CN209958910U - Novel construction rail guard - Google Patents

Novel construction rail guard Download PDF

Info

Publication number
CN209958910U
CN209958910U CN201920703573.9U CN201920703573U CN209958910U CN 209958910 U CN209958910 U CN 209958910U CN 201920703573 U CN201920703573 U CN 201920703573U CN 209958910 U CN209958910 U CN 209958910U
Authority
CN
China
Prior art keywords
horizontal pole
cross rod
novel construction
rod
universal joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920703573.9U
Other languages
Chinese (zh)
Inventor
李慧星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jingfeng Construction Standardization Engineering Co Ltd
Original Assignee
Hunan Jingfeng Construction Standardization Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Jingfeng Construction Standardization Engineering Co Ltd filed Critical Hunan Jingfeng Construction Standardization Engineering Co Ltd
Priority to CN201920703573.9U priority Critical patent/CN209958910U/en
Application granted granted Critical
Publication of CN209958910U publication Critical patent/CN209958910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a novel construction rail guard relates to architectural equipment's technical field, has solved the heavy problem of user rail guard when transportation construction rail guard. Construction rail guard includes the dead lever, the spacing subassembly that cup joints with the dead lever, the slider, with slider fixed connection's fixed column, rotate the universal joint of being connected with the fixed column, the protection horizontal pole includes horizontal pole one, horizontal pole two, horizontal pole three, the horizontal pole cup joints in horizontal pole two, horizontal pole cup joints in horizontal pole three, and the both ends of horizontal pole three joint respectively in the universal joint, the user is when transporting the rail guard, open universal joint and horizontal pole three, the buckle joint in an organic whole that will protect the horizontal pole and shrink in proper order through the three outer walls of horizontal pole, can dismantle dead lever and protection horizontal pole separately, carry respectively. The utility model discloses have the effect that the construction rail guard simply carried in the transportation.

Description

Novel construction rail guard
Technical Field
The utility model belongs to the technical field of the technique of architectural equipment and specifically relates to a novel construction rail guard is related to.
Background
The construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and can also be said to be the process of changing various lines on the design drawing into a real object in a designated place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
The guard rail is usually made of steel, such as: stainless steel, round steel pipe, square steel pipe or profiled steel sheet. In order to prevent an extraneous person from entering a dangerous construction site, a guard fence is often provided near a construction site or beside some dangerous construction equipment.
When a user arranges the guard rail on a construction site, the guard rail is too heavy, a plurality of people are required to assist in the carrying process to smoothly install the guard rail during construction, and the guard rail is more troublesome to arrange in a turning position due to the heavy guard rail at the position where the user needs to turn. The existing guard rail cannot be flexibly installed, is inconvenient to detach and transport, and has an improved space.
SUMMERY OF THE UTILITY MODEL
Install to the unable nimble of current rail guard, the technical problem of be not convenient for dismantle simultaneously and transportation, the utility model aims at providing a novel construction rail guard convenient to dismantle the transportation.
The above utility model discloses an above-mentioned utility model aims at a novel construction rail guard that can realize through following technical scheme, including dead lever, slider, with slider fixed connection's fixed column, rotate the universal joint of being connected, the protection horizontal pole with the fixed column the protection horizontal pole includes horizontal pole one, horizontal pole two, horizontal pole three, its characterized in that: the fixed rod is sleeved with a limiting assembly, the cross rod is sleeved on the second cross rod, the cross rod is sleeved on the third cross rod, and two ends of the third cross rod are respectively clamped on the universal joints.
Through adopting above-mentioned technical scheme, the horizontal pole cup joints in horizontal pole two, and horizontal pole cup joints in horizontal pole three, and like this, horizontal pole one and horizontal pole two can stretch out and draw back in horizontal pole three, can open when needs, have made things convenient for the storage and the transport of protection horizontal pole. The universal joints are connected to the two ends of the third transverse rod in a clamped mode, when the construction protective guard is installed, the three ends of the transverse rod can be connected with the universal joints in a clamped mode to complete installation of the protective transverse rod, the third transverse rod can be opened in the clamped mode with the universal joints when being carried, the protective transverse rod is taken down, convenience is brought to a user to carry, the universal joints are arranged at the two ends of the third protective transverse rod, and the protective transverse rod can be moved to a specified angle according to the requirements of the terrain to complete installation of the construction protective guard.
The utility model discloses further set up to: the third cross rod comprises a buckle, a fixed block and a fixture block, the fixed block is fixedly connected to the outer wall of the three opening directions of the cross rod, the fixture block is fixedly connected to the outer wall of the other opening direction of the three cross rod, the buckle is hinged to the fixed block, and the buckle is connected with the fixture block in a clamped mode.
Through adopting above-mentioned technical scheme, the fixedly connected with buckle of opening outer wall department of horizontal pole three is in order to protect the horizontal pole block through buckle and fixture block when horizontal pole one and horizontal pole two stretch out and draw back in horizontal pole three, and horizontal pole one and horizontal pole two in avoiding the horizontal pole three drop injures the user by a crashing object, and sets up the buckle and can reduce the wearing and tearing that horizontal pole one and horizontal pole two produced in exposing the air effectively.
The utility model discloses further set up to: the limiting assembly comprises a limiting sleeve sleeved on the fixed rod, a threaded hole formed in one side of the limiting sleeve, and a fastening screw penetrating through the threaded hole and abutted against the fixed rod to achieve positioning.
Through adopting above-mentioned technical scheme, spacing subassembly cup joints on the dead lever, and the user removes the protection horizontal pole to the position that needs are fixed through removing the slider, removes the stop collar to the slider lower extreme, is fixed in the dead lever with the stop collar through the cooperation of fastening screw and screw hole on, accomplishes the location action of protection horizontal pole, can remove the guard horizontal pole according to the demand in place effectively and highly reach the guard action of construction rail guard.
The utility model discloses further set up to: the fixed rod is provided with a groove along the height direction of the fixed rod, and the sliding block is connected with the groove in a sliding mode.
Through adopting above-mentioned technical scheme, the dead lever sets up the recess along its direction of height, is provided with the slider of sliding connection recess in the recess, can carry out the location of direction of height to the protection horizontal pole effectively, will protect the horizontal pole and remove appointed height according to the demand in place, accomplishes the location action of protection horizontal pole, and the slider is used for connecting the protection horizontal pole, can accomplish being connected between protection horizontal pole and the dead lever, is convenient for construct and the installation of rail guard.
The utility model discloses further set up to: the handle is arranged on the outer wall of the cross rod, and the handle is fixedly connected to the outer wall of the cross rod.
Through adopting above-mentioned technical scheme, the three outer walls of horizontal pole are provided with the handle and are in the horizontal pole three for the convenience of user's shrink protection horizontal pole, and the user can open the expansion of protection horizontal pole through the convenient completion of handle when the protection horizontal pole is opened in the installation.
The utility model discloses further set up to: the fixed column towards the one end of dead lever with slider fixed connection, the fixed column towards the one end of horizontal pole three with the universal joint rotates to be connected.
Through adopting above-mentioned technical scheme, fixed column link block and universal joint can remove the protection horizontal pole appointed position effectively, and the installation fixed column can make things convenient for being connected between universal joint and the slider, with setting up between universal joint and the fixed column and rotate and be connected the universal joint and can rotate the universal joint according to the demand of protection horizontal pole position and remove the installation of appointed orientation completion protection horizontal pole.
The utility model discloses further set up to: one end of the universal joint facing the fixed rod is rotatably connected with the fixed column, and one end of the universal joint facing the cross rod III is connected with the cross rod III in a clamped mode.
Through adopting above-mentioned technical scheme, the universal joint left end rotates with the fixed column to be connected, can be according to the demand in place, rotate the universal joint to the installation of appointed orientation completion protection horizontal pole, the right-hand member and the three joint of horizontal pole of universal joint, be for when the protection horizontal pole is dismantled to needs, through the dismantlement work of opening the joint completion protection horizontal pole between universal joint and the horizontal pole three, the transport of convenient construction rail guard and the space that the reduction rail guard took in the transportation, the problem that the rail guard is heavy in handling has been improved effectively.
The utility model discloses further set up to: and one end of the fixed rod, which faces the ground, is fixedly connected with a fixed disk.
By adopting the technical scheme, the fixed disc is arranged at one end, facing the ground, of the fixed bar, so that the whole construction protective guard is fixed after the height position of the protective cross bar is limited, and the protective guard can be effectively and stably fixed on the ground through the fixed connection of the fixed disc and the ground, so that the protective guard can better play a protective role.
To sum up, the utility model discloses a beneficial technological effect does:
1. the user can disassemble the protective cross bar for simple transportation in the process of transporting the protective fence;
2. the user can move the guard rail to the required direction through the universal joint during the installation process to install the guard rail.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a front view of the utility model.
FIG. 3 is a sectional view taken along the direction B.
Fig. 4 is an enlarged schematic view at a in fig. 1.
In the figure, 1, fixing the rod; 2. a first cross bar; 3. a second cross bar; 4. a cross bar III; 5. a protective cross bar; 6. a universal joint; 7. buckling; 8. a fixed block; 9. a clamping block; 10. a handle; 11. fixing the disc; 12. fastening screws; 13. a threaded hole; 14. a limiting sleeve; 15. a limiting component; 16. a slider; 17. fixing a column; 18. and (4) a groove.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, fig. 2, fig. 4, for the utility model discloses a novel construction protective guard, including dead lever 1, with dead lever 1 cup joint spacing subassembly 15, slider 16, with slider 16 fixed connection's fixed column 17, with fixed column 17 rotate the universal joint 6 of being connected, protection horizontal pole 5, and protection horizontal pole 5 includes horizontal pole one 2, horizontal pole two 3, horizontal pole three 4. The fixing rod 1 is a fixing base of the protective cross rod 5, the shape of the fixing rod can be cylindrical, square and the like, and the material of the fixing rod is preferably a metal material. The cross rod I2 is sleeved in the cross rod II 3, the shape of the cross rod I can be a cylinder, a square column or other polygonal columns, and the material of the cross rod I is preferably a metal material. The second cross rod 3 is sleeved in the third cross rod 4 and can be cylindrical, square cylindrical or other polygonal cylinders, the shape of the second cross rod 3 is consistent with that of the first cross rod 2, the first cross rod 2 is conveniently sleeved in the second cross rod 3, and the second cross rod 3 is preferably made of metal materials. The third cross rod 4 is clamped with the universal joint 6, two ends of the third cross rod 4, which are close to the universal joint 6, are solid bodies, the shapes of the two ends can be cylindrical, square cylindrical or other polygonal cylindrical shapes, the shapes of the two ends are consistent with those of the second cross rod 3, and the material of the third cross rod 4 is preferably a metal material. The number of the protective cross bars 5 is at least two. The outer wall of the cross rod three 4 is provided with a handle 10 which is fixedly connected with the outer wall of the cross rod three 4, the shape of the handle can be a square ring, and the like, and the material of the handle 10 is preferably a metal material. The outer wall of the opening end of the cross rod III 4 is provided with a clamping block 9, a fixing block 8 and a clamping buckle 7, the clamping buckle 7 is annular, the material of the clamping buckle is preferably metal material, and the number of the clamping buckle 7 is at least two. The shape of the fixing block 8 may be square, and the like, and the material of the fixing block 8 is preferably a metal material. The shape of the latch 9 can be square, and the material thereof is preferably a metal material, and the number of the latches 9 is the same as that of the latches.
Referring to fig. 2 and 3, the utility model discloses a novel construction rail guard, 6 one end of universal joint and fixed column 17 rotate to be connected, the other end and three 4 joints of horizontal pole, and the material of universal joint 6 is preferred metallic material, and fixed column 17 one end rotates with universal joint 6 to be connected, other end and 16 fixed connection of slider, and the preferred cylinder of shape of fixed column 17, the preferred metallic material of fixed column 17. One end of the sliding block 16 facing the protective cross bar 5 is fixedly connected with the fixed column 17, one end of the sliding block 16 facing the fixed bar 1 is slidably connected with the groove 18, the shape of the sliding block 16 can be round, square and the like, and the material of the sliding block is preferably a metal material. The groove 18 is disposed along the height of the fixing post 17, and is preferably shaped like a half-i, or other shape capable of accommodating the slider 16, so that the slider 16 can slide in the groove 18. The fixed plate 11 is disposed at the bottom end of the fixed column 17, the guard rail is fixedly connected with the ground through the fixed plate 11, the shape of the fixed plate 11 can be round, square or the like, and the fixed plate 11 is preferably made of a metal material. The limiting assembly 15 comprises a limiting sleeve 14 and a fastening screw 12, the limiting sleeve 14 is sleeved on the outer wall of the fixing rod 1 and can move on the fixing rod 1, and the limiting sleeve 14 is fixed at the bottom end of the protective cross rod 5 through the threaded connection of the fastening screw 12 and a threaded hole 13 in the limiting sleeve 14. The stop collar 14 is preferably circular in shape and the material thereof is preferably a metallic material. The fastening screw 12 is cylindrical in shape, and the material of the fastening screw 12 is preferably a metal material. Two or more sets of limiting assemblies 15 are required.
The implementation principle of the embodiment is as follows:
and (3) a transportation process: the user is when the construction rail guard needs to be removed, opens horizontal pole three 4 and universal joint 6, through horizontal pole two 3 shrink horizontal pole one 2, through horizontal pole three 4 shrink horizontal pole two 3, buckles buckle 7 with horizontal pole three 4 opening outer wall department, accomplishes the shrink work of protection horizontal pole 5, opens fixed disk 11 with dead lever 1 bottom, accomplishes the dismantlement action of rail guard promptly, carries dead lever 1 and protection horizontal pole 5 assigned position.
The installation process comprises the following steps: the user is when needs installation rail guard, opens buckle 7 of horizontal pole three 4, stretches out protection horizontal pole 5 to appointed length through horizontal pole two 3 and horizontal pole three 4, and horizontal pole three 4 and the universal joint 6 joint at both ends remove dead lever 1 to suitable position, through fixed disk 11 with dead lever 1 fixed connection subaerial, pass through the rotation between universal joint 6 and the fixed column 17 according to the needs in position and remove protection horizontal pole 5 to the installation action of appointed orientation completion rail guard.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a novel construction rail guard, includes dead lever (1), slider (16), with slider (16) fixed connection's fixed column (17), rotate universal joint (6), protection horizontal pole (5) of being connected with fixed column (17), protection horizontal pole (5) include horizontal pole one (2), horizontal pole two (3), horizontal pole three (4), its characterized in that: the fixed rod (1) is sleeved with a limiting assembly (15), the first cross rod (2) is sleeved on the second cross rod (3), the second cross rod (3) is sleeved in the third cross rod (4), and two ends of the third cross rod (4) are respectively clamped on the universal joints (6).
2. The novel construction protective guard of claim 1, wherein: horizontal pole three (4) are including buckle (7), fixed block (8), fixture block (9), fixedly connected with on the outer wall of horizontal pole three (4) opening direction fixed block (8), fixedly connected with fixture block (9) on the outer wall of horizontal pole three (4) another opening direction, buckle (7) with fixed block (8) are articulated, just buckle (7) with fixture block (9) joint.
3. The novel construction protective guard of claim 1, wherein: the limiting component (15) comprises a limiting sleeve (14) sleeved on the fixing rod (1), a threaded hole (13) formed in one side of the limiting sleeve (14), and a fastening screw (12) penetrating through the threaded hole (13) and abutted against the fixing rod (1) to achieve positioning.
4. The novel construction protective guard of claim 1, wherein: the fixing rod (1) is provided with a groove (18) along the height direction, and the sliding block (16) is in sliding connection with the groove (18).
5. The novel construction protective guard of claim 1, wherein: the outer wall of the third cross rod (4) is provided with a handle (10), and the handle (10) is fixedly connected to the outer wall of the third cross rod (4).
6. The novel construction protective guard of claim 1, wherein: one end, facing the fixing rod (1), of the fixing column (17) is fixedly connected with the sliding block (16), and one end, facing the cross rod III (4), of the fixing column (17) is rotatably connected with the universal joint (6).
7. The novel construction protective guard of claim 1, wherein: one end of the universal joint (6) facing the fixing rod (1) is rotatably connected with the fixing column (17), and one end of the universal joint (6) facing the cross rod III (4) is clamped with the cross rod III (4).
8. The novel construction protective guard of claim 1, wherein: one end of the fixing rod (1) facing the ground is fixedly connected with a fixing disc (11).
CN201920703573.9U 2019-05-15 2019-05-15 Novel construction rail guard Expired - Fee Related CN209958910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920703573.9U CN209958910U (en) 2019-05-15 2019-05-15 Novel construction rail guard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920703573.9U CN209958910U (en) 2019-05-15 2019-05-15 Novel construction rail guard

Publications (1)

Publication Number Publication Date
CN209958910U true CN209958910U (en) 2020-01-17

Family

ID=69246089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920703573.9U Expired - Fee Related CN209958910U (en) 2019-05-15 2019-05-15 Novel construction rail guard

Country Status (1)

Country Link
CN (1) CN209958910U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481877A (en) * 2022-01-25 2022-05-13 同济大学 Freely-telescopic bridge windbreak structure with limiting function
CN115095226A (en) * 2022-06-05 2022-09-23 中建八局第三建设有限公司 Light high and large enclosure and erection method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114481877A (en) * 2022-01-25 2022-05-13 同济大学 Freely-telescopic bridge windbreak structure with limiting function
CN115095226A (en) * 2022-06-05 2022-09-23 中建八局第三建设有限公司 Light high and large enclosure and erection method
CN115095226B (en) * 2022-06-05 2023-11-14 中建八局第三建设有限公司 Light high-large fence and erection method

Similar Documents

Publication Publication Date Title
CN209958910U (en) Novel construction rail guard
CN210460066U (en) Liftable and rotatable building strutting arrangement
CN205476545U (en) Multipurpose combined strength construction ground protection shed structure support frame
CN214423940U (en) Node instrument formula operation platform
CN203783170U (en) Detachable protective shed
CN204804371U (en) But regularization switching formula is faced limit entrance to a cave and is prevented guardrail bar
CN205857565U (en) The column mounting seat on stair provisional protection hurdle and mounting structure thereof
CN204001802U (en) A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
CN206418861U (en) A kind of switch base for facing skirt shield and multiduty skirt of facing are protected
CN216587822U (en) Portable face limit protector
CN212316694U (en) Support for bridge construction
CN213417851U (en) Interim protector of foundation ditch for construction site operation
CN211736369U (en) Entrance to a cave protection location reinforcing apparatus
CN211521313U (en) Can have enough to meet need formula construction elevator protector
CN210316507U (en) Novel scaffold for building construction
CN211736646U (en) Telescopic windproof combined enclosure
CN203308339U (en) Finalized protective door of elevator shaft opening
CN218324024U (en) Steel pipe faces limit protection combination external member
CN112211384A (en) Scaffold for building site
CN219931846U (en) Building protection device for building engineering management
CN109083406B (en) Multi-dimensional adjustable movable formwork support frame
CN209817588U (en) Elevator shaft doorway protective fence
CN206158343U (en) Modular protection rail
CN213742193U (en) Support for house building engineering
CN213774491U (en) Single-layer industrial factory building cast-in-place concrete double-limb-column-hole internal mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200117