CN209837866U - Building fence device - Google Patents
Building fence device Download PDFInfo
- Publication number
- CN209837866U CN209837866U CN201822170470.9U CN201822170470U CN209837866U CN 209837866 U CN209837866 U CN 209837866U CN 201822170470 U CN201822170470 U CN 201822170470U CN 209837866 U CN209837866 U CN 209837866U
- Authority
- CN
- China
- Prior art keywords
- rods
- fence
- building
- concrete prefabricated
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Fencing (AREA)
Abstract
The utility model discloses a building rail device belongs to assembly building technical field. The building enclosure apparatus includes: the concrete prefabricated member comprises a connecting plate, a fence, at least two concrete prefabricated members and at least two upright rods; the at least two concrete prefabricated members correspond to the at least two upright rods, and the upright rods are fixedly arranged on the corresponding concrete prefabricated members; the connecting plate is arranged between every two adjacent vertical rods in at least two vertical rods; the fence is arranged between every two adjacent vertical rods in the at least two vertical rods; fence, connecting plate and concrete prefabricated member with the length direction of riser sets gradually from top to bottom. The utility model discloses building rail device improves the installation rate, and construction technology is simple, and the easy to assemble workman operates, shortens installation period, and it is simple convenient to maintain, save material and cost of labor, and the manufacturing of pure family of genera, energy-concerving and environment-protective, on-the-spot assembly forms.
Description
Technical Field
The invention relates to the technical field of assembly buildings, in particular to a building fence device.
Background
The building fence is mainly used for isolating roads and people during building construction.
However, in the prior art, the construction of the building fence needs to be carried out through concrete pouring of a foundation, the fixed type stand columns are anchored and positioned by the embedded screws, the guard plates are cement mortar brick building blocks, the fence is built in the bricks and fixedly leveled by cement mortar layers, the mounting speed is low, the construction technology is complex, the mounting period is long, the maintenance is troublesome, and material loss and waste are caused.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building rail device reaches, and the construction installation rate of having solved or partly having solved building rail among the prior art is slow, and the construction technology is complicated, and the installation period is long, and it is troublesome to maintain, causes material loss and extravagant technical problem.
In order to solve the technical problem, the utility model provides a building rail device includes: the concrete prefabricated member comprises a connecting plate, a fence, at least two concrete prefabricated members and at least two upright rods; the at least two concrete prefabricated members correspond to the at least two upright rods, and the upright rods are fixedly arranged on the corresponding concrete prefabricated members; the connecting plate is arranged between every two adjacent vertical rods in at least two vertical rods; the fence is arranged between every two adjacent vertical rods in the at least two vertical rods; fence, connecting plate and concrete prefabricated member with the length direction of riser sets gradually from top to bottom.
Further, the connecting plate is a hollow plate.
Further, the hollow plate includes: a bottom plate and a side plate; the side plates extend upwards from the periphery of the bottom plate along the length direction of the vertical rod and form a box body structure together with the bottom plate; a cavity is arranged in the box body structure.
Furthermore, a supporting plate is arranged on the end face, facing the fence, of the box body.
Further, the fence is of a truss structure.
Further, the truss structure includes: two first cross rods and a plurality of connecting rods; the two first cross rods are arranged between every two adjacent vertical rods in the at least two vertical rods; the two ends of the plurality of supporting rods are respectively connected with the two first cross rods.
Furthermore, the two first cross rods are sequentially arranged from top to bottom along the length direction of the vertical rod; the supporting rods are evenly arranged between the two first cross rods at intervals along the length direction of the first cross rods.
Further, the utility model discloses building rail device still includes: the second cross bar, a plurality of fence thatch tips and a plurality of supporting rods; a plurality of fence thatch tops are uniformly arranged on the second cross rod at intervals; the first ends of the support rods are connected with the second cross rod, and the second ends of the support rods penetrate through the fence to be connected with the connecting plate.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
place two at least concrete prefabricated members in the foundation pit, two at least concrete prefabricated members are corresponding with two at least pole settings, with the fixed setting on corresponding concrete prefabricated member of pole setting, set up the connecting plate between per two adjacent pole settings in two at least pole settings, set up the rail between per two adjacent pole settings in two at least pole settings, the rail, connecting plate and concrete prefabricated member set gradually from top to bottom with the length direction of pole setting, the installation rate is improved, the construction technology is simple, the operation of easy installer, the erection time is shortened, it is simple and convenient to maintain, save material loss and cost of labor, it is the factory manufacture to belong to only, energy saving and environmental protection, the field assembly forms.
Drawings
Fig. 1 is a schematic structural diagram of a building fence device and a construction method thereof according to an embodiment of the present invention.
Detailed Description
Referring to fig. 1, an embodiment of the present invention provides a building fence device including: connecting plate 1, rail 2, two at least concrete precast members 3 and two at least pole setting 4.
At least two precast concrete members 3 correspond to at least two upright rods 4, and the upright rods 4 are fixedly arranged on the corresponding precast concrete members 3.
A connecting plate 1 is arranged between every two adjacent vertical rods in at least two vertical rods 4.
A fence 2 is arranged between every two adjacent vertical rods of the at least two vertical rods 4.
Fence 2, connecting plate 1 and concrete prefabricated component 3 set gradually from top to bottom with the length direction of pole setting 4.
This application embodiment will at least two precast concrete members 3 place in the foundation pit, at least two precast concrete members 3 are corresponding with two at least pole settings 4, with pole setting 4 fixed setting on corresponding precast concrete member 3, set up connecting plate 1 between per two adjacent pole settings in two at least pole settings 4, set up rail 2 between per two adjacent pole settings in two at least pole settings 4, rail 2, connecting plate 1 and precast concrete member 3 set gradually from top to bottom with the length direction of pole setting 4, improve the installation rate, construction technology is simple, facilitate the operation of installer, shorten the erection time, it is simple and convenient to maintain, save material loss and cost of labor, it is the factory manufacturing purely, energy saving and environmental protection, field assembly forms.
The structure of the connection plate 1 will be described in detail.
The connecting plate 1 is a hollow plate 1-1, and the hollow plate 1-1 is used as a guard plate, so that the whole weight can be reduced, and the installation is convenient.
The hollow board 1-1 includes: bottom plate and curb plate.
The side plates extend upwards from the periphery of the bottom plate along the length direction of the upright stanchion 4 and form a box body structure together with the bottom plate; a cavity is arranged in the box body structure.
The box is provided with backup pad 5 on the terminal surface towards the rail, and backup pad 5 is used for supporting a plurality of bracing pieces 8, guarantees structural strength.
The structure of the enclosure 2 is described in detail.
The fence 2 is of a truss structure, can be directly arranged between the two upright posts 4, is convenient to install, improves the installation speed, and is simple in construction technology.
The truss structure includes: two first cross bars 2-1 and a plurality of connecting bars 2-2.
The two first cross bars 2-1 are fixedly arranged between every two adjacent vertical rods of the at least two vertical rods 4. Specifically, in the present embodiment, two first crossbars 2-1 can be fixedly arranged between every two adjacent vertical rods of the at least two vertical rods 4 through bolts, and in other embodiments, two first crossbars 2-1 can be fixedly arranged between every two adjacent vertical rods of the at least two vertical rods 4 through other means, such as shaft pins and the like.
Two ends of the plurality of support rods 2-2 are respectively fixedly connected with the two first cross rods 2-1. Specifically, in the present embodiment, two ends of the plurality of support rods 2-2 may be fixedly connected to the two first cross rods 2-1 by welding, respectively, and in other embodiments, two ends of the plurality of support rods 2-2 may be fixedly connected to the two first cross rods 2-1 by other means, such as a shaft pin, respectively.
The two first cross rods 2-1 are sequentially arranged from top to bottom along the length direction of the upright rod 4; the plurality of support rods 2-2 are uniformly arranged between the two first cross rods 2-1 at intervals along the length direction of the first cross rods 2-1, so that the support strength is ensured.
This application building rail device still includes: a second cross bar 6, a plurality of fence thatch tips 7 and a plurality of support bars 8.
A plurality of fence spears 7 are evenly and fixedly arranged on the second cross bar 6 at intervals. Specifically, in the present embodiment, the plurality of fence tips 7 are uniformly spaced and fixedly disposed on the second cross bar 6 by welding, and in other embodiments, the plurality of fence tips 7 are uniformly spaced and fixedly disposed on the second cross bar 6 by other means, such as bolts.
The first ends of the plurality of support rods 8 are fixedly connected with the second cross rod 6. Specifically, in the present embodiment, the first ends of the plurality of support rods 8 may be fixedly connected to the second cross bar 6 by welding, and in other embodiments, the first ends of the plurality of support rods 8 may be fixedly connected to the second cross bar 6 by other means, such as bolts. The second ends of the plurality of support rods 8 penetrate through the fence to be fixedly connected with the connecting plate 1. Specifically, in the present embodiment, the second ends of the plurality of support rods 8 are fixedly connected to the connecting plate 1 by welding through the rail, and in other embodiments, the second ends of the plurality of support rods 8 are fixedly connected to the connecting plate 1 by other means such as bolts through the rail.
Through setting up a plurality of rail mao jian 7, guarantee pleasing to the eye, prevent burglary simultaneously.
In order to more clearly describe the embodiment of the present invention, the following description is provided on the using method of the embodiment of the present invention.
At least two concrete pre-forms 3 are placed in the foundation pit. And a connecting steel plate is vertically arranged on the concrete prefabricated member 3. At least two precast concrete members 3 are corresponding to at least two vertical rods 4, and the vertical rods 4 are fixedly arranged on the corresponding precast concrete members 3, namely, the vertical rods 4 are inserted into the connecting steel plates and then penetrate through the rod walls of the vertical rods 4 through bolts to be connected with the connecting steel plates, and the vertical rods 4 are fastened on the corresponding precast concrete members 3.
The hollow core plate 1-1 is fixedly arranged between every two adjacent vertical rods of the at least two vertical rods 4 through welding, and the hollow core plate 1-1 is used as a guard plate, so that the overall weight can be reduced, and the installation is convenient. Two first cross bars 2-1 of the fence 2 are fixedly arranged between every two adjacent vertical rods of at least two vertical rods 4, two ends of a plurality of supporting rods 2-2 are respectively and fixedly connected with the two first cross bars 2-1, and the two first cross bars 2-1 are sequentially arranged from top to bottom along the length direction of the vertical rods 4; the plurality of support rods 2-2 are uniformly arranged between the two first cross rods 2-1 at intervals along the length direction of the first cross rods 2-1, so that the support strength is ensured.
Fence 2, connecting plate 1 and concrete prefabricated member 3 set gradually from top to bottom with the length direction of pole setting 4, and fence 2, connecting plate 1 and concrete prefabricated member 3 are the modularization, can directly be under construction the installation at the scene, improve the installation rate, and construction technology is simple, and the installer operation of making things convenient for shortens the erection time, and it is simple convenient to maintain, save material loss and cost of labor, and the manufacturing of pure mill belongs to, and is energy-concerving and environment-protective, and on-site assembly forms.
Simultaneously, be connected a plurality of bracing pieces 8 first end and second horizontal pole, the second end passes rail 2 and is connected with connecting plate 1, evenly sets up a plurality of rail cogongrass point 7 intervals on second horizontal pole 6, through set up a plurality of rail cogongrass points 7 on second horizontal pole 6, guarantees pleasing to the eye, prevents burglary moreover.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the examples, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the scope of the claims of the present invention.
Claims (8)
1. A building enclosure apparatus, comprising: the concrete prefabricated member comprises a connecting plate, a fence, at least two concrete prefabricated members and at least two upright rods;
the at least two concrete prefabricated members correspond to the at least two upright rods, and the upright rods are fixedly arranged on the corresponding concrete prefabricated members;
the connecting plate is arranged between every two adjacent vertical rods in at least two vertical rods;
the fence is arranged between every two adjacent vertical rods in the at least two vertical rods;
fence, connecting plate and concrete prefabricated member with the length direction of riser sets gradually from top to bottom.
2. A building fence arrangement as defined in claim 1 wherein:
the connecting plate is a hollow plate.
