CN209942380U - Windproof dust suppression net structure system for bulk cargo storage yard - Google Patents
Windproof dust suppression net structure system for bulk cargo storage yard Download PDFInfo
- Publication number
- CN209942380U CN209942380U CN201920137220.7U CN201920137220U CN209942380U CN 209942380 U CN209942380 U CN 209942380U CN 201920137220 U CN201920137220 U CN 201920137220U CN 209942380 U CN209942380 U CN 209942380U
- Authority
- CN
- China
- Prior art keywords
- trench
- wind
- bulk cargo
- suppression net
- dust suppression
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model provides a prevent wind and press down dirt net structural system for bulk cargo storage yard, it is including being used for the installation fixed steel support who prevents wind and press down the dirt net, and the polylith prevent wind and press down the dirt net, and the concrete foundation, the concrete foundation includes the bottom basis, arrange the frame post on the bottom basis, a comprehensive trench for taking in and arranging the pipeline and cover the backfill soil on the bottom basis, in the steel support, outside column base installation is fixed in two adjacent rows of frame capital portions, it locates inside and outside the steel support to synthesize the trench, between the frame post that the side column foot located, the tank bottom of synthesizing the trench is the top surface on bottom basis, the lateral wall top of synthesizing the trench is preset and is used for placing the recess of apron, the apron is placed and is used for sealing comprehensive trench notch in the recess, apron top surface and frame capital face parallel and level. The utility model provides a prevent wind and press down dirt net structural system suitable for bulk cargo field etc. have shallow layer basis for prevent wind and press down the utilization of dirt net under the condition on shallow layer basis.
Description
Technical Field
The utility model relates to a prevent wind technical field who presses down the structure of dirt net.
Background
When various scattered materials such as coal, ore, lime, cement and the like piled in the open air meet strong wind weather of more than three levels, dust often falls all day, and serious pollution is caused to the surrounding environment.
In recent years, the development trend of strengthening environmental governance and establishing harmony between human and nature is increasingly obvious. In view of this, the department of transportation promulgated mandatory regulations at 12 months 2015, specifying: "open storage yard should set up dustproof barriers such as enclosure, windproof dust suppression net or protection forest as required".
In view of the above problems, it is necessary to research how to realize the form and safety of the windproof and dust suppression net structure.
SUMMERY OF THE UTILITY MODEL
To the deficiency in the prior art, an object of the utility model is to provide a prevent wind and press down dirt net structure system for bulk cargo storage yard.
In order to solve the above problem, the utility model provides a prevent wind and press down dirt net structural system for bulk cargo storage yard, it includes:
a steel support for mounting and fixing the windproof and dust-suppression net, the steel support being uniformly arranged at intervals according to the contour line of the open position of the bulk cargo yard plane, an
A plurality of windproof dust suppression nets fixed on the vertical surfaces of the steel brackets, a protective net which forms a vertical surface enclosure with the retaining wall of the bulk cargo storage yard, and
concrete foundation, concrete foundation includes the bottom basis, arranges the frame post on the bottom basis, be used for accomodating and arranging the comprehensive trench of pipeline and cover the backfill soil on the bottom basis, the inside and outside column base installation of steel support is fixed in two adjacent rows of frame capital portions, synthesize the trench and offer inside and outside the steel support, between the frame post that the side column base was located, the tank bottom of synthesizing the trench is the top surface on bottom basis, the lateral wall top of synthesizing the trench is preset and is used for placing the recess of apron, the apron is placed and is used for sealing in the recess and synthesizes the trench notch, apron top surface and frame capital face parallel and level.
Preferably, the bottom foundation is a raft foundation.
Preferably, the wind screen of the wind-proof dust suppression net adopts a double-peak wind-proof dust suppression plate.
Preferably, a cable support is fixed on the side wall of the comprehensive pipe trench.
Preferably, a water pipe is arranged in the comprehensive pipe ditch.
Preferably, a drain hole is preset in the concrete foundation.
Adopt above-mentioned preferred scheme, compare with prior art, the utility model provides a prevent wind and press down dirt net structural system suitable for bulk cargo field etc. have shallow layer basis for prevent wind and press down the dirt net and utilize under the condition of shallow layer basis. The utility model can effectively fix the wind-proof and dust-suppression net to achieve the wind-proof and dust-suppression effect, and simultaneously, the space below the steel bracket of the wind-proof and dust-suppression net is utilized to arrange the comprehensive pipe trench, the space of the field is effectively utilized, and the electromechanical pipelines such as water, electricity and the like are arranged in the comprehensive pipe trench, thereby being convenient for maintenance; in addition, other pipeline positions can be reserved in the pipe trench, and secondary excavation is avoided.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort.
FIG. 1 is an overall schematic view of the structural system of the windproof and dust suppression net of the present invention;
FIG. 2 is a basic plan view of the windproof and dust suppression net structure system of the present invention;
FIG. 3 is a sectional view of the foundation of the windproof and dust suppression net structure system of the present invention;
FIG. 4 is a schematic view of the front of the attachment point of the wind and dust control screen;
FIG. 5 is a schematic side view of the attachment point of the wind and dust control screen;
wherein: the comprehensive pipe ditch 1, the steel support 2, the windproof dust suppression net 3, the water pipe 4, the cable support 5, the cover plate 6, the water drainage hole 7, the foundation 8, the frame column 9, the inter-column pressure plate 10, the cone tail wire 11, the connecting piece 12, the gravel 13 and the outside of the field 100
Detailed Description
The utility model discloses implement according to following step:
1. concrete foundation construction and comprehensive pipe trench arrangement
As shown in fig. 1 to 3, frame columns 9 are poured on a foundation 8 of a bulk cargo storage yard, and a comprehensive pipe trench 1 is excavated between two rows of frame columns 9 for installing and fixing inner and outer column bases of a steel support.
After the excavation of the foundation trench of the comprehensive pipe trench 1 is finished, templates on two sides of the inner side of the comprehensive pipe trench 1 are installed on the initially-set trench bottom concrete. The temporary support is arranged at the top of the trench wall to support the wooden template, and the wall concrete is removed when poured to the top. And when the trench wall concrete is poured to the height of the reserved cover plate groove, installing the processed battens on the cover plate groove position to continue pouring the concrete so as to reserve the position of the cover plate groove on the top of the trench wall.
When the concrete is poured, firstly, the ditch bottom concrete is poured, after the ditch bottom concrete is initially set (24 hours at normal temperature), the side wall concrete is poured by the vertical ditch wall formwork, and the ditch bottom concrete and the ditch wall concrete can be poured by one-time vertical formwork.
And after concrete pouring is finished, covering and watering for curing within 12 hours after slurry collection. And (4) dismantling the side mold when the compressive strength of the concrete reaches 1.2 Mpa.
Before the cover plate 6 is installed, a transportation pavement is built, and the two sides of the platform back are backfilled to prepare for hoisting. Before the cover plate is installed, two layers of felt with the thickness of 1cm are paved; marking the placing position of the cover plate in advance; during installation, the corresponding of the settlement joint at the lower part and the length of the plate end support are required to be noticed; after the installation is finished, the plate position is accurately adjusted, after the plate position is adjusted to the proper position, small stones are tightly propped, and then C20 small stone concrete is used for filling a gap between the table back and the cover plate. A water drainage hole 7 is preset in the foundation 8. The drainage holes are generally round holes with the diameter not less than 100 mm. The distance between the holes is about 2m, and coarse sand is mixed with coarse stone aggregate before the water outlet for water seepage.
The foundation 8 adopts a raft foundation, is integrally composed of a bottom plate, a beam and the like, is formed by connecting the independent foundations or the strip foundations below the column by a connecting beam, and integrally pouring the bottom plate below the connecting beam to form the raft foundation. The integrated foundation has good integrity and large bottom area, can reduce the stress of the foundation and can well resist the uneven settlement of the foundation.
2. Mounting of steel supports
The bulk cargo yard is provided with a bank protection retaining wall, the bank protection retaining wall is provided with an opening, and steel supports for installing and fixing the windproof dust suppression net are uniformly arranged according to the contour line interval of the position of the opening.
Hoisting the steel bracket part, and performing bidirectional straightening after taking place. The inner and outer column feet of the steel bracket are respectively fixed on the tops of two adjacent rows of frame columns,
after the steel support column base is installed in place and straightened, the steel support column base is screwed down through bolts, so that the bolts are prevented from loosening, and the stability of a steel frame is ensured.
After the steel support is installed, the tie bars among the steel support column feet are connected in time, so that a unit body with good stress is formed, the safety of the unit body is improved, and the instability of the steel support is prevented.
3. And installing and fixing the windproof dust suppression net.
As shown in fig. 4 and 5, the bimodal windproof dust suppression net is installed and fixed on the vertical surface of the steel bracket, so that the bimodal windproof dust suppression net and the retaining wall together form a vertical surface protective net for enclosing the bulk cargo storage yard.
Claims (6)
1. A wind and dust suppression net structural system for a bulk storage yard, comprising:
a steel support for mounting and fixing the windproof and dust-suppression net, the steel support being uniformly arranged at intervals according to the contour line of the open position of the bulk cargo yard plane, an
A plurality of windproof dust suppression nets fixed on the vertical surfaces of the steel brackets, a protective net which forms a vertical surface enclosure with the retaining wall of the bulk cargo storage yard, and
concrete foundation, concrete foundation includes the bottom basis, arranges the frame post on the bottom basis, be used for accomodating and arranging the comprehensive trench of pipeline and cover the backfill soil on the bottom basis, the inside and outside column base installation of steel support is fixed in two adjacent rows of frame capital portions, synthesize the trench and offer inside and outside the steel support, between the frame post that the side column base was located, the tank bottom of synthesizing the trench is the top surface on bottom basis, the lateral wall top of synthesizing the trench is preset and is used for placing the recess of apron, the apron is placed and is used for sealing in the recess and synthesizes the trench notch, apron top surface and frame capital face parallel and level.
2. The wind-proof and dust-suppression net structure system for the bulk cargo yard according to claim 1, wherein the bottom foundation is a raft foundation.
3. The structural system of the wind and dust suppression net for the bulk cargo storage yard according to claim 1, wherein the wind shield and dust suppression net wind shield adopts a double-peak wind and dust suppression plate.
4. The wind and dust suppression net structural system for the bulk cargo storage yard according to claim 1, wherein a cable support is fixed to a side wall of the integrated pipe trench.
5. The wind and dust suppression net structural system for the bulk cargo storage yard according to claim 1, wherein a water pipe is arranged in the comprehensive pipe trench.
6. The wind-proof and dust-suppression net structure system for the bulk cargo yard according to claim 1, wherein a water drainage hole is preset in the concrete foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920137220.7U CN209942380U (en) | 2019-01-25 | 2019-01-25 | Windproof dust suppression net structure system for bulk cargo storage yard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920137220.7U CN209942380U (en) | 2019-01-25 | 2019-01-25 | Windproof dust suppression net structure system for bulk cargo storage yard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209942380U true CN209942380U (en) | 2020-01-14 |
Family
ID=69121868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920137220.7U Active CN209942380U (en) | 2019-01-25 | 2019-01-25 | Windproof dust suppression net structure system for bulk cargo storage yard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209942380U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021169055A1 (en) * | 2020-02-28 | 2021-09-02 | 山东建筑大学 | Quick-assembly windbreak device for preventing storm damage to low-rise wooden dwelling |
-
2019
- 2019-01-25 CN CN201920137220.7U patent/CN209942380U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021169055A1 (en) * | 2020-02-28 | 2021-09-02 | 山东建筑大学 | Quick-assembly windbreak device for preventing storm damage to low-rise wooden dwelling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101768976B (en) | Base pit dewatering and water saving device and construction method thereof | |
CN101298782B (en) | Method and system for basement engineering water proof and water drain | |
CN106013954B (en) | A kind of construction method of combination enclosing | |
CN105297630A (en) | Construction method for double-component steel tubes of main arch arcs | |
CN104947682A (en) | Foundation pit support construction method and device thereof | |
CN104594361B (en) | A kind of I shape fender post and building enclosure also serve as the construction method of agent structure | |
CN1952273A (en) | Digging foundation with baffle and its construction method | |
CN108301440A (en) | With waterproof, the underground pipe gallery construction method of drain function | |
CN212477844U (en) | Basement drainage decompression anti-floating structure | |
CN106968692B (en) | Tunnel excavation supporting structure and construction method thereof | |
CN210262555U (en) | Light soil road structure | |
CN201567582U (en) | Rainwater saving device of foundation pit | |
CN105862662B (en) | A kind of curl arched mole | |
CN209942380U (en) | Windproof dust suppression net structure system for bulk cargo storage yard | |
CN103882883A (en) | Method for constructing foundation shared by tower crane and garage frame column | |
CN111173042B (en) | Advanced water stop post-cast strip of foundation slab and construction method | |
CN106567365B (en) | Earth and rockfill dam longitudinal reinforcement construction method | |
CN204780944U (en) | Soil structure is kept off to additional formula in foundation ditch limit | |
CN204715364U (en) | A kind of foundation pit support device | |
CN208363508U (en) | The underground space can white-out infiltration ground structure | |
CN206667263U (en) | A kind of foundation pit supporting construction | |
CN206457737U (en) | Conveyance Box Culvert bottom plate waterstop reinforces stopping means | |
CN108130889A (en) | Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production | |
CN109322332A (en) | It is a kind of in advance to basis and post-cast strip method for waterproofing | |
CN209429119U (en) | A kind of cast-in-place concrete pile for mortar depositing construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |