CN220059138U - Building engineering protection network - Google Patents
Building engineering protection network Download PDFInfo
- Publication number
- CN220059138U CN220059138U CN202321489898.4U CN202321489898U CN220059138U CN 220059138 U CN220059138 U CN 220059138U CN 202321489898 U CN202321489898 U CN 202321489898U CN 220059138 U CN220059138 U CN 220059138U
- Authority
- CN
- China
- Prior art keywords
- plate
- buffer
- rain collecting
- column
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005507 spraying Methods 0.000 claims abstract description 6
- 230000000712 assembly Effects 0.000 claims abstract 2
- 238000000429 assembly Methods 0.000 claims abstract 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 34
- 238000010276 construction Methods 0.000 claims description 24
- 239000007921 spray Substances 0.000 claims description 16
- 230000001681 protective effect Effects 0.000 abstract description 16
- 239000000428 dust Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 241001233242 Lontra Species 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000005489 elastic deformation Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model relates to the technical field of protective nets, in particular to a protective net for constructional engineering, which comprises a first upright post and a second upright post, wherein a rain collecting plate, a protective screen plate and a first buffer plate are sequentially connected between the first upright post and the second upright post from top to bottom, a spraying pipe is fixedly arranged on the outer side of the rain collecting plate, a second buffer plate is arranged on the front side of the first buffer plate, warning strips are arranged on the outer side of the second buffer plate, a plurality of buffer assemblies are connected between the first buffer plate and the second buffer plate, and fixed bases are connected to the bottoms of the first upright post and the second upright post.
Description
Technical Field
The utility model relates to the technical field of protective nets, in particular to a protective net for building engineering.
Background
The construction engineering is an engineering entity formed by constructing various house buildings and auxiliary facilities thereof and installing and moving matched lines, pipelines and equipment, and in the construction process of the construction engineering, a protection net is often used for protecting, so that the construction site and pedestrians are isolated and protected by the protection net.
The traditional construction engineering protective net has the following defects that 1, the traditional construction engineering protective net has no functions of collecting rainwater and spraying dust, and the construction site tends to have more dust, so that the surrounding environment of the protective net cannot be sprayed with dust; 2. the traditional building engineering protection net has no buffering protection function, and when the device is subjected to external large impact force on a construction site, for example, a vehicle enters the construction site by mistake due to accidents, so that the protection net can be directly broken through, the vehicle cannot be buffered and blocked, and accidents are finally caused.
Therefore, it is important to design a protection net for building engineering to improve the whole practicality by changing the technical defects.
Disclosure of Invention
The utility model aims to provide a constructional engineering protective net for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
the utility model provides a building engineering protection network, includes stand first and stand second, from last to having connected gradually the collection rain board down between stand first and the stand second, protection otter board and first buffer board, the fixed shower that is provided with in collection rain board outside, first buffer board front side is provided with the second buffer board, the second buffer board outside is provided with the warning strip, be connected with a plurality of buffer units between first buffer board and the second buffer board, stand first and stand second bottom all are connected with unable adjustment base.
As a preferable scheme of the utility model, a plurality of fixed plug bushes are fixedly connected to the two corresponding inner sides of the first stand column and the second stand column, right-angle bolts are fixedly connected to the two sides of the rain collecting plate, the protection screen plate and the first buffer plate, and the first stand column, the second stand column, the rain collecting plate, the protection screen plate and the first buffer plate are connected with the fixed plug bushes in a plugging manner through the right-angle bolts.
As a preferable scheme of the utility model, the rain collecting plate is provided with the rain collecting groove at the top, the water collecting holes are uniformly formed in the top of the rain collecting groove, the inclined plate is arranged in the rain collecting plate, a connecting pipe is arranged at the bottom of one end of the inclined plate and extends to the bottom to be communicated with the water storage tank, one side of the water storage tank is communicated with a small water pump through a water pipe, a water outlet pipe of the small water pump extends to the outside to be communicated with a spray pipe, and a plurality of spray heads are arranged outside the spray pipe.
As a preferable scheme of the utility model, the buffer assembly comprises a first connecting plate, the first connecting plate is fixedly connected with the outer side of a first buffer plate, the top of the first connecting plate is fixedly connected with a fixed cylinder, a spring is installed at the bottom of the inner side of the fixed cylinder, the top of the spring is fixedly connected with a limiting plate, the top of the limiting plate is fixedly connected with a telescopic cylinder, one end of the telescopic cylinder is spliced in the fixed cylinder, the end part of the telescopic cylinder is fixedly connected with a second connecting plate, and the two end parts of the connecting plate are fixedly connected with a second buffer plate.
As a preferable scheme of the utility model, the fixing base comprises a fixing column, the first upright column and the second upright column are integrally formed, a sleeve is arranged in the center of the top of the fixing base, fixing holes are formed in four corners of the top of the fixing base, a limiting block is arranged in the sleeve, and bolts are connected to the outside of the sleeve through threads.
As a preferable scheme of the utility model, the fixed column is provided with a limit groove matched with the limit block, the first upright column and the second upright column are spliced with the sleeve and are in threaded connection through external bolts, and four triangular rib plates are welded between the outer circumferential wall of the sleeve and the fixed base at equal intervals.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the structure of the rainwater collecting plate, the water collecting tank, the water collecting holes, the small water pump and the spraying pipes, rainwater can be collected and dust fall can be sprayed to the surrounding environment during use, and the problems that the traditional building engineering protective net has no function of collecting and spraying the rainwater, and the dust fall cannot be sprayed to the surrounding environment of the protective net due to more dust in a construction site are effectively solved.
2. According to the utility model, through the structure of the first buffer plate, the second buffer plate and the buffer assembly, the buffer protection can be carried out when the device is subjected to external large impact force during use, so that the safety and stability of the whole use are improved, the problem that the traditional building engineering protection net has no buffer protection function is effectively solved, and when the device is subjected to external large impact force on a construction site, for example, a vehicle is accidentally mistakenly put into the construction site, the protection net can be directly broken, so that the vehicle can not be buffered and blocked, and finally the unexpected problem is caused.
Drawings
FIG. 1 is an overall structure diagram of a construction engineering protective net of the present utility model;
FIG. 2 is a diagram showing the construction of the fixed plug bush and the right-angle plug bush of the protection net for the building engineering;
FIG. 3 is a view showing the construction structure of the rain collecting plate of the protection net for the construction engineering;
FIG. 4 is a block diagram of a buffer assembly of the protection network for construction engineering according to the present utility model;
FIG. 5 is a block diagram of a fixed base of the protection network for construction engineering according to the present utility model.
In the figure: 1. a first upright post; 2. a second upright post; 3. rain collecting plate; 31. a rain collecting groove; 32. a water collecting hole; 33. a sloping plate; 34. a connecting pipe; 35. a water storage tank; 36. a small water pump; 4. a protective screen; 5. a first buffer plate; 6. a spray tube; 61. a spray head; 7. a second buffer plate; 8. an alert bar; 9. a buffer assembly; 91. a first connecting plate; 92. a fixed cylinder; 93. a spring; 94. a limiting plate; 95. a telescopic cylinder; 96. a second connecting plate; 10. a fixing assembly; 101. fixing the column; 102. a sleeve; 103. a fixing hole; 104. a limiting block; 105. a bolt; 11. fixing the plug bush; 12. a right angle bolt.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below in conjunction with the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making any inventive effort based on the embodiments of the present utility model are within the scope of protection of the present utility model.
In order that the utility model may be readily understood, a more complete description of the utility model will be rendered by reference to the appended drawings. Several embodiments of the utility model are presented. This utility model may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "mounted" on another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like are used herein for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs. The terminology used herein in the description of the utility model is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-5, the present utility model provides a technical solution:
the building engineering protective net comprises a first upright post 1 and a second upright post 2, wherein a rain collecting plate 3, a protective net plate 4 and a first buffer plate 5 are sequentially connected between the first upright post 1 and the second upright post 2 from top to bottom, and the bottoms of the first upright post 1 and the second upright post 2 are respectively connected with a fixed base 10;
the corresponding inboard of stand 1 and stand two 2 equal fixedly connected with a plurality of fixed plug bush 11, rain collecting plate 3, protection otter board 4 and the equal fixedly connected with right angle bolt 12 in first buffer board 5 both sides, and stand 1, stand two 2 and rain collecting plate 3, protection otter board 4 and first buffer board 5 are pegged graft through right angle bolt 12 and fixed plug bush 11 and are connected, make things convenient for holistic installation and dismantlement through right angle bolt 12 and fixed plug bush 11, wherein unable adjustment base includes fixed column 101, and fixed column 101 and stand 1 and stand two 2 integrated into one piece, unable adjustment base 10 top central authorities are provided with sleeve 102, and four corners in top all have seted up fixed orifices 103, sleeve 102 inside is provided with stopper 104, and outside has bolt 105 through threaded connection, be equipped with the spacing groove with stopper 104 looks adaptation on the fixed column 101, stand 1 and stand two 2 peg graft and carry out threaded connection through outer bolt 105 between the outer circumference wall of sleeve 102 and the unable adjustment base 10 equidistant welding has four triangular ribbed slabs, make things convenient for the setting up stopper 104 and looks adaptation spacing groove and outside connection with stand 1 and stand two and 2, make things convenient for the stability to dismantle at the convenient for the top at the fixed base through setting up the spacing groove of top 10 and two to make things convenient for the top to be connected with two at the same time.
In this embodiment, referring to fig. 1 and 3, a spraying pipe 6 is fixedly disposed on the outer side of the rain collecting plate 3;
the rain collecting tank 31 has been seted up at rain collecting plate 3 top, rain collecting tank 31 top evenly is provided with water collecting hole 32, the inside swash plate 33 that is provided with of rain collecting plate 3, swash plate 33 one end bottom is provided with connecting pipe 34 and extends to the bottom and communicates with water storage tank 35, water storage tank 35 one side is provided with miniature water pump 36 through the water pipe intercommunication, miniature water pump 36 outlet pipe extends to outside and sprays pipe 6 and communicate, and spray pipe 6 outside is provided with a plurality of sprinkler heads 61, can collect the rainwater through top water collecting tank 31 and water collecting hole 32 and fall into inside and finally get into water storage tank 35 and preserve, accessible miniature water pump 36 draws water and transports outside spray pipe 6 when required, and spray through sprinkler head 61 on the spray pipe 6, spray the dust fall to the surrounding environment.
In this embodiment, referring to fig. 1 and 4, a second buffer plate 7 is disposed at the front side of the first buffer plate 5, an alarm strip 8 is disposed at the outer side of the second buffer plate 7, the alarm strip 8 is used for alarming, a plurality of buffer components 9 are connected between the first buffer plate 7 and the second buffer plate 8, and the buffer components 9 can buffer and protect the device when the device receives a large external impact force, so as to improve the safety;
the buffer assembly 9 comprises a first connecting plate 91, the first connecting plate 91 is fixedly connected with the outer side of the first buffer plate 5, a fixed cylinder 92 is fixedly connected to the top, a spring 93 is installed at the bottom of the inner side of the fixed cylinder 92, a limiting plate 94 is fixedly connected to the top of the spring 93, a telescopic cylinder 95 is fixedly connected to the top of the limiting plate 94, one end of the telescopic cylinder 95 is inserted into the fixed cylinder 92, a second connecting plate 96 is fixedly connected to the end of the telescopic cylinder 95, the end of the second connecting plate 96 is fixedly connected with the second buffer plate 7, when external impact force is received, the telescopic cylinder 95 is stressed to be extruded into the fixed cylinder 92, the spring 93 in the fixed cylinder 92 is stressed to deform, so that the impact force is buffered, and the stability and safety of the device are improved.
The utility model discloses a work flow: when using this building engineering protection network, the staff can peg graft the fixed plug bush 11 of stand 1 and stand 2 both sides with collection rain board 3, guard plate 4 and first buffer board 5 both sides's right angle bolt 12, and peg graft and outside bolt 105 is screwed with sleeve 102 through the fixed column 101 of stand 1 and stand 2 bottom, thereby be connected with unable adjustment base 10, make things convenient for holistic dismantlement and installation, in the use, accessible top water catch bowl 31 and water collecting hole 32 collect the rainwater and fall into inside water storage tank 35 and preserve, accessible small-size water pump 36 is pumped and is transported to outside spray tube 6 when required, and spray the dust fall through sprinkler head 61 on spray tube 6, when the device receives outside great impact force such as have the vehicle mistake to go into this construction site and strike this network, through striking second buffer board 8 and carry out the atress buffering through the cushion member 9 that the rear side set up, wherein the protective cylinder 95 on the cushion member 9 is to the inside of fixed cylinder 92, thereby the elastic deformation of spring 93 takes place the inside is avoided to the elastic deformation device, and the unexpected deformation of the spring 93 is avoided.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building engineering protection network, includes stand one (1) and stand two (2), its characterized in that: the novel rain collecting device is characterized in that a rain collecting plate (3), a protection screen plate (4) and a first buffer plate (5) are sequentially connected between the first stand column (1) and the second stand column (2) from top to bottom, a spraying pipe (6) is fixedly arranged on the outer side of the rain collecting plate (3), a second buffer plate (7) is arranged on the front side of the first buffer plate (5), a warning strip (8) is arranged on the outer side of the second buffer plate (7), a plurality of buffer assemblies (9) are connected between the first buffer plate (5) and the second buffer plate (7), and fixing bases (10) are respectively connected to the bottoms of the first stand column (1) and the second stand column (2).
2. The construction protection net according to claim 1, wherein: the rain collecting plate comprises a first stand column (1) and a second stand column (2), wherein a plurality of fixed plug bushes (11) are fixedly connected to the corresponding inner sides of the first stand column (1) and the second stand column (2), right-angle plug pins (12) are fixedly connected to the two sides of the rain collecting plate (3), the protection screen plate (4) and the first buffer plate (5), and the first stand column (1), the second stand column (2) and the rain collecting plate (3), the protection screen plate (4) and the first buffer plate (5) are connected through the right-angle plug pins (12) in an inserting mode with the fixed plug bushes (11).
3. The construction protection net according to claim 1, wherein: rain collecting groove (31) have been seted up at rain collecting plate (3) top, rain collecting groove (31) top evenly is provided with water collecting hole (32), rain collecting plate (3) inside is provided with swash plate (33), swash plate (33) one end bottom is provided with connecting pipe (34) and extends to the bottom and communicate with water storage tank (35), water storage tank (35) one side is provided with miniature water pump (36) through the water pipe intercommunication, miniature water pump (36) outlet pipe extends to outside and communicates with spray tube (6), just spray tube (6) outside is provided with a plurality of sprinkler heads (61).
4. The construction protection net according to claim 1, wherein: the buffer assembly (9) comprises a first connecting plate (91), the first connecting plate (91) is fixedly connected with the outer side of the first buffer plate (5), a fixed cylinder (92) is fixedly connected to the top of the first connecting plate, a spring (93) is installed at the bottom of the inner side of the fixed cylinder (92), a limiting plate (94) is fixedly connected to the top of the spring (93), a telescopic cylinder (95) is fixedly connected to the top of the limiting plate (94), one end of the telescopic cylinder (95) is inserted into the fixed cylinder (92), a second connecting plate (96) is fixedly connected to the end of the telescopic cylinder (95), and the end of the second connecting plate (96) is fixedly connected with the second buffer plate (7).
5. The construction protection net according to claim 1, wherein: the fixing base comprises a fixing column (101), the fixing column (101) is integrally formed with a first upright column (1) and a second upright column (2), a sleeve (102) is arranged at the center of the top of the fixing base (10), fixing holes (103) are formed in four corners of the top, a limiting block (104) is arranged in the sleeve (102), and bolts (105) are connected to the outside through threads.
6. The construction protection net according to claim 5, wherein: the fixing column (101) is provided with a limit groove matched with the limit block (104), the first upright column (1) and the second upright column (2) are inserted into the sleeve (102) and are in threaded connection through an external bolt (105), and four triangular rib plates are welded between the outer circumferential wall of the sleeve (102) and the fixing base (10) at equal intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321489898.4U CN220059138U (en) | 2023-06-12 | 2023-06-12 | Building engineering protection network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321489898.4U CN220059138U (en) | 2023-06-12 | 2023-06-12 | Building engineering protection network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220059138U true CN220059138U (en) | 2023-11-21 |
Family
ID=88752127
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321489898.4U Active CN220059138U (en) | 2023-06-12 | 2023-06-12 | Building engineering protection network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220059138U (en) |
-
2023
- 2023-06-12 CN CN202321489898.4U patent/CN220059138U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220059138U (en) | Building engineering protection network | |
CN209874660U (en) | Enclose fender suitable for construction is built with degradable dirt in room | |
CN208844454U (en) | A kind of road construction warning sign with cleaning function | |
CN215632171U (en) | Construction is with enclosing fender | |
CN210598211U (en) | Novel aluminum alloy safety protection net | |
CN212200059U (en) | A guardrail for on town road bridge | |
CN211522870U (en) | Anticorrosive and rustproof fixed support railing for bridge | |
CN213175128U (en) | Bridge construction is with warning protector that has dust fall structure | |
CN218485495U (en) | Construction protection device with dust removal function | |
CN218991128U (en) | Building site temporary enclosure | |
CN218861429U (en) | Guardrail installation mechanism | |
CN205776272U (en) | A kind of anti-slope of highway landslide device | |
CN219509381U (en) | Fence structure for road construction | |
CN216740998U (en) | Fence for building construction | |
CN216043093U (en) | Municipal works are with construction rail with alarming function | |
CN220247695U (en) | A face limit operation protector for construction | |
CN214303235U (en) | Building site safety protection rail | |
CN219701457U (en) | Spraying dust suppression device for green construction | |
CN221461037U (en) | Novel guardrail | |
CN214886142U (en) | A pin-connected panel rail guard for water conservancy construction | |
CN217461739U (en) | Face early warning device of frontier defense in construction | |
CN211621791U (en) | Damage-reducing, anti-theft and anti-collision type ground fire hydrant | |
CN218204079U (en) | Road guardrail anti-block | |
CN220469533U (en) | Protective bracket for building engineering | |
CN221879089U (en) | Protective fence for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |