged on the fixing column respectively for limiting, so that the bottom end of the tower main body is more stable to be fixed with the earth contact part, and the possibility of falling of the cement tower due to the fact that the cement tower bears more snow in a snowy day is reduced.
The utility model discloses further set up to: and a second jack communicated with the bayonet is arranged in the middle of the fixing column, and one end of the inserting plate departing from the inner ring of the transverse blocking plate penetrates through the bayonet and enters the inside of the second jack.
By adopting the technical scheme, the second jack is arranged in the fixed column, so that the plug board can be fully inserted into the fixed column, the contact area between the plug board and the fixed column is increased, and the structural stability is improved.
The utility model discloses further set up to: and a second clamping groove is formed in the top surface of the transverse blocking plate, and the bottom end of the tower main body is connected with the second clamping groove in a clamping manner.
By adopting the technical scheme, the second clamping groove is connected with the tower main body in a clamping manner, so that the tower main body and the transverse blocking plate are fixed more stably.
The utility model discloses further set up to: the bottom end of the longitudinal blocking plate is of a triangular structure, and the tip end of the triangular part of the longitudinal blocking plate is vertically downward.
Through adopting above-mentioned technical scheme, will the bottom of vertical separation board sets up to closed angle triangular structure, is convenient for vertical separation board is inside down inserting earth.
The utility model discloses further set up to: and a plurality of baffles are vertically arranged on the bottom surface of the transverse barrier plate.
Through adopting above-mentioned technical scheme horizontal separation board bottom sets up perpendicularly the baffle is convenient for promote horizontal separation board grab the ground effect, promote spacing effect.
The utility model discloses further set up to: and a cushion pad is arranged at the contact part of the top of the fixed column and the tower main body.
Through adopting above-mentioned technical scheme, set up the blotter for it is inseparabler to fix between the fixed column and the shaft tower main part, reduces the collision wearing and tearing between the two simultaneously.
Compared with the prior art, the utility model provides a fixed knot of cement shaft tower constructs has following beneficial effect:
the utility model provides a fixed knot of cement shaft tower constructs, through the bottom of shaft tower main part sets up the fixed column horizontal and vertical installation respectively of fixed column horizontal separation board vertical separation board carries on spacingly, makes the bottom of shaft tower main part is fixed more firm with earth contact site, reduces the snow day owing to bear more snow, and the cement shaft tower takes place to empty probably.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of a fixing structure of a cement tower provided by the present invention;
FIG. 2 is a schematic view of the connection structure between the fixing post and the longitudinal baffle shown in FIG. 1;
fig. 3 is a schematic structural view of the transverse barrier plate shown in fig. 1.
Reference numbers in the figures: 1. a tower main body; 2. fixing a column; 21. a slot; 22. a first jack; 23. a first screw hole; 24. a second jack; 3. a transverse barrier plate; 31. inserting plates; 32. a first card slot; 33. a second card slot; 4. a longitudinal barrier panel; 41. a bayonet; 42. a second screw hole; 5. a bolt; 6. a baffle plate; 7. a cushion pad.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of a fixing structure of a cement tower according to the present invention; FIG. 2 is a schematic view of the connection structure between the fixing post and the longitudinal baffle shown in FIG. 1; fig. 3 is a schematic structural view of the transverse barrier plate shown in fig. 1. The fixing structure of the cement tower comprises a tower main body 1, wherein the tower main body 1 is sleeved with a fixing column 2, one end of the fixing column 2, which is far away from the tower main body 1, is provided with two insertion slots 21, the outer surface of the fixing column 2 is respectively provided with two first insertion holes 22 and first screw holes 23 which are communicated with the two insertion slots 21, the first screw holes 23 are positioned below the first insertion holes 22, the bottom of the fixing column 2 is provided with two longitudinal baffle plates 4, the top ends of the two longitudinal baffle plates 4 are inserted into the two insertion slots 21 along the vertical direction, one ends of the two longitudinal baffle plates 4, which are positioned in the insertion slots 21, are respectively provided with a bayonet 41 and a second screw hole 42 which correspond to the first insertion holes 22 and the first screw holes 23, the outer surface of the fixing column 2 is provided with two transverse baffle plates 3, and the transverse baffle plates 3 are in a semicircular structure, an insert plate 31 is arranged on an inner ring of the transverse blocking plate 3, the transverse blocking plate 3 sequentially penetrates through the first insertion hole 22 and the bayonet 41 through the insert plate 31 to enter the fixing column 2, a first clamping groove 32 is arranged on the top surface of the insert plate 31, the first clamping groove 32 is connected with the bayonet 41 in a clamping manner, a bolt 5 connected with the first screw hole 23 is arranged outside the fixing column 2, and the bolt 5 penetrates through the first screw hole 23 to be connected with the second screw hole 42; through the bottom of shaft tower main part 1 sets up fixed column 2 horizontal and vertical installation respectively of fixed column 2 horizontal separation board 3, vertical separation board 4 is spacing for the bottom of shaft tower main part 1 is fixed more firm with earth contact site, reduces the possibility that the cement shaft tower takes place to empty because bear more snow in the snowy day.
Furthermore, a second insertion hole 24 communicated with the bayonet 41 is formed in the middle of the fixing column 2, and one end, away from the inner ring of the transverse blocking plate 3, of the insertion plate 31 penetrates through the bayonet 41 and enters the second insertion hole 24; the second insertion hole 24 is formed in the fixed column 2, so that the insertion plate 31 can be fully inserted into the fixed column 2, the contact area between the insertion plate 31 and the fixed column 2 is increased, and the structural stability is improved.