3. A building fence arrangement as claimed in claim 2 wherein said hollow core panel comprises: a bottom plate and a side plate;
the side plates extend upwards from the periphery of the bottom plate along the length direction of the vertical rod and form a box body structure together with the bottom plate;
a cavity is arranged in the box body structure.
4. A building fence arrangement as defined in claim 3 wherein:
and a supporting plate is arranged on the end face, facing the fence, of the box body.
5. A building fence arrangement as claimed in claim 1 wherein:
the fence is of a truss structure.
6. A building fence arrangement as claimed in claim 5 wherein the truss structure comprises: two first cross rods and a plurality of connecting rods;
the two first cross rods are arranged between every two adjacent vertical rods in the at least two vertical rods;
the two ends of the connecting rods are respectively connected with the two first cross rods.
7. A building fence arrangement as claimed in claim 6, wherein:
the two first cross rods are sequentially arranged from top to bottom along the length direction of the vertical rod;
the connecting rods are uniformly arranged between the two first cross rods at intervals along the length direction of the first cross rods.
8. The building fence device of claim 1, further comprising: the second cross bar, a plurality of fence thatch tips and a plurality of supporting rods;
a plurality of fence thatch tops are uniformly arranged on the second cross rod at intervals;
the first ends of the support rods are connected with the second cross rod, and the second ends of the support rods penetrate through the fence to be connected with the connecting plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822170470.9U CN209837866U (en) | 2018-12-24 | 2018-12-24 | Building fence device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822170470.9U CN209837866U (en) | 2018-12-24 | 2018-12-24 | Building fence device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209837866U true CN209837866U (en) | 2019-12-24 |
Family
ID=68900270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822170470.9U Active CN209837866U (en) | 2018-12-24 | 2018-12-24 | Building fence device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209837866U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109854072A (en) * | 2018-12-24 | 2019-06-07 | 武汉达权绿色建材集团有限公司 | A kind of building fence apparatus and its construction method |
-
2018
- 2018-12-24 CN CN201822170470.9U patent/CN209837866U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109854072A (en) * | 2018-12-24 | 2019-06-07 | 武汉达权绿色建材集团有限公司 | A kind of building fence apparatus and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101769008B (en) | Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams | |
CN111677326B (en) | Temporary underpinning device for concrete column and using method thereof | |
CN203866966U (en) | Novel assembly type frame core tube steel structure residential housing system | |
CN103437458A (en) | Precast concrete double-plate shear wall with built-in oblique supports and construction method thereof | |
CN203440948U (en) | Precast concrete double-plate shear wall with built-in diagonal bracing | |
CN209837866U (en) | Building fence device | |
CN206769200U (en) | First wear formula post stretching vertical prestressing cast-in-place concrete rod structure | |
CN104060757B (en) | Precast concrete frame supports shear wall wallboard | |
CN103334492A (en) | Prefabricated assembled type framework structure | |
CN215442339U (en) | Newly-increased steel structure balcony of existing masonry structure house | |
CN215167163U (en) | Shear structure and maintenance structure integrated prefabricated hoisting wallboard unit | |
CN210049380U (en) | Steel concrete combined frame column and reinforced concrete frame column combined assembly type structure system | |
CN210049379U (en) | Steel concrete combined frame column assembly type structure system | |
CN110238962B (en) | Method for manufacturing novel precast concrete inner wall | |
CN210049489U (en) | Steel concrete combined frame column | |
CN108277918B (en) | Assembled type toothed joint edge-punched steel sheet ribbed floor | |
CN207597652U (en) | A kind of cast-in-place sandwiched heat-preservation shear wall structure and assembled architecture | |
KR20030036380A (en) | An iron plate frame work | |
CN219754221U (en) | Can have enough to meet need and use and enclose fender basis | |
CN215802933U (en) | Assembled elevator pit | |
CN210031888U (en) | Pipeline bracket assembled independent foundation structure | |
CN221761628U (en) | Can have enough to meet need interim fender that encloses of reinforced concrete combination formula | |
CN218894194U (en) | Precast column and superposed beam connection structure based on prestressed reinforcement | |
CN219012118U (en) | Frame system of industrialized steel structure damping house | |
CN219138623U (en) | Assembled simple enclosing wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |