CN202693622U - Power transformer test connecting device - Google Patents

Power transformer test connecting device Download PDF

Info

Publication number
CN202693622U
CN202693622U CN 201220268479 CN201220268479U CN202693622U CN 202693622 U CN202693622 U CN 202693622U CN 201220268479 CN201220268479 CN 201220268479 CN 201220268479 U CN201220268479 U CN 201220268479U CN 202693622 U CN202693622 U CN 202693622U
Authority
CN
China
Prior art keywords
test
power transformer
wire
terminal
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220268479
Other languages
Chinese (zh)
Inventor
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Grid Co Ltd Beijing Ultra-Hv Co
State Grid Corp of China SGCC
Original Assignee
North China Grid Co Ltd Beijing Ultra-Hv Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Grid Co Ltd Beijing Ultra-Hv Co, State Grid Corp of China SGCC filed Critical North China Grid Co Ltd Beijing Ultra-Hv Co
Priority to CN 201220268479 priority Critical patent/CN202693622U/en
Application granted granted Critical
Publication of CN202693622U publication Critical patent/CN202693622U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model discloses a power transformer test connecting device. The device comprises two leads, shielding layers, shielding layer grounding terminals, measuring terminals and a pair of wiring pincers, wherein insulating layers wrap the leads; the leads consist of wire cores wrapped by the insulating layers; the shielding layers wrap the lead shielding layers; the shielding layer grounding terminals are connected with the shielding layers; the measuring terminals are connected with one end of each of the wire cores; and the pair of wiring pincers is connected with the other end of each of the wire cores. When the device is used for testing direct-current resistance, insulating resistance and dielectric loss for a power transformer in the same process, only the connection between the measuring terminals and test equipment is required to be replaced, a measuring wire is not required to be replaced in high altitude, the high-altitude operation time is shortened, and the working efficiency and the safety factor are improved.

Description

The power transformer test connecting apparatus
Technical field
The utility model relates to the power transformer technical field of measurement and test, more particularly, relates to a kind of power transformer test connecting apparatus.
Background technology
Power transformer is the nucleus equipment of electric system, need to regularly carry out routine test with the state of checkout equipment, guarantees the safety of electrical network.Wherein, direct current resistance test, megger test and dielectric loss test event have taken the test period that surpasses half.
At present, when carrying out above-mentioned three kinds of tests, for different tests, need to adopt different test connecting apparatus that power transformer is connected with testing apparatus, for example: when carrying out the direct current resistance test, need select the test connecting apparatus that satisfies the direct current resistance test; When carrying out megger test, the test connecting apparatus that needs again to satisfy the direct current resistance test changes the test connecting apparatus that satisfies megger test into, therefore, need repeatedly to carry out connection and the dismounting of different test connecting apparatus in test process, complicated operation, activity duration are long; And the connection of test connecting apparatus and dismounting work are all finished in the air at height, and safety coefficient is lower.
The utility model content
In view of this, the utility model provides a kind of power transformer test connecting apparatus, realizing convenient, fast, safe power transformer is linked to each other with checkout equipment, thereby realizes power transformer is carried out different tests.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of power transformer test connecting apparatus comprises:
By the wire that two cores that are enclosed with respectively insulation course form, described wire is wrapped with insulation course;
Be wrapped in the outer screen layer of described wire insulation;
The shielding layer grounding terminal that is connected with described screen layer;
The measurement terminal that is connected with described core one end;
The jointing clamp that is connected with the described core other end.
Further, the core of described wire is the copper core.
Further, the sectional area of described copper core is 2.5mm 2
Further, described measurement terminal comprises:
Slot, line nose and terminal insulating layer; Wherein:
Described terminal insulating layer is socketed in outside the described slot;
Described line nose one end and slot are fixedly linked.
Further, described line nose is U-shaped line nose.
Can find out from above-mentioned technical scheme, the disclosed a kind of power transformer coupling arrangement of the utility model, at same process power transformer is carried out the direct current resistance test, when megger test and dielectric loss test, only need at first link to each other the jointing clamp of test connecting apparatus respectively with each test point of power transformer, and then according to different test needs measurement terminal is linked to each other with corresponding testing tool, when test need to prevent duplex wire over the ground or metal shell when discharge, the shielding layer grounding terminal that only needs to link to each other with screen layer is connected to the ground and can meets the demands, therefore, when different tests, only need to change being connected of measurement terminal and testing apparatus, and need not in the air test connecting apparatus to be changed at height, shorten the work high above the ground time, improved work efficiency and safety coefficient.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art, apparently, accompanying drawing in the following describes only is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the disclosed a kind of power transformer test connecting apparatus structural representation of the utility model embodiment;
Fig. 2 is the cross-sectional view of measurement terminal among Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is a part of embodiment of the present utility model, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
The utility model embodiment discloses a kind of power transformer test connecting apparatus, realizing convenient, fast, safe power transformer is linked to each other with checkout equipment, thereby power transformer is carried out different tests.
As shown in Figure 1, the disclosed a kind of power transformer test connecting apparatus of embodiment comprises:
By the wire 2 that two cores 6 that are enclosed with respectively insulation course form, described wire 2 is wrapped with insulation course;
Be wrapped in the outer screen layer 3 of described wire 2 insulation courses;
The shielding layer grounding terminal 5 that is connected with described screen layer 3;
The measurement terminal 4 that is connected with described core 2 one ends;
The jointing clamp 1 that is connected with described core 2 other ends.
In the above-described embodiments, when carrying out the DC resistance of power transformer test, by jointing clamp 1 is connected with power transformer, when after jointing clamp 1 is opened, being connected with power transformer, the core 6 of wire 2 is separated from each other, mutually insulated, has satisfied the needs of double bridge experiment in the direct current resistance test experiments, therefore, by with measurement terminal 4 with after instrument for measuring DC resistance is connected, can carry out the test of DC resistance of power transformer;
When carrying out electric power transformer insulated resistance test, by screen layer terminal 5 is connected with ground, prevented wire 2 over the ground or the discharge such as metal shell, satisfied the insulating requirements of power transformer when megger test, therefore, by jointing clamp 1 is connected with power transformer, measurement terminal 4 can be carried out electric power transformer insulated resistance test with after insulation resistance meter is connected;
When carrying out the test of power transformer dielectric loss, by screen layer terminal 5 is connected with ground, prevented wire 2 over the ground or the discharge such as metal shell, reduce simultaneously space electric field and disturbed the impact that dielectric loss is tested, therefore, by jointing clamp 1 is connected with power transformer, measurement terminal 4 can be carried out electric power transformer insulated resistance test with after the insulation dielectric loss tester is connected;
In sum, at same process power transformer is carried out the direct current resistance test, when megger test and dielectric loss test, only need at first link to each other the jointing clamp 1 of test connecting apparatus respectively with each test point of power transformer, and then according to different test needs measurement terminal 4 is linked to each other with corresponding testing tool, when test need to prevent wire 2 over the ground or metal shell when discharge, the shielding layer grounding terminal 5 that only needs to link to each other with screen layer 3 is connected to the ground and can meets the demands, therefore, when different tests, only need to change being connected of measurement terminal 4 and testing apparatus, and need not in the air test connecting apparatus to be changed at height, shorten the work high above the ground time, improved work efficiency and safety coefficient.
Preferably, the core 6 of wire 2 is the copper core.
Preferably, the sectional area of copper core is 2.5mm 2
Since adopted sectional area be the copper core of 2.5mm2 as the core of wire 2, satisfied the needs of testing 10A exciting current in the quick response process at direct current resistance.
Another embodiment of the present utility model also discloses the cross-sectional view of measurement terminal, as shown in Figure 2, comprising:
Slot 41, line nose 42 and terminal insulating layer 43; Wherein:
Terminal insulating layer 43 is socketed in outside the slot 41;
Line nose 42 1 ends and slot 41 are fixedly linked.
Preferably, line nose 42 is U-shaped line nose.
Concrete, terminal insulating layer 43 is socketed in outside the slot 41, has played insulating effect, so that safer when using measurement terminal; Line nose 42 1 ends and slot 41 are fixedly linked, so that can well switch between duplex wire and the testing apparatus in the process of test; Line nose 42 adopts U-shaped line nose in addition, more convenient being connected with testing apparatus of energy; Slot 41 can also adopt extendible slot.
For clearer explanation the utility model, the below describes take the 500kV single-phase autotransformer as example.
When power transformer being carried out direct current resistance test, megger test and dielectric loss test, need altogether five cover test connecting apparatus, the jointing clamp with each test connecting apparatus before the test is connected to high-pressure side (hereinafter being designated as A), intermediate voltage terminal (hereinafter being designated as M), high-pressure side neutral point (hereinafter being designated as O) and low-pressure side output terminal (hereinafter being designated as a, x).
When carrying out the test of high pressure winding D.C. resistance, two measurement terminal of high-pressure side A duplex wire are connected to respectively C1, the P1 end of instrument for measuring DC resistance, two measurement terminal of high pressure neutral point O end duplex wire are connected to respectively P2, the C2 end of instrument for measuring DC resistance, wherein C1, P1, P2, C2 are four terminals of double bridge, the shielding layer grounding terminal need not ground connection, can test by the rules requirement after the unsettled placement of duplex wire of other three covers test connecting apparatus.Carrying out low pressure winding D.C. resistance when test and above-mentioned test in like manner, do not repeat them here.
When carrying out the low pressure winding to the megger test on high, middle pressure winding and ground, hold the four measuring terminal of duplex wire to be connected to simultaneously the high-voltage output end of insulation resistance meter a, the x of low-pressure side output terminal, shielding layer grounding terminal ground connection can be tested by the rules requirement after the equal ground connection of all measurement terminal that duplex wires of other three covers test connecting apparatus connect to prevent duplex wire over the ground or the discharge such as metal shell.Carrying out high, medium and low voltage winding insulation resistance over the ground, high, middle pressure winding to the low pressure winding and ground megger test the time and above-mentioned test in like manner, do not repeat them here.
When carrying out high, middle pressure winding to the dielectric dissipation factor test on low pressure winding and ground, six measurement terminal of high-pressure side A, intermediate voltage terminal M, high-pressure side neutral point O end duplex wire are connected to the high-pressure side of the dielectric loss electric bridge of dielectric loss tester simultaneously, shielding layer grounding terminal ground connection in case the principal vertical line material over the ground or the discharge such as metal shell, can test by the rules requirement after the equal ground connection of all measurement terminal that other two duplex wires connect.Carrying out the dielectric loss test of low pressure winding to high, middle pressure winding and ground, during over the ground the dielectric loss test of high, medium and low voltage winding and above-mentioned test in like manner, do not repeat them here.
Each embodiment adopts the mode of going forward one by one to describe in this instructions, and what each embodiment stressed is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be apparent concerning those skilled in the art, and General Principle as defined herein can be in the situation that do not break away from spirit or scope of the present utility model, in other embodiments realization.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (5)

1. a power transformer test connecting apparatus is characterized in that, comprising:
By the wire that two cores that are enclosed with respectively insulation course form, described wire is wrapped with insulation course;
Be wrapped in the outer screen layer of described wire insulation;
The shielding layer grounding terminal that is connected with described screen layer;
The measurement terminal that is connected with described core one end;
The jointing clamp that is connected with the described core other end.
2. device according to claim 1 is characterized in that, the core of described wire is the copper core.
3. device according to claim 2 is characterized in that, the sectional area of described copper core is 2.5mm 2
4. device according to claim 1 is characterized in that, described measurement terminal comprises:
Slot, line nose and terminal insulating layer; Wherein:
Described terminal insulating layer is socketed in outside the described slot;
Described line nose one end and slot are fixedly linked.
5. device according to claim 4 is characterized in that, described line nose is U-shaped line nose.
CN 201220268479 2012-06-07 2012-06-07 Power transformer test connecting device Expired - Lifetime CN202693622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220268479 CN202693622U (en) 2012-06-07 2012-06-07 Power transformer test connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220268479 CN202693622U (en) 2012-06-07 2012-06-07 Power transformer test connecting device

Publications (1)

Publication Number Publication Date
CN202693622U true CN202693622U (en) 2013-01-23

Family

ID=47549223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220268479 Expired - Lifetime CN202693622U (en) 2012-06-07 2012-06-07 Power transformer test connecting device

Country Status (1)

Country Link
CN (1) CN202693622U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105301299A (en) * 2015-11-30 2016-02-03 杭州西湖电子研究所 Near potential tapping test wiring clamp
CN106093485A (en) * 2016-08-03 2016-11-09 国网电力科学研究院武汉南瑞有限责任公司 Copper-line device for electric power equipment on-site test
CN106771394A (en) * 2016-12-16 2017-05-31 国家电网公司 A kind of power transformer test mode of connection
CN107807258A (en) * 2017-09-26 2018-03-16 杭州西湖电子研究所 A kind of cable connector with double shield function
CN111220826A (en) * 2019-12-05 2020-06-02 国网河南省电力公司南阳供电公司 Integrated transformer test device for electrical test of transformer

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105301299A (en) * 2015-11-30 2016-02-03 杭州西湖电子研究所 Near potential tapping test wiring clamp
CN105301299B (en) * 2015-11-30 2018-05-29 杭州西湖电子研究所 A kind of nearly current potential tap test jointing clamp
CN106093485A (en) * 2016-08-03 2016-11-09 国网电力科学研究院武汉南瑞有限责任公司 Copper-line device for electric power equipment on-site test
CN106093485B (en) * 2016-08-03 2018-11-30 国网电力科学研究院武汉南瑞有限责任公司 Copper-line device for electric power equipment on-site test
CN106771394A (en) * 2016-12-16 2017-05-31 国家电网公司 A kind of power transformer test mode of connection
CN107807258A (en) * 2017-09-26 2018-03-16 杭州西湖电子研究所 A kind of cable connector with double shield function
CN107807258B (en) * 2017-09-26 2023-04-28 杭州西湖电子研究所 Cable connector with double shielding function
CN111220826A (en) * 2019-12-05 2020-06-02 国网河南省电力公司南阳供电公司 Integrated transformer test device for electrical test of transformer

Similar Documents

Publication Publication Date Title
CN202693622U (en) Power transformer test connecting device
CN103308832B (en) A kind of high-voltage cable insulating transition joint local discharge test device and using method
CN204989239U (en) Transformer test multipurpose plant of working a telephone switchboard
CN102156242B (en) Method for testing transformer insulation combination
CN103323751A (en) High-voltage short-cable insulation terminal partial discharge testing device and using method
CN104991095B (en) A kind of transformer test wiring fexible unit
CN104880652A (en) Switch cabinet live-line partial discharge test system and voltage signal extraction device thereof
CN204832314U (en) Measurement device for electric wire netting primary current
CN205157597U (en) Power transformer's experimental pencil
CN203259547U (en) Wiring board for high-voltage electric test of transformer
CN104316736B (en) Combined insulated lead for switch cabinet power-frequency and alternating-current withstand voltage test
CN203148978U (en) Connection device for puncture test equipment
CN210155235U (en) Testing arrangement of transformer core no-load performance
CN214622719U (en) Novel auxiliary wiring device for transformer test
CN103293413B (en) A kind of transformer test high pressure special purpose device
CN202041553U (en) Combined wiring device for transformer test
CN205229199U (en) General experimental binding post row of transformer
CN101661090A (en) Through-flow tester of neutral point current transformer of transformer
CN212989429U (en) Power transformer high-voltage lead switching system
CN204789879U (en) Test system is put in electrified office of cubical switchboard and voltage signal extraction element thereof
CN106932613A (en) A kind of 35kV and 110kV transformers routine test wiring cross box
CN106771394A (en) A kind of power transformer test mode of connection
CN203479920U (en) Special high-voltage testing device for transformers
CN203838324U (en) Special test grounding device for secondary winding of high-voltage transformer
CN102629512B (en) A kind of for delta connection structure for secondary side of high-current pulse short-circuit dry type transformer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Yongdong

Inventor after: Wu Siyuan

Inventor after: Zhou Ranran

Inventor after: Mao Ting

Inventor after: Wang Jun

Inventor after: Zhang Wei

Inventor after: Shang Lixin

Inventor after: Zhang Guoliang

Inventor after: Zhang Jianxing

Inventor after: Liu Shuyong

Inventor after: Yu Guanchao

Inventor before: Zhang Wei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG WEI TO: LI YONGDONG MAO TING WANG JUN ZHANG WEI SHANG LIXIN ZHANG GUOLIANG ZHANG JIANXING LIU SHUYONG YU GUANCHAO WU SIYUAN ZHOU RANRAN

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Yongdong

Inventor after: Liu Shuyong

Inventor after: Wu Siyuan

Inventor after: Zhou Ranran

Inventor after: Mao Ting

Inventor after: Wang Jun

Inventor after: Zhang Wei

Inventor after: Shang Lixin

Inventor after: Zhang Guoliang

Inventor after: Zhang Jianxing

Inventor after: Jiang Guohua

Inventor after: Yu Guanchao

Inventor before: Li Yongdong

Inventor before: Wu Siyuan

Inventor before: Zhou Ranran

Inventor before: Mao Ting

Inventor before: Wang Jun

Inventor before: Zhang Wei

Inventor before: Shang Lixin

Inventor before: Zhang Guoliang

Inventor before: Zhang Jianxing

Inventor before: Liu Shuyong

Inventor before: Yu Guanchao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI YONGDONG MAO TING WANG JUN ZHANG WEI SHANG LIXIN ZHANG GUOLIANG ZHANG JIANXING LIU SHUYONG YU GUANCHAO WU SIYUAN ZHOU RANRAN TO: LI YONGDONG MAO TING WANG JUN ZHANG WEI SHANG LIXIN ZHANG GUOLIANG ZHANG JIANXING JIANG GUOHUA YU GUANCHAO LIU SHUYONG WU SIYUAN ZHOU RANRAN

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130123