Further, a second clamping groove 33 is formed in the top surface of the transverse blocking plate 3, and the bottom end of the tower main body 1 is connected with the second clamping groove 33 in a clamping mode; through setting up second draw-in groove 33 with shaft tower main part 1 block connection for it is more firm to fix between shaft tower main part 1 and the horizontal baffler 3.
Further, the bottom end of the longitudinal blocking plate 4 is of a triangular structure, and the tip of the triangular part of the longitudinal blocking plate 4 is vertically downward; through with the bottom of vertical separation board 4 sets up to closed angle triangular structure, is convenient for vertical separation board 4 inserts inside earth down.
Further, a plurality of baffles 6 are vertically arranged on the bottom surface of the transverse barrier plate 3; through transverse blocking board 3 bottom sets up perpendicularly baffle 6 is convenient for promote transverse blocking board 3 grab ground effect, promote spacing effect.
Furthermore, a cushion pad 7 is arranged at the position where the top of the fixed column 2 is contacted with the tower main body 1; through setting up blotter 7 for it is inseparabler to fix between fixed column 2 and the shaft tower main part 1, reduces the collision wearing and tearing between the two simultaneously.
The utility model provides a fixed knot of cement tower constructs's theory of operation as follows:
firstly, inserting the longitudinal blocking plate 4 into the lowest end of the insertion slot 21, then inserting the insertion plate 31 on the transverse blocking plate 3 into the first insertion hole 22, inserting the insertion plate 31 into the second insertion hole 24 through the bayonet 41, wherein the bayonet 41 is connected with the first clamping slot 32 in a clamping manner, after the insertion, the first screw hole 23 is exactly aligned with the second screw hole 42, connecting the bolt 5 with the first screw hole 23 and the second screw hole 42 to complete the fixation of one transverse blocking plate 3, similarly, fixing the transverse blocking plate 3 on the other side, making the two transverse blocking plates 3 mutually butted to form a transverse plate, providing resistance in the transverse direction, fixing the fixed device in the soil, then sleeving the tower main body 1 on the fixing column 2, so that the bottom end of the tower main body 1 is clamped with the second clamping slot 33, the fixing is completed, and the transverse blocking plate 3 and the longitudinal blocking plate 4 are limited, so that the bottom end of the tower main body 1 is fixed to the soil contact part more stably.
Compared with the prior art, the utility model provides a fixed knot of cement shaft tower constructs has following beneficial effect:
the utility model provides a fixed knot of cement shaft tower constructs, through the bottom of shaft tower main part 1 sets up fixed column 2 horizontal and vertical installation respectively of fixed column 2 horizontal separation board 3 vertical separation board 4 carries on spacingly, makes the bottom of shaft tower main part 1 is fixed more firm with earth contact site, reduces snow day owing to bear more snow, and the cement shaft tower takes place to empty probably.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a fixed knot of cement shaft tower constructs, includes shaft tower main part (1), its characterized in that:
a fixing column (2) is sleeved on the tower main body (1), two inserting slots (21) are formed in one end, away from the tower main body (1), of the fixing column (2), two first inserting holes (22) and first screw holes (23) communicated with the two inserting slots (21) are formed in the outer surface of the fixing column (2), the first screw holes (23) are located below the first inserting holes (22), two longitudinal blocking plates (4) are arranged at the bottom of the fixing column (2), the top ends of the two longitudinal blocking plates (4) are inserted into the two inserting slots (21) along the vertical direction, bayonets (41) and second screw holes (42) corresponding to the first inserting holes (22) and the first screw holes (23) are formed in one end, located in the inserting slots (21), of the two longitudinal blocking plates (4), two transverse blocking plates (3) are arranged on the outer surface of the fixing column (2), horizontal baffler (3) are semicircle annular structure, the inner circle of horizontal baffler (3) is equipped with picture peg (31), horizontal baffler (3) pass through picture peg (31) pass in proper order first jack (22) with bayonet socket (41) get into the inside of fixed column (2), the top surface of picture peg (31) is equipped with first draw-in groove (32), first draw-in groove (32) with bayonet socket (41) block is connected, the outside of fixed column (2) be equipped with bolt (5) that first screw (23) are connected, bolt (5) pass first screw (23) with second screw (42) are connected.
2. The fixing structure of the cement tower as claimed in claim 1, wherein a second insertion hole (24) communicated with the bayonet (41) is formed in the middle of the fixing column (2), and one end of the insertion plate (31) departing from the inner ring of the transverse blocking plate (3) penetrates through the bayonet (41) and enters the inside of the second insertion hole (24).
3. The fixing structure of the cement tower as claimed in claim 1, wherein a second clamping groove (33) is formed in the top surface of the transverse blocking plate (3), and the bottom end of the tower main body (1) is connected with the second clamping groove (33) in a clamping manner.
4. The fixed structure of the cement tower as claimed in claim 1, wherein the bottom end of the longitudinal baffle plate (4) is of a triangular structure, and the tip of the triangular part of the longitudinal baffle plate (4) is vertically downward.
5. The fixed structure of the cement tower as claimed in claim 1, wherein the bottom surface of the transverse baffle plate (3) is vertically provided with a plurality of baffles (6).
6. The fixing structure of the cement tower as claimed in claim 1, wherein a cushion pad (7) is provided at a portion where the top of the fixing column (2) contacts with the tower main body (1).
CN201920834332.8U 2019-06-04 2019-06-04 Fixing structure of cement tower Active CN210086960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920834332.8U CN210086960U (en) 2019-06-04 2019-06-04 Fixing structure of cement tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920834332.8U CN210086960U (en) 2019-06-04 2019-06-04 Fixing structure of cement tower

