CN210037949U - Electrode voltage collector for ore-smelting electric furnace - Google Patents

Electrode voltage collector for ore-smelting electric furnace Download PDF

Info

Publication number
CN210037949U
CN210037949U CN201920750029.XU CN201920750029U CN210037949U CN 210037949 U CN210037949 U CN 210037949U CN 201920750029 U CN201920750029 U CN 201920750029U CN 210037949 U CN210037949 U CN 210037949U
Authority
CN
China
Prior art keywords
dead lever
ore
electric furnace
measuring
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920750029.XU
Other languages
Chinese (zh)
Inventor
张文来
刘富敏
牛群峰
李勇
靖红伟
陈运字
任胜杰
冯太伟
刘晓东
麻林伟
杨红鹤
王俊凯
杜勇
史向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Xukun Energy Saving Technology Co Ltd
Original Assignee
Zhengzhou Xukun Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Xukun Energy Saving Technology Co Ltd filed Critical Zhengzhou Xukun Energy Saving Technology Co Ltd
Priority to CN201920750029.XU priority Critical patent/CN210037949U/en
Application granted granted Critical
Publication of CN210037949U publication Critical patent/CN210037949U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model relates to an ore-smelting electric furnace electrode voltage collector, including insulating base, be provided with the dead lever on the base, the dead lever has the centre bore, install the measuring stick through the spring along dead lever axial direction elasticity and direction removal in the centre bore, the tip of measuring stick rotates through the pivot and is provided with the rotation wheel, install the elongated slot that is provided with length along its axis direction extension in the measuring stick part in the centre bore, be provided with spacing bolt on the dead lever, spacing bolt has the both ends cell wall that stretches into in the elongated slot so that the elongated slot with stretch into the spacing block cooperation in the upper and lower direction of end. The fixing rod is not provided with an elongated slot or a channel for dust to enter the inside, the measuring rod is installed in the center hole in a guiding mode, the function of voltage collection is achieved, meanwhile, dust can be prevented from entering the inside of the fixing rod, and the problem that in the prior art, dust and water vapor can enter the inside of the fixing rod to enable the spring and the measuring rod to be solidified, so that the measuring rod cannot move is solved.

Description

Electrode voltage collector for ore-smelting electric furnace
Technical Field
The utility model relates to the fields of ferroalloy electric furnaces, corundum electric furnaces, industrial silicon electric furnaces, calcium carbide furnaces, yellow phosphorus electric furnaces and the like, in particular to an electrode voltage collector of an ore-smelting electric furnace.
Background
The ore-smelting electric furnace is a high-energy consumption electric device, wherein the electric energy consumption is dominant, and the secondary current of the ore-smelting electric furnace is tens of thousands to hundreds of thousands of amperes according to the capacity. The core theory of smelting is that the furnace charge is preheated by the furnace charge current, and the furnace gas is ionized to form directional high-temperature ion flow-electric arc, so that electric energy is converted into heat energy, and a high enough temperature field is provided for reduction reaction. The safety, stability and energy consumption level of the operation of the electrode depend on the working position of the electrode in the ore-smelting electric furnace. Since the three-phase motor (A, B, C) of the ore-smelting electric furnace belongs to the asymmetric load, the asymmetry determines the imbalance of the work done by the electrode. Currently, most of the existing methods measure whether the voltages of the phases of the three electrodes are consistent to judge whether the end faces of the three electrodes are positioned on the same horizontal plane or not so as to balance the three electrodes.
However, the secondary voltage access of the traditional ore-smelting electric furnace is all at the connection position of the electric furnace transformer and the short net, and is led out by being pressed on the short net screw, and the most common secondary voltage access method is to take the secondary voltage at the uppermost layer or the lowermost layer of a1, b1, c1 or a8, b8 and c8 of the secondary appearance terminal of the electric furnace transformer, because the short net is convenient for wiring. Because the ore-smelting electric furnace adopts low-voltage large current, and the secondary current is tens of thousands to hundreds of thousands of amperes, the inductive reactance is relatively large when the method is used for measurement, and the measured electrode voltage is relatively high.
In the periodic 12 of 2015, 25-27 of the total 251, a novel voltage collector is disclosed in journal articles named as design and application of three-phase electrode voltage collectors of ore-smelting electric furnaces, such as Murray Wei and Lishuai and the like. The voltage collector comprises an insulating base, a fixing rod is arranged on the insulating base, a measuring rod is movably mounted inside the fixing rod through elasticity of a spring, an elongated groove is formed in the fixing rod, a limiting bolt is connected to the part, located inside the fixing rod, of the measuring rod, a conductive pulley which is pressed on a corresponding electrode in a pushing mode when the measuring rod is used is arranged in a rotating mode at the end portion of the measuring rod, a lead terminal is arranged on the measuring rod, and the measuring rod is used for leading out voltage through a soft copper wire. The voltage collector not only solves the problems, but also ensures that the conductive pulley is always pressed on the corresponding electrode under the action of the spring when the electrodes frequently move up and down, thereby ensuring the reliability of voltage collection.
However, the voltage collector also has the following disadvantages that the long groove is arranged on the fixed rod, so that the electrode frequently moves up and down to drive the measuring rod to elastically move along the fixed rod, the working environment of the ore-smelting electric furnace is full of dust and water vapor containing cement components, the dust and the water vapor enter the fixed rod through the long groove, the dust and the water vapor enable the spring and the measuring rod to be solidified, the measuring rod cannot move, the electrode can bend or even break the motor collector when moving up and down, and the stainless steel pulley can rub the surface of the electrode hard to rub, so that the surface of the electrode is pressed out of a deep pit, and the use of the whole ore-smelting electric furnace is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a can guarantee the ore smelting electric stove electrode voltage collector of elasticity roof pressure all the time between voltage collector and the corresponding electrode to thereby solve among the prior art dust and vapor can get into the inside problem that makes spring and measuring stick solidify and lead to the unable activity of measuring stick that makes of dead lever.
In order to realize the purpose, the utility model discloses an ore-smelting electric furnace electrode voltage collector adopts following technical scheme: the electrode voltage collector for the ore-smelting electric furnace comprises an insulating base, wherein a fixed rod is arranged on the base, the fixed rod is provided with a central hole, a measuring rod is arranged in the central hole through a spring in an elastic and guide moving mode along the axial direction of the fixed rod, a conductive rotating wheel used for pushing and pressing a corresponding electrode is rotatably arranged at the end part of the measuring rod through a rotating shaft, an elongated slot with the length extending along the axial direction of the elongated slot is arranged on the measuring rod part arranged in the central hole, and a limiting bolt is arranged on the fixed rod and provided with an extending end extending into the elongated slot so that the slot walls at two ends of the elongated slot are matched with the extending end in a limiting and.
The measuring stick is the step shaft structure, and the measuring stick is equipped with the dead lever dust cover including being used for installing the path section in the dead lever centre bore and supplying to rotate the big footpath section of taking turns the installation, the outside cover of dead lever, and the dead lever dust cover is connected with big footpath section.
The large-diameter section is provided with an installation step matched with the inner cavity of the fixed rod dust cover, and the fixed rod dust cover is detachably connected with the installation step.
The vertical surface of the mounting step is provided with jacking planes which are oppositely arranged, and the fixed rod dust cover is provided with fastening screws corresponding to the jacking planes.
The limiting bolt is provided with a screw head extending out of the outer side of the fixing rod so as to be matched with the dust cover of the fixing rod in a limiting and blocking manner in the vertical direction.
The utility model has the advantages that: the fixing rod of the voltage collector with the structure is not provided with an elongated slot or a channel for dust to enter the interior, the measuring rod is installed in the center hole in a guiding mode, the function of voltage collection is achieved, meanwhile, the dust can be prevented from entering the fixing rod, and the problem that in the prior art, dust and water vapor can enter the fixing rod to enable the spring and the measuring rod to be solidified, so that the measuring rod cannot move is solved.
Furthermore, the design of the fixed rod dust cover further prevents dust from being brought into the fixed rod by the measuring rod, and a better dustproof effect is achieved.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the electrode voltage collector for the ore-smelting electric furnace of the present invention;
FIG. 2 is a schematic view of the installation structure of the fixed rod dust cover and the measuring rod in FIG. 1;
FIG. 3 is a schematic illustration of the structure of the gear set;
FIG. 4 is a first schematic structural diagram of a measuring rod;
FIG. 5 is a second schematic view of the measuring rod;
FIG. 6 is a schematic structural view of a fixing rod;
fig. 7 is a schematic view of the mounting structure of the gear set and the measuring rod.
Detailed Description
The utility model discloses an embodiment of ore smelting electric furnace electrode voltage collector, as shown in fig. 1-7, including insulating base 1, be provided with dead lever 2 on the base 1 and install measuring stick 3 on the dead lever through spring 21 along axial direction elasticity to measuring stick 3 is installed in dead lever 2 along axial direction removal. The lower extreme of dead lever 2 is provided with the engaging lug, and the engaging lug passes through bolt releasable connection with base 1. The end part of the measuring rod 3 is rotatably provided with a rotating shaft 8, a gear set 4 is rotatably arranged on the rotating shaft 8, and the gear set 4 comprises two gear sheets 9 which are arranged along the axial direction of the rotating shaft 8 at intervals and elastically press the gear tooth tops on the corresponding electrodes of the mine thermal electric furnace. The gear piece is the rotating wheel. The rotating shaft 8 is provided with a D-shaped mounting section 16, and D-shaped mounting holes are formed in each gear piece of the gear set, so that the rotating shaft and the gear set can rotate synchronously.
Be provided with fixed knot between the gear piece 9 and construct, fixed knot constructs and adopts the bolt, and the both ends of bolt all with the terminal surface parallel and level of corresponding gear piece or be located inside the corresponding terminal surface of corresponding gear piece, do not influence the rotation of gear train. The detection device further comprises an encoder (not shown) for detecting the number of revolutions of the shaft 8. The encoder transmits the electric signals to the processor for processing and conversion, and the descending length of the corresponding electrode at the position displayed on the display determines the position of the electrode. The number of the gear pieces 9 in the gear set 4 is two, and one of the two gear pieces 9 is reversely installed, so that the gear teeth of the two gear pieces are in different directions. The different orientation of the teeth of a cogwheel can cooperate the up-and-down motion that corresponds the electrode for when the electrode moves up or moves down, all can be firm drive gear train and pivot rotate, guarantee that measuring result is accurate. The tip of measuring stick 3 is provided with the encoder installation casing that holds the encoder, and the electricity is connected with the wire on encoder installation casing 5 or measuring stick 3 or the electricity is connected with the wire, and the wire is intraductal from the integrated same cable of electrified cable line of encoder, and the rotor and the 8 transmission of pivot of encoder are connected. In the embodiment, the encoder is an ADK-3806 photoelectric encoder.
The measuring rod 3 is of a stepped shaft structure, the fixing rod 2 is provided with a central hole 20 for guiding and movably installing the small-diameter section 10 of the measuring rod 3 along the axial direction, and the spring 21 pressed by the end face of the small-diameter section is arranged below the small-diameter section 20 in the central hole 20. An elongated slot 17 with the length extending along the length direction of the measuring rod is arranged on the outer peripheral surface of the small-diameter section 10 of the measuring rod 3, a limiting bolt 7 is arranged on the fixed rod 2, and the limiting bolt 7 is provided with an extending end extending into the elongated slot 17 so that the slot walls at two ends of the elongated slot are matched with the extending end in an up-and-down limiting and blocking mode. The dead lever outside is led from top to bottom to remove and is provided with dead lever dust cover 6, is provided with the installation step 11 that is used for with the inner chamber adaptation of dead lever dust cover 6 on the major diameter section 12, detachable connection between dead lever dust cover 6 and the installation step 11. The vertical surface of the mounting step 11 is provided with opposite top pressure planes 13, and the fixed rod dust cover 6 is provided with fastening screws 14 corresponding to the top pressure planes. The limiting bolt 7 is provided with a bolt head extending out of the outer side of the fixing rod so as to be matched with the fixing rod dust cover 6 in a limiting and stopping manner in the vertical direction. The large diameter section 12 of the measuring rod is provided with a U-shaped opening 18 for the rotational mounting of the gear unit 4. The large-diameter section 12 of the measuring rod is symmetrically provided with steps 16, and a mounting hole 19 for mounting the rotating shaft is formed in the vertical surface of each step 16. The mounting hole 19 is fitted with a bearing 22, and a bearing dust cover 23. The rotating shaft is rotatably mounted in the mounting hole 19 through a bearing.
When the electrode voltage collector of the ore-smelting electric furnace of the embodiment is used: the ore-smelting electric furnace is provided with three electrodes, the number of the detection devices is three, the detection devices correspond to the corresponding electrodes one by one, each detection device is arranged on a support through an insulating base, a gear set of each detection device is pressed on the corresponding electrode under the action of a spring, the up-and-down movement of each electrode can synchronously drive the corresponding gear set and the corresponding rotating shaft to rotate, and the rotation number of the corresponding rotating shaft is transmitted out through electric signals by respective encoders so as to determine the position of each electrode. And each detection device can detect the voltage of the detection electrode. The position of each electrode of the ore-smelting electric furnace is accurately positioned.
In other embodiments of the utility model, the rotating wheel can adopt the existing stainless steel pulley instead of the gear piece; the measuring rod is provided with a wiring screw, and when the measuring rod is used, a lead can be independently used for connecting and leading out a voltage signal, so that the lead electrically connected to the measuring rod or the shell of the encoder is omitted, and the integration of the lead and a cable of the encoder is also omitted; the dust cover of the fixing rod can also be connected to the mounting step in a threaded manner.

Claims (5)

1. The utility model provides an ore-smelting electric furnace electrode voltage collector, includes insulating base, is provided with the dead lever on the base, and the dead lever has the centre bore, installs the measuring stick through spring along dead lever axial direction elasticity and direction removal in the centre bore, and the tip of measuring stick is provided with through the pivot rotation and is used for pushing up the electrically conductive rotation wheel on corresponding electrode, its characterized in that: the measuring rod part arranged in the central hole is provided with a long groove with the length extending along the axial direction of the measuring rod part, the fixed rod is provided with a limit bolt, and the limit bolt is provided with an extending end extending into the long groove so that the groove walls at two ends of the long groove are matched with the extending end in a limiting and stopping manner in the up-down direction.
2. The electrode voltage collector for the ore-smelting electric furnace according to claim 1, characterized in that: the measuring stick is the step shaft structure, and the measuring stick is equipped with the dead lever dust cover including being used for installing the path section in the dead lever centre bore and supplying to rotate the big footpath section of taking turns the installation, the outside cover of dead lever, and the dead lever dust cover is connected with big footpath section.
3. The electrode voltage collector for the ore-smelting electric furnace according to claim 2, characterized in that: the large-diameter section is provided with an installation step matched with the inner cavity of the fixed rod dust cover, and the fixed rod dust cover is detachably connected with the installation step.
4. The electrode voltage collector for the ore-smelting electric furnace according to claim 3, wherein: the vertical surface of the mounting step is provided with jacking planes which are oppositely arranged, and the fixed rod dust cover is provided with fastening screws corresponding to the jacking planes.
5. The electrode voltage collector for the ore-smelting electric furnace according to claim 2, characterized in that: the limiting bolt is provided with a screw head extending out of the outer side of the fixing rod so as to be matched with the dust cover of the fixing rod in a limiting and blocking manner in the vertical direction.
CN201920750029.XU 2019-05-23 2019-05-23 Electrode voltage collector for ore-smelting electric furnace Expired - Fee Related CN210037949U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920750029.XU CN210037949U (en) 2019-05-23 2019-05-23 Electrode voltage collector for ore-smelting electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920750029.XU CN210037949U (en) 2019-05-23 2019-05-23 Electrode voltage collector for ore-smelting electric furnace

Publications (1)

Publication Number Publication Date
CN210037949U true CN210037949U (en) 2020-02-07

Family

ID=69367485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920750029.XU Expired - Fee Related CN210037949U (en) 2019-05-23 2019-05-23 Electrode voltage collector for ore-smelting electric furnace

Country Status (1)

Country Link
CN (1) CN210037949U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110044390A (en) * 2019-05-23 2019-07-23 郑州市旭坤节能科技有限公司 A kind of ore-smelting electric furnace electrode position detection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110044390A (en) * 2019-05-23 2019-07-23 郑州市旭坤节能科技有限公司 A kind of ore-smelting electric furnace electrode position detection device

Similar Documents

Publication Publication Date Title
CN210037949U (en) Electrode voltage collector for ore-smelting electric furnace
CN208063003U (en) Novel Force measurement motor
CN209639734U (en) Ore-smelting electric furnace electrode position detection device
CN209639733U (en) A kind of ore-smelting electric furnace electrode position detection device with dust reduction capability
CN201611829U (en) Three-phase high-safety asynchronous motor for engineering drilling machine
CN209639641U (en) A kind of electrode inspector being able to detect ore-smelting electric furnace electrode position
CN216350254U (en) Pencil sliding degree instrument
CN116840656A (en) Inspection device for charging pile power supply circuit
CN203414033U (en) Center hole-free rotor spindle bouncing test tool
CN206736372U (en) A kind of aluminium cell melt thing boundary height and stove side Thickness sensitivity instrument
CN110044390A (en) A kind of ore-smelting electric furnace electrode position detection device
CN202853537U (en) Clamp for live-line testing of metal bare conductor diameter
CN211652978U (en) Puncture type voltage and temperature collector
CN202158918U (en) Wide-voltage energy-saving power testing system of permanent magnet motor
CN110361040B (en) Encoder support and encoder
CN208795320U (en) A kind of dedicated level-sensing device in limekiln
CN200959082Y (en) Automatic controller of built-in graphitic transmission curve
CN209709816U (en) A kind of low temperature resistant motor
CN210953106U (en) Rotating mechanical shaft vibration measurement support
CN213239236U (en) High-temperature wear-resistant corrosion-resistant full-armored thermocouple
CN221667821U (en) Circuit break detection device with positioning device
CN219247662U (en) Noise-reduction type three-phase asynchronous motor installation positioning device
CN101748440B (en) Anode stroke display and control device
CN206056634U (en) It is a kind of to lift the range unit that tests the speed for skull crucible electrode stem
CN209800223U (en) Water supply pump rotating speed measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200207

Termination date: 20210523