CN210037889U - A take-up reel for ZnO arrester high-voltage testing scene - Google Patents

A take-up reel for ZnO arrester high-voltage testing scene Download PDF

Info

Publication number
CN210037889U
CN210037889U CN201920551249.XU CN201920551249U CN210037889U CN 210037889 U CN210037889 U CN 210037889U CN 201920551249 U CN201920551249 U CN 201920551249U CN 210037889 U CN210037889 U CN 210037889U
Authority
CN
China
Prior art keywords
wire groove
take
reel
wire
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920551249.XU
Other languages
Chinese (zh)
Inventor
周文文
徐文辉
温晓阳
黄晟韬
刘汉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201920551249.XU priority Critical patent/CN210037889U/en
Application granted granted Critical
Publication of CN210037889U publication Critical patent/CN210037889U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The embodiment of the utility model discloses take-up reel for ZnO arrester high-voltage testing is on-spot for the wiring of using among the solution current test scene is longer, and all kinds of wire rods often twine together, influence the technical problem of operating efficiency. The embodiment of the utility model comprises a take-up reel main body; a first wire groove and a third wire groove are formed in the first side of the take-up reel body, and the first wire groove is located above the third wire groove; the second side of the take-up reel body is arranged opposite to the first side, a second wire groove and a fourth wire groove are formed in the second side, and the second wire groove is arranged above the fourth wire groove; the first wire groove and the second wire groove are oppositely arranged and are used for winding wires together; the third wire groove and the fourth wire groove are oppositely arranged, and the third wire groove and the fourth wire groove are jointly used for winding wires.

Description

A take-up reel for ZnO arrester high-voltage testing scene
Technical Field
The utility model relates to an electric power industry technical field especially relates to a take-up reel for ZnO arrester high-voltage testing scene.
Background
Secondly, insulation defects of primary equipment of the power system are important factors influencing power supply reliability of a power grid, and serious power failure accidents are caused once the insulation defects occur. In an outdoor high-voltage field of a transformer substation, high-voltage test can be performed on primary equipment in the substation through related instruments so as to test the insulation performance of running equipment and effectively find equipment defects. According to the regulation of 'inspection and test regulations for power equipment' (Q/CSG 1206007-2017-) issued by southern Power grid Limited liability company in China, the zinc oxide (ZnO) arresters with various voltage grades are subjected to an alternating current leakage current live-line test under one operating voltage before thunderstorm season every year. In the test process, the test wiring length of the instrument reaches 5 meters, and the three-phase wiring is often twisted together, so that the operation efficiency is influenced.
Therefore, in order to solve the above technical problems, finding a take-up reel for a ZnO arrester high-voltage test field is an important subject of research by those skilled in the art.
SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model discloses take-up reel for ZnO arrester high-voltage testing is on-spot for the wiring of using among the solution current test scene is longer, and all kinds of wire rods often twine together, influence the technical problem of operating efficiency.
The embodiment of the utility model provides a take-up reel for a ZnO arrester high-voltage test field, which comprises a take-up reel main body;
a first wire groove and a third wire groove are formed in the first side of the take-up reel body, and the first wire groove is located above the third wire groove;
the second side of the take-up reel main body is arranged opposite to the first side of the take-up reel main body, a second wire groove and a fourth wire groove are arranged on the second side, and the second wire groove is arranged above the fourth wire groove;
the first wire groove and the second wire groove are oppositely arranged and are used for winding wires together;
the third wire groove and the fourth wire groove are oppositely arranged, and the third wire groove and the fourth wire groove are jointly used for winding wires.
Optionally, a clamping groove is formed in the middle of the take-up reel body.
Optionally, a silica gel layer is arranged in each of the first wire slot, the second wire slot, the third wire slot and the fourth wire slot.
Optionally, a first partition plate is disposed on a first side of the take-up reel body, and the first partition plate is disposed between the first wire slot and the third wire slot;
and a second partition plate is arranged on the second side of the take-up reel main body and arranged between the second wire groove and the fourth wire groove.
According to the technical solution provided by the utility model, the embodiment of the utility model has the following advantage:
in this embodiment, the staff can twine the different wires that use in first wire casing and second wire casing and third wire casing and fourth wire casing through rotatory winding mode, has avoided the in-process that uses multiple wire rod, the problem of multiple wire rod intertwine to can improve testing personnel's work efficiency by a wide margin.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a schematic structural view of a take-up reel for a ZnO arrester high-voltage test site provided in an embodiment of the present invention;
illustration of the drawings: a take-up reel body 1; a first wire groove 2; a second wire groove 3; a third wire groove 4; a fourth wire groove 5; a second partition plate 6; a first partition 7; and a clamping groove 8.
Detailed Description
The embodiment of the utility model discloses a take-up reel for ZnO arrester high-voltage testing is on-spot for the take-up reel at ZnO arrester high-voltage testing is on-spot for the wiring that uses in solving current test scene is longer, and all kinds of wires often twine the hank together, influence the technical problem of operating efficiency.
In order to make the technical field better understand the solution of the present invention, the following detailed description of the present invention is provided with reference to the accompanying drawings and the detailed description. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1, a take-up reel for a ZnO arrester high voltage test field provided in this embodiment includes:
a take-up reel body 1;
a first wire groove 2 and a third wire groove 4 are formed in the first side of the take-up reel body 1, and the first wire groove 2 is located above the third wire groove 4;
the second side of the take-up reel body 1 is arranged opposite to the first side, the second side is provided with a second wire groove 3 and a fourth wire groove 5, and the second wire groove 3 is arranged above the fourth wire groove 5;
the first wire groove 2 and the second wire groove 3 are oppositely arranged, and the first wire groove 2 and the second wire groove 3 are used for winding wires together;
the third wire groove 4 and the fourth wire groove 5 are arranged oppositely, and the third wire groove 4 and the fourth wire groove 5 are used for winding wires together.
Further, a clamping groove 8 is formed in the middle of the take-up reel body 1.
It should be noted that, the take-up reel body 1 can be fixed on the electrical device by arranging the clamping groove 8 on the take-up reel body 1.
Further, the silica gel layer is arranged in the groove of the first wire groove 2, the groove of the second wire groove 3, the groove of the third wire groove 4 and the groove of the fourth wire groove 5.
It should be noted that, the wire rod winding probably receives influences such as friction at the in-process in wire casing, leads to surface damage, through set up the silica gel layer in each wire casing, can avoid damaging the wire rod.
Further, a first partition plate 7 is arranged on a first side of the take-up reel main body 1, and the first partition plate 7 is arranged between the first wire groove 2 and the third wire groove 4;
the second side of take-up reel main part 1 is provided with second baffle 6, and second baffle 6 sets up between second wire casing 3 and fourth wire casing 5.
It should be noted that, by providing the partition, the wires in the first wire groove 2 and the second wire groove 3 and the wires in the third wire groove 4 and the fourth wire groove 5 can be separated, so as to avoid the winding between the different wires.
In this embodiment, the staff can twine the different wires that use in first wire casing 2 and second wire casing 3 and third wire casing 4 and fourth wire casing 5 through rotatory winding mode, has avoided the in-process that uses multiple wire rod, the problem of multiple wire rod intertwine to can improve experimenter's work efficiency by a wide margin, furtherly, this take-up reel still solves the wire rod wearing and tearing and ageing problem of receipts line in-process, extension wire rod life.
It is right above the utility model provides a take-up reel for ZnO arrester high-voltage testing scene introduces in detail, to the general technical personnel in this field, the foundation the utility model discloses the thought of embodiment all has the change part on concrete implementation mode and application scope, to sum up, this description content should not be understood as right the utility model discloses a restriction.