Publications (1)

Publication Number Publication Date
CN210086960U true CN210086960U (en) 2020-02-18

Family

ID=69481700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920834332.8U Active CN210086960U (en) 2019-06-04 2019-06-04 Fixing structure of cement tower

Country Status (1)

Country Link
CN (1) CN210086960U (en)

Similar Documents

Publication Publication Date Title
CN201865398U (en) Fixing device for high-voltage wire pole
CN210086960U (en) Fixing structure of cement tower
CN211171996U (en) High-strength supporting foundation
CN205309012U (en) A stock shaping device for tunneling in face
CN211369314U (en) Building guardrail for civil engineering convenient to concatenation
CN211821056U (en) Pipeline bracket for petroleum drilling
CN210341952U (en) Slope protection device for preventing water and soil loss
CN204898683U (en) Underground structure of high strength
CN210141035U (en) 10kV circuit pole card tray
CN210272723U (en) Jumper splicing sleeve of overhead power transmission line
CN207559471U (en) A kind of pipe gallery cable bearer
CN110880648A (en) Graphite alkene earth bar structure
CN206922030U (en) A kind of New-style electrical wire earthing or grounding means
CN214061224U (en) Bridge supporting structure for effectively expanding tension for building
CN210223328U (en) Outdoor sign convenient to installation is maintained
CN221029940U (en) Slope protection net convenient to disassemble and assemble for hydraulic engineering
CN213123979U (en) Anti-broken wire porcelain insulator
CN105019922B (en) A kind of scalable steel arch frame connector
CN210985498U (en) Cable bridge stand column mounting structure
CN210069140U (en) Pipeline fixing device is used in municipal works pipe network construction
CN214574044U (en) Structure for repairing mine by using arbuscular mycorrhizal fungi
CN204387489U (en) A kind of Novel cable steel bracket
CN213716344U (en) Cement mark pile
CN216520566U (en) A monitoring devices for municipal works design
CN220768016U (en) Plug-in type corrugated steel sheet pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant