CN209881104U - Micromodule data center adopting bus duct rack top installation as tail-end power distribution - Google Patents
Micromodule data center adopting bus duct rack top installation as tail-end power distribution Download PDFInfo
- Publication number
- CN209881104U CN209881104U CN201920822925.2U CN201920822925U CN209881104U CN 209881104 U CN209881104 U CN 209881104U CN 201920822925 U CN201920822925 U CN 201920822925U CN 209881104 U CN209881104 U CN 209881104U
- Authority
- CN
- China
- Prior art keywords
- data center
- intelligent
- micromodule data
- intelligent bus
- micromodule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Patch Boards (AREA)
Abstract
The utility model belongs to the technical field of micromodule data center, a micromodule data center who adopts bus duct frame top installation as terminal distribution is provided. The utility model discloses an adopt bus duct frame top installation to include as the micromodule data center of terminal distribution: the intelligent bus comprises an intelligent bus, a starting end box, a jack box, an intelligent bus mounting bracket and a micro-module data center frame. The utility model discloses an adopt bus duct frame top installation to erect the micromodule data center frame top with intelligent generating line as the micromodule data center frame top of terminal distribution, the rack top in the micromodule data center frame is introduced with the electric energy to the jack box through intelligent generating line, and the PDU that is connected to in the rack at last is for rack equipment and air conditioning equipment power supply, has saved the installation space of micromodule data center switch board.
Description
Technical Field
The utility model relates to a micromodule data center structure, concretely relates to micromodule data center structure of intelligent generating line as terminal distribution.
Background
Along with the application of micromodule data center more and more extensively, some drawbacks that current micromodule structure exists also show out, and the distribution system of current micromodule data center adopts intelligent accurate switch board, and IT needs to occupy the space of a rack, and micromodule rack quantity is less, generally all about 10 so have the micromodule space that 10 can not be utilized by IT equipment and cause the waste in space.
SUMMERY OF THE UTILITY MODEL
To the defect among the prior art, the utility model provides a pair of adopt bus duct frame top installation as the micromodule data center of terminal distribution, erect intelligent generating line in micromodule data center frame top, the jack box through intelligent generating line introduces the rack top in the micromodule data center frame with the electric energy, and the PDU that is connected to in the rack at last is rack equipment and air conditioning equipment power supply.
The utility model provides an adopt bus duct frame top installation as micromodule data center of terminal distribution, includes intelligent generating line, initial end case, jack box, intelligent generating line installing support, micromodule data center frame, initial end case install in micromodule data center frame top, initial end one side of intelligent generating line install in initial end case, the trunk portion of intelligent generating line is fixed in intelligent generating line installing support, jack box fixed mounting in under the intelligent generating line, the intelligent generating line installing support be fixed in on the micromodule data center frame or suspension mounting in micromodule data center frame top.
Based on the technical scheme, symmetrical cabinet mounting positions and air conditioner mounting positions are arranged on two sides of the interior of the micro-module data center frame.
Based on the technical scheme, the PDU is installed in the cabinet, and the plug-in box of the intelligent bus is connected to the PDU through a cable to supply power for the cabinet equipment and the air conditioner.
According to the above technical scheme, the beneficial effects of the utility model are that: the intelligent bus is erected at the top of the micro-module data center frame, electric energy is introduced into the top of a cabinet in the micro-module data center frame through a jack box of the intelligent bus, and finally the intelligent bus is connected to a PDU (Power distribution Unit) in the cabinet to supply power for cabinet equipment and air conditioning equipment, so that the installation space of a power distribution cabinet of the micro-module data center is saved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below. Throughout the drawings, like elements or portions are generally identified by like reference numerals. In the drawings, elements or portions are not necessarily drawn to scale.
Fig. 1 is a schematic structural diagram of a micro module data center using a bus duct rack top as a terminal power distribution according to an embodiment of the present invention;
fig. 2 is a left side view of a micromodule data center employing busway rack top mounting as end power distribution as shown in fig. 1.
Reference numerals:
1-starting end box; 2-intelligent bus; 3-an intelligent bus mounting bracket; 4-a jack box; 5-a micro-module data center framework; 6, a cabinet; 7-air conditioning;
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and therefore are only examples, and the protection scope of the present invention is not limited thereby.
As shown in fig. 1 and 2, the micromodule data center adopting bus duct rack top installation as terminal power distribution provided in this embodiment includes a start box 1, an intelligent bus 2, a jack box 4, an intelligent bus installing support 3, a micromodule data center frame 5, the start box 1 is installed at the top of the micromodule data center frame 5, a start side of the intelligent bus 2 is installed at the start box 1, a trunk portion of the intelligent bus 2 is fixed to the intelligent bus installing support 3, the jack box 4 is fixedly installed under the intelligent bus installing support 3, the intelligent bus installing support 3 is fixed on the micromodule data center frame 5 or is installed above the micromodule data center frame 5 in a suspension manner, symmetrical cabinet 6 installing positions and air conditioner 7 installing positions are arranged on two sides inside the micromodule data center frame 5.
Through the setting, intelligent generating line 2 is fixed in on the intelligent generating line installing support 3, intelligent generating line installing support 3 sets up terminal distribution device in the top of micromodule data center frame 5 through being fixed in micromodule data center frame 5 top, intelligent generating line 2 obtains the electric energy through the starting end case 1 that is fixed in micromodule data center frame 5 top, the one end of jack box 4 links to each other with intelligent generating line 2 through participating in, the other end of jack box 4 is supplied power for rack equipment and air conditioning equipment through cable junction to 6 internally mounted's of rack PDU, the installation space of micromodule data center switch board has been saved.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the scope of the embodiments of the present invention, and are intended to be covered by the claims and the specification.
Claims (3)
1. The utility model provides an adopt bus duct frame top installation as micromodule data center of terminal distribution, includes intelligent generating line, starting end case, jack box, intelligent generating line installing support, micromodule data center frame, its characterized in that: the intelligent bus comprises a start end box, an intelligent bus, a jack box, a micromodule data center frame, a connection box and an intelligent bus mounting bracket, wherein the start end box is mounted at the top of the micromodule data center frame, one side of the start end of the intelligent bus is mounted in the start end box, the main part of the intelligent bus is fixed on the intelligent bus mounting bracket, the jack box is fixedly mounted under the intelligent bus, and the intelligent bus mounting.
2. The micromodule data center adopting busway rack top mounting as tail end power distribution according to claim 1, characterized in that: and symmetrical cabinet mounting positions and air conditioner mounting positions are arranged on two sides in the micro-module data center frame.
3. The micromodule data center adopting busway rack top mounting as tail end power distribution according to claim 2, characterized in that: the intelligent bus-bar power supply cabinet is characterized in that a PDU is installed inside the cabinet, and a plug-in box of the intelligent bus-bar is connected to the PDU through a cable to supply power for cabinet equipment and an air conditioner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920822925.2U CN209881104U (en) | 2019-06-03 | 2019-06-03 | Micromodule data center adopting bus duct rack top installation as tail-end power distribution |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920822925.2U CN209881104U (en) | 2019-06-03 | 2019-06-03 | Micromodule data center adopting bus duct rack top installation as tail-end power distribution |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209881104U true CN209881104U (en) | 2019-12-31 |
Family
ID=68948539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920822925.2U Active CN209881104U (en) | 2019-06-03 | 2019-06-03 | Micromodule data center adopting bus duct rack top installation as tail-end power distribution |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209881104U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022178990A1 (en) * | 2021-02-25 | 2022-09-01 | 维谛技术(西安)有限公司 | New-type bus power distribution micromodule |
CN117200007A (en) * | 2023-09-25 | 2023-12-08 | 广东云下汇金科技有限公司 | Integrated installation method and device for intelligent computation center modularized cabinet small bus system |
-
2019
- 2019-06-03 CN CN201920822925.2U patent/CN209881104U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022178990A1 (en) * | 2021-02-25 | 2022-09-01 | 维谛技术(西安)有限公司 | New-type bus power distribution micromodule |
CN117200007A (en) * | 2023-09-25 | 2023-12-08 | 广东云下汇金科技有限公司 | Integrated installation method and device for intelligent computation center modularized cabinet small bus system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209881104U (en) | Micromodule data center adopting bus duct rack top installation as tail-end power distribution | |
CN202721351U (en) | A double-layer outgoing line structure of a 220kV HGIS power distribution unit | |
CN206790212U (en) | A kind of small busbar electric distribution system of data center | |
CN209805685U (en) | Double-bridge-arm power unit module | |
CN212429264U (en) | Magnetic suspension air-blower outage protection system | |
WO2016184185A1 (en) | Method and apparatus for realizing power distribution | |
CN208461208U (en) | A kind of power distribution cabinet that outdoor safety uses | |
CN219248379U (en) | Controller bracket of electric loader | |
CN206179815U (en) | Total fuse structure of car power supply | |
CN203911382U (en) | Vehicle wire harness adapter part fixing device, vehicle central power distribution box and vehicle | |
CN204442151U (en) | A kind ofly support that the ER effect of hot plug compares device | |
CN218182664U (en) | PDU module | |
CN2425441Y (en) | AC distribution cabinet | |
CN209195592U (en) | Pitch-controlled system and wind power generating set | |
CN210608994U (en) | Modular hanging rod type solar power supply system | |
CN209028557U (en) | It is a kind of for connecting the printed wiring board of multiple fans and functional module | |
CN212289488U (en) | Lithium ion power battery bracket | |
CN218275686U (en) | Lighting equipment distribution box with current detection function | |
CN214380720U (en) | Motor controller of electric industrial vehicle | |
CN203850700U (en) | Movable-type switch device | |
CN219534780U (en) | Battery pack | |
CN203827033U (en) | One body machine for realizing balanced power charging | |
CN202019168U (en) | Urban network distribution box | |
CN209929746U (en) | 3U frame power distribution system | |
CN220985523U (en) | Electric motor car power inverter installs protection architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |