CN210049634U - Ancient building roofing suspension wire device - Google Patents

Ancient building roofing suspension wire device Download PDF

Info

Publication number
CN210049634U
CN210049634U CN201920457605.1U CN201920457605U CN210049634U CN 210049634 U CN210049634 U CN 210049634U CN 201920457605 U CN201920457605 U CN 201920457605U CN 210049634 U CN210049634 U CN 210049634U
Authority
CN
China
Prior art keywords
suspension wire
ancient building
wire device
rod
guide arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920457605.1U
Other languages
Chinese (zh)
Inventor
董凌含
马桂刚
刘利尧
杨明亮
孙如梦
张鑫凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Wangfu Garden Ancient Architectural Engineering Co Ltd
Original Assignee
Jinan Wangfu Garden Ancient Architectural Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Wangfu Garden Ancient Architectural Engineering Co Ltd filed Critical Jinan Wangfu Garden Ancient Architectural Engineering Co Ltd
Priority to CN201920457605.1U priority Critical patent/CN210049634U/en
Application granted granted Critical
Publication of CN210049634U publication Critical patent/CN210049634U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an ancient building roofing suspension wire device, including the guide arm, along a plurality of jibs that guide arm length direction arranged and the flexible rope that passes each jib in proper order, set up the slide that extends along length direction on the guide arm, it has a plurality of sliders to slip on the slide, the slider includes the slider body and the bottom through threaded connection, forms between bottom and the slider body and has placed spheroidal holding chamber, the jib upwards passes behind the bottom with the spheroid rigid coupling, and it has the screw rod that passes the slide to go back the rigid coupling on the slider body, is equipped with the fastening nut who is located the guide arm top on the screw rod. The utility model makes the flexible rope form the shape consistent with the roof through the movement of the sliding block body and the extension of the guide rod, thereby providing a benchmark for tile hanging construction, ensuring construction quality, reducing rework rate and greatly improving construction efficiency; and the universal suspension wire is strong in universality and simple to operate, and is suitable for suspension wires of various arc-shaped roofs.

Description

Ancient building roofing suspension wire device
Technical Field
The utility model relates to an auxiliary facilities field for ancient building construction especially relates to the suspension wire device of roofing construction usefulness, specifically indicates an ancient building roofing suspension wire device.
Background
In the ancient building repairing construction, the repairing of the roof is an important link, wherein tiles are hung on the roof, in order to ensure the regular arrangement of the tiles, a suspension wire needs to be firstly carried out before the tiles are hung, and workers lay the tiles along the suspension wire. But the roofing of ancient building is many with the arc to in order to make trickling water keep away from the eave, the building roofing of bright, clear two generations all is anomalous arc, and the roofing upper segment is steeper, and is more gentle when closing on the eave, under the inertia effect, makes the rainwater have more the trend along the lateral flow, thereby makes the rainwater flow down the back and keeps away from the corridor.
When the suspension wire is arranged on the irregular arc-shaped roof, the difficulty is very high, more workers are required to grasp the suspension wire by experience, and therefore the construction efficiency is seriously influenced.
Disclosure of Invention
The utility model discloses to prior art's not enough, provide an ancient building roofing suspension wire device, can satisfy the suspension wire requirement of arc roofing, improved the efficiency of construction by a wide margin.
The utility model discloses a through following technical scheme realizes, provide an ancient building roofing suspension wire device, including the guide arm, along a plurality of jibs that guide arm length direction arranged and the flexible rope that passes each jib in proper order, set up the slide that extends along length direction on the guide arm, it has a plurality of sliders to slip on the slide, the slider includes the slider body and the bottom through threaded connection, forms between bottom and the slider body and has placed spheroidal holding chamber, the jib upwards passes behind the bottom with the spheroid rigid coupling, and it has the screw rod that passes the slide to go back the rigid coupling on the slider body, is equipped with the fastening nut who is located the guide arm top on the screw rod.
When the guide rod is used, the upper end of the guide rod is fixed on the ridge, and the lower end of the guide rod is fixed on the eave, so that plaster can be used for fixing for convenience; according to the shape of the roof, the sliding blocks are dispersed along the slide ways, the guide rods vertically hang down, the lower ends of the guide rods are in contact with the roof, the shape of the flexible rope is consistent with that of the roof, then the bottom cover and the sliding block body are screwed, and the upward moving distance of the bottom cover is far smaller than the thickness of the tile when the bottom cover is screwed, so that the use is not influenced; the slider carries out position fixing through fastening nut, conveniently adjusts the position of guide arm.
Preferably, a chamfer ring matched with the ball body is arranged on the bottom cover. This optimization scheme supports the spheroid through setting up the chamfer ring, has improved spheroidal stability, also conveniently rotates the location to the guide arm, because the length that the guide arm stretches out downwards is far greater than the spheroid diameter, under natural state, the guide arm is in vertical state.
Preferably, the surface of the slider body, which is in contact with the ball, is an upwardly arched cambered surface. This optimization scheme is through at the internal cambered surface that sets up of slider, and spheroid and slider body take place to interfere when can effectively avoiding the guide arm to rotate, have further improved spheroidal stability simultaneously.
Preferably, the hanger rod is a telescopic rod. This optimization scheme sets up the jib into the telescopic link, makes the length of jib adjustable to enlarge application range, can satisfy different roofing operation requirements.
As optimization, the jib includes the last body of rod with the spheroid rigid coupling to and the lower body of rod that cup joints with last body of rod, wear to establish through the screw on the lower body of rod and be connected with the fastening bolt who pushes up to the body of rod. This optimization scheme's jib simple structure utilizes the body of rod and the regulation of the slip realization jib length down between the body of rod, realizes the body of rod and the relatively fixed of the body of rod down through fastening bolt, and it is more convenient to adjust the operation, is favorable to improving regulation efficiency.
Preferably, the lower end of the suspension rod is fixedly connected with a heavy hammer, and the heavy hammer is provided with a threading hole for the flexible rope to pass through. This optimization scheme is through setting up the weight, and further guarantee that the jib is in vertically at natural state to increased the anti-wind ability, in order to improve the uniformity of flexible rope and roofing, can set up the through wires hole in the weight bottom.
Preferably, the wire hanging device comprises two guide rods, and the two guide rods are hinged with each other. This optimization scheme can realize the hanging wire simultaneously behind the front of the room and the room through setting up two guide arms, has further improved the efficiency of construction, and after finishing using, folds up two guide arms, reduces occupation space.
Furthermore, the roof comprises a hanging shaft arranged along the length direction of the ridge, and the two guide rods are hinged through the hanging shaft. According to the optimized scheme, the hanging shaft is arranged, the guide rods can be installed at the same time, and hanging rings sleeved on the hanging shaft can be fixedly connected to the guide rods for simplifying the structure.
Furthermore, two opposite guide rods form a hanging wire group, and at least three groups of hanging wire groups distributed along the length direction are arranged on the hanging shaft. This optimization scheme can set up a plurality of guide arms along roofing length direction, has realized the unified suspension wire of whole roofing, has improved construction quality and efficiency of construction by a wide margin.
The ancient building roof suspension wire device comprises the following steps when in use:
1. the guide rod is perpendicular to the ridge and placed on the roof, the upper end of the guide rod is fixed on the ridge, the lower end of the guide rod is fixed on the eave, and the two ends of the guide rod can be fixed through plaster, so that the guide rod is convenient to fix and disassemble, and the building cannot be damaged;
2. loosening threads between the bottom cover and the sliding block bodies to enable the guide rods to naturally hang down, adjusting the positions of the sliding block bodies to enable the lower ends of the guide rods to be in contact with a roof, enabling the shape of the flexible rope to be consistent with that of the roof, fixing the positions of the sliding block bodies through fastening nuts, screwing the bottom cover on the sliding block bodies, and clamping the ball bodies;
3. the guide rod is set to be a telescopic rod, the guide rod is extended after the bottom cover and the sliding block body are screwed, the lower end of the guide rod is tightly pressed against the roof, and the guide rod is limited to swing by the friction force of the roof to the guide rod.
The method is simple to operate, can be suitable for different arc-shaped roofs, improves the universality of the device, and ensures the construction efficiency and the construction quality.
The utility model has the advantages that: the flexible rope is made to be in the shape consistent with the roof through the movement of the sliding block body and the extension of the guide rod, so that a reference is provided for tile hanging construction, the construction quality is guaranteed, the rework rate is reduced, and the construction efficiency is greatly improved; and the universal suspension wire is strong in universality and simple to operate, and is suitable for suspension wires of various arc-shaped roofs.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a slider structure;
FIG. 3 is a state diagram of simultaneous suspension wires for front and rear roofs;
shown in the figure:
1. guide rod, 2, screw rod, 3, fastening nut, 4, suspender, 5, weight, 6, flexible rope, 7, slider body, 8, bottom cover, 9, sphere, 10, fastening bolt, 11, lower rod body, 12, upper rod body, 13 and hanging shaft.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present solution is explained below by way of specific embodiments.
As shown in fig. 1, the ancient building roof suspension wire device comprises a guide rod 1 extending from a ridge to an eave, a plurality of suspension rods 4 arranged along the length direction of the guide rod, and flexible ropes 6 sequentially penetrating through the suspension rods, wherein the flexible ropes are common suspension wire ropes. The guide rod 1 is provided with a slide way extending along the length direction, the slide way is connected with a plurality of slide blocks in a sliding way, and the slide blocks can move along the slide way.
The slider includes the slider body 7 and the bottom 8 through threaded connection, set up opening cavity down on the slider body, cavity inner wall sets up the internal thread, be equipped with the external screw thread on the bottom, form the holding chamber between bottom 8 and the slider body 7, spheroid 9 has been placed to the holding intracavity, the internal cambered surface that is the arch-up with the face of spheroid contact of slider, when the bottom was screwed up with the slider body, the realization was tight to spheroidal clamp, prevent the spheroid and remove, but when not separating again bottom and the slider body of being connected of not hard up bottom and the slider body, but spheroid free rotation. The sliding block body is further fixedly connected with a screw rod 2 penetrating through the slideway, the screw rod 2 is provided with a fastening nut 3 positioned above the guide rod, and the position of the sliding block body is fixed by the fastening nut.
The suspender 4 upwards penetrates through the bottom cover and then is fixedly connected with the ball body, a chamfer ring which supports the ball body and is matched with the ball body is arranged on the bottom cover, and a through hole which is used for the guide rod to penetrate through and is small at the top and big at the bottom is further formed in the bottom cover so as to increase the rotation angle of the guide rod.
As an optimization scheme, the suspender is a telescopic rod, specifically, the suspender includes an upper rod body 12 fixedly connected with the sphere and a lower rod body 11 sleeved with the upper rod body, the lower end of the upper rod body is arranged in the lower rod body, a fastening bolt 10 pushing against the upper rod body is penetratingly connected to the lower rod body 11 through a thread, and when the fastening bolt is screwed, the upper rod body and the lower rod body are relatively fixed. The upper rod body, the lower rod body and the guide rod are rigid rods.
The lower end of the suspender is fixedly connected with a heavy hammer 5, the heavy hammer 5 is provided with a threading hole for the flexible rope to pass through, the weight of the suspender is increased by arranging the heavy hammer, the suspender is prevented from being blown by wind, and meanwhile, the suspender is in a vertical state in a natural state.
In order to further improve the construction efficiency, the wire hanging device comprises two guide rods, and the two guide rods are hinged with each other. A hanging shaft 13 is arranged along the length direction of the ridge, the two guide rods are hinged through the hanging shaft, and hanging rings sleeved on the hanging shaft are fixedly connected to the guide rods. The two opposite guide rods form a hanging wire group, and three groups of hanging wire groups distributed along the length direction are arranged on the hanging shaft. The front roof and the rear roof are respectively provided with three suspension wire devices, so that the suspension wire reference is unified, the construction quality is ensured more easily, the guide rod is fixed more conveniently, and the stability of the whole device is better.
The ancient building roof suspension wire device comprises the following steps when in use:
1. the guide rod is perpendicular to the ridge and placed on the roof, the upper end of the guide rod is fixed on the ridge through plaster, the lower end of the guide rod is fixed on the eave through plaster, and the plaster can fix the guide rod after being solidified.
2. Loosening the screw thread between the bottom cover and the sliding block body to make the guide rod naturally hang down, adjusting the position of each sliding block body to make the lower end of the guide rod contact with the roof, so that the shape of the flexible rope is consistent with the roof, fixing the position of the sliding block body through a fastening nut, screwing the bottom cover on the sliding block body to clamp the ball body, fixing the upper end of the flexible rope and the upper end of the guide rod, sequentially penetrating through the heavy hammers from top to bottom at the lower end of the flexible rope, and tying the redundant part at the lower end of the flexible rope at the lower end of the guide rod.
3. After the bottom cover and the sliding block body are screwed, the guide rod is extended, the lower end of the guide rod is tightly pressed against the roof, the guide rod is limited to swing by the friction force of the roof on the guide rod, and the wind resistance strength is improved. In this embodiment, the bottom surface of the weight is pressed against the roof, and the swinging of the guide rod is limited by the friction force of the roof against the weight.
4. After the tiles are laid, the plaster for fixing the guide rod is broken, and the device can be taken down.
Of course, the above description is not limited to the above examples, and technical features of the present invention that are not described in the present application may be implemented by or using the prior art, and are not described herein again; the above embodiments and drawings are only used for illustrating the technical solutions of the present invention and are not intended to limit the present invention, and the present invention has been described in detail with reference to the preferred embodiments, and those skilled in the art should understand that changes, modifications, additions or substitutions made by those skilled in the art within the spirit of the present invention should also belong to the protection scope of the claims of the present invention.

Claims (9)

1. The utility model provides an ancient building roofing suspension wire device which characterized in that: including guide arm (1), a plurality of jib (4) of arranging along guide arm length direction and flexible rope (6) that pass each jib in proper order, set up the slide that extends along length direction on guide arm (1), it has a plurality of sliders to slip on the slide, the slider includes the slider body (7) and bottom (8) through threaded connection, forms the holding chamber of placing spheroid (9) between bottom (8) and the slider body (7), jib (4) upwards pass behind the bottom with the spheroid rigid coupling, go back the rigid coupling on the slider body have screw rod (2) that pass the slide, are equipped with fastening nut (3) that are located the guide arm top on screw rod (2).
2. The ancient building roof suspension wire device of claim 1, wherein: and a chamfer ring matched with the ball body is arranged on the bottom cover.
3. The ancient building roof suspension wire device of claim 1, wherein: the surface in contact with the ball body in the sliding block body is an upwards arched cambered surface.
4. The ancient building roof suspension wire device of claim 1, wherein: the hanger rod is a telescopic rod.
5. The ancient building roof suspension wire device of claim 4, wherein: the suspender comprises an upper rod body (12) fixedly connected with the ball body and a lower rod body (11) sleeved with the upper rod body, and a fastening bolt (10) which is pushed to the upper rod body is connected on the lower rod body (11) in a penetrating manner through threads.
6. The ancient building roof suspension wire device of claim 1, wherein: the lower end of the suspender is fixedly connected with a heavy hammer (5), and the heavy hammer (5) is provided with a threading hole for the flexible rope to pass through.
7. The ancient building roof suspension wire device of claim 1, wherein: the wire hanging device comprises two guide rods, and the two guide rods are hinged with each other.
8. The ancient building roof suspension wire device of claim 7, wherein: the roof is characterized by further comprising a hanging shaft (13) arranged along the length direction of the ridge, and the two guide rods are hinged through the hanging shaft.
9. The ancient building roof suspension wire device of claim 8, wherein: the two opposite guide rods form a hanging wire group, and at least three groups of hanging wire groups distributed along the length direction are arranged on the hanging shaft.
CN201920457605.1U 2019-04-08 2019-04-08 Ancient building roofing suspension wire device Active CN210049634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920457605.1U CN210049634U (en) 2019-04-08 2019-04-08 Ancient building roofing suspension wire device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920457605.1U CN210049634U (en) 2019-04-08 2019-04-08 Ancient building roofing suspension wire device

Publications (1)

Publication Number Publication Date
CN210049634U true CN210049634U (en) 2020-02-11

Family

ID=69378297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920457605.1U Active CN210049634U (en) 2019-04-08 2019-04-08 Ancient building roofing suspension wire device

Country Status (1)

Country Link
CN (1) CN210049634U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043064A (en) * 2019-04-08 2019-07-23 济南王府园林古建筑工程有限公司 A kind of ancient building roofing wrap attachment and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043064A (en) * 2019-04-08 2019-07-23 济南王府园林古建筑工程有限公司 A kind of ancient building roofing wrap attachment and its application method

Similar Documents

Publication Publication Date Title
CN210049634U (en) Ancient building roofing suspension wire device
CN107082373A (en) The derrick crane of the windproof sleeve of extensibility is installed
CN110043064B (en) Ancient building roof hanging wire device and use method thereof
CN213015314U (en) Building outer wall construction structures
CN209536855U (en) A kind of safe lifting appliance of curtain wall glass plate
CN211351626U (en) Bus duct installation gallows
CN215101506U (en) Hoist device that intelligence building was used
CN107986207A (en) A kind of bow member job platform and bow member Operation Van
CN207957510U (en) A kind of steel construction indirect cool tower triangle hoisting gripping member
CN206044295U (en) It is a kind of to link up with and using the curtain wall of the hook
CN206878409U (en) Cable testing bridge mounting bracket
CN206958386U (en) A kind of fire water-supply Pipe installing standpipe mounting bracket
CN206748385U (en) A kind of construction tool rack easy to use
CN207390805U (en) One kind has the gripping adjustable concrete slab timber-used fixture of thickness
CN206957203U (en) Full working scope adaptive type socket joint type disk button steel pipe support system
CN220845123U (en) Building curtain wall hoisting clamping mechanism
CN213585096U (en) Send and become cable supporting device for electric construction
CN206279855U (en) Rod-adjurstable formula steel column correcting structure
CN208603613U (en) Super high-rise building electromechanical equipment masts type hanging apparatus
CN216564418U (en) Cable bridge with rotation function
CN213802532U (en) Three-jaw groove type lifting appliance
CN217908650U (en) Arm-selecting type descent control device support for power distribution equipment
CN221034346U (en) BIM technology-based support and hanger system for decoration and fitment engineering
CN215957469U (en) Be used for cherry plantation protection canopy cable suspension device
CN209261118U (en) A kind of decorative stone cladding mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 250014 1-103, No.66 Heping Road, Lixia District, Jinan City, Shandong Province

Patentee after: Wangfu (Shandong) Cultural Relics Protection Group Co., Ltd

Address before: 250000 No. 1-103, Heping Road, Lixia District, Jinan City, Shandong Province

Patentee before: JINAN WANGFU GARDEN ANCIENT ARCHITECTURE ENGINEERING Co.,Ltd.