CN210032674U - Tool for installing frame type glass curtain wall panel - Google Patents
Tool for installing frame type glass curtain wall panel Download PDFInfo
- Publication number
- CN210032674U CN210032674U CN201920356613.7U CN201920356613U CN210032674U CN 210032674 U CN210032674 U CN 210032674U CN 201920356613 U CN201920356613 U CN 201920356613U CN 210032674 U CN210032674 U CN 210032674U
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- frame
- guide rail
- wall panel
- glass curtain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a frock for installing frame-type glass curtain wall panel, including base, guide rail and wheeled dolly, a plurality of bases are arranged in a row in proper order, and on the guide rail vertical fixation was on the base, wheeled dolly was arranged in on the guide rail, and on the frame of wheeled dolly was arranged in to glass panel, promote wheeled dolly and remove along the guide rail, transported glass panel to installation work face department. When the glass panel is conveyed, workers only need to hold the glass panel at two sides and slowly push the wheel type trolley to move along the guide rail, so that the number of the workers is reduced, the labor intensity is greatly reduced, and the operation safety is also improved. When the device is used, the base of the device is fixed on the operating platform, the wheel type trolley stably moves along the guide rail, the glass can be ensured to be upright, the required space and the required field are small, and the glass panel can be prevented from being damaged in various construction environments. After the glass panel of one installation working face is transported, the base is detached, and the glass panel is fixed at the corresponding proper position of the next installation working face, so that the transportation work can be carried out.
Description
Technical Field
The utility model belongs to glass curtain wall installs the field, specifically is a frock for installing frame-type glass curtain wall panel.
Background
The glass curtain wall is a common construction mode for buildings in modern metropolis, and makes up a whole city, so that the city is more environment-friendly. From the aspect of curtain wall construction structures, glass curtain walls can be divided into four categories, namely frame type glass curtain walls, full glass curtain walls, point type glass curtain walls and unit type glass curtain walls.
When installing frame-type glass curtain wall panel, all lift glass to the working face through the staff on the operation platform after lifting glass from ground at present, when glass size is great heavier, need more staff, and operation platform's scope is limited, probably all can not stand down, so the transport difficulty, have the potential safety hazard of staff's person moreover. In the case where the working conditions are not ideal, there is a risk of damaging the glass.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a small amount of staff can be light transport glass to the frock of installation working face, and the frock can be suitable for various construction conditions.
The utility model provides a this kind of a frock for installing frame-type glass curtain wall panel, including base, guide rail and wheeled dolly, a plurality of bases are arranged in a row in proper order, and on the guide rail vertical fixation was on the base, wheeled dolly was arranged in on the guide rail, and on the frame of wheeled dolly was arranged in to glass panel, promote wheeled dolly and remove along the guide rail, transported glass panel to installation work face department.
In an embodiment of the above technical solution, the base includes a pad beam and supporting members symmetrically fixed to both sides of a middle position of the pad beam in a length direction.
In an embodiment of the above technical scheme, the pad beam is rectangular steel, the support member is an angle steel, and the support member is welded on the pad beam in outward symmetrical arrangement with an included angle between the two arms.
In an embodiment of the above technical solution, the cross section of the guide rail is U-shaped, and the guide rail is fixed between the supporting members with an opening facing upward.
In an embodiment of the above technical solution, the guide rail is a channel steel, and two side arms of the channel steel are welded and fixed to side walls of the support member.
In an embodiment of the above technical scheme, the frame includes a spandrel girder and a supporting beam, the spandrel girder and the supporting beam are all arranged horizontally, the two ends of the spandrel girder are vertically fixed with a column, the supporting beam is connected to the opposite side of the fixed spandrel girder of the column, the connecting position of the supporting beam on the column is higher than the position of the spandrel girder, and the lower side of the supporting beam is provided with an ear seat for mounting a wheel.
In an embodiment of the above technical solution, the bearing beam, the supporting beam and the upright are all rectangular steel.
In one embodiment of the above technical solution, vertical plates are fixed to two sides of the bearing beam in the length direction, and a clamping groove for a glass panel is formed between the vertical plates on the two sides.
In one embodiment of the above technical solution, the vertical plates are arranged at two sides of the bearing beam in a staggered manner, and the inner sides of the vertical plates are adhered with hard films.
In one embodiment of the above technical solution, the surface of the bearing beam and the inner side of the upper section of the upright column corresponding to the bearing beam are both adhered with hard films.
After the glass panel is placed on the frame of the wheeled trolley of the device, workers only need to hold the glass panel on two sides and then slowly push the wheeled trolley to move along the guide rail, so that the glass panel can be conveyed to an installation working surface, the number of the workers is reduced, the labor intensity is greatly reduced, and the operation safety is improved. When the device is used, only the base of the device needs to be fixed on the operating platform, and the device is simple to assemble and disassemble. When the glass panel is conveyed, the wheel type trolley stably moves along the guide rail, the glass can be ensured to be upright, and the required space and the required field are smaller, so that the glass panel can be prevented from being damaged in various construction environments. After the glass panel of an installation working face is transported, only need to pull down the base of this device from operation platform, then fix in the corresponding suitable position of next installation working face and can begin to transport glass panel, repeatedly usable.
Drawings
Fig. 1 is a schematic front view of an embodiment of the present invention.
Fig. 2 is a schematic top view of fig. 1.
Fig. 3 is an enlarged side view of fig. 1.
Detailed Description
As shown in fig. 1 to 3, the transportation tool for installing the frame-type glass curtain wall panel disclosed in the present embodiment includes a base 1, a guide rail 2 and a wheeled cart 3.
The base 1 includes a pad beam 11 and a support 12. This embodiment adopts rectangle shaped steel as backing beam 11, adopts the angle steel as support piece 12, at rectangle shaped steel length direction's intermediate position bilateral symmetry welding angle steel, the angle steel is arranged outwards with the contained angle between the two arms.
A plurality of bases 1 are arranged in rows, and the arrangement distance of adjacent bases is determined according to actual needs.
This embodiment adopts the channel-section steel as guide rail 2 to better assurance guide rail's straightness accuracy welds its both sides side arm and angle steel side arm after upwards arranging the channel-section steel with the opening, and the concatenation position of channel-section steel best corresponds base position department, if not in base position department, then needs adopt the reinforcement measure. Adjacent channel steel is spliced and butt-welded into a whole, and a welding seam at the butt-welded position needs to be polished to be smooth.
The wheeled trolley 3 comprises a frame and wheels 36 at the bottom of the frame, the frame mainly comprises a bearing beam 31 and a supporting beam 32, the bearing beam 31 and the supporting beam 32 are horizontally arranged, two ends of the bearing beam 31 are vertically fixed with upright posts 33, the supporting beam 32 is connected to the opposite sides of the upright posts 33 for fixing the bearing beam, the connecting position of the supporting beam 32 on the upright posts is higher than that of the bearing beam 31, and the lower side of the supporting beam 32 is provided with lug seats for mounting the wheels. The lower position of the bearing beam 31 is more beneficial to the stability of the glass panel in the transportation process.
In the embodiment, rectangular section steel is used as the bearing beam 31, and the supporting beam 32 and the upright column 33 are both made of rectangular section steel of the same type.
The bearing beam 31 is provided with a plurality of vertical plates 34 at two sides in the length direction, a clamping groove is formed between the vertical plates at two sides, and the glass panel is arranged in the clamping groove. In the embodiment, the steel plate is used as the vertical plate, and the hard film 35 is adhered to the inner side of the steel plate, so that the glass panel and the steel plate are prevented from directly colliding. In addition, hard films 35 are adhered to the bearing beam surface and the inner side surface of the upright post which can be contacted by the glass panel so as to protect the glass panel in all directions and prevent the glass panel from rigid collision.
In order to achieve the purpose of protection and save materials, the vertical plates 34 are arranged on two sides of the bearing beam 31 in a staggered mode.
The length of the bearing beam 31 is determined according to the maximum width dimension of the glass panel, so as to ensure that the glass panels of all the dimensions of the curtain wall can be conveyed to a working surface through the device.
After the wheel type trolley is manufactured, the wheel type trolley needs to be pushed back and forth on the guide rail, and the trolley is guaranteed to flexibly move in the guide rail.
When the device is used, two ends of the pad beam of the base are fixed at proper positions on the operating platform, and after the glass panel is transferred to the wheel type trolley from the lifting equipment, workers stably hold the glass panel at two sides and then slowly push the wheel type trolley until the glass panel is conveyed to a working surface needing to be installed.
After one working face is transported, the device is detached from the working platform and then fixed at a corresponding proper position of the other installation working face, so that the glass panel required by the other installation working face can be transported.
After the glass panel is placed on the frame of the wheeled trolley of the device, workers only need to hold the glass panel on two sides and then slowly push the wheeled trolley to move along the guide rail, so that the glass panel can be conveyed to an installation working surface, the number of the workers is reduced, the labor intensity is greatly reduced, and the operation safety is improved. When the device is used, only the base of the device needs to be fixed on the operating platform, and the device is simple to assemble and disassemble. When the glass panel is conveyed, the wheel type trolley stably moves along the guide rail, the glass can be ensured to be upright, and the required space and the required field are smaller, so that the glass panel can be prevented from being damaged in various construction environments. After the glass panel of an installation working face is transported, only need to pull down the base of this device from operation platform, then fix in the corresponding suitable position of next installation working face and can begin to transport glass panel, repeatedly usable.
