CN209891615U - Regeneration heat preservation decorative wallboard based on building rubbish - Google Patents
Regeneration heat preservation decorative wallboard based on building rubbish Download PDFInfo
- Publication number
- CN209891615U CN209891615U CN201920139241.2U CN201920139241U CN209891615U CN 209891615 U CN209891615 U CN 209891615U CN 201920139241 U CN201920139241 U CN 201920139241U CN 209891615 U CN209891615 U CN 209891615U
- Authority
- CN
- China
- Prior art keywords
- wall body
- prefabricated wall
- piece
- floor
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to a building materials field discloses a regeneration heat preservation decorative wall board based on building rubbish, including prefabricated wall body, prefabricated wall body both sides are provided with a plurality of floor, the floor passes through coupling assembling and sets up on the prefabricated wall body, coupling assembling includes fixed connection and is in spacer, grafting on the prefabricated wall body installation piece between spacer and the prefabricated wall body, set up spliced eye on the installation piece, wear to establish in the spliced eye and the crooked connection piece that sets up, connection piece and floor fixed connection. The utility model discloses have the effect that reduces the floor probability of droing.
Description
Technical Field
The utility model belongs to the technical field of the technique of building materials and specifically relates to a regeneration heat preservation decorative wall board based on building rubbish.
Background
The present wallboard is a building material, and is a house structure of a bearing system formed by walls and floor slabs. The load-bearing wall of the wallboard structure may be made of bricks, blocks, prefabricated or cast-in-place concrete.
The general structure of current wallboard is at the both sides fixed floor of prefabricated wall body, and prefabricated wall body carries out the bearing and supports, and the floor passes through concrete or glue to be fixed on prefabricated wall body, shelters from the beautification to prefabricated wall body to play certain guard action to prefabricated wall body.
The above prior art solutions have the following drawbacks: the floor slab and the prefabricated wall body are fixed through concrete or glue, when the concrete or the glue has quality defects or a construction process has problems, the floor slab fixed on the prefabricated wall body is in an unstable state, and after the floor slab and the prefabricated wall body are used for a long time, the floor slab and the prefabricated wall body are easily separated, so that the floor slab falls off.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model provides a regeneration heat preservation decorative wallboard based on building rubbish has the effect that reduces the floor probability of droing.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a regeneration heat preservation decorative wall board based on building rubbish, includes prefabricated wall body, prefabricated wall body both sides are provided with a plurality of floor, the floor passes through coupling assembling and sets up on the prefabricated wall body, coupling assembling includes fixed connection and is in spacer on the prefabricated wall body, peg graft and be in installation piece between spacer and the prefabricated wall body, set up the spliced eye on the installation piece, wear to establish in the spliced eye and the crooked connection piece that sets up, connection piece and floor fixed connection.
Through adopting above-mentioned technical scheme, the mounting plate is inserted and is established between spacer and prefabricated wall body to make the position of mounting plate fixed, the mounting plate can take out again simultaneously, the connection piece of crooked setting is inserted and is established in the spliced eye, and crooked setting makes the connection piece be difficult to slide in the spliced eye, thereby has played better fixed action to the floor, makes the floor be difficult for breaking away from prefabricated wall body, also makes things convenient for the workman to take off the floor from prefabricated wall body simultaneously.
The utility model discloses further set up to: the mounting piece is in including pegging graft first grafting portion and second grafting portion, fixed connection between spacer and the prefabricated wall body supporting part, fixed connection in on the first grafting portion elastic component, both ends on the second grafting portion respectively with elastic component and supporting part fixed connection's installation department, the supporting part is contradicted with the spacer, the spliced eye is seted up on the installation department.
Through adopting above-mentioned technical scheme, when the installation of installing the piece, the workman will insert first grafting portion to between spacer and the prefabricated wall body earlier, then through the bending of elasticity portion, make second grafting portion also peg graft to between spacer and the prefabricated wall body, the supporting part is contradicted with the spacer this moment, supports, then the workman wears to establish the connection piece in the spliced eye, fixes a position the position of connection piece, thereby fixes the floor at the installation of completion floor on the connection piece.
The utility model discloses further set up to: be provided with the reinforcement on the prefabricated wall body, the reinforcement includes elastic component, the fixed connection of fixed connection on prefabricated wall body the reinforcing block of prefabricated wall body one end is kept away from to the elastic component, the reinforcing block with the connection piece is contradicted, the elastic component is applyed the power of keeping away from prefabricated wall body direction to the reinforcing block.
