CN210086565U - Wall body of assembled wallboard component combination - Google Patents

Wall body of assembled wallboard component combination Download PDF

Info

Publication number
CN210086565U
CN210086565U CN201920685171.0U CN201920685171U CN210086565U CN 210086565 U CN210086565 U CN 210086565U CN 201920685171 U CN201920685171 U CN 201920685171U CN 210086565 U CN210086565 U CN 210086565U
Authority
CN
China
Prior art keywords
wall body
prefabricated wall
prefabricated
bodies
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920685171.0U
Other languages
Chinese (zh)
Inventor
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jun Peng Energy Saving Technology Co Ltd
Original Assignee
Shandong Jun Peng Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jun Peng Energy Saving Technology Co Ltd filed Critical Shandong Jun Peng Energy Saving Technology Co Ltd
Priority to CN201920685171.0U priority Critical patent/CN210086565U/en
Application granted granted Critical
Publication of CN210086565U publication Critical patent/CN210086565U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a wall body of assembled wallboard component combination, roof beam, prefabricated wall body, No. two prefabricated wall bodies, roof beam upper end joint has a plurality of prefabricated wall bodies, and a plurality of prefabricated wall bodies press from both sides the rear end joint of department and have No. two prefabricated wall bodies, and the roof beam upper end is located the front end stand of department and has the post muscle in the prefabricated wall body presss from both sides. When a constructor is in construction, the first prefabricated wall body can be suspended to the upper end of the beam by using a hoisting machine, the deformed steel bar of the first prefabricated wall body is inserted into the beam, then the second prefabricated wall body is inserted into the clamping groove, the first prefabricated wall body and the second prefabricated wall body can be clamped and fixed, and finally, operation can be completed only by performing secondary concrete pouring after a formwork is clamped at the middle of the first prefabricated wall body.

Description

Wall body of assembled wallboard component combination
Technical Field
The utility model relates to an assembled wallboard specifically is a wall body of assembled wallboard component combination.
Background
With the development of modern industrial technology, building houses can be manufactured in batches and sets like machine production. The prefabricated house components are transported to a construction site to be assembled. Fabricated buildings have become of interest since the beginning of the 20 th century and have been realized through the sixties. The first attempts made in English, French, Soviet Union, etc. The assembly type building has high construction speed and low production cost, and is rapidly popularized and developed all over the world.
However, the existing assembled wall body has a complex structure and poor stability. Accordingly, one skilled in the art provides a wall body assembled by assembled wall panel members to solve the problems set forth in the background of the invention described above.
Disclosure of Invention
An object of the utility model is to provide a wall body of assembled wallboard component combination to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a wall body of assembled wallboard component combination, roof beam, prefabricated wall body, No. two prefabricated wall bodies, roof beam upper end joint has a plurality of prefabricated wall bodies, and a plurality of prefabricated wall body press from both sides the rear end joint of department and have No. two prefabricated wall bodies, and the roof beam upper end is located a prefabricated wall body and presss from both sides the front end stand of department and has the post muscle.
When a constructor is in construction, the first prefabricated wall body can be suspended to the upper end of the beam by using a hoisting machine, the deformed steel bar of the first prefabricated wall body is inserted into the beam, then the second prefabricated wall body is inserted into the clamping groove, the first prefabricated wall body and the second prefabricated wall body can be clamped and fixed, and finally, operation can be completed only by performing secondary concrete pouring after a formwork is clamped at the middle of the first prefabricated wall body.
As a further aspect of the present invention: and hooping is bound on the circumferential side of the column reinforcement.
As a further aspect of the present invention: a plurality of screw-thread steels are inserted into the side of the first prefabricated wall body.
As a further aspect of the present invention: a joint groove has all been seted up to prefabricated wall body both sides, and a prefabricated wall body passes through joint groove and No. two prefabricated wall body fixed connection.
Compared with the prior art, the beneficial effects of the utility model are that:
when a constructor is in construction, the first prefabricated wall body can be suspended to the upper end of the beam by using a hoisting machine, the deformed steel bar of the first prefabricated wall body is inserted into the beam, then the second prefabricated wall body is inserted into the clamping groove, the first prefabricated wall body and the second prefabricated wall body can be clamped and fixed, and finally, operation can be completed only by performing secondary concrete pouring after a formwork is clamped at the middle of the first prefabricated wall body.
Drawings
Fig. 1 is a schematic structural view of a wall body combined by assembled wall panel components.
Fig. 2 is a schematic structural diagram of a prefabricated wall body I in the wall body combined by the assembled wallboard components.
Fig. 3 is a schematic structural diagram of a second prefabricated wall in a wall combined by assembled wallboard components.
In the figure: 1. a beam; 2. prefabricating a wall body I; 201. a clamping groove; 202. deformed steel bar; 3. prefabricating a wall body II; 4. a column reinforcement; 5. and (5) hooping.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, in the embodiment of the present invention, an assembled wall panel component combined wall body, beam 1, prefabricated wall body 2, prefabricated wall body 3 No. two, the joint of the upper end of beam 1 has a plurality of prefabricated wall bodies 2, the rear end of the middle of the clamp of a plurality of prefabricated wall bodies 2 has prefabricated wall body 3 No. two, the front end of the upper end of beam 1 in the clamp of prefabricated wall body 2 has column reinforcement 4.
When a constructor is in construction, the hoisting machine can be used for suspending the first prefabricated wall body 2 to the upper end of the beam 1, the deformed steel bar 202 of the first prefabricated wall body is inserted into the beam 1, then the second prefabricated wall body 3 of the first prefabricated wall body is inserted into the clamping groove 201, the first prefabricated wall body 2 and the second prefabricated wall body can be clamped and fixed, and finally, the operation can be completed only by clamping the middle of the first prefabricated wall body 2 and erecting a formwork and then pouring concrete for the second time.
And hooping 5 is bound on the circumferential side of the column reinforcement 4.
And a plurality of deformed steel bars 202 are inserted into the side of the first prefabricated wall body 2.
A joint groove 201 has all been seted up to prefabricated wall body 2 both sides, and prefabricated wall body 2 passes through joint groove 201 and No. two prefabricated wall body 3 fixed connection.
The utility model discloses a theory of operation is:
when a constructor is in construction, the hoisting machine can be used for suspending the first prefabricated wall body 2 to the upper end of the beam 1, the deformed steel bar 202 of the first prefabricated wall body is inserted into the beam 1, then the second prefabricated wall body 3 of the first prefabricated wall body is inserted into the clamping groove 201, the first prefabricated wall body 2 and the second prefabricated wall body can be clamped and fixed, and finally, the operation can be completed only by clamping the middle of the first prefabricated wall body 2 and erecting a formwork and then pouring concrete for the second time.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (4)

1. The utility model provides a wall body of assembled wallboard component combination, its characterized in that, roof beam (1), prefabricated wall body (2), No. two prefabricated wall bodies (3), roof beam (1) upper end joint has a plurality of prefabricated wall bodies (2), and a plurality of prefabricated wall bodies (2) press from both sides the department rear end joint and have No. two prefabricated wall bodies (3), and roof beam (1) upper end is located prefabricated wall body (2) and presss from both sides the department front end arbour and has post muscle (4).
2. A fabricated panel component assembly wall according to claim 1, wherein the studs (4) are bound circumferentially with stirrups (5).
3. A wall body formed by assembling prefabricated wall panel components according to claim 1, wherein a plurality of screw-thread steels (202) are inserted into the side edges of the first prefabricated wall body (2).
4. The wall body formed by combining the assembled wallboard components according to claim 1, wherein clamping grooves (201) are formed in two sides of the first prefabricated wall body (2), and the first prefabricated wall body (2) is fixedly connected with the second prefabricated wall body (3) through the clamping grooves (201).
CN201920685171.0U 2019-05-14 2019-05-14 Wall body of assembled wallboard component combination Active CN210086565U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920685171.0U CN210086565U (en) 2019-05-14 2019-05-14 Wall body of assembled wallboard component combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920685171.0U CN210086565U (en) 2019-05-14 2019-05-14 Wall body of assembled wallboard component combination

Publications (1)

Publication Number Publication Date
CN210086565U true CN210086565U (en) 2020-02-18

Family

ID=69478276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920685171.0U Active CN210086565U (en) 2019-05-14 2019-05-14 Wall body of assembled wallboard component combination

Country Status (1)

Country Link
CN (1) CN210086565U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012367A (en) * 2020-09-03 2020-12-01 李磊 Flexible connection's assembled wall body
CN112227404A (en) * 2020-10-12 2021-01-15 山东大学 Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall
CN112227403A (en) * 2020-10-12 2021-01-15 山东大学 Connecting system and connecting method for prefabricated superposed foundation and full-prefabricated shear wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012367A (en) * 2020-09-03 2020-12-01 李磊 Flexible connection's assembled wall body
CN112227404A (en) * 2020-10-12 2021-01-15 山东大学 Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall
CN112227403A (en) * 2020-10-12 2021-01-15 山东大学 Connecting system and connecting method for prefabricated superposed foundation and full-prefabricated shear wall
CN112227404B (en) * 2020-10-12 2021-07-30 山东大学 Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall

Similar Documents

Publication Publication Date Title
CN210086565U (en) Wall body of assembled wallboard component combination
CN201972269U (en) Prefabricated reinforcing steel bar concrete shear wall
CN103352564B (en) Horizontal structure shuttering system and construction method
CN107023076A (en) A kind of assembly concrete pole steel beam connecting node and preparation method thereof
CN101240566A (en) Square steel pipe concrete and H-shaped steel beam nod connection structure
CN103912074B (en) A kind of framework-steel pipe bundle and steel plate concrete shear wall combined structure system
CN210827937U (en) Steel pipe column combination wall
CN104499577B (en) A kind of Space Free-Form Surface wood net shell assembling type node of variable-angle
CN204456527U (en) A kind of lightgage steel joist internal partition wall and girder steel syndeton
CN103243861A (en) Multi-chamber type steel pipe and concrete combined T-shaped column
CN203403669U (en) Horizontally-structural formwork system
CN203977692U (en) A kind of steel pipe bundle combined structure system for industrialization residential building
CN216109355U (en) Precast concrete post suitable for draw-in groove formula precast beam
CN111021540B (en) Super-thick plate box-type joint column and manufacturing method thereof
CN103850349A (en) Frame-steel pipe bundle combined structure system for industrial residential building
CN210049378U (en) U-shaped connecting beam of precast concrete beam and box-shaped steel column
CN212743149U (en) Steel bar connecting structure of assembled concrete building
CN103850348A (en) Industrial steel tube bindle composite structure building system
CN210887602U (en) Quick connection structure of precast concrete wallboard and building main body
CN210562651U (en) Prefabricated concrete wallboard and building main body's assembled connection structure
CN203769057U (en) Industrialized steel tube bundle combined structure construction system
CN221119192U (en) Assembled template splicing structure of arched roof unit
CN203769060U (en) Framework-steel pipe bundle combined structure system for industrial residential buildings
CN210336348U (en) A pc mould for making C type angle coincide floor
CN213198160U (en) Recycled concrete precast pile mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Wall body of assembled wallboard component combination

Effective date of registration: 20200311

Granted publication date: 20200218

Pledgee: Weifang rural commercial bank, Limited by Share Ltd hi tech sub branch

Pledgor: SHANDONG JUNPENG ENERGY SAVING TECHNOLOGY Co.,Ltd.

Registration number: Y2020980000604

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210324

Granted publication date: 20200218

Pledgee: Weifang rural commercial bank Limited by Share Ltd. hi tech sub branch

Pledgor: SHANDONG JUNPENG ENERGY SAVING TECHNOLOGY Co.,Ltd.

Registration number: Y2020980000604