Claims (4)

1. A take-up reel for a ZnO arrester high-voltage test field is characterized by comprising a take-up reel main body;
a first wire groove and a third wire groove are formed in the first side of the take-up reel body, and the first wire groove is located above the third wire groove;
the second side of the take-up reel main body is arranged opposite to the first side of the take-up reel main body, a second wire groove and a fourth wire groove are arranged on the second side, and the second wire groove is arranged above the fourth wire groove;
the first wire groove and the second wire groove are oppositely arranged and are used for winding wires together;
the third wire groove and the fourth wire groove are oppositely arranged, and the third wire groove and the fourth wire groove are jointly used for winding wires.
2. The take-up reel for the ZnO arrester high-voltage test field according to claim 1, wherein a clamping groove is formed in the middle of the take-up reel body.
3. The take-up reel for the ZnO arrester high-voltage test field according to claim 1, wherein silica gel layers are arranged in the grooves of the first wire groove, the second wire groove, the third wire groove and the fourth wire groove.
4. The take-up reel for the ZnO arrester high-voltage test field according to claim 1, wherein a first partition plate is arranged on a first side of the take-up reel body, and the first partition plate is arranged between the first wire groove and the third wire groove;
and a second partition plate is arranged on the second side of the take-up reel main body and arranged between the second wire groove and the fourth wire groove.
CN201920551249.XU 2019-04-22 2019-04-22 A take-up reel for ZnO arrester high-voltage testing scene Active CN210037889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920551249.XU CN210037889U (en) 2019-04-22 2019-04-22 A take-up reel for ZnO arrester high-voltage testing scene

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920551249.XU CN210037889U (en) 2019-04-22 2019-04-22 A take-up reel for ZnO arrester high-voltage testing scene

Publications (1)

Publication Number Publication Date
CN210037889U true CN210037889U (en) 2020-02-07

Family

ID=69360735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920551249.XU Active CN210037889U (en) 2019-04-22 2019-04-22 A take-up reel for ZnO arrester high-voltage testing scene

Country Status (1)

Country Link
CN (1) CN210037889U (en)

Similar Documents

Publication Publication Date Title
CN107843817B (en) A kind of cable insulation degradation detecting method based on polarization depolarization current method
Elombo et al. Comparative evaluation of the leakage current and aging performance of HTV SR insulators of different creepage lengths when energized by AC, DC+ or DC–in a severe marine environment
CN103578624A (en) Flat transposed aluminum conductor with cooling channel
CN205429680U (en) Cable cross -bonding case
CN202693622U (en) Power transformer test connecting device
CN102798805A (en) Voltage-withstanding testing jig of vertical transformer
CN210037889U (en) A take-up reel for ZnO arrester high-voltage testing scene
CN105548821A (en) Lightning arrester live detection method
CN110957875B (en) Process method for preventing bar from mistakenly breaking down during alternating current voltage withstanding of stator winding of large motor
Oguchi et al. Observational and experimental study of the lightning stroke attraction effect with ground wire system constructions
CN204832314U (en) Measurement device for electric wire netting primary current
CN201465603U (en) Winding wire with thin film winding round aluminum wire as multilayer transposition
Liu et al. Experimental investigation on the breakage in earth wire suspension string with winding preformed armor rods
CN109061358A (en) A kind of single-phase transient earthing short-circuit test method and system of transmission line of electricity
CN203433045U (en) Ground resistance test device
CN207502568U (en) Insulation protection device
CN101216519A (en) Distribution cable line live working measurement method
CN210863931U (en) Live detection device for partial discharge of distribution cable
CN201126460Y (en) Cable surge voltage test terminal
CN107271775A (en) A kind of power overhead network phase shift inspection method
CN206930715U (en) A kind of new circuit resistance tester
CN204142876U (en) A kind of Leakage Current of Zinc-oxide Lightning Arresters measures servicing unit
CN203554108U (en) Stator coil of high-voltage generator
CN209215494U (en) A kind of movable fixture for the test of multicolumn lightning arrester connected in parallel current distribution
Cuixia et al. Insulation coordination optimization study for±800kV UHVDC project with increased transmission capacity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant