CN209958561U - Crack structure is prevented to building wall - Google Patents
Crack structure is prevented to building wall Download PDFInfo
- Publication number
- CN209958561U CN209958561U CN201920693062.3U CN201920693062U CN209958561U CN 209958561 U CN209958561 U CN 209958561U CN 201920693062 U CN201920693062 U CN 201920693062U CN 209958561 U CN209958561 U CN 209958561U
- Authority
- CN
- China
- Prior art keywords
- wall body
- wall
- groove
- close
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model belongs to building wall field, especially, crack structure is prevented to building wall is not convenient for prevent cracked problem between first wall body and the second wall body to current building wall, the scheme is as follows now put forward, and it includes first wall body and the second wall body that is located first wall body one side, one side that first wall body and second wall body are close to each other all is connected with buddha's warrior attendant net, and one side fixed mounting that first wall body is close to the second wall body has the boss, and one side that the second wall body is close to first wall body is seted up flutedly, and the boss run through corresponding buddha's warrior attendant net and with recess looks adaptation, and first groove has been seted up to the bottom of second wall body, rotates on the top inner wall of first groove and installs the lead screw. The utility model relates to a rationally, when painting cement mortar between first wall body and second wall body, through two close contact's buddha's warrior attendant nets, increase the anti ability of splitting between first wall body and the second wall body.
Description
Technical Field
The utility model relates to a building wall structure technical field especially relates to a crack structure is prevented to building wall.
Background
The types of building walls are various, the assembly wall is one of the building walls, and the assembly wall is a green building material which conforms to the national development, so that the aims of saving energy consumption, reducing dust, reducing cost, accelerating construction progress, reducing labor and improving wall quality are fulfilled. The whole wall adopts a high-strength glass magnesium flat plate as a panel, a light steel keel as a framework and a wall core is molded by casting light, non-toxic and flame-retardant materials, so that the flatness of the wall surface is ensured, the integrity, the sound insulation and the shock strength of the wall body are improved, the development trend of the wall body material is completely met, and the characteristics of light weight, energy conservation and environmental protection are particularly highlighted.
When the existing assembly type wall body is assembled, the first wall body and the second wall body are connected through cement mortar smearing, cracks are easily generated between the first wall body and the second wall body, and the problem that the cracks between the first wall body and the second wall body are not convenient to prevent is solved.
Disclosure of Invention
The utility model aims at solving the problem that the crack is prevented to being convenient for between first wall body and the second wall body in the prior art, and the crack structure is prevented to the building wall body that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a crack-proof structure of a building wall comprises a first wall body and a second wall body positioned on one side of the first wall body, wherein one side, close to each other, of the first wall body and one side, close to the second wall body, of the second wall body are both connected with a diamond mesh, a boss is fixedly installed on one side, close to the second wall body, of the first wall body, a groove is formed in one side, close to the first wall body, of the second wall body, the boss penetrates through the corresponding diamond mesh and is matched with the groove, a first groove is formed in the bottom of the second wall body, a lead screw is rotatably installed on the inner wall of the top of the first groove, two external threads with opposite rotation are arranged on the lead screw, two second grooves which are symmetrically arranged are formed in the inner wall of one side of the first groove, the same stabilizer bars are fixedly installed on the inner walls of the top and the bottom of the second groove, a transverse plate is slidably installed, the equal fixed mounting in one side that two diaphragms are close to each other has the depression bar, the chute has all been seted up to the top and the bottom of boss, and depression bar and the chute looks adaptation that corresponds, the spread groove that two symmetries set up is seted up to one side of second wall body, slidable mounting has the clamp plate in the spread groove, one side fixed mounting of clamp plate has the one end of connecting rod, the other end of connecting rod extends to the second inslot and fixed mounting has three hornblocks, and three hornblocks slidable mounting are in the second inslot, and the diaphragm contacts with the three hornblocks that correspond, the bottom of lead screw extends to the below and the fixed mounting of second wall body has.
Preferably, the rotating handle is provided with a screw hole, a screw is installed in the screw hole through threads, the bottom of the second wall body is provided with a plurality of clamping grooves, the screw is matched with the corresponding clamping groove, and the rotating handle is convenient to fix and remove fixation through the matching of the clamping groove and the screw.
Preferably, the screw rod is fixedly sleeved with a bearing, an outer ring of the bearing is fixedly mounted on the inner wall of the first groove, and the screw rod is enabled to rotate stably through the bearing.
Preferably, the quantity of draw-in groove is ten to fourteen, and ten to fourteen draw-in grooves are the equidistant setting of annular, through the setting of a plurality of draw-in grooves for rotating the twist grip of different positions, all have draw-in groove and screw to cooperate.
Preferably, a round hole is formed in the inner wall of one side, away from the opening, of the second groove, the connecting rod is connected with the round hole in a sliding mode, and the connecting rod is enabled to move left and right stably through the round hole.
In the utility model, the crack-proof structure of the building wall body is matched with the first wall body, the second wall body, the diamond net, the groove and the boss, when the first wall body and the second wall body are assembled, the boss is placed in the groove, so that the two diamond nets are contacted;
through the lead screw, the second groove, the stabilizer bar, the diaphragm, the screw hole, the depression bar, the chute, the spread groove, the clamp plate, the connecting rod, three hornblocks, twist grip, the draw-in groove, screw hole and screw cooperate, twist grip rotates twist grip, twist grip drives the lead screw and rotates, the lead screw drives two diaphragms and removes to the one side that is close to each other, the diaphragm drives the depression bar and removes, make the depression bar card go into the chute, rotate twist grip, under the effect of chute, depression bar extrusion boss removes to the one side that is close to the second wall body, make two buddha's warrior attendant net in close contact with, the removal extrusion three hornblocks of diaphragm, make the three hornblocks remove, the three hornblocks drive the connecting rod and remove, the connecting rod drives the clamp plate and removes, make the clamp plate.
The utility model relates to a rationally, when painting cement mortar between first wall body and second wall body, through two close contact's buddha's warrior attendant nets, increase the anti ability of splitting between first wall body and the second wall body.
Drawings
Fig. 1 is a schematic structural view of a crack-proof structure of a building wall body provided by the utility model;
FIG. 2 is a schematic structural view of part A of an anti-crack structure of a building wall according to the present invention;
fig. 3 is the utility model provides a B part schematic structure of crack structure is prevented to building wall.
In the figure: the steel wire rope comprises a first wall body 1, a second wall body 2, a diamond mesh 3, a groove 4, a boss 5, a first groove 6, a lead screw 7, a second groove 8, a stabilizer bar 9, a transverse plate 10, a threaded hole 11, a compression bar 12, a chute 13, a connecting groove 14, a pressure plate 15, a connecting rod 16, a triangular block 17, a rotating handle 18, a clamping groove 19, a screw hole 20 and a screw 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a crack-proof structure of a building wall comprises a first wall 1 and a second wall 2 located at one side of the first wall 1, wherein the sides of the first wall 1 and the second wall 2 close to each other are both connected with a diamond mesh 3, a boss 5 is fixedly installed at one side of the first wall 1 close to the second wall 2, a groove 4 is opened at one side of the second wall 2 close to the first wall 1, the boss 5 penetrates through the corresponding diamond mesh 3 and is matched with the groove 4, a first groove 6 is opened at the bottom of the second wall 2, a screw rod 7 is rotatably installed on the inner wall at the top of the first groove 6, two external threads with opposite rotation are arranged on the screw rod 7, two symmetrically arranged second grooves 8 are opened on the inner wall at one side of the first groove 6, the same stabilizer bar 9 is fixedly installed on the inner wall at the top and the inner wall at the bottom of the second groove 8, a transverse plate 10 is slidably installed in, and diaphragm 10 movable sleeve establishes on corresponding stabilizer bar 9, threaded hole 11 has been seted up on diaphragm 10, and lead screw 7 and threaded hole 11 threaded connection, equal fixed mounting in one side that two diaphragms 10 are close to each other has depression bar 12, chute 13 has all been seted up to the top and the bottom of boss 5, and depression bar 12 and the chute 13 looks adaptation that corresponds, two symmetrical spread groove 14 that set up are seted up to one side of second wall body 2, slidable mounting has clamp plate 15 in the spread groove 14, one side fixed mounting of clamp plate 15 has the one end of connecting rod 16, the other end of connecting rod 16 extends to in the second groove 8 and fixed mounting has triangle-shaped block 17, and triangle-shaped block 17 slidable mounting is in the second groove 8, and diaphragm 10 contacts with the triangle-shaped block 17 that corresponds, the bottom of lead screw 7 extends to the below of second wall body 2 and fixed mounting has twist grip.
The utility model discloses in, screw hole 20 has been seted up to twist grip 18, and screw 21 has been installed to screw hole 20 internal thread, and a plurality of draw-in grooves 19 have been seted up to the bottom of second wall body 2, and screw 21 and the draw-in groove 19 looks adaptation that corresponds, through draw-in groove 19 and screw 21's cooperation, the twist grip 18 of being convenient for is fixed and is relieved fixedly.
The utility model discloses in, the fixed cover is equipped with the bearing on the lead screw 7, and the outer lane fixed mounting of bearing makes lead screw 7 carry out stable rotation through the bearing on the inner wall of first groove 6.
The utility model discloses in, the quantity of draw-in groove 19 is ten to fourteen, and ten to fourteen draw-in grooves 19 are equidistant setting of annular, through the setting of a plurality of draw-in grooves 19 for rotating the twist grip 18 of different positions, all have draw-in groove 19 and screw 21 to cooperate.
The utility model discloses in, the round hole has been seted up on second groove 8 keeps away from its open-ended one side inner wall, and connecting rod 16 and round hole sliding connection make connecting rod 16 control the removal steadily through the round hole.
In the utility model, when the first wall body 1 and the second wall body 2 are required to be assembled, the boss 5 is placed in the groove 4, so that the two diamond nets 3 are contacted, the rotating handle 18 is rotated, the rotating handle 18 drives the screw rod 7 to rotate, the screw rod 7 drives the two transverse plates 10 to move towards one side close to each other, the transverse plates 10 drive the press rod 12 to move, so that the press rod 12 is clamped into the chute 13, the rotating handle 18 is rotated, under the action of the chute 13, the press rod 12 extrudes the boss 5 to move towards one side close to the second wall body 2, so that the two diamond nets 3 are in close contact with each other, the moving of the transverse plates 10 extrudes the triangular blocks 17, so that the triangular blocks 17 drive the connecting rod 16 to move, the connecting rod 16 drives the pressing plate 15 to move, so that the pressing plate 15 extrudes the diamond nets 3, so that the two diamond nets 3, finally, the screw 21 is rotated, under the action of the screw hole 20, the screw 21 is rotated and moved at the same time, the screw 21 is clamped into the corresponding clamping groove 19, the rotating handle 18 is fixed, cement mortar is coated between the first wall body 1 and the second wall body 2, and the anti-cracking capacity between the first wall body 1 and the second wall body 2 is improved through the two diamond nets 3 which are in close contact with each other.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. A crack-proof structure of a building wall comprises a first wall body (1) and a second wall body (2) positioned on one side of the first wall body (1), and is characterized in that one side, close to each other, of the first wall body (1) and the second wall body (2) is connected with a diamond net (3), a boss (5) is fixedly installed on one side, close to the second wall body (2), of the first wall body (1), a groove (4) is formed in one side, close to the first wall body (1), of the second wall body (2), the boss (5) penetrates through the corresponding diamond net (3) and is matched with the groove (4), a first groove (6) is formed in the bottom of the second wall body (2), a screw rod (7) is rotatably installed on the inner wall of the top of the first groove (6), two external threads with opposite rotation are arranged on the screw rod (7), two second grooves (8) which are symmetrically arranged are formed in one side of the first groove (6), the top inner wall and the bottom inner wall of the second groove (8) are fixedly provided with the same stabilizer bar (9), the second groove (8) is internally provided with a transverse plate (10) in a sliding manner, the transverse plate (10) is movably sleeved on the corresponding stabilizer bar (9), the transverse plate (10) is provided with a threaded hole (11), the screw rod (7) is in threaded connection with the threaded hole (11), one sides of the two transverse plates (10) close to each other are fixedly provided with a pressure lever (12), the top and the bottom of the boss (5) are both provided with a chute (13), the pressure lever (12) is matched with the corresponding chute (13), one side of the second wall body (2) is provided with two symmetrically arranged connecting grooves (14), the connecting grooves (14) are internally provided with a pressure plate (15) in a sliding manner, one side of the pressure plate (15) is fixedly provided with one end of a connecting rod (16), the other end of the connecting rod (16) extends into, and the triangular blocks (17) are slidably arranged in the second groove (8), the transverse plate (10) is in contact with the corresponding triangular blocks (17), and the bottom end of the screw rod (7) extends to the lower part of the second wall body (2) and is fixedly provided with a rotating handle (18).
2. The building wall crack prevention structure as claimed in claim 1, wherein the rotating handle (18) is provided with a screw hole (20), a screw (21) is internally threaded in the screw hole (20), the bottom of the second wall (2) is provided with a plurality of slots (19), and the screw (21) is matched with the corresponding slot (19).
3. The anti-crack structure for building walls as claimed in claim 1, wherein the screw rod (7) is fixedly sleeved with a bearing, and the outer ring of the bearing is fixedly mounted on the inner wall of the first groove (6).
4. The crack prevention structure for building walls as claimed in claim 2, wherein the number of the clamping grooves (19) is ten to fourteen, and ten to fourteen clamping grooves (19) are annularly arranged at equal intervals.
5. The anti-crack structure of a building wall as claimed in claim 1, wherein a circular hole is formed on an inner wall of the second groove (8) at a side away from the opening thereof, and the connecting rod (16) is slidably connected with the circular hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920693062.3U CN209958561U (en) | 2019-05-15 | 2019-05-15 | Crack structure is prevented to building wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920693062.3U CN209958561U (en) | 2019-05-15 | 2019-05-15 | Crack structure is prevented to building wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209958561U true CN209958561U (en) | 2020-01-17 |
Family
ID=69245580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920693062.3U Active CN209958561U (en) | 2019-05-15 | 2019-05-15 | Crack structure is prevented to building wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209958561U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112252485A (en) * | 2020-10-22 | 2021-01-22 | 闫锋 | Anti-cracking prestressed precast concrete member |
CN114382201A (en) * | 2022-02-22 | 2022-04-22 | 华工匠建筑装配工程(深圳)有限公司 | Integrated detachable assembled T-shaped die wall and installation method |
-
2019
- 2019-05-15 CN CN201920693062.3U patent/CN209958561U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112252485A (en) * | 2020-10-22 | 2021-01-22 | 闫锋 | Anti-cracking prestressed precast concrete member |
CN114382201A (en) * | 2022-02-22 | 2022-04-22 | 华工匠建筑装配工程(深圳)有限公司 | Integrated detachable assembled T-shaped die wall and installation method |
CN114382201B (en) * | 2022-02-22 | 2023-11-24 | 新疆紫欣成业工程建设有限责任公司 | Integrated detachable assembled T-shaped formwork wall and mounting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209958561U (en) | Crack structure is prevented to building wall | |
CN208202270U (en) | A kind of laminated floor slab for steel buildings | |
CN109357154B (en) | L-shaped edge sealing aluminum profile | |
CN209088471U (en) | A kind of cable connection tackling that waterproof performance is good | |
CN213622842U (en) | Girder steel construction stands up frock | |
CN213112232U (en) | Assembled hoisting device for building | |
CN213348711U (en) | Raw material stirring device for producing light bricks | |
CN208100655U (en) | A kind of timber clamping shaping equipment | |
CN105058560B (en) | A kind of bolt fast-assembling brick-making mould | |
CN112072581A (en) | Pipeline erecting device for assembled wall | |
CN205497752U (en) | Novel shearing seepage flow mould | |
CN216207883U (en) | Sampling device is used in concrete material production | |
CN217925562U (en) | Anti-deformation environment-friendly wooden door | |
CN216638634U (en) | Prefabricated well lifting device of assembled | |
CN213927574U (en) | Keel pre-fixing device for mounting modular suspended ceiling | |
CN204040454U (en) | A kind of zinc steel lumps of wood | |
CN216239373U (en) | High-strength wear-resistant prestressed steel bar | |
CN202787946U (en) | Template for building | |
CN221586782U (en) | Cement block loading and unloading device for constructional engineering | |
CN210522731U (en) | Reinforced concrete module breaker | |
CN211004129U (en) | External wall insulation board plays gallows convenient to unload | |
CN211566280U (en) | High-pressure brick die | |
CN213418237U (en) | Combined type anchoring plate for cement construction | |
CN213390833U (en) | Building wallboard | |
CN209369357U (en) | A kind of hardened structure of aluminum alloy mould plate K |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |