CN209891234U - Precise positioning mechanism of pre-buried anchor bolts for steel tube column concrete foundation - Google Patents
Precise positioning mechanism of pre-buried anchor bolts for steel tube column concrete foundation Download PDFInfo
- Publication number
- CN209891234U CN209891234U CN201920158596.6U CN201920158596U CN209891234U CN 209891234 U CN209891234 U CN 209891234U CN 201920158596 U CN201920158596 U CN 201920158596U CN 209891234 U CN209891234 U CN 209891234U
- Authority
- CN
- China
- Prior art keywords
- steel
- embedded
- anchor bolts
- concrete foundation
- embedded anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本实用新型公开了一种钢管柱混凝土基础预埋地脚螺栓精准定位机构,解决了钢管柱混凝土基础上的预埋地脚螺栓的精准定位困难的问题。包括钢管柱、环形布置的钢管柱混凝土基础钢筋(1)、钢管搭建的龙门架(2)、预埋地脚螺拴(5)和钢板定位环(3),制作一个模拟钢管柱法兰盘的钢板定位环(3),在钢板定位环(3)上加工出与钢管柱法兰盘上的螺栓孔完全一致的螺栓孔,将预埋地脚螺栓穿接在钢板定位环(3)上,通过钢管支架对穿接有预埋地脚螺栓的定位环进行支撑定位,并将其与钢管柱混凝土基础中的模板钢筋固定连接在一起,浇筑基础混凝土,当浇筑基础混凝土凝固后,将定位环拆掉。实现了预埋地脚螺拴的准确定位预埋。
The utility model discloses a precise positioning mechanism for pre-embedded anchor bolts on a steel tube column concrete foundation, which solves the problem of difficulty in precise positioning of the pre-embedded anchor bolts on the steel tube column concrete foundation. Including steel tube columns, steel tube column concrete foundation steel bars (1) arranged in a ring, gantry constructed with steel tubes (2), pre-embedded anchor bolts (5) and steel plate positioning rings (3) to make a simulated steel tube column flange The steel plate positioning ring (3) is machined on the steel plate positioning ring (3) to make bolt holes that are exactly the same as the bolt holes on the steel pipe column flange, and the pre-embedded anchor bolts are threaded on the steel plate positioning ring (3). , The positioning ring with the embedded anchor bolts is supported and positioned through the steel pipe bracket, and it is fixedly connected with the formwork steel in the steel pipe column concrete foundation, and the foundation concrete is poured. When the poured foundation concrete solidifies, the positioning ring Ring removed. Accurate positioning and pre-embedding of pre-embedded anchor bolts are realized.
Description
技术领域technical field
本发明涉及一种钢管柱混凝土基础,特别涉及一种钢管柱混凝土基础上连接固定钢管柱底端法兰盘的预埋地脚螺栓的精准定位机构及定位方法。The invention relates to a steel tube column concrete foundation, in particular to a precise positioning mechanism and a positioning method for connecting and fixing a pre-buried anchor bolt at the bottom end flange of a steel tube column on the steel tube column concrete foundation.
背景技术Background technique
钢管柱基础一般为现浇混凝土基础,在该基础底板上需要预埋地脚螺栓,钢管柱通过其底部设置的连接法兰与预埋地脚螺栓连接在一起,以完成钢管柱的固定;地脚螺栓的预埋是否能精准定位,直接关系到后续的钢管柱的顺利安装,即,钢管柱从高空吊装落下时,其底部的法兰盘上的螺栓孔是否能顺利地套入到预埋地脚螺栓上。现有的混凝土浇筑前预埋地脚螺栓的定位方法是:根据钢管柱底部法兰盘上的螺栓孔的位置,在钢管柱混凝土基础的模板钢筋上,通过测量标记各地脚螺栓的准确定位位置,将各地脚螺栓绑扎固定在标记位上,然后,再进行钢管柱基础的混凝土浇筑,并使预埋螺栓的尾部露出到现浇混凝土顶面的外部;这种定位方法存在以下问题:(1)测量误差是不可避免的,(2)标记操作容易存在误差,(3)在基础混凝土浇筑中所预埋的地脚螺栓容易出现位移现象,导致预埋螺栓定位出现偏差,使钢管柱吊装安装时预埋螺拴无法进入到钢管柱法兰盘的螺栓孔中,由于预埋螺拴已固定在混凝土中,若要调整位置,变得非常困难。The steel pipe column foundation is generally a cast-in-place concrete foundation, and the anchor bolts need to be embedded on the base plate of the foundation. The steel pipe column is connected with the embedded anchor bolts through the connecting flange set at the bottom to complete the fixing of the steel pipe column; Whether the pre-embedding of the anchor bolts can be accurately positioned is directly related to the smooth installation of the subsequent steel pipe columns, that is, whether the bolt holes on the flanges at the bottom of the steel pipe columns can be smoothly inserted into the pre-embedded steel pipe columns when they are hoisted and dropped from a height. on the anchor bolts. The existing positioning method of pre-embedded anchor bolts before concrete pouring is: according to the position of the bolt holes on the flange plate at the bottom of the steel pipe column, on the template steel bar of the steel pipe column concrete foundation, the accurate positioning position of each anchor bolt is marked by measuring , bind and fix the anchor bolts on the marked position, and then carry out the concrete pouring of the steel pipe column foundation, and expose the tail of the embedded bolt to the outside of the top surface of the cast-in-place concrete; this positioning method has the following problems: (1 ) Measurement errors are unavoidable, (2) the marking operation is prone to errors, (3) the anchor bolts embedded in the foundation concrete pouring are prone to displacement, resulting in deviations in the positioning of the embedded bolts, making the steel pipe column hoisting and installation. At this time, the embedded bolts cannot enter the bolt holes of the steel pipe column flange. Since the embedded bolts have been fixed in the concrete, it is very difficult to adjust the position.
发明内容SUMMARY OF THE INVENTION
本发明提供了一种钢管柱混凝土基础预埋地脚螺栓精准定位机构及定位方法,解决了钢管柱混凝土基础上的预埋地脚螺栓的精准定位困难的技术问题。The invention provides a precise positioning mechanism and a positioning method for the pre-embedded anchor bolts of the steel tube column concrete foundation, and solves the technical problem of difficulty in precise positioning of the pre-embedded anchor bolts on the steel tube column concrete foundation.
本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:
本发明的总体构思是:制作一个模拟钢管柱法兰盘的定位环,在定位环上加工出与钢管柱法兰盘上的螺栓孔完全一致的螺栓孔,将预埋地脚螺栓穿接在定位环上,通过钢管支架对穿接有预埋地脚螺栓的定位环进行支撑定位,并将其与钢管柱基础模板中的钢筋固定连接在一起,然后浇筑基础混凝土,当浇筑基础混凝土凝固后,将定位环拆掉,通过定位环真实模拟钢管柱法兰盘,实现对预埋地脚螺栓的准确预埋定位。The general idea of the present invention is to make a positioning ring that simulates the flange of a steel pipe column, process bolt holes on the positioning ring that are completely consistent with the bolt holes on the flange of the steel pipe column, and thread the pre-embedded anchor bolts on the flange. On the positioning ring, the positioning ring with the embedded anchor bolts is supported and positioned by the steel pipe bracket, and it is fixedly connected with the steel bars in the steel pipe column foundation formwork, and then the foundation concrete is poured. When the poured foundation concrete solidifies , Remove the positioning ring, and simulate the steel pipe column flange through the positioning ring to realize the accurate embedded positioning of the embedded anchor bolts.
一种钢管柱混凝土基础预埋地脚螺栓精准定位机构,包括钢管柱、环形布置的钢管柱混凝土基础钢筋、钢管搭建的龙门架、预埋地脚螺拴和钢板定位环,在钢管柱的底端固定设置有固定连接法兰盘,在固定连接法兰盘上等间隔弧度地设置有预埋螺拴穿接孔,在预埋地脚螺拴的底端固定设置有底托板,在预埋地脚螺拴的上部设置有上端台阶,在上端台阶以上的预埋地脚螺拴的顶端设置有阳螺纹,在钢板定位环上等间隔弧度地设置有预埋螺栓预先穿接孔,钢板定位环的形状与钢管柱底端固定设置的固定连接法兰盘的形状是完全相同的,在钢板定位环上等间隔弧度地设置的预埋螺栓预先穿接孔与在固定连接法兰盘上等间隔弧度地设置的预埋螺拴穿接孔是完全重合的;在钢管柱混凝土基础钢筋上沿同一水平面分别梆扎设置有环形内侧定位筋和环形外侧定位筋,在环形内侧定位筋与环形外侧定位筋之间等间隔弧度地搭接有架力筋,在环形布置的钢管柱混凝土基础钢筋上等间隔弧度地架设有钢管搭建的龙门架,钢板定位环是搭接在龙门架的顶部横梁上的,预埋地脚螺拴的底端固定设置的底托板放置在架力筋上,预埋地脚螺拴的顶端穿过钢板定位环上等间隔弧度地设置的预埋螺栓预先穿接孔后与螺母螺接在一起。An accurate positioning mechanism for pre-embedded anchor bolts of a steel tube column concrete foundation, comprising a steel tube column, annularly arranged steel tube column concrete foundation bars, a gantry constructed of steel tubes, pre-embedded anchor bolts and a steel plate positioning ring. A fixed connection flange is fixed at the end, and pre-embedded bolt penetration holes are arranged at equal intervals on the fixed connection flange. The upper part of the embedded anchor bolt is provided with an upper end step, and the top of the embedded anchor bolt above the upper end step is provided with a male thread. The shape of the positioning ring is exactly the same as the shape of the fixed connection flange fixed at the bottom end of the steel pipe column. The pre-embedded bolt penetration holes arranged at equal intervals and radians are completely coincident; on the steel tube-column concrete foundation bars, annular inner positioning ribs and annular outer positioning ribs are respectively set along the same horizontal plane, and the annular inner positioning ribs and the annular The outer locating ribs are lapped with radians at equal intervals, and the gantry frame made of steel pipes is erected on the steel tube column concrete foundation steel bars arranged in a circular manner with radians at equal intervals. The steel plate positioning ring is lapped on the top beam of the gantry frame. The bottom support plate fixedly arranged at the bottom of the pre-embedded anchor bolts is placed on the frame reinforcement, and the top of the pre-embedded anchor bolts passes through the pre-embedded bolts arranged at equal intervals on the steel plate positioning ring. After the hole is connected, it is screwed together with the nut.
钢板定位环的下底面是搭接在预埋地脚螺拴上部设置的上端台阶上的;在环形布置的钢管柱混凝土基础钢筋上等间隔弧度地架设的钢管搭建的龙门架是以环形布置的钢管柱混凝土基础钢筋的中心轴线为中心呈放射形布置的。The bottom surface of the steel plate positioning ring is lapped on the upper step set on the upper part of the pre-embedded anchor bolt; the gantry built with steel pipes erected at equal intervals on the steel pipe column concrete foundation steel bars arranged in a ring is arranged in a ring. The central axis of the steel tube-column concrete foundation reinforcement is radially arranged in the center.
一种钢管柱混凝土基础预埋地脚螺栓精准定位方法,包括以下步骤:A method for precise positioning of pre-embedded anchor bolts of a steel tube column concrete foundation, comprising the following steps:
第一步、制作钢板定位环,并在钢板定位环上加工出预埋螺栓预先穿接孔,使钢板定位环的形状与钢管柱底端固定设置的固定连接法兰盘的形状完全相同,在钢板定位环上等间隔弧度地设置的预埋螺栓预先穿接孔与在固定连接法兰盘上等间隔弧度地设置的预埋螺拴穿接孔完全重合;用钢管制作龙门架;The first step is to make a steel plate positioning ring, and process the pre-embedded bolt pre-penetrating holes on the steel plate positioning ring, so that the shape of the steel plate positioning ring is exactly the same as the shape of the fixed connection flange fixed at the bottom end of the steel pipe column. The pre-embedded bolt penetration holes set at equal intervals on the steel plate positioning ring are completely coincident with the pre-embedded bolt penetration holes set at equal intervals on the fixed connection flange; the steel pipe is used to make the gantry;
第二步、根据安装钢管柱的标高和预埋地脚螺拴的高度,确定环形内侧定位筋和环形外侧定位筋的绑扎标高,将环形内侧定位筋和环形外侧定位筋绑扎在钢管柱混凝土基础钢筋上;The second step: According to the elevation of the installed steel pipe column and the height of the pre-buried anchor bolts, determine the binding elevation of the annular inner positioning rib and the annular outer positioning rib, and bind the annular inner positioning rib and the annular outer positioning rib to the concrete foundation of the steel pipe column. on steel
第三步、在环形布置的钢管柱混凝土基础钢筋上等间隔弧度地架设龙门架,龙门架是以环形布置的钢管柱混凝土基础钢筋的中心轴线为中心呈放射形布置的;调整各龙门架的高度,使各龙门架的横梁均设置在钢管柱底端固定设置的固定连接法兰盘的安装标高平面内,将钢板定位环焊接固定在龙门架的横梁上,并使钢板定位环的中心轴线与钢管柱混凝土基础钢筋的中心轴线重合;The third step is to erect gantry frames at equal intervals on the steel tube column concrete foundation steel bars arranged in a circular manner. height, so that the beams of each gantry are set in the installation elevation plane of the fixed connection flange fixed at the bottom end of the steel pipe column, the steel plate positioning ring is welded and fixed on the beam of the gantry, and the central axis of the steel plate positioning ring It is coincident with the central axis of the steel tube column concrete foundation reinforcement;
第四步、将预埋地脚螺拴的顶端从下向上从钢板定位环上等间隔弧度地设置的预埋螺栓预先穿接孔中穿出,并将预埋地脚螺拴的底端固定设置的底托板放置在架力筋上,在预埋地脚螺拴的顶端螺接螺母;The fourth step is to pass the top of the pre-embedded anchor bolt from the bottom to the top through the pre-embedded bolt pre-penetrating holes set at equal intervals on the steel plate positioning ring, and fix the bottom end of the pre-embedded anchor bolt. The set bottom support plate is placed on the frame reinforcement, and the nut is screwed on the top of the pre-embedded anchor bolt;
第五步、塔设钢管柱混凝土基础的混凝土浇筑模板,浇筑混凝土,并使钢板定位环露出在混凝土基础顶面上;The fifth step is to set up the concrete pouring formwork of the steel tube column concrete foundation, pour the concrete, and expose the steel plate positioning ring on the top surface of the concrete foundation;
第六步、待浇筑的混凝土凝固后,卸掉螺母,将钢板定位环从已定位好的预埋地脚螺拴上取下;
第七步、进行钢管柱的吊装安装。The seventh step is to hoist and install the steel pipe column.
本发明在钢管柱基础浇筑前将真实模拟钢管柱法兰盘的钢板定位环支设在钢管柱基础钢筋的正上方,并将预埋地脚螺拴螺接在钢板定位环上,将各预埋地脚螺拴的底端准确支撑定位在钢管柱基础钢筋上,然后浇注钢管柱基础混凝土,实现了预埋地脚螺拴的准确定位预埋,提高了地脚螺栓的安装精度,使后序钢管柱的安装省时顺畅。In the present invention, before the steel pipe column foundation is poured, the steel plate positioning ring that truly simulates the flange plate of the steel pipe column is supported directly above the steel pipe column foundation steel bars, and the pre-embedded anchor bolts are screwed on the steel plate positioning ring, and the The bottom end of the buried anchor bolt is accurately supported and positioned on the steel pipe column foundation steel bar, and then the steel pipe column foundation concrete is poured, which realizes the accurate positioning and pre-embedding of the pre-buried anchor bolt, improves the installation accuracy of the anchor bolt, and makes the The installation of the sequence steel column is time-saving and smooth.
附图说明Description of drawings
图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;
图2是本发明的钢管柱基础钢筋的结构示意图;Fig. 2 is the structural representation of the steel pipe column foundation reinforcement of the present invention;
图3是本发明的钢管柱基础钢筋、龙门架2和钢板定位环3之间的配合关系图;FIG. 3 is a diagram of the cooperation relationship between the steel pipe column foundation steel bar, the
图4是本发明的预埋地脚螺拴5的结构示意图;4 is a schematic structural diagram of the
图5是本发明的钢板定位环3、预埋地脚螺拴5和环形定位筋之间的配合关系图;FIG. 5 is a diagram showing the cooperation relationship between the steel plate positioning ring 3, the
图6是钢管柱基础浇筑混凝土后的结构示意图;Fig. 6 is the structural schematic diagram after the steel pipe column foundation is poured concrete;
图7是本发明的钢管柱基础成形后的结构示意图。FIG. 7 is a schematic structural diagram of the steel pipe column foundation of the present invention after forming.
具体实施方式Detailed ways
下面结合附图对本发明进行详细说明:The present invention is described in detail below in conjunction with the accompanying drawings:
一种钢管柱混凝土基础预埋地脚螺栓精准定位机构,包括钢管柱、环形布置的钢管柱混凝土基础钢筋1、钢管搭建的龙门架2、预埋地脚螺拴5和钢板定位环3,龙门架2具有足够的刚度、强度和稳定性,在钢管柱的底端固定设置有固定连接法兰盘,在固定连接法兰盘上等间隔弧度地设置有预埋螺拴穿接孔,在预埋地脚螺拴5的底端固定设置有底托板8,在预埋地脚螺拴5的上部设置有上端台阶9,在上端台阶9以上的预埋地脚螺拴5的顶端设置有阳螺纹10,在钢板定位环3上等间隔弧度地设置有预埋螺栓预先穿接孔11,钢板定位环3的形状与钢管柱底端固定设置的固定连接法兰盘的形状是完全相同的,在钢板定位环3上等间隔弧度地设置的预埋螺栓预先穿接孔11与在固定连接法兰盘上等间隔弧度地设置的预埋螺拴穿接孔是完全重合的;在钢管柱混凝土基础钢筋1上沿同一水平面分别梆扎设置有环形内侧定位筋6和环形外侧定位筋7,在环形内侧定位筋6与环形外侧定位筋7之间等间隔弧度地搭接有架力筋12,在环形布置的钢管柱混凝土基础钢筋1上等间隔弧度地架设有钢管搭建的龙门架2,钢板定位环3是搭接在龙门架2的顶部横梁上的,预埋地脚螺拴5的底端固定设置的底托板8放置在架力筋12上,预埋地脚螺拴5的顶端穿过钢板定位环3上等间隔弧度地设置的预埋螺栓预先穿接孔11后与螺母4螺接在一起。An accurate positioning mechanism for pre-embedded anchor bolts of a steel tube column concrete foundation, comprising a steel tube column, a steel tube column concrete foundation steel bar 1 arranged in a ring, a
钢板定位环3的下底面是搭接在预埋地脚螺拴5上部设置的上端台阶9上的;在环形布置的钢管柱混凝土基础钢筋1上等间隔弧度地架设的钢管搭建的龙门架2是以环形布置的钢管柱混凝土基础钢筋1的中心轴线为中心呈放射形布置的。The lower bottom surface of the steel plate positioning ring 3 is lapped on the
一种钢管柱混凝土基础预埋地脚螺栓精准定位方法,包括以下步骤:A method for precise positioning of pre-embedded anchor bolts of a steel tube column concrete foundation, comprising the following steps:
第一步、制作钢板定位环3,并在钢板定位环3上加工出预埋螺栓预先穿接孔11,使钢板定位环3的形状与钢管柱底端固定设置的固定连接法兰盘的形状完全相同,在钢板定位环3上等间隔弧度地设置的预埋螺栓预先穿接孔11与在固定连接法兰盘上等间隔弧度地设置的预埋螺拴穿接孔完全重合,钢板定位环3的厚度为10毫米,预埋螺拴穿接孔的直径要比预埋地脚螺拴5的顶端设置的阳螺纹10的外径大1毫米;用钢管制作龙门架2;The first step is to make a steel plate positioning ring 3, and process the pre-embedded bolt pre-penetrating holes 11 on the steel plate positioning ring 3, so that the shape of the steel plate positioning ring 3 is the same as that of the fixed connection flange fixed at the bottom end of the steel pipe column. It is exactly the same. The pre-embedded bolt penetration holes 11 arranged at equal intervals on the steel plate positioning ring 3 are completely coincident with the pre-embedded bolt penetration holes arranged at equal intervals in the fixed connection flange, and the steel plate positioning ring The thickness of 3 is 10 mm, and the diameter of the penetration hole of the embedded bolt is 1 mm larger than the outer diameter of the
第二步、根据安装钢管柱的标高和预埋地脚螺拴5的高度,确定环形内侧定位筋6和环形外侧定位筋7的绑扎标高,将环形内侧定位筋6和环形外侧定位筋7绑扎在钢管柱混凝土基础钢筋1上;The second step is to determine the binding elevation of the annular
第三步、在环形布置的钢管柱混凝土基础钢筋1上等间隔弧度地架设龙门架2,龙门架2是以环形布置的钢管柱混凝土基础钢筋1的中心轴线为中心呈放射形布置的;调整各龙门架2的高度,使各龙门架2的横梁均设置在钢管柱底端固定设置的固定连接法兰盘的安装标高平面内,将钢板定位环3焊接固定在龙门架2的横梁上,并使钢板定位环3的中心轴线与钢管柱混凝土基础钢筋1的中心轴线重合;The third step is to erect a
第四步、将预埋地脚螺拴5的顶端从下向上从钢板定位环3上等间隔弧度地设置的预埋螺栓预先穿接孔11中穿出,并将预埋地脚螺拴5的底端固定设置的底托板8放置在架力筋12上,在预埋地脚螺拴5的顶端螺接螺母4,通过螺母5的松紧,调节地脚螺栓5的顶部的高度,用水准仪测量控制地脚螺栓5顶端标高一致;在确保预埋地脚螺拴5的底部不偏移和不下沉的情况下,将架力筋12与预埋地脚螺拴5的底端固定设置的底托板8焊接在一起,再将架力筋12分别与环形内侧定位筋6和环形外侧定位筋7焊接在一起;The fourth step is to pass the top end of the
第五步、塔设钢管柱混凝土基础的混凝土浇筑模板,浇筑混凝土,并使钢板定位环3露出在混凝土基础顶面上;浇筑混凝土前,预埋地脚螺拴5上部的螺杆及螺母须抹上固体黄油后用塑料布包裹,并用铁丝扎紧,保护丝扣;浇筑混凝土中,特别是采取泵送混凝土施工时,须避免混凝土对预埋地脚螺拴5的挤压,而导致地脚螺栓走位;混凝土泵管应避免直接对着预埋地脚螺拴5浇筑,尽可能在预埋地脚螺拴5的周边300毫米范围内采用人工浇筑混凝土布料;在使用振动棒时,切勿在预埋地脚螺拴5的周边300毫米范围内振动过频;在浇筑混凝土时,施工人员须加强对预埋地脚螺拴5的位置监测,用水准仪和经纬仪随时对各组预埋地脚螺拴5的位置进行复核,一旦发现偏差,应立刻进行校正;The fifth step is to set up the concrete pouring formwork of the steel tube column concrete foundation, pour the concrete, and expose the steel plate positioning ring 3 on the top surface of the concrete foundation; After applying solid butter, wrap it with plastic cloth, and tie it with iron wire to protect the thread; in pouring concrete, especially when pumping concrete is used, it is necessary to avoid the extrusion of the concrete on the
第六步、待浇筑的混凝土凝固后,卸掉螺母4,将钢板定位环3从已定位好的预埋地脚螺拴5上取下;The sixth step, after the concrete to be poured is solidified, remove the nut 4, and remove the steel plate positioning ring 3 from the positioned
第七步、进行钢管柱的吊装安装。The seventh step is to hoist and install the steel pipe column.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920158596.6U CN209891234U (en) | 2019-01-30 | 2019-01-30 | Precise positioning mechanism of pre-buried anchor bolts for steel tube column concrete foundation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920158596.6U CN209891234U (en) | 2019-01-30 | 2019-01-30 | Precise positioning mechanism of pre-buried anchor bolts for steel tube column concrete foundation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209891234U true CN209891234U (en) | 2020-01-03 |
Family
ID=69016237
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920158596.6U Expired - Fee Related CN209891234U (en) | 2019-01-30 | 2019-01-30 | Precise positioning mechanism of pre-buried anchor bolts for steel tube column concrete foundation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209891234U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109853610A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method |
| CN112283507A (en) * | 2020-10-20 | 2021-01-29 | 中国建筑第八工程局有限公司 | High-precision pre-embedded installation method of group flow pump flange in special-shaped concrete structure |
| CN114809672A (en) * | 2022-05-06 | 2022-07-29 | 山西三建集团有限公司 | Accurate positioning method for steel beam connection embedded bottom plate of frame structure factory building |
-
2019
- 2019-01-30 CN CN201920158596.6U patent/CN209891234U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109853610A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method |
| CN112283507A (en) * | 2020-10-20 | 2021-01-29 | 中国建筑第八工程局有限公司 | High-precision pre-embedded installation method of group flow pump flange in special-shaped concrete structure |
| CN112283507B (en) * | 2020-10-20 | 2022-03-01 | 中国建筑第八工程局有限公司 | High-precision pre-embedding installation method for flange of group flow-making pump in special-shaped concrete structure |
| CN114809672A (en) * | 2022-05-06 | 2022-07-29 | 山西三建集团有限公司 | Accurate positioning method for steel beam connection embedded bottom plate of frame structure factory building |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109853610A (en) | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method | |
| CN108643192A (en) | Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method | |
| CN108978718B (en) | A combination template for inspection well | |
| CN107246026B (en) | A construction mold for pre-embedding anchor bolts of tower equipment and its pre-embedding method | |
| CN204001428U (en) | A kind of Large-diameter Steel tubing string suspension column is installed pre-buried location structure and suspension column structure thereof | |
| CN203891058U (en) | Built-in foundation bolt positioning tool for fixed type tower crane foundation | |
| CN109736204A (en) | A kind of precast of segmental beam by short line method construction technology | |
| CN107130628A (en) | The construction method of embedding anchor bolts flange and embedding anchor bolts | |
| CN101538858B (en) | Method and device for jointing reinforcement and vibration readjustment construction of pre-embedded bolt | |
| CN106759457A (en) | The installation method of cantilever design high-accuracy built-in fitting | |
| CN105780995A (en) | Curved surface space pipe truss structure and mounting method thereof | |
| CN112458905A (en) | Splicing adjustment method for prefabricated capping beam and prefabricated stand column | |
| CN114150766A (en) | Prefabricated reinforced concrete column connecting joint and construction method thereof | |
| CN204343319U (en) | Cableway pipe patten pre-embedded anchoring bolts jig | |
| CN216947906U (en) | Highway bridge column type pier body steel reinforcement cage positioner | |
| CN110080271B (en) | Construction method for embedded quality control of foundation bolt embedded part | |
| CN116497863B (en) | High-precision embedding method for sleeve embedded part of power machine | |
| CN207032279U (en) | A kind of tower kind equipment embedding anchor bolts construction mould | |
| CN205134545U (en) | Steel structure for circulated profit | |
| JP5563409B2 (en) | Anchor bolt installation jig and pile foundation construction method using the installation jig | |
| CN109235483A (en) | A kind of large equipment base foundation bolt positioning device and its application method | |
| CN206769201U (en) | A kind of reinforced concrete combination rod structure | |
| CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
| CN211499464U (en) | Steel pipe concrete composite column for high-rise building and reinforcing system thereof | |
| CN105643791B (en) | Precast wall body grout sleeve strip solid matter exposed steel bar accurate positioning die |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200103 |
