CN210069151U - Concrete floor pump line fixing tool - Google Patents

Concrete floor pump line fixing tool Download PDF

Info

Publication number
CN210069151U
CN210069151U CN201920641664.4U CN201920641664U CN210069151U CN 210069151 U CN210069151 U CN 210069151U CN 201920641664 U CN201920641664 U CN 201920641664U CN 210069151 U CN210069151 U CN 210069151U
Authority
CN
China
Prior art keywords
concrete floor
pump line
fixing tool
tight piece
clamping blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920641664.4U
Other languages
Chinese (zh)
Inventor
张云柱
王效增
李瑞华
王跃文
孙炎杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd filed Critical Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201920641664.4U priority Critical patent/CN210069151U/en
Application granted granted Critical
Publication of CN210069151U publication Critical patent/CN210069151U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete floor pump line fixing tool, it includes two at least and the tight piece of clamp of pump line laminating, the internal surface of pressing from both sides tight piece be with the cambered surface of pump line outer peripheral face adaptation, the surface of pressing from both sides tight piece be with the inclined plane of floor preformed hole adaptation, the lower extreme of surface is to the pump line slope. According to the utility model discloses a concrete floor pump line fixing tool can make the pump line more firm in the fixed of concrete floor reservation hole department, has avoided the pump line to take place acutely vibrations when carrying the concrete. On the other hand, according to the utility model discloses a concrete floor pump line fixing tool makes simply, easy dismounting to can reuse.

Description

Concrete floor pump line fixing tool
Technical Field
The utility model belongs to the technical field of the construction, more specifically, the utility model relates to a concrete floor pump line fixing tool.
Background
The cast-in-place concrete floor slab is poured by using the ground pump, reserved holes need to be formed in floor slabs of floors above positive and negative zero, when the template is erected, the pump pipe reserved holes are installed by using two templates for facilitating the removal of the template, and the reserved holes are usually square. Concrete feeding pump line is installed to the operation surface course perpendicularly from the reservation hole, and at the concrete placement in-process, the violent vibrations of perpendicular concrete feeding pump line arouse horizontal hunting, can cause the buckle connecting piece of two sections concrete feeding pumps to damage, and even fracture probably destroys the stability of the template braced system on construction layer, causes the destruction of different degree to the concrete floor quality of pouring simultaneously.
SUMMERY OF THE UTILITY MODEL
The utility model aims to fix the pump pipe and prevent the pump pipe from violently shaking when conveying concrete.
Other objects of the present invention are to solve or at least alleviate the problems of the prior art.
According to some aspects of the utility model provide a concrete floor pump line fixing tool, it includes two at least and the tight piece of clamp of pump line laminating, the internal surface of pressing from both sides tight piece be with the cambered surface of pump line outer peripheral face adaptation, the surface of pressing from both sides tight piece be with the inclined plane of floor preformed hole adaptation, the lower extreme of surface is to the pump line slope.
Optionally, in some embodiments of the concrete floor pump pipe fixing tool described above, the clamping blocks include left and right clamping blocks that are symmetrically arranged.
Optionally, in some embodiments of the concrete floor pump pipe fixing tool, the clamping block wraps part or all of the outer peripheral surface of the pump pipe.
Optionally, in some embodiments of the concrete floor pump pipe fixing tool, the left and right clamping blocks wrap the entire outer circumferential surface of the pump pipe.
Optionally, in some embodiments of the above concrete floor pump tube fixing tool, the left and right clamping blocks are made of hard elastic material.
Optionally, in some embodiments of the above concrete floor pump tube fixing tool, the left and right clamping blocks are made of a rubber material.
Optionally, in some embodiments of the concrete floor pump pipe fixing tool described above, the left clamping block and the right clamping block form a frustum structure.
According to the utility model discloses a concrete floor pump line fixing tool can make the pump line more firm in the fixed of concrete floor reservation hole department, has avoided the pump line to take place acutely vibrations when carrying the concrete.
On the other hand, according to the utility model discloses a concrete floor pump line fixing tool makes simply, easy dismounting to can reuse.
Drawings
The disclosure of the present invention will become more readily understood with reference to the accompanying drawings. As is readily understood by those skilled in the art: these drawings are for illustrative purposes only and are not intended to limit the scope of the present disclosure. Moreover, in the drawings, like numerals are used to indicate like parts, and in which:
fig. 1 shows a schematic structural view of the present invention;
FIG. 2 shows a schematic structural view of the left clamping block of FIG. 1;
FIG. 3 shows a schematic top view of the structure of FIG. 2;
fig. 4 shows a schematic view of the mounting structure of the present invention.
Detailed Description
It is easily understood that, according to the technical solution of the present invention, a plurality of alternative structural modes and implementation modes can be proposed by those skilled in the art without changing the spirit of the present invention. Therefore, the following detailed description and the accompanying drawings are merely illustrative of the technical solutions of the present invention, and should not be considered as limiting or restricting the technical solutions of the present invention in their entirety or in any other way.
The terms of orientation of up, down, left, right, front, back, top, bottom, and the like referred to or may be referred to in this specification are defined relative to the configuration shown in the drawings, and are relative terms, and thus may be changed correspondingly according to the position and the use state of the device. Therefore, these and other directional terms should not be construed as limiting.
Referring to fig. 1-4, the concrete floor pumping pipe fixing tool includes a left clamping block 3 and a right clamping block 4 which are symmetrical in structure, the left clamping block 3 and the right clamping block 4 can form a frustum structure with a wide upper part and a narrow lower part, the inner surfaces 5 and 7 of the left clamping block 3 and the right clamping block 4 are semicircular in radial section, the inner surfaces 5 and 7 of the left clamping block 3 and the right clamping block 4 are both attached to the outer surface of the pumping pipe 2, and the outer surfaces 6 and 8 of the left clamping block 3 and the right clamping block 4 are both adapted to a reserved hole on the floor 1.
During the use, pass the preformed hole on the floor with the pump line earlier, then press from both sides tight piece with the left side and press from both sides tight piece with the right side and fill in the gap between pump line and the preformed hole, press from both sides tight piece with exerting oneself and press from both sides tight piece with the right side downwards, make the pump line fix firmly and accomplish installation work promptly.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a concrete floor pump line fixing tool, its characterized in that, its includes two at least and the tight piece of clamp of pump line laminating, the internal surface of pressing from both sides tight piece be with the cambered surface of pump line outer peripheral face adaptation, the surface of pressing from both sides tight piece be with the inclined plane of floor preformed hole adaptation, the lower extreme of surface is to the pump line slope.
2. The concrete floor pump tube securing tool of claim 1, wherein the clamping blocks include left and right clamping blocks that are symmetrically disposed.
3. The concrete floor pump tube securing tool of claim 1, wherein the clamping block wraps around part or all of the outer peripheral surface of the pump tube.
4. The concrete floor pump tube securing tool of claim 2, wherein said left and right clamping blocks wrap the entire outer peripheral surface of the pump tube.
5. The concrete floor pump tube securing tool of claim 2, wherein the left and right clamping blocks are made of a hard resilient material.
6. The concrete floor pump tube securing tool of claim 5, wherein the left and right clamping blocks are made of a rubber material.
7. The concrete floor pump tube securing tool of claim 2, wherein the left and right clamping blocks comprise a frustum structure.
CN201920641664.4U 2019-05-07 2019-05-07 Concrete floor pump line fixing tool Expired - Fee Related CN210069151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920641664.4U CN210069151U (en) 2019-05-07 2019-05-07 Concrete floor pump line fixing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920641664.4U CN210069151U (en) 2019-05-07 2019-05-07 Concrete floor pump line fixing tool

Publications (1)

Publication Number Publication Date
CN210069151U true CN210069151U (en) 2020-02-14

Family

ID=69450670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920641664.4U Expired - Fee Related CN210069151U (en) 2019-05-07 2019-05-07 Concrete floor pump line fixing tool

Country Status (1)

Country Link
CN (1) CN210069151U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605707A (en) * 2021-08-25 2021-11-05 江苏南通三建集团股份有限公司 Fixing structure of concrete conveying pump pipe between floor boards and construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605707A (en) * 2021-08-25 2021-11-05 江苏南通三建集团股份有限公司 Fixing structure of concrete conveying pump pipe between floor boards and construction process

Similar Documents

Publication Publication Date Title
CN210069151U (en) Concrete floor pump line fixing tool
CN108385982A (en) A kind of Super High concrete pumping pipe and its installation method
CN211229506U (en) Beam slab mold system for pouring bare concrete
CN106437146A (en) Template used for casting floor beam and construction method of floor beam
CN108930403B (en) Device for preventing slurry leakage at root of concrete aluminum template and using method thereof
CN209653132U (en) One kind is based on strip leakage-proof structure between prefabricated board
CN205839701U (en) Expansion joint department concrete formwork integrated equipment
CN209958735U (en) Pouring template and concrete pouring equipment
CN214739905U (en) Hole instrument of pouring is reserved to floor
CN202187562U (en) Concrete pump pipe fixing device
CN209040542U (en) Die worker's tool is hung in a kind of concrete construction
CN210266209U (en) Anti pipeline mounting structure that floats
CN209907915U (en) Aluminum formwork reinforced structure
CN210686009U (en) Shield tunnel two-lining concrete structure
CN204098471U (en) A kind of detachable suspension scaffold fastening devices
CN210421461U (en) Construction joint waterproof construction
CN214272452U (en) Built-in heat preservation composite wall insulation board
CN206189257U (en) V type bridge telescoping device
CN211475079U (en) Horizontal fixing vibration damper for concrete pump pipe
CN214531904U (en) Combined profile steel device for supporting prefabricated laminated plate post-cast strip template
CN214093330U (en) Novel concrete pump pipe is fixed device
CN204386155U (en) Building alter-pouring strips mould plate fixator
CN218149795U (en) Fender for building aluminum formwork
CN210049502U (en) Reinforced concrete stair step cement mortar face plastering construction structures
CN216616863U (en) Pouring support structure arranged at position of opening hole in beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214