Claims (10)
1. The utility model provides a frock for installing frame-type glass curtain wall panel which characterized in that: the glass panel mounting device comprises bases, guide rails and wheel-type trolleys, wherein the bases are sequentially arranged in rows, the guide rails are vertically fixed on the bases, the wheel-type trolleys are arranged on the guide rails, glass panels are arranged on frames of the wheel-type trolleys, the wheel-type trolleys are pushed to move along the guide rails, and the glass panels are conveyed to a mounting working face.
2. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 1, wherein: the base comprises a pad beam and supporting pieces symmetrically fixed on two sides of the middle position of the pad beam in the length direction.
3. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 2, wherein: the pad beam is rectangular section steel, the supporting piece is an angle steel, and the supporting piece is welded on the pad beam in outward symmetrical arrangement by using an included angle between the two arms.
4. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 3, wherein: the cross section of the guide rail is U-shaped, and the guide rail is fixed between the supporting pieces with an opening facing upwards.
5. A tool for mounting a frame-type glass curtain wall panel according to claim 4, wherein: the guide rail is a channel steel, and two side arms of the guide rail are welded and fixed with the side walls of the supporting piece.
6. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 1, wherein: the frame includes spandrel girder and a supporting beam, and spandrel girder and a supporting beam equal level are arranged, and the both ends vertical fixation of spandrel girder has the stand, and a supporting beam connects in the offside of the fixed spandrel girder of stand, and the hookup location of a supporting beam on the stand is higher than the position of spandrel girder, and a supporting beam's downside has the ear seat that is used for installing the wheel.
7. A tool for mounting a frame-type glass curtain wall panel according to claim 6, wherein: the bearing beam, the supporting beam and the upright post are all rectangular section steel.
8. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 7, wherein: vertical plates are fixed on two sides of the bearing beam in the length direction, and a clamping groove of the glass panel is formed between the vertical plates on the two sides.
9. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 8, wherein: the vertical plates are arranged on two sides of the bearing beam in a position staggered mode, and hard films are adhered to the inner sides of the vertical plates.
10. A tool for mounting a frame-type glass curtain wall panel as claimed in claim 9, wherein: hard films are pasted on the surfaces of the bearing beams and the inner sides of the upper sections of the bearing beams corresponding to the upright columns.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920356613.7U CN210032674U (en) | 2019-03-20 | 2019-03-20 | Tool for installing frame type glass curtain wall panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920356613.7U CN210032674U (en) | 2019-03-20 | 2019-03-20 | Tool for installing frame type glass curtain wall panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210032674U true CN210032674U (en) | 2020-02-07 |
Family
ID=69355506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920356613.7U Active CN210032674U (en) | 2019-03-20 | 2019-03-20 | Tool for installing frame type glass curtain wall panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210032674U (en) |
-
2019
- 2019-03-20 CN CN201920356613.7U patent/CN210032674U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101787891B (en) | Station-crossing construction method and station-crossing construction device of wheel type mobile foundation | |
CN210032674U (en) | Tool for installing frame type glass curtain wall panel | |
CN212052263U (en) | Steel truss assembly for overpass | |
CN111847242A (en) | Special trolley for mounting movable adjustable sliding contact line | |
CN115282769A (en) | Portable SCR denitration tower catalyst installation device | |
CN210912488U (en) | Vehicle frame transportation tool | |
CN204676864U (en) | A kind of attaching lifting discharging platform monolith platform underframe and detachable lateral guardrail | |
CN210101714U (en) | Camera door plant assembly part carrier | |
CN212150164U (en) | Packing device for box type container | |
KR102242485B1 (en) | Method for vertical transportation of a heavy module using of a module lifting system inculding of a strand jack | |
CN209578560U (en) | Lift is oriented to cohesion device | |
CN103287986A (en) | Curtain board transport lifting device and method for mounting curtain board by using device | |
CN206668304U (en) | A kind of anti-collapse operation platform | |
KR101549032B1 (en) | Carrier device for use in construction of the h-beam structure for lattice beam type clean room and method thereof and method of construction the same | |
CN209872065U (en) | Knapsack frame structure of steel band ladder | |
CN210762256U (en) | Cassette for transplanting liquid crystal display panel | |
CN212865606U (en) | Aerial working safety platform for box girder construction | |
CN204823723U (en) | S columnar order door -shaped hanging bracket | |
CN219060809U (en) | Operating platform for overhauling railway vehicle | |
CN210127621U (en) | Assembly type building external hanging platform | |
CN211253971U (en) | Novel shuttle type goods shelf | |
CN103590592A (en) | Detachable steel-structure platform | |
CN211306158U (en) | Frock is dismantled to uranium concentration production line pipeline | |
CN213703354U (en) | Storage device for positioning module | |
CN220451463U (en) | Building sliding platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |