CN209895167U - Data center load integrated control system - Google Patents

Data center load integrated control system Download PDF

Info

Publication number
CN209895167U
CN209895167U CN201921114270.XU CN201921114270U CN209895167U CN 209895167 U CN209895167 U CN 209895167U CN 201921114270 U CN201921114270 U CN 201921114270U CN 209895167 U CN209895167 U CN 209895167U
Authority
CN
China
Prior art keywords
unit
air switch
load
signal
ways
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921114270.XU
Other languages
Chinese (zh)
Inventor
骆樵波
骆禄堂
郑伟民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zeyu Technology Group Co ltd
Original Assignee
Xiamen Zeyu Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Zeyu Technology Engineering Co Ltd filed Critical Xiamen Zeyu Technology Engineering Co Ltd
Priority to CN201921114270.XU priority Critical patent/CN209895167U/en
Application granted granted Critical
Publication of CN209895167U publication Critical patent/CN209895167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)

Abstract

The utility model discloses a data center load integrated control system, including first air switch, the second air switch, ac contactor, a socket, eight ways illumination load units, with the electrical load unit, four ways sight control unit and signal unit, two air switches are connected with commercial power access, first air switch respectively with eight ways illumination load units etc. electrical intercommunication and through mains supply, the second air switch is connected with ac contactor's incoming line terminal series connection, ac contactor's leading-out terminal and a plurality of socket parallel connection, four ways sight control unit embeds there is control circuit, signal unit respectively with eight ways illumination load units, with the electrical load unit, four ways sight control unit signal intercommunication through the E-bus; the control circuit in the control unit is used for carrying out centralized control on illumination, loads and the like, and the control is simple and convenient, the use of parts is less, the use cost is low, the failure rate is low, the maintenance is convenient, and the operation and the use are simple and convenient.

Description

Data center load integrated control system
Technical Field
The utility model belongs to the control system field, in particular to an integrated control system for data center load.
Background
All be equipped with very many power consumption loads in the data center, to present, these loads of data center all are independent control, and a load carries out independent control through a controller or control box, and this kind of independent control mode of carrying out through single controller can satisfy certain operation requirement, but also has great defect, and independent control needs the control unit many, and use cost is high, and the troublesome operation of control is inconvenient, and the high maintenance of fault rate is inconvenient, and it is extremely inconvenient to operate the use.
The to-be-solved technical problem of the utility model is to provide a data center load integrated control system that integrated control part is few, use cost is low, control is simple convenient, the low easy maintenance of fault rate, operation convenient to use.
SUMMERY OF THE UTILITY MODEL
For solving the troublesome inconvenient operation of the above-mentioned prior art independent control, use many use cost of part high, the control degree of difficulty is big, the high inconvenient scheduling problem of maintenance of fault rate, the utility model discloses a following technical scheme:
the utility model provides a data center load integrated control system, including first air switch, second air switch, ac contactor, a plurality of socket, eight way lighting load units, power consumption load unit, four ways sight control unit and signal unit, first air switch, second air switch are connected with the commercial power access, first air switch respectively with eight way lighting load units, power consumption load unit, four ways sight control unit, signal unit electrical property intercommunication and through the commercial power supply, second air switch and ac contactor's incoming line terminal series connection, ac contactor's contact terminal and eight ways lighting load unit's signal terminal signal intercommunication, ac contactor's leading-out terminal and a plurality of socket parallel connection, four ways sight control unit embeds there is control circuit, signal unit respectively with eight ways lighting load unit through E-bus, The power load unit is in signal communication with the four scene control units.
As right the utility model discloses an improvement, the signal unit is any one of infrared code learning, 4G wireless transceiver or LAN serial converter.
As right the utility model discloses a further improvement still includes the reserve air switch of a plurality of, reserve air switch is connected with the commercial power access.
The beneficial effects of the utility model reside in that: the control circuit in the control unit is used for carrying out centralized control on illumination, loads and the like, and the control is simple and convenient, the use of parts is less, the use cost is low, the failure rate is low, the maintenance is convenient, and the operation and the use are simple and convenient.
Drawings
Fig. 1 is a schematic block diagram according to an embodiment of the present invention.
Fig. 2 is a schematic diagram of the control circuit of the present invention.
Detailed Description
The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
Referring to fig. 1, a data center load integrated control system includes a first air switch 11, a second air switch 12, an ac contactor 2, a plurality of sockets 3, eight lighting load units 4, an electrical load unit 5, a four scene control unit 6, and a signal unit 7, where the first air switch 11 and the second air switch 12 are connected to a mains supply to introduce the mains supply to supply power to the electrical load, the first air switch 11 is respectively electrically connected to the eight lighting load units 4, the electrical load unit 5, the four scene control unit 6, and the signal unit 7 and supplies power through the mains supply, the second air switch 12 is connected in series to an incoming terminal of the ac contactor 2, a contact terminal of the ac contactor 2 is in signal communication with a signal terminal of the eight lighting load units 4, and an outgoing terminal of the ac contactor 2 is connected in parallel to the plurality of sockets 3, the four scene control units 6 are internally provided with control circuits (shown in fig. 2), the signal unit 7 is respectively in signal communication with the eight lighting load units 4, the power load units 5 and the four scene control units 6 through an E-bus, the signal units send instructions to the used power loads, lighting bulbs and the like, and the control circuits in the thought scene control units are used for actual control, so that integrated centralized control is realized, and the control is convenient and simple.
The utility model discloses in, signal unit 7 is any one of infrared code learning, 4G wireless transceiver or LAN serial converter, and signal unit optional use wherein in the above-mentioned one, but not limited to this, other can carry out signal communication also within this protection scope, do not give unnecessary detail here one by one.
The utility model discloses in, still include a plurality of reserve air switch 8, reserve air switch 8 is connected with the commercial power access, can connect more loads through reserve switch, and it is more convenient to use.
The beneficial effects of the utility model reside in that: the control circuit in the control unit is used for carrying out centralized control on illumination, loads and the like, and the control is simple and convenient, the use of parts is less, the use cost is low, the failure rate is low, the maintenance is convenient, and the operation and the use are simple and convenient. .
The above embodiments and drawings are not intended to limit the form and style of the present invention, and any suitable changes or modifications made by those skilled in the art should not be construed as departing from the scope of the present invention.

Claims (3)

1. A data center load integrated control system is characterized in that: the intelligent lighting system comprises a first air switch (11), a second air switch (12), an alternating current contactor (2), a plurality of sockets (3), eight paths of lighting load units (4), a power load unit (5), four paths of scene control units (6) and a signal unit (7), wherein the first air switch (11) and the second air switch (12) are connected with a mains supply in an access mode, the first air switch (11) is respectively electrically communicated with the eight paths of lighting load units (4), the power load unit (5), the four paths of scene control units (6) and the signal unit (7) and is powered by the mains supply, the second air switch (12) is connected with an incoming line terminal of the alternating current contactor (2) in series, a contact terminal of the alternating current contactor (2) is in signal communication with a signal terminal of the eight paths of lighting load units (4), and an outgoing line terminal of the alternating current contactor (2) is connected with the plurality of sockets (3) in parallel, the four-path scene control unit (6) is internally provided with a control circuit, and the signal unit (7) is respectively in signal communication with the eight-path lighting load unit (4), the electric load unit (5) and the four-path scene control unit (6) through an E-bus.
2. The data center load integration control system of claim 1, wherein: still include a plurality of reserve air switch (8), reserve air switch (8) are connected with the commercial power access.
3. The data center load integration control system of claim 1, wherein: the signal unit (7) is any one of an infrared code learning device, a 4G wireless transceiver or a local area network serial port converter.
CN201921114270.XU 2019-07-16 2019-07-16 Data center load integrated control system Active CN209895167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921114270.XU CN209895167U (en) 2019-07-16 2019-07-16 Data center load integrated control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921114270.XU CN209895167U (en) 2019-07-16 2019-07-16 Data center load integrated control system

Publications (1)

Publication Number Publication Date
CN209895167U true CN209895167U (en) 2020-01-03

Family

ID=69021730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921114270.XU Active CN209895167U (en) 2019-07-16 2019-07-16 Data center load integrated control system

Country Status (1)

Country Link
CN (1) CN209895167U (en)

Similar Documents

Publication Publication Date Title
TW201914146A (en) Integrated power supply system
CN112202571A (en) POE power transmission device, POE switch and POE system
CN209895167U (en) Data center load integrated control system
CN110602821B (en) POE power supply-based light control system, method and storage medium
CN203786272U (en) AAAAAC-DC dual-purpose test load
CN105633942B (en) A kind of low-voltage direct home intelligent electric power system
CN211580264U (en) Lighting control system for forklift
CN103199390A (en) Wall space power supply patch panel
CN215682703U (en) Centralized controller and street lamp system
CN220673402U (en) Inverter parallel-to-off-grid switching device
CN205595293U (en) Intelligent air switch who possesses long -haul telemetry and remote control
CN110831299A (en) Lighting control system for forklift
CN111162662A (en) Intelligent power adapter and working method thereof, and intelligent electric pole
CN201178382Y (en) Electric power change-over circuit
CN212324439U (en) Safety protection circuit, safety protection device and lamp
CN220254144U (en) Factory user side energy storage system
EP3089552B1 (en) Dc low voltage power distribution unit and system for a power grid
CN102573173A (en) LED street lamp system with power carrier wave and design method thereof
CN218041858U (en) Control logic for lighting heater
CN102573174A (en) LED (light-emitting diode) street lamp with electric carrier wave and design method thereof
CN211349044U (en) Drive control node circuit applied to smart home
CN219042051U (en) Control module and have its light control system
CN212210494U (en) Safety protection circuit, safety protection device and lamp
CN214754514U (en) Intelligent charging socket for electric bicycle and network type intelligent charging socket cluster system
CN216904709U (en) Brushless motor lift table controlgear based on RS485 bus formula communication

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 361000 Room 302, No. 52, guanri Road, phase II, software park, Xiamen, Fujian

Patentee after: Zeyu Technology Group Co.,Ltd.

Address before: 361000 unit 302, 52 guanri Road, phase II, software park, Siming District, Xiamen City, Fujian Province

Patentee before: Xiamen Zeyu Technology Engineering Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Data Center Load Integrated Control System

Effective date of registration: 20220805

Granted publication date: 20200103

Pledgee: Xiamen Branch of PICC

Pledgor: Zeyu Technology Group Co.,Ltd.

Registration number: Y2022980012065

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231201

Granted publication date: 20200103

Pledgee: Xiamen Branch of PICC

Pledgor: Zeyu Technology Group Co.,Ltd.

Registration number: Y2022980012065

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Integrated Load Control System for Data Centers

Granted publication date: 20200103

Pledgee: Xiamen Jimei Sub branch of Agricultural Bank of China Co.,Ltd.

Pledgor: Zeyu Technology Group Co.,Ltd.

Registration number: Y2024980039944