CN209957116U - Special cable coiling mechanism of job site is built in room - Google Patents

Special cable coiling mechanism of job site is built in room Download PDF

Info

Publication number
CN209957116U
CN209957116U CN201920750938.3U CN201920750938U CN209957116U CN 209957116 U CN209957116 U CN 209957116U CN 201920750938 U CN201920750938 U CN 201920750938U CN 209957116 U CN209957116 U CN 209957116U
Authority
CN
China
Prior art keywords
fixedly connected
movable plate
side wall
moving mechanism
special cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920750938.3U
Other languages
Chinese (zh)
Inventor
叶昊阳
詹国峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920750938.3U priority Critical patent/CN209957116U/en
Application granted granted Critical
Publication of CN209957116U publication Critical patent/CN209957116U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model discloses a special cable coiling mechanism in construction site is built in room, including the movable plate, be equipped with moving mechanism on the movable plate, moving mechanism is including setting up in a plurality of locking formula ten thousand of the rounds of movable plate lower extreme, two montants of upper end fixedly connected with of movable plate, the upper end fixedly connected with slewing mechanism of movable plate, the last wire winding mechanism that has cup jointed of slewing mechanism, wire winding mechanism and slewing mechanism swing joint, the upper end fixedly connected with stop gear of movable plate, be equipped with moving mechanism on stop gear's the lateral wall, moving mechanism is connected with stop gear's one end. The utility model discloses make things convenient for constructor to change the reel to the cable of reply different models, clearance piece, lead screw and screw-nut not only can let the more even winding of cable on the reel simultaneously, can clear up the foreign matter on the cable, thereby made things convenient for constructor to collect the cable.