Through adopting above-mentioned technical scheme, the effect of elastic component application power to the boss makes the boss support tightly on the connection piece to make the frictional force increase between connection piece and the installation piece, further restrict the removal of connection piece, thereby make the floor be difficult for taking place to remove.
The utility model discloses further set up to: fixedly connected with guide bar on the prefabricated wall body, the guide bar is worn to establish in the elastic component, the boss cover is established on the guide bar.
Through adopting above-mentioned technical scheme, the setting up of guide bar makes boss and elastic component be difficult for taking place to remove at will to conflict that can be more stable on the connection piece, make the difficult slip that produces great distance of connection piece, make the position of floor comparatively stable.
The utility model discloses further set up to: the reinforcing block is close to fixedly connected with a plurality of buffering bulges on one side of the connecting sheet, and the buffering bulges are abutted against the connecting sheet.
Through adopting above-mentioned technical scheme, the buffering is protruding to make the frictional force between boss and the connection piece obtain promoting to make the difficult slip that produces great distance of connection piece, make the position of floor comparatively stable.
The utility model discloses further set up to: and a concrete connecting layer is arranged between the prefabricated wall body and the floor slab and is formed by filling concrete.
Through adopting above-mentioned technical scheme, the concrete connection layer is connected between to prefabricated wall body and the floor for no longer be the connection of small area between prefabricated wall body and the floor, make the connection between floor and the prefabricated wall body more stable.
The utility model discloses further set up to: the floor is fixedly connected with a fixing piece, and two ends of the connecting piece are tightly propped against the fixing piece.
Through adopting above-mentioned technical scheme, when the connection piece takes place deformation, the connection piece more supports tightly on the stationary blade to carry out better injecing to the position of floor, make the floor be difficult for taking place to drop.
The utility model discloses further set up to: the floor slab is a heat-insulating decorative plate.
By adopting the technical scheme, the heat-insulating decorative plate is formed by compounding the heat-insulating material and the decorative material, has heat-insulating and decorative functions, can well shield and decorate the prefabricated wall body, and enables the prefabricated wall body to have a good heat-insulating effect.
To sum up, the utility model discloses following beneficial effect has:
through setting up the installation component, the installation component is connected floor and prefabricated wall body for connection structure intensity between floor and the prefabricated wall body is higher, thereby is difficult for making the floor drop from prefabricated wall body, thereby has improved the stability of floor.
Drawings
FIG. 1 is a schematic cross-sectional view of the internal connection structure of the present invention;
fig. 2 is an enlarged view of a portion a of fig. 1, showing a connection structure of the mounting portion and the insertion hole.
Reference numerals: 1. prefabricating a wall body; 2. a floor slab; 21. a fixing sheet; 3. a connecting assembly; 31. positioning plates; 32. mounting a sheet; 321. a first insertion part; 322. a second insertion part; 323. a support portion; 324. an elastic portion; 325. an installation part; 33. inserting holes; 34. connecting sheets; 4. a concrete joint layer; 5. a reinforcement; 51. an elastic member; 52. a reinforcing block; 521. a buffer protrusion; 522. sleeving a hole; 6. a guide rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses a regeneration heat preservation decorative wall board based on construction waste, including prefabricated wall body 1, prefabricated wall body 1's both sides are provided with a plurality of floor 2 through coupling assembling 3, are provided with concrete linkage 4 between floor 2 and the coupling assembling 3, and concrete linkage 4 forms with concrete filling, and concrete linkage 4's both sides respectively with prefabricated wall body 1 and 2 fixed connection of floor, floor 2 is the heat preservation decorative board.
The connecting assembly 3 comprises a positioning piece 31, an installation piece 32, an inserting hole 33 and a connecting piece 34, the connecting piece 34 in a C shape is fixedly connected to the prefabricated wall 1, two ends of the connecting piece 34 are fixedly connected with the prefabricated wall 1 respectively, and a gap is formed between the middle of the connecting piece 34 and the prefabricated wall 1. The mounting sheet 32 is located between the two connecting sheets 34, the mounting sheet 32 includes a first inserting portion 321, a second inserting portion 322, a supporting portion 323, an elastic portion 324 and a mounting portion 325, the first inserting portion 321 and the second inserting portion 322 are respectively inserted into the two connecting sheets 34, the first inserting portion 321 and the second inserting portion 322 are located between the positioning sheet 31 and the prefabricated wall 1 and are abutted against the prefabricated wall 1 and the positioning sheet 31, the supporting portion 323 is fixedly connected to the first inserting portion 321, the lower surface of the supporting portion is abutted against the positioning sheet 31, the elastic portion 324 is fixedly connected to the second inserting portion 322, two ends of the mounting portion 325 are respectively fixedly connected to the supporting portion 323 and the elastic portion 324, and the first inserting portion 321, the second inserting portion 322, the supporting portion 323, the elastic portion 324 and the mounting portion 325 are combined to form a shape of a Chinese character 'ji'. The two insertion holes 33 are formed in the mounting portion 325 and are uniformly distributed along the length direction of the mounting portion 325, and the connecting piece 34 which is bent penetrates through the two insertion holes 33. The floor 2 is towards fixedly connected with stationary blade 21 on the one side of prefabricated wall 1, and the one end that the floor 2 was kept away from to stationary blade 21 slopes down, and the both ends of connection piece 34 are contradicted with stationary blade 21.
Be provided with reinforcement 5 on prefabricated wall body 1, reinforcement 5 includes elastic component 51 and boss 52, elastic component 51 fixed connection is on prefabricated wall body 1, elastic component 51 is the spring, the one end of prefabricated wall body 1 is kept away from to boss 52 fixed connection at elastic component 51, the power of keeping away from prefabricated wall body 1 direction is applyed to elastic component 51 to boss 52, boss 52 keeps away from one of elastic component 51 and serves a plurality of buffer protrusion 521 that fixedly connected with, buffer protrusion 521 contradicts with connection piece 34, buffer protrusion 521 adopts rubber to make. Fixedly connected with guide bar 6 on prefabricated wall body 1, guide bar 6 wears to establish in elastic component 51, has seted up the cover on the boss 52 and has established hole 522, and guide bar 6 wears to establish in the cover hole 522, and the week side outer wall of guide bar 6 is contradicted with the inner wall of cover hole 522.
The implementation principle of the embodiment is as follows: when the floor slab 2 is installed, a worker firstly inserts the first inserting portion 321 between the positioning piece 31 and the prefabricated wall body 1, then bends the elastic portion 324, so that the second inserting portion 322 enters between the other positioning piece 31 and the prefabricated wall body 1, thereby fixing the position of the installation piece 32 is completed, then the worker sequentially penetrates the connecting piece 34 through the two inserting holes 33, thereby abutting two ends of the connecting piece 34 against the fixing piece 21, and thereby fixing the position of the floor slab 2 is completed. At this time, the elastic member 51 pushes the reinforcing block 52 to move, so that the buffering protrusion 521 abuts against the connecting piece 34, and the connecting piece 34 is slightly deformed under the pushing of the reinforcing block 52, so that the two ends of the connecting piece 34 abut against the fixing pieces 21, thereby reinforcing the connection of the floor slab 2. And finally, filling concrete by workers to finish the construction of the wallboard.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a regeneration heat preservation decorative wall board based on building rubbish, includes prefabricated wall body (1), characterized by: prefabricated wall body (1) both sides are provided with a plurality of floor (2), floor (2) set up through coupling assembling (3) on prefabricated wall body (1), coupling assembling (3) are including fixed connection locating piece (31) on prefabricated wall body (1), peg graft and be in installation piece (32) between locating piece (31) and prefabricated wall body (1), set up spliced eye (33) on installation piece (32), wear to establish connection piece (34) that just bending set up in spliced eye (33), connection piece (34) and floor (2) fixed connection.
2. The construction waste-based regenerated thermal insulation decorative wallboard as claimed in claim 1, characterized in that: the mounting piece (32) comprises a first inserting portion (321) and a second inserting portion (322) which are inserted between the positioning piece (31) and the prefabricated wall body (1), a supporting portion (323) fixedly connected to the first inserting portion (321), an elastic portion (324) fixedly connected to the second inserting portion (322), and a mounting portion (325) with two ends fixedly connected to the elastic portion (324) and the supporting portion (323) respectively, wherein the supporting portion (323) is abutted to the positioning piece (31), and the inserting hole (33) is formed in the mounting portion (325).
3. The construction waste-based regenerated thermal insulation decorative wallboard as claimed in claim 1, characterized in that: be provided with reinforcement (5) on prefabricated wall body (1), reinforcement (5) are including elastic component (51), the fixed connection of fixed connection on prefabricated wall body (1) boss (52) of prefabricated wall body (1) one end are kept away from in elastic component (51), boss (52) with connection piece (34) are contradicted, elastic component (51) are applyed the power of keeping away from prefabricated wall body (1) direction to boss (52).
4. The construction waste-based recycled heat-insulating decorative wallboard as claimed in claim 3, wherein: fixedly connected with guide bar (6) on prefabricated wall body (1), guide bar (6) wear to establish in elastic component (51), boss (52) cover is established on guide bar (6).
5. The construction waste-based recycled heat-insulating decorative wallboard as claimed in claim 3, wherein: the reinforcing block (52) is fixedly connected with a plurality of buffering bulges (521) on one side close to the connecting sheet (34), and the buffering bulges (521) are abutted against the connecting sheet (34).
6. The construction waste-based regenerated thermal insulation decorative wallboard as claimed in claim 1, characterized in that: the prefabricated wall body (1) with be provided with concrete connecting layer (4) between floor (2), concrete connecting layer (4) are formed for concrete filling.
7. The construction waste-based regenerated thermal insulation decorative wallboard as claimed in claim 1, characterized in that: the floor (2) is fixedly connected with a fixing piece (21), and two ends of the connecting piece (34) are tightly propped against the fixing piece (21).
8. The construction waste-based regenerated thermal insulation decorative wallboard as claimed in claim 1, characterized in that: the floor (2) is a heat-insulating decorative plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920139241.2U CN209891615U (en) | 2019-01-25 | 2019-01-25 | Regeneration heat preservation decorative wallboard based on building rubbish |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920139241.2U CN209891615U (en) | 2019-01-25 | 2019-01-25 | Regeneration heat preservation decorative wallboard based on building rubbish |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209891615U true CN209891615U (en) | 2020-01-03 |
Family
ID=69016094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920139241.2U Expired - Fee Related CN209891615U (en) | 2019-01-25 | 2019-01-25 | Regeneration heat preservation decorative wallboard based on building rubbish |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209891615U (en) |
-
2019
- 2019-01-25 CN CN201920139241.2U patent/CN209891615U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0162166A2 (en) | Facing material for building and method for connecting same | |
KR20140081788A (en) | Thermal insulation composite system, building comprising such a system and method for producing a thermal insulation composite system | |
CN209891615U (en) | Regeneration heat preservation decorative wallboard based on building rubbish | |
CN111335506B (en) | Plug-type assembled wall body and assembled building structure | |
CN212026833U (en) | Prefabricated bay window | |
CN213626081U (en) | Reinforced fastening connection structure of concrete precast slab | |
CN113062623B (en) | Reinforcing structure for uneven joints of outer vertical surfaces of concrete frame structures | |
CN114991355A (en) | Keel framework, partition wall and installation method | |
KR100862668B1 (en) | An assembly type flooring block | |
KR100885400B1 (en) | Corner connector of ceramic complex panel and structure for installing that | |
CN220565529U (en) | Gypsum mould box convenient to installation | |
JPS60195256A (en) | Brick lining structure | |
CN213477270U (en) | Connecting mechanism of building wallboard | |
JPH0644966Y2 (en) | Partition wall panel | |
CN218643749U (en) | Wallboard mounting structure for decoration | |
CN219261511U (en) | Green building wall body of outer heat preservation | |
CN218522005U (en) | Bearing wall structure of aerated concrete block | |
CN215253691U (en) | Assembled gypsum board partition wall structure | |
CN220414590U (en) | Composite keel wall system | |
CN217680143U (en) | Buckle connecting piece of glass partition guardrail | |
CN218234140U (en) | Galvanized steel keel for early-dismantling system of template | |
CN211622114U (en) | New old wall overlap joint of T type prevents structure of ftractureing | |
CN110761454A (en) | Assembled wall body convenient to install and installation method thereof | |
CN114790866B (en) | Pouring box type hidden sliding door mounting system | |
CN220100287U (en) | Interior wall mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200103 Termination date: 20210125 |