CN210002885U - stair template with cleaning opening - Google Patents

stair template with cleaning opening Download PDF

Info

Publication number
CN210002885U
CN210002885U CN201920765753.XU CN201920765753U CN210002885U CN 210002885 U CN210002885 U CN 210002885U CN 201920765753 U CN201920765753 U CN 201920765753U CN 210002885 U CN210002885 U CN 210002885U
Authority
CN
China
Prior art keywords
plate
blocking
sealing bottom
bottom plate
clearly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920765753.XU
Other languages
Chinese (zh)
Inventor
吕春龙
陈玲
陈椰镇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhuchuang aluminum mould technology Co.,Ltd.
Original Assignee
Zhangzhou Zhuchuang Aluminum Mold Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangzhou Zhuchuang Aluminum Mold Technology Co Ltd filed Critical Zhangzhou Zhuchuang Aluminum Mold Technology Co Ltd
Priority to CN201920765753.XU priority Critical patent/CN210002885U/en
Application granted granted Critical
Publication of CN210002885U publication Critical patent/CN210002885U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a stair template with clearly draw mouth relates to building die field its technical essential is have clearly draw the stair template of mouth, including reciprocal anchorage's vertical board and hang plate, the hang plate has been seted up clearly and has been drawn the hole, clearly draw downthehole sliding movement be connected with the sealed bottom plate of hang plate place plane coincidence, be provided with the fixed subassembly of that is used for fixed sealed bottom plate between sealed bottom plate and the hang plate, the lower end of sealed bottom plate upper surface is provided with the barrier plate, the hang plate is located clearly draws hole week side symmetry and is provided with the deflector that is used for leading building rubbish to the barrier plate, the utility model has the advantages of can make building rubbish pile up at the entrance to a cave, be convenient for clear up, guarantee construction quality.

Description

stair template with cleaning opening
Technical Field
The utility model relates to a building mould field, more specifically say, it relates to kinds of stair templates with draw mouthful clearly.
Background
In cast-in-place stair in house, need before pouring building rubbish clean up such as saw-dust, stone in the mould, otherwise can influence the appearance quality after pouring, lead to the pouring stress of building rubbish department not up to standard even, adopt the water-washed formula more in the past, nevertheless because the stair roof beam cross-section is less, the reinforcing bar is more intensive, building rubbish is difficult to be in place from last mould department clearance, consequently people just can set up the clearance hole in the lower mould department of stair, draw out the clearance through the clearance hole with the building rubbish in the mould.
Chinese utility model patent like publication number CN207863470U discloses can clear up stair beam die block board device of debris, pour the template including the stair beam bottom, it has debris clearance entrance to a cave to open on the template is pour to the stair beam bottom, and entrance to a cave department has the apron that can pour 180 upsets in template below at the stair beam bottom through hinge connection.
In the actual building process, the stair beam bottom formwork is obliquely arranged, so when the building garbage falls on the stair beam bottom formwork, the building garbage can obliquely roll downwards under the action of gravity, the building garbage can only fall out from the hole if the hole is constantly opened, the building garbage can directly fall from the hole to the lower floor to smash constructors if the hole is opened, potential safety hazards are caused, if the cover plate is always kept in a closed state with the hole, the cover plate is opened when needed, the building garbage can easily continue to roll on the cover plate to be away from the hole, and after the cover plate is opened by the constructors, the building garbage is far away from the hole, and the building garbage far away from the hole cannot be cleaned, so that the construction quality is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a stair templates with draw mouthful clearly, it has can make building rubbish pile up at the entrance to a cave, be convenient for clear up, guarantee construction quality's advantage.
In order to achieve the above purpose, the utility model provides a following technical scheme:
stair template with clearly draw mouth, vertical board and hang plate including the reciprocal anchorage, the hang plate has been seted up clearly and has been drawn the hole, the downthehole cunning of drawing clearly is connected with the sealing bottom plate with hang plate place plane coincidence, be provided with the fixed subassembly that is used for fixed sealing bottom plate between sealing bottom plate and the hang plate, the lower end of sealing bottom plate upper surface is provided with the barrier plate, the hang plate is located clearly and draws hole week side symmetry and be provided with the deflector that is used for leading building rubbish to the barrier plate.
Through adopting above-mentioned technical scheme, building rubbish rolls to being close to when drawing the hole clearly on the hang plate, and building rubbish can roll to the barrier plate direction along with the deflector, can be blocked by the barrier plate when building rubbish rolls to the barrier plate, and subsequent building rubbish also can be piled up between barrier plate and sealing bottom plate, only need draw downthehole slip-out can clear up building rubbish with barrier plate and sealing bottom plate from the clearance this moment, and it is very convenient to operate.
At this in-process, building rubbish is blockked by the barrier plate and piles up drawing the hole in the clearance, can not continue to roll to keeping away from the clearance and draw the hole for building rubbish can be cleared up completely, not only can guarantee construction quality, is convenient for clear up moreover.
, arranging a top plate on the side of the blocking plate far away from the sealing bottom plate, wherein the area of the top plate is larger than that of the clearing hole.
Through adopting above-mentioned technical scheme, draw the hole outside sliding back when sealing plate and barrier plate to clear, the roof can take place the butt with the hang plate, sealing plate and barrier plate can not draw the hole completely and break away from with clear, consequently sealing plate and barrier plate need not once more and clearly draw the hole counterpoint, easy to assemble sealing plate and barrier plate.
And , symmetrically arranging blocking side plates at two ends of the guide plate of the sealing bottom plate, wherein the blocking side plates, the blocking plates, the sealing bottom plate and the top plate surround a placing groove with an opening.
Through adopting above-mentioned technical scheme, the standing groove can play the effect of storing construction waste, avoids construction waste to fall out from the both ends that block the curb plate, improves cleaning efficiency.
, the blocking plate is provided with a plurality of water leakage holes.
Through adopting above-mentioned technical scheme, when carrying out the water-washed formula clearance, water can spill through the hole that leaks, and building rubbish can not spill in the hole that leaks yet, and the hole that leaks plays the filtering action, reduces the water yield in the standing groove, reduces whole weight, avoids the staff to be drenched by water when clearing up rubbish.
, the blocking plate is hinged with the sealing bottom plate, and a fixing piece for fixing the blocking plate is arranged between the blocking plate and the sealing bottom plate.
Through adopting above-mentioned technical scheme, drawing the hole back of sliding out with the standing groove from clearly, the roof can block at the hang plate upper surface, and construction waste is difficult to take out from the opening part of standing groove this moment, and can produce passageways in the bottom of standing groove after articulated with sealed bottom plate with the barrier plate, and construction waste can directly discharge in this passageway, makes things convenient for the staff to clear up construction waste.
step, the roof is located side that blocks the curb plate back of the body and is provided with rectangular guide plate towards the sealing bottom plate direction, the hang plate is located clearly draws the hole inner wall and offers the direction slide that supplies the guide plate to slide.
Through adopting above-mentioned technical scheme, the direction piece plays the guide effect with the direction slide, avoids the standing groove and clearly draws and take place to block between the hole, makes things convenient for the staff to draw the standing groove from clearly and slide in the hole.
, a engaging groove corresponding to the shape of the top plate is formed on the side of the inclined plate close to the top plate.
Through adopting above-mentioned technical scheme, after the construction waste clearance finishes, with the roof cunning to gomphosis inslot, the roof of roof and the roof of hang plate can be in with planes this moment, conveniently concreting, the work of saving follow-up repair.
, the guide plate is connected with an inclined plate in a sliding way, a second fixing component for fixing the guide plate is arranged between the inclined plate and the guide plate, a top plate is arranged at the top of the guide plate, and a second embedding groove which is similar to the shape of the top plate is arranged at the side of the inclined plate close to the top plate.
After the construction waste is cleaned, the top plate is slid into the second embedded groove, and the top wall of the top plate and the top wall of the inclined plate are located on the same plane, so that concrete pouring is facilitated, and subsequent repairing work is omitted.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) by arranging the sealing bottom plate, the blocking plate, the th fixing assembly and the guide plate, the construction waste can roll along with the guide plate to the direction of the blocking plate, when the construction waste rolls to the blocking plate, the construction waste can be blocked by the blocking plate, the subsequent construction waste can be accumulated between the blocking plate and the sealing bottom plate, and at the moment, the construction waste can be cleaned only by sliding the blocking plate and the sealing bottom plate out of the cleaning hole, so that the operation is very convenient, and the construction quality is ensured;
(2) by arranging the top plate and the blocking side plate, the blocking plate, the sealing bottom plate and the top plate surround the placing groove with the opening, the construction waste is prevented from falling out of two ends of the blocking side plate, and the cleaning efficiency is improved; the barrier plate is provided with water leakage holes, so that water can leak through the water leakage holes when water-flushing cleaning is carried out, the overall weight is reduced, and workers are prevented from being wetted by the water when cleaning garbage;
(3) by arranging the blocking plate to be hinged with the sealing bottom plate and arranging the fixing piece, passages can be generated at the bottom of the placing groove after the blocking plate is hinged with the sealing bottom plate, and construction waste can be directly discharged from the passages, so that workers can conveniently clean the construction waste;
(4) through the th tabling groove, the top plate and the second tabling groove, when concrete is poured, the top plate can be tabling with the th tabling groove, the top plate can be tabling with the second tabling groove, thereby being convenient for pouring concrete and saving the subsequent repairing work.
Drawings
FIG. 1 is an overall view of the present embodiment;
FIG. 2 is a schematic structural view of the present embodiment with the placement groove removed;
FIG. 3 is a schematic view of the th fastening component and the second fastening component of the present embodiment;
FIG. 4 is a schematic view of the construction of a salient barrier;
fig. 5 is a schematic cross-sectional view of the present embodiment.
The reference numbers of the vertical plate, the inclined plate, the clearing hole, the sealing bottom plate, the fixing assembly of the No. 5 and the No. , the fixing ring of the No. 501 and the No. , the bolts of the No. 502 and the No. , the bolt of the No. 6 and the blocking plate, the guide plate of the No. 7 and the guide plate of the No. 8 and the top plate of the No. 9 and the blocking side plate of the No. 10 and the placing groove of the No. 11 and the leakage hole of the No. 12 and the fixing piece of the No. 13 and the guide piece of the No. 14 and the guide slideway of the No. 15 and the No. embedding groove of the No. 16 and the second fixing assembly of the.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
Referring to fig. 1 and 2, kinds of stair templates with clearly draw mouth include body shaping and be the vertical board 1 and the hang plate 2 of obtuse angle setting, and the hole 3 is drawn clearly to the hang plate 2 that sets up the cuboid form, and the hang plate 2 lies in clearly drawing the hole 3 inner wall symmetry and has seted up guide slide 14, and the length limit of guide slide 14 is parallel with the high limit of clearly drawing the hole 3.
Referring to fig. 2 and 3, a sealing bottom plate 4 coinciding with the plane of the inclined plate 2 is slidably connected in the cleaning hole 3, the peripheral side wall of the sealing bottom plate 4 is attached to the inner wall of the cleaning hole 3, an -th fixing assembly 5 for fixing the sealing bottom plate 4 is arranged between the sealing bottom plate 4 and the inclined plate 2, the -th fixing assembly 5 comprises two -th fixing rings 501 respectively welded to the bottom wall of the sealing bottom plate 4 and the bottom wall of the inclined plate 2, and a -th plug 502 inserted in the -th fixing ring 501, and after the -th plug 502 is pulled out from the -th fixing ring 501, the sealing bottom plate 4 and the inner wall of the cleaning hole 3 can slide with each other.
Referring to fig. 3 and 4, rectangular guide pieces 13 are welded to two sides of the sealing bottom plate 4 close to the guide slide ways 14 and face the guide slide ways 14, the guide pieces 13 are connected with the guide slide ways 14 in a sliding mode, two blocking side plates 9 are arranged on opposite sides of the guide pieces 13, the two blocking side plates 9 are respectively welded to the two guide pieces 13, and the blocking side plates 9 are perpendicular to the sealing bottom plate 4.
The side of the sealing bottom plate 4 close to the blocking side plate 9 is provided with a blocking plate 6, the blocking plate 6 is positioned at the lower end of the sealing bottom plate 4, the blocking plate 6 and the two blocking side plates 9 are distributed in an H shape, building garbage falls to the blocking plate 6 and then can be blocked by the blocking plate 6 and is accumulated between the blocking side plates 9 and the blocking plate 6, the blocking plate 6 is hinged with the sealing bottom plate 4, a fixing part 12 for fixing the blocking plate 6 is arranged between the blocking plate 6 and the sealing plate, the fixing part 12 of the embodiment is a cylindrical bolt, the bolt vertically penetrates through the two blocking side plates 9 and is in sliding connection with the two blocking side plates, the blocking plate 6 is abutted against the peripheral side walls of the bolt, after the bolt is taken out, the blocking plate 6 can automatically turn over and generate an opening, and the.
The barrier plate 6 is provided with a plurality of water leakage holes 11, and the washing water can leak from the water leakage holes 11.
The side of the blocking plate 6 far away from the sealing bottom plate 4 is provided with a rectangular top plate 8, the area of the top plate 8 is larger than the area of the cleaning holes 3 (refer to fig. 2), the side of the top plate 8 near the sealing bottom plate 4 is welded and fixed with the blocking side plate 9 and the guide piece 13, when the sealing bottom plate 4 and the blocking plate 6 slide towards the outside of the cleaning holes 3 (refer to fig. 3), the sealing bottom plate 4 and the blocking plate 6 can not be completely separated from the cleaning holes 3 (refer to fig. 3), and the sealing bottom plate 4 and the blocking plate 6 do not need to be aligned with the cleaning holes 3 again.
Referring to fig. 1 and 2, a th embedding groove 15 corresponding to the shape and size of the top plate 8 is formed in the side of the inclined plate 2 close to the top plate 8, the top plate 8 is slid into the th embedding groove 15, the top wall of the top plate 8 and the top wall of the inclined plate 2 are located on the same plane, concrete pouring is facilitated, and subsequent repairing work is omitted.
Referring to fig. 5, the blocking side plate 9, the blocking plate 6, the sealing bottom plate 4, and the top plate 8 enclose a placing groove 10 having an opening and the opening thereof is inclined upward. Standing groove 10 can play the effect of storing building rubbish, and the staff only need with standing groove 10 from drawing the hole 3 (refer to fig. 3) and the gliding play can clear up building rubbish.
Referring to fig. 1 and 5, the inclined plate 2 is symmetrically provided with guide plates 7 at the opening of the placing groove 10 for guiding construction waste to the blocking plate 6, the two guide plates 7 are distributed in an inverted splay shape, the side of the two guide plates 7 close to the placing groove 10 is attached to the opening edge of the placing groove 10, the side of the guide plate 7 close to the inclined plate 2 penetrates through the inclined plate 2 and is connected with the inclined plate 2 in a sliding manner, and a second fixing assembly 16 for fixing the guide plates 7 is arranged between the inclined plate 2 and the guide plate 7.
Referring to fig. 3, the second fixing unit 16 includes two second fixing rings 1601 welded to the bottom wall of the inclined plate 2, and second latches 1602 inserted into the two second fixing rings 1601 and the guide plate 7, wherein the two second fixing rings 1601 are respectively located at both sides of the guide plate 7, and after the -th latch 502 is pulled out from the -th fixing ring 501, the sealing bottom plate 4 and the inclined plate 2 can slide with each other.
Referring to fig. 2, the top plate 17 is welded to the top of the guide plate 7, a second embedding groove 18 which is formed by the shape of the top plate 17 is formed in the side, close to the top plate 17, of the inclined plate 2, after construction waste is cleared, the top plate 17 slides into the second embedding groove 18, at the moment, the top wall of the top plate 17 and the top wall of the inclined plate 2 are located on the same plane, concrete pouring is facilitated, and subsequent repairing work is omitted.
The utility model discloses an operating process and beneficial effect are as follows with the water flush building rubbish before pouring, water can leak out in the hole 11 that leaks afterwards, and building rubbish can roll along with deflector 7 and fall to the standing groove 10 in, pull out bolt 502 afterwards, draw out standing groove 10 and can follow clearly downthehole 3 and slide down, because roof 8 can block in gomphosis groove 15 this moment, standing groove 10 can not drop from clearly drawing out hole 3 completely, extract mounting 12 afterwards, shake standing groove 10, building rubbish can roll out standing groove 10 from 6 departments of barrier plate.
After the construction waste is completely cleaned, the fixing member 12 is inserted, the second pin 1602 is pulled out, and the guide piece 13 slides downwards until the top plate 17 is clamped in the second embedding groove 18. At this time, concrete can be poured.
In this process, construction waste is blockked by the blockade board 6 and is piled up in standing groove 10, can not continue to roll to keeping away from to clearly draw hole 3 for construction waste can be cleared up completely, guarantees construction quality.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (8)

  1. The stair template with clearly draw mouth of kind, including vertical board (1) and hang plate (2) of reciprocal anchorage, hang plate (2) have been seted up clearly and have been drawn hole (3), its characterized in that, it is connected with sealing bottom plate (4) with hang plate (2) place plane coincidence clearly to draw hole (3) internal sliding, be provided with between sealing bottom plate (4) and hang plate (2) fixed component (5) that are used for fixed sealing bottom plate (4), the lower end of sealing bottom plate (4) upper surface is provided with barrier plate (6), hang plate (2) are located clearly and draw hole (3) week side symmetry and are provided with deflector (7) that are used for leading building rubbish to barrier plate (6).
  2. 2. stair template with clearing hole according to claim 1, wherein the side of the blocking plate (6) away from the sealing bottom plate (4) is provided with a top plate (8), the area of the top plate (8) is larger than that of the clearing hole (3).
  3. 3. stair template with clearing hole according to claim 2, wherein the sealing bottom plate (4) is symmetrically provided with a blocking side plate (9) at two ends of the guiding plate (7), the blocking side plate (9), the blocking plate (6), the sealing bottom plate (4) and the top plate (8) enclose a placing groove (10) with an opening.
  4. 4. stair template with clearing hole according to claim 3, wherein the blocking plate (6) is opened with a plurality of water leakage holes (11).
  5. 5. stair template with clearing hole according to claim 3, wherein the blocking plate (6) is hinged with the sealing bottom plate (4), and a fixing piece (12) for fixing the blocking plate (6) is arranged between the blocking plate (6) and the sealing bottom plate (4).
  6. 6. stair template with clearing hole according to claim 3, wherein the top plate (8) is located on the side opposite to the blocking side plate (9) and provided with a rectangular guide piece (13) towards the sealing bottom plate (4), and the inclined plate (2) is located on the inner wall of the clearing hole (3) and provided with a guide slide way (14) for the guide piece (13) to slide.
  7. 7. stair template with clearing hole according to claim 3, wherein the inclined plate (2) is provided with a engagement groove (15) close to side of the top plate (8) and corresponding to shape of the top plate (8).
  8. 8. stair template with clearing opening according to claim 1, wherein the guiding plate (7) is connected with the inclined plate (2) in a sliding way, a second fixing component (16) for fixing the guiding plate (7) is arranged between the inclined plate (2) and the guiding plate (7), a top plate (17) is arranged on the top of the guiding plate (7), and a second embedding groove (18) with the shape of the top plate (17) is arranged on the side of the inclined plate (2) close to the top plate (17).
CN201920765753.XU 2019-05-25 2019-05-25 stair template with cleaning opening Active CN210002885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920765753.XU CN210002885U (en) 2019-05-25 2019-05-25 stair template with cleaning opening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920765753.XU CN210002885U (en) 2019-05-25 2019-05-25 stair template with cleaning opening

Publications (1)

Publication Number Publication Date
CN210002885U true CN210002885U (en) 2020-01-31

Family

ID=69308039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920765753.XU Active CN210002885U (en) 2019-05-25 2019-05-25 stair template with cleaning opening

Country Status (1)

Country Link
CN (1) CN210002885U (en)

Similar Documents

Publication Publication Date Title
CN205677249U (en) A kind of casting concrete constructional column hopper
CN210002885U (en) stair template with cleaning opening
CN214786016U (en) Outer wall hole plugging device
CN214424038U (en) Constructional column pouring device is built in room
CN207277835U (en) A kind of masonry constructional column pours mouth template
CN210164233U (en) Constructional column pouring tool
CN205857707U (en) Stair step constructing device
CN209891379U (en) House building convenient to dismantle
CN210289130U (en) Wall opening formwork supporting tool
CN209478473U (en) A kind of distribution box reserved-hole die
CN106481082A (en) A kind of improvement casting method of constructional column
CN209791622U (en) Abandonment building is demolishd and is used reinforcing bar recovery unit
CN113638430A (en) Sediment and accumulated water discharging device for post-cast strip of bottom plate of underground chamber
CN207686287U (en) Doorframe steel bar piece
CN207538650U (en) Doorframe top firmware
CN219931623U (en) Non-picking chiseling dustpan pouring device suitable for post-pouring concrete
CN207130780U (en) A kind of inspection shaft
CN205777512U (en) Encorbelment I-steel embedded box die device
CN221276775U (en) Prefabricated two-sided drainage device of integration
CN214006042U (en) Vertical post-cast strip antiseep plugging device
CN106393405B (en) Make the mold of diaphragm wall and the method with the Mold Making diaphragm wall
CN214605068U (en) Agitated vessel is used in grout production
CN208918419U (en) Building site safety barrier capable of being turned and opened
CN211949717U (en) Elevator shaft protection device
CN117468705B (en) Concrete aerated block masonry auxiliary tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 363107 Hongjian village, jiaomei Town, Taiwan investment zone, Zhangzhou City, Fujian Province

Patentee after: Fujian Zhuchuang aluminum mould technology Co.,Ltd.

Address before: 363107 Hongjian village, jiaomei Town, Taiwan investment zone, Zhangzhou City, Fujian Province

Patentee before: Zhangzhou Zhuchuang Aluminum Mold Technology Co.,Ltd.