Description

Special cable coiling mechanism of job site is built in room
Technical Field
The utility model relates to a construction technical field especially relates to a special cable coiling mechanism of job site is built in room.
Background
The engineering construction is a special subject for accounting of the integrated accounting engineering cost of a building installation enterprise, and is a new construction, extension and reconstruction activity for a construction project according to the requirements of a construction project design file.
In the process of building a house, the used cable can be contaminated by too many foreign matters, if the foreign matters on the cable are not cleaned, the cable winding device can be influenced to collect the cable, meanwhile, in the process of building the house, constructors need to use different cables, and therefore the constructors need to use different reels, but the reels can not be replaced by the conventional device.
Therefore, the cable winding device special for the building construction site is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the special cable coiling mechanism of job site is built in room that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a special cable coiling mechanism in construction site is built in room, includes the movable plate, be equipped with moving mechanism on the movable plate, the upper end fixedly connected with slewing mechanism of movable plate, the last wire winding mechanism that has cup jointed of slewing mechanism, wire winding mechanism and slewing mechanism swing joint, the upper end fixedly connected with stop gear of movable plate, be equipped with moving mechanism on stop gear's the lateral wall, moving mechanism is connected with stop gear's one end.
Preferably, moving mechanism is including setting up in a plurality of locking type every phenomenon wheel of movable plate lower extreme, two montants of upper end fixedly connected with of movable plate, two all be fixed with the connecting rod on the lateral wall of montant, two the same handle of the equal fixedly connected with of one end that the montant was kept away from to the connecting rod.
Preferably, slewing mechanism includes fixed connection and places the post in the movable plate upper end, the upper end fixedly connected with support column of movable plate, driving motor has been placed on the lateral wall of support column, driving motor's the epaxial fixedly connected with pivot of drive, driving motor's one end is kept away from in the pivot is passed the lateral wall of placing the post and is rotated with it and be connected, two dead levers of fixedly connected with on the lateral wall of pivot, winding mechanism is located the pivot.
Preferably, winding mechanism is including cup jointing in the epaxial reel of commentaries on classics, fixedly connected with fixed block on the lateral wall of reel, it is equipped with two fixing bolt to run through on the lateral wall of fixed block, be equipped with on the lateral wall of fixed block two with dead lever assorted draw-in groove, be equipped with two screw holes on the lateral wall of pivot, two fixing bolt respectively with two screw hole threaded connection.
Preferably, stop gear includes two spinal branch vaulting poles of fixed connection in the movable plate upper end, two be equipped with the gag lever post between the bracing piece, the both ends of gag lever post are connected with two spinal branch vaulting poles respectively, the stopper has been cup jointed in the slip on the gag lever post, moving mechanism and one of them spinal branch vaulting pole is connected.
Preferably, moving mechanism includes fixed connection in the servo motor on one of them spinal branch vaulting pole lateral wall, fixedly connected with lead screw in servo motor's the drive shaft, one of them gag lever post is passed and is extended to its outside to the one end of lead screw, screw-nut has been cup jointed on the lead screw, screw-nut's upper end fixedly connected with clearance piece, be equipped with the clearance hole on the lateral wall of clearance piece, the upper end of clearance piece is connected with the stopper.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through moving mechanism's use, when constructor needs thrust unit, directly promote the handle, just can make the removal of locking formula universal wheel to made things convenient for constructor mobile device, further improved the practicality of device, reduced constructor's operating procedure, indirect improvement constructor's work efficiency.
2. Through slewing mechanism and winding mechanism's cooperation use, when constructor need change different reels, at first insert the reel in the pivot, make the dead lever enter into the draw-in groove, later rotatory fixing bolt again, when fixing bolt rotates, just can make fixing bolt and screw hole threaded connection to make the reel fix in the pivot, made things convenient for constructor more to change the device, further messenger's device is handled different wire rods.
3. Through stop gear and moving mechanism's use, when the reel began the wire winding, the clearance piece removed thereupon, and further can let the winding that the cable can be even on the reel, and the clearance hole can be cleared up the foreign matter on the cable simultaneously to made things convenient for constructor to collect the cable.
Drawings
Fig. 1 is a schematic structural view of a special cable winding device for a building construction site provided by the utility model;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a schematic view of a test of a rotating shaft, a fixing rod, a clamping groove and a fixing block in the special cable winding device for a house construction site provided by the utility model;
fig. 4 is a schematic view of a connection structure of a cleaning block and a cleaning hole in the special cable winding device for a house construction site according to the present invention;
fig. 5 is the utility model provides a special cable coiling mechanism of job site is built in room overlook the schematic diagram.
In the figure: the device comprises a movable plate 1, a locking type universal wheel 2, a vertical rod 3, a connecting rod 4, a handle 5, a placing column 6, a supporting column 7, a driving motor 8, a rotating shaft 9, a fixing rod 10, a winding wheel 11, a fixing block 12, a fixing bolt 13, a clamping groove 14, a threaded hole 15, a supporting rod 16, a limiting rod 17, a limiting block 18, a servo motor 19, a screw rod 20, a screw rod nut 21, a cleaning block 22 and a cleaning hole 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, a special cable winding device for a house building construction site comprises a movable plate 1, wherein a moving mechanism is arranged on the movable plate 1, the moving mechanism comprises a plurality of locking type universal wheels 2 arranged at the lower end of the movable plate 1, the locking type universal wheels 2 are fixed below the movable plate 1, the state is the prior art, two vertical rods 3 are fixedly connected to the upper end of the movable plate 1, connecting rods 4 are fixed on the side walls of the two vertical rods 3, and one ends, far away from the vertical rods 3, of the two connecting rods 4 are fixedly connected with a same handle 5.
The upper end fixedly connected with slewing mechanism of movable plate 1, slewing mechanism includes fixed connection and places post 6 in movable plate 1 upper end, the upper end fixedly connected with support column 7 of movable plate 1, driving motor 8 has been placed on the lateral wall of support column 7, wherein be equipped with on the lateral wall of support column 7 with driving motor 8 assorted prevent the groove, wherein driving motor 8 is prior art, not too much statement here, fixedly connected with pivot 9 in driving shaft of driving motor 8, the one end that driving motor 8 was kept away from to pivot 9 is passed the lateral wall of placing post 6 and is rotated with it and be connected, two dead levers 10 of fixedly connected with on the lateral wall of pivot 9, winding mechanism is located pivot 9.
The last wire winding mechanism that has cup jointed of slewing mechanism, wire winding mechanism is including cup jointing in the epaxial reel 11 of pivot 9, fixedly connected with fixed block 12 on the lateral wall of reel 11, it is equipped with two fixing bolt 13 to run through on the lateral wall of fixed block 12, be equipped with on the lateral wall of fixed block 12 two with dead lever 10 assorted draw-in groove 14, be equipped with two screw holes 15 on the lateral wall of pivot 9, two fixing bolt 13 respectively with two screw hole 15 threaded connection, fixing bolt 13 can remove according to the screw thread direction of screw hole 15, wire winding mechanism and slewing mechanism swing joint.
The upper end fixedly connected with stop gear of movable plate 1, stop gear include two spinal branch vaulting poles 16 of fixed connection in movable plate 1 upper end, are equipped with gag lever post 17 between two spinal branch vaulting poles 16, and the both ends of gag lever post 17 are connected with two spinal branch vaulting poles 16 respectively, and the stopper 18 has been cup jointed in the slip on gag lever post 17, and wherein stopper 18 can be on the slip of gag lever post 17 freedom, and the movable gear is connected with one of them spinal branch vaulting pole 16.
Be equipped with moving mechanism on stop gear's the lateral wall, moving mechanism includes servo motor 19 of fixed connection on 16 lateral walls of one of them spinal branch vaulting pole, wherein servo motor 19 is prior art, not too much state here, fixedly connected with lead screw 20 in servo motor 19's the drive shaft, one of them gag lever post 17 is passed and extends to its outside to the one end of lead screw 20, lead screw nut 21 has been cup jointed on the lead screw 20, the upper end fixedly connected with clearance piece 22 of lead screw nut 21, be equipped with clearance hole 23 on clearance piece 22's the lateral wall, wherein be equipped with the cleaning brush on the lateral wall of clearance hole 23, wherein the cleaning brush can clear up the foreign matter on the cable, the upper end of clearance piece 22 is connected with stopper 18, moving mechanism is connected with stop gear's one end.
The utility model discloses in, when needs are to changing reel 11, at first insert reel 11 in pivot 9, make dead lever 10 enter into draw-in groove 14, later rotatory fixing bolt 13 again, when fixing bolt 13 rotated, just can make reel 11 fix in pivot 9, later constructor places driving motor 8 again on the lateral wall of support column 7, further can let more convenient reel 11 of constructor, indirect constructor's work efficiency that has improved.
When the needs wire winding, at first start driving motor 8, when driving motor 8 during operation, just can make pivot 9 rotate, when pivot 9 rotates, just can make reel 11 rotate, when reel 11 rotates, start servo motor 19 simultaneously, when servo motor 19 during operation, just can make lead screw 20 rotate, when lead screw 20 rotates, lead screw nut 21 can be under stopper 18 and gag lever post 17's effect, lead screw nut 21 can remove on lead screw 20, thereby can make reel 11's cable can be winding more even, clearance piece 22 can clear up the foreign matter on the cable simultaneously, further make reel 11 can normal operating.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a special cable coiling mechanism of job site is built in room, includes movable plate (1), its characterized in that, be equipped with moving mechanism on movable plate (1), the upper end fixedly connected with slewing mechanism of movable plate (1), the last wire winding mechanism that has cup jointed of slewing mechanism, wire winding mechanism and slewing mechanism swing joint, the upper end fixedly connected with stop gear of movable plate (1), be equipped with moving mechanism on stop gear's the lateral wall, moving mechanism is connected with stop gear's one end.
2. The special cable winding device for the house building construction site as claimed in claim 1, wherein the moving mechanism comprises a plurality of locking type universal wheels (2) arranged at the lower end of the moving plate (1), the upper end of the moving plate (1) is fixedly connected with two vertical rods (3), the side walls of the two vertical rods (3) are both fixed with connecting rods (4), and one ends of the two connecting rods (4) far away from the vertical rods (3) are both fixedly connected with the same handle (5).
3. The special cable winding device for the house building construction site as claimed in claim 2, wherein the rotating mechanism comprises a placing column (6) fixedly connected to the upper end of the moving plate (1), the upper end of the moving plate (1) is fixedly connected with a supporting column (7), a driving motor (8) is placed on the side wall of the supporting column (7), a rotating shaft (9) is fixedly connected to the driving shaft of the driving motor (8), one end, far away from the driving motor (8), of the rotating shaft (9) penetrates through the side wall of the placing column (6) and is rotatably connected with the side wall, two fixing rods (10) are fixedly connected to the side wall of the rotating shaft (9), and the winding mechanism is located on the rotating shaft (9).
4. The special cable winding device for the house building construction site as claimed in claim 3, wherein the winding mechanism comprises a winding wheel (11) sleeved on a rotating shaft (9), a fixing block (12) is fixedly connected to a side wall of the winding wheel (11), two fixing bolts (13) penetrate through a side wall of the fixing block (12), two clamping grooves (14) matched with the fixing rod (10) are formed in the side wall of the fixing block (12), two threaded holes (15) are formed in a side wall of the rotating shaft (9), and the two fixing bolts (13) are respectively in threaded connection with the two threaded holes (15).
5. The special cable winding device for the house building construction site as claimed in claim 4, wherein the limiting mechanism comprises two support rods (16) fixedly connected to the upper end of the movable plate (1), a limiting rod (17) is arranged between the two support rods (16), two ends of the limiting rod (17) are respectively connected with the two support rods (16), a limiting block (18) is sleeved on the limiting rod (17) in a sliding manner, and the moving mechanism is connected with one of the support rods (16).
6. The special cable winding device for the house building construction site as claimed in claim 5, wherein the moving mechanism comprises a servo motor (19) fixedly connected to a side wall of one of the support rods (16), a lead screw (20) is fixedly connected to a drive shaft of the servo motor (19), one end of the lead screw (20) penetrates through one of the limit rods (17) and extends to the outer side of the limit rod, a lead screw nut (21) is sleeved on the lead screw (20), a cleaning block (22) is fixedly connected to the upper end of the lead screw nut (21), a cleaning hole (23) is formed in a side wall of the cleaning block (22), and the upper end of the cleaning block (22) is connected with a limit block (18).
CN201920750938.3U 2019-05-23 2019-05-23 Special cable coiling mechanism of job site is built in room Expired - Fee Related CN209957116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920750938.3U CN209957116U (en) 2019-05-23 2019-05-23 Special cable coiling mechanism of job site is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920750938.3U CN209957116U (en) 2019-05-23 2019-05-23 Special cable coiling mechanism of job site is built in room

Publications (1)

Publication Number Publication Date
CN209957116U true CN209957116U (en) 2020-01-17

Family

ID=69246334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920750938.3U Expired - Fee Related CN209957116U (en) 2019-05-23 2019-05-23 Special cable coiling mechanism of job site is built in room

Country Status (1)

Country Link
CN (1) CN209957116U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111899946A (en) * 2020-07-24 2020-11-06 上海南大集团浙江电缆有限公司 Cable production equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111899946A (en) * 2020-07-24 2020-11-06 上海南大集团浙江电缆有限公司 Cable production equipment
CN111899946B (en) * 2020-07-24 2022-04-01 上海南大集团浙江电缆有限公司 Cable production equipment

Similar Documents

Publication Publication Date Title
CN209957116U (en) Special cable coiling mechanism of job site is built in room
CN211437318U (en) Automatic cleaning device for inner wall of steel pipe
CN216441956U (en) Super-huge steel member assembly structure
CN210288691U (en) House building steel structure construction device
CN210394970U (en) Device convenient for winding steel wire rope
CN111453526A (en) Construction pay-off for building
CN214696440U (en) Steel frame crossbeam for steel structure factory building
CN110449392A (en) A kind of insulator chain cleaning device
CN219577580U (en) Frame type universal control cabinet
CN220283139U (en) Winding device for elevator steel wire rope processing
CN211594644U (en) Wire bundle winding and unwinding device for electric power engineering
CN213573167U (en) Construction engineering is with diversified ground support that consolidates
CN220726753U (en) Diagonal bracing hoop
CN112430821B (en) Reinforcing bar surface cleaning device for concrete construction
CN221894601U (en) Steel wire rope winding and unwinding device
CN220814953U (en) Light steel bar clamp
CN221524314U (en) Oblique support for building
CN113477590B (en) Auxiliary tool for cleaning building components and cleaning system
CN216965057U (en) Motor shell surface spraying device for ultrasonic motor machining
CN221629210U (en) Farmland illegal occupation monitoring equipment
CN216235745U (en) Tower crane standard festival with swift dismouting structure
CN221806330U (en) Threading auxiliary device
CN218324291U (en) Safety device is used in construction in room
CN215594813U (en) Safety device for construction
CN220253960U (en) Mounting equipment for four-split damping spacer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200117

Termination date: 20200523