CN209941501U - Interim protector is used in bridge construction - Google Patents

Interim protector is used in bridge construction Download PDF

Info

Publication number
CN209941501U
CN209941501U CN201920240703.XU CN201920240703U CN209941501U CN 209941501 U CN209941501 U CN 209941501U CN 201920240703 U CN201920240703 U CN 201920240703U CN 209941501 U CN209941501 U CN 209941501U
Authority
CN
China
Prior art keywords
straight rod
straight
bridge construction
protection device
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920240703.XU
Other languages
Chinese (zh)
Inventor
贾文
冯进宙
贾凯
陈强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920240703.XU priority Critical patent/CN209941501U/en
Application granted granted Critical
Publication of CN209941501U publication Critical patent/CN209941501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a temporary protection device for bridge construction, which comprises a fixed seat, wherein the top end of the fixed seat is provided with a first straight rod and a third straight rod, the side end of the first straight rod is fixedly provided with a connecting buckle, the side end of the third straight rod is provided with a connecting sleeve, the connecting sleeve is sleeved and connected with the connecting buckle, a second straight rod and a fourth straight rod are welded between the first straight rod and the third straight rod, the welding end of the second straight rod and the first straight rod and the welding end of the second straight rod and the third straight rod are both sleeved with rubber sleeves, the bottom end of the fourth straight rod is provided with a cloth curtain, a reinforcing plate is fixedly arranged between the second straight rod and the fourth straight rod, a warning board is fixedly arranged on the reinforcing plate, and the side end faces of the first straight rod, the second straight rod and the third straight rod are all fixedly provided with a reflecting plate, the temporary protection device has the advantages of convenient installation and disassembly, convenient storage and, the safety factor of the operating personnel is greatly improved.

Description

Interim protector is used in bridge construction
Technical Field
The utility model relates to a protector technical field specifically is a bridge construction is with interim protector.
Background
The bridge protection device is an isolation device installed on the top end of a bridge roadbed, is mainly used for bridge construction, can isolate a construction site from the outside, can form a closed construction space, avoids non-operating personnel from entering, and reduces the occurrence probability of accidents. And relatively, the protection device can also protect the operators in the protection device, so that the operators are prevented from falling off the bridge, and the safety of the operators is guaranteed. In particular, the temporary protection device for bridge construction cannot affect the installation efficiency in addition to the protection effect.
Traditional protector is used in bridge construction, most of installations are complicated, dismantle the trouble, are not convenient for deposit and transport, greatly reduced the convenience of its installation, only be provided with the guardrail simultaneously and protect, protective properties is relatively poor, greatly reduced operation personnel's factor of safety.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a temporary protection device for bridge construction, through inserting the first straight-bar and the third straight-bar into the groove arranged in the middle of the fixing base, the installation of the protection device and the transportation after the disassembly are convenient, the first straight-bar and the third straight-bar can be stably connected in the fixing base through the first nut, the firmness of the installation of the protection device is effectively improved, through the clamping connection between the connecting buckle and the connecting sleeve, a plurality of protection devices are conveniently connected into a whole, the convenience of the installation is effectively improved, through the reflecting plate, an operator can be prompted under the environment with poor sight line, the operator can conveniently identify the boundary of the protection device, then the protection device can be prevented from falling off the bridge, the safety performance of the protection device can be improved through the protective net, in the bridge construction process, sundries such as stones can be prevented from splashing from the bottom of the protection device through the curtain, effectively prevent that it from causing the damage to the outer personnel of protector, can avoid the operation personnel to be put sharp-pointed department scratch through the rubber sleeve, improved protector's security performance greatly, this interim protector is used in bridge construction, it is convenient not only to install and dismantle, conveniently deposits the transportation, has improved the convenience of its installation greatly, and barrier propterty is good simultaneously, effectively improves its security performance, has improved operation personnel's factor of safety greatly.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bridge construction is with interim protector, includes the fixing base, the fixing base top is equipped with first straight-bar and third straight-bar, first straight-bar side fixed mounting has the connector link, third straight-bar side is equipped with the adapter sleeve, just adapter sleeve and connector link registrate the connection, the welding has second straight-bar and fourth straight-bar between first straight-bar and the third straight-bar, the welding end of second straight-bar and first straight-bar and the welding end of second straight-bar and third straight-bar all overlap there is the rubber sleeve, fourth straight-bar bottom is equipped with the curtain made of cloth, fixed mounting has the gusset plate between second straight-bar and the fourth straight-bar, just the gusset plate is located first straight-bar and second straight-bar intermediate position, fixed mounting has the warning sign on the gusset plate, the equal fixed mounting of side end face of first straight-bar, second straight-bar and third straight-bar has the reflector panel.
Preferably, a groove is formed in the middle of the fixing seat, and a first straight rod is arranged in the groove.
Preferably, the wall end of the groove is provided with a through hole, the wall ends of the first straight rod and the third straight rod are provided with through holes, and a first nut is inserted into the through holes.
Preferably, straight plates are welded on two sides of the bottom of the fixing seat, threaded holes are formed in the straight plates, and fastening screws are arranged in the middle of the threaded holes.
Preferably, a round hole is formed in one end of the connecting sleeve, a clamping groove is formed in the other end of the connecting sleeve, and the clamping groove is connected with the third straight rod in a clamping mode.
Preferably, the bottom end of the connecting buckle is welded with a second nut, and one end of the second nut penetrates through the round hole.
Preferably, a protective net is connected among the first straight rod, the second straight rod, the third straight rod, the fourth straight rod and the reinforcing plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model has the advantages that the first straight rod and the third straight rod are inserted into the grooves arranged in the middle of the fixing base, the installation of the protective device and the transportation after the disassembly are convenient, the first straight rod and the third straight rod can be stably connected into the fixing base through the first nut, the firmness of the installation of the protective device is effectively improved, a plurality of protective devices can be conveniently connected into a whole through the clamping connection between the connecting buckle and the connecting sleeve, the convenience of the installation is effectively improved, the operating personnel can be prompted under the environment with poor sight line through the reflecting plate, the operating personnel can conveniently identify the boundary of the protective device, the falling from the bridge can be avoided, the safety performance of the protective device can be improved through the protective net, in the bridge construction process, the splashing of sundries such as stones from the bottom of the protective device can be avoided through the cloth curtain, the damage to the personnel outside the protective device can be effectively prevented, can avoid the operation personnel to be put sharp-pointed department scratch through the rubber sleeve, improve protector's security performance greatly, this interim protector is used in bridge construction, it is convenient not only to install and dismantle, conveniently deposits the transportation, has improved the convenience of its installation greatly, and barrier propterty is good simultaneously, effectively improves its security performance, has improved operation personnel's factor of safety greatly.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the present invention;
fig. 3 is a schematic view of the structure of the connection sleeve of the present invention;
fig. 4 is a schematic view of the connecting buckle structure of the present invention.
In the figure: 1. a fixed seat; 2. a connecting buckle; 3. a first straight rod; 4. a rubber sleeve; 5. a reflector; 6. A second straight rod; 7. a warning board; 8. a third straight rod; 9. a fourth straight rod; 10. connecting sleeves; 11. a first nut; 12. a straight plate; 13. cloth curtain; 14. a reinforcing plate; 15. a groove; 16. a through hole; 17. fastening screws; 18. a threaded hole; 19. a circular hole; 20. a card slot; 21. a second nut; 22. and (4) a protective net.
Detailed Description
The technical solution of the present invention will be clearly and completely described with reference to the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a temporary protection device is used in bridge construction, includes fixing base 1, 1 top of fixing base is equipped with first straight-bar 3 and third straight- bar 8, 3 side fixed mounting of first straight-bar have connector link 2, 8 sides of third straight-bar are equipped with adapter sleeve 10, just adapter sleeve 10 and 2 registrates of connector link are connected, the welding has second straight-bar 6 and fourth straight-bar 9 between first straight-bar 3 and the third straight-bar 8, the welding end of second straight-bar 6 and first straight-bar 3 and the welding end of second straight-bar 6 and third straight-bar 8 all overlap there is rubber sleeve 4, fourth straight-bar 9 bottom is equipped with curtain cloth 13, fixed mounting has gusset plate 14 between second straight-bar 6 and the fourth straight-bar 9, just gusset plate 14 is located first straight-bar 3 and second straight-bar 6 intermediate position, fixed mounting has warning sign 7 on the gusset plate 14, first straight-bar 3, The side end faces of the second straight rod 6 and the third straight rod 8 are fixedly provided with a reflector 5.
A groove 15 is formed in the middle of the fixing seat 1, and a first straight rod 3 is arranged in the groove 15, so that the first straight rod 3 and the third straight rod 8 can be conveniently mounted and dismounted.
Through holes 16 are formed in the wall ends of the grooves 15, through holes 16 are formed in the wall ends of the first straight rod 3 and the third straight rod 8, a first nut 11 is inserted into each through hole 16, and the first straight rod 3 and the third straight rod 8 are guaranteed to be fixed in the fixing seat 1.
The welding of fixing base 1 bottom both sides has straight board 12, threaded hole 18 has been seted up on the straight board 12, be equipped with fastening screw 17 in the middle of the threaded hole 18, be convenient for be fixed in the bridge floor with protector.
A round hole 19 is formed in one end of the connecting sleeve 10, a clamping groove 20 is formed in the other end of the connecting sleeve 10, and the clamping groove 20 is connected with the third straight rod 8 in a clamping mode, so that the protection devices can be conveniently connected and installed.
The bottom end of the connecting buckle 2 is welded with a second nut 21, and one end of the second nut 21 penetrates through the round hole 19, so that stable connection between the connecting buckle 2 and the connecting sleeve 10 is ensured.
A protective net 22 is connected among the first straight rod 3, the second straight rod 6, the third straight rod 8, the fourth straight rod 9 and the reinforcing plate 14, so that the safety performance of the protective device is ensured.
The working principle is as follows: a temporary protection device for bridge construction is characterized in that a first straight rod 3 and a third straight rod 8 are inserted into a groove 15 formed in the middle of a fixed seat 1, so that the installation and the transportation after the disassembly of the protection device are facilitated, the first straight rod 3 and the third straight rod 8 can be stably connected into the fixed seat 1 through a first nut 11, the installation firmness of the protection device is effectively improved, a plurality of protection devices are conveniently connected into a whole through the clamping connection between a connecting buckle 2 and a connecting sleeve 10, the installation convenience is effectively improved, operating personnel can be prompted under the environment with poor sight through a reflector panel 5, the operating personnel can conveniently identify the boundary of the protection device, the protection device can be prevented from falling off a bridge, the safety performance of the protection device can be improved through a protective net 22, in the bridge construction process, sundries such as stones can be prevented from splashing from the bottom of the protection device through a curtain 13, effectively prevent that it from causing the damage to the outer personnel of protector, can avoid the operation personnel to be put sharp-pointed department scratch through rubber sleeve 4, improved protector's security performance greatly, this interim protector is used in bridge construction, it is convenient not only to install and dismantle, conveniently deposits the transportation, has improved the convenience of its installation greatly, and barrier propterty is good simultaneously, effectively improves its security performance, has improved operation personnel's factor of safety greatly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a bridge construction is with interim protector which characterized in that: the novel cloth curtain comprises a fixing seat (1), wherein a first straight rod (3) and a third straight rod (8) are arranged at the top end of the fixing seat (1), a connecting buckle (2) is fixedly arranged at the side end of the first straight rod (3), a connecting sleeve (10) is arranged at the side end of the third straight rod (8), the connecting sleeve (10) is connected with the connecting buckle (2) in a sleeved mode, a second straight rod (6) and a fourth straight rod (9) are welded between the first straight rod (3) and the third straight rod (8), rubber sleeves (4) are sleeved at the welding end of the second straight rod (6) and the first straight rod (3) and the welding end of the second straight rod (6) and the third straight rod (8), a cloth curtain (13) is arranged at the bottom end of the fourth straight rod (9), a reinforcing plate (14) is fixedly arranged between the second straight rod (6) and the fourth straight rod (9), and the reinforcing plate (14) is located in the middle position of the first straight rod (3) and the second, the warning board (7) is fixedly mounted on the reinforcing plate (14), and the side end faces of the first straight rod (3), the second straight rod (6) and the third straight rod (8) are fixedly provided with the reflecting plate (5).
2. The temporary protection device for bridge construction according to claim 1, wherein: a groove (15) is formed in the middle of the fixed seat (1), and a first straight rod (3) is arranged in the groove (15).
3. The temporary protection device for bridge construction according to claim 2, wherein: through holes (16) are formed in the wall ends of the grooves (15), through holes (16) are formed in the wall ends of the first straight rod (3) and the third straight rod (8), and first nuts (11) are inserted into the through holes (16).
4. The temporary protection device for bridge construction according to claim 1, wherein: the fixing seat is characterized in that straight plates (12) are welded on two sides of the bottom of the fixing seat (1), threaded holes (18) are formed in the straight plates (12), and fastening screws (17) are arranged in the middles of the threaded holes (18).
5. The temporary protection device for bridge construction according to claim 1, wherein: round hole (19) have been seted up to adapter sleeve (10) one end, the adapter sleeve (10) other end is equipped with draw-in groove (20), just draw-in groove (20) are connected with third straight-bar (8) block.
6. The temporary protection device for bridge construction according to claim 1, wherein: the bottom end of the connecting buckle (2) is welded with a second nut (21), and one end of the second nut (21) penetrates through the round hole (19).
7. The temporary protection device for bridge construction according to claim 1, wherein: and a protective net (22) is connected among the first straight rod (3), the second straight rod (6), the third straight rod (8), the fourth straight rod (9) and the reinforcing plate (14).
CN201920240703.XU 2019-02-25 2019-02-25 Interim protector is used in bridge construction Expired - Fee Related CN209941501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920240703.XU CN209941501U (en) 2019-02-25 2019-02-25 Interim protector is used in bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920240703.XU CN209941501U (en) 2019-02-25 2019-02-25 Interim protector is used in bridge construction

Publications (1)

Publication Number Publication Date
CN209941501U true CN209941501U (en) 2020-01-14

Family

ID=69122919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920240703.XU Expired - Fee Related CN209941501U (en) 2019-02-25 2019-02-25 Interim protector is used in bridge construction

Country Status (1)

Country Link
CN (1) CN209941501U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395865A (en) * 2020-04-21 2020-07-10 杭州佧斯家居设计有限公司 Bridge construction protector convenient to use

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395865A (en) * 2020-04-21 2020-07-10 杭州佧斯家居设计有限公司 Bridge construction protector convenient to use
CN111395865B (en) * 2020-04-21 2021-06-08 江苏陆通基础设施有限公司 Bridge construction protector convenient to use

Similar Documents

Publication Publication Date Title
CN209941501U (en) Interim protector is used in bridge construction
KR100859013B1 (en) Installing apparatus of power-transmission and distribution and transformation cable tunnel and method thereof
CN205276911U (en) Fixing device and contain this fixing device's entrance to a cave safety device
CN205713445U (en) A kind of grating type protective fence
CN104762899B (en) Fence stand column connecting piece
CN213267636U (en) Road safety device with positioning chip
CN213360150U (en) Underground multidirectional support flexible safety protection net
CN210577110U (en) Armored movable alternating current metal-enclosed switchgear cabinet body
CN204590427U (en) Metal roofing board Wind-proof fixture
CN220318423U (en) Impact-resistant highway warning guard board
CN216406388U (en) Building deep basal pit construction is with interim rail guard
KR101274739B1 (en) Bracket for mounting signboard with tightness
CN209703379U (en) A kind of highway barrier
CN212716109U (en) Iron tower cross arm with safety protection
CN217153503U (en) Protection fence for ground gas overhead facility
CN214273189U (en) Road construction is with protection isolation barrier convenient to loading and unloading
CN217602175U (en) Pile foundation hole protection device
CN213878858U (en) Floor type power cabinet with alarm function
CN218453920U (en) Tower machine that can plug fast is with standard festival platform rail
CN213328915U (en) Building block type ecological slope protection
CN214330010U (en) Lock pin type protective railing for edge protection
CN220150964U (en) Building engineering is with facing limit protection device
CN215528455U (en) Cable terminal platform
CN210927219U (en) UPS power control side vanning
CN213597433U (en) Insulating fast-assembling scaffold frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200114

Termination date: 20210225

CF01 Termination of patent right due to non-payment of annual fee