CN209837081U - Street lamp foundation capable of being installed quickly - Google Patents

Street lamp foundation capable of being installed quickly Download PDF

Info

Publication number
CN209837081U
CN209837081U CN201920220284.3U CN201920220284U CN209837081U CN 209837081 U CN209837081 U CN 209837081U CN 201920220284 U CN201920220284 U CN 201920220284U CN 209837081 U CN209837081 U CN 209837081U
Authority
CN
China
Prior art keywords
steel pipe
foundation
shaping steel
ground
street lamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920220284.3U
Other languages
Chinese (zh)
Inventor
王峥
高利强
薛道荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING AOPU KEXING TECHNOLOGY Co Ltd
Original Assignee
BEIJING AOPU KEXING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AOPU KEXING TECHNOLOGY Co Ltd filed Critical BEIJING AOPU KEXING TECHNOLOGY Co Ltd
Priority to CN201920220284.3U priority Critical patent/CN209837081U/en
Application granted granted Critical
Publication of CN209837081U publication Critical patent/CN209837081U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model relates to a street lamp ground that can install fast, including stake type ground, twist device, cutting edge and direction helical blade, stake type ground includes the shaping steel pipe and sets up at the foraminiferous ring flange of shaping steel pipe one end, and the other end of shaping steel pipe is located to the cutting edge, and shaping steel pipe outer fringe is located to direction helical blade, twists the device and includes positioning flange dish and set up the handle on positioning flange dish, and positioning flange dish can dismantle with foraminiferous ring flange and be connected. The utility model has the advantages that: the foundation structure can be simplified, the foundation is small in size, the influence on the environment is small, the material cost is reduced, civil construction is reduced or not needed, the construction cost is saved, and the construction period is shortened.

Description

Street lamp foundation capable of being installed quickly
Technical Field
The utility model relates to a street lamp ground construction field particularly, relates to a street lamp ground that can install fast.
Background
At present, the road lamp foundation is a steel ground cage and concrete foundation structure. The conventional foundation needs to dig the ground and cast the concrete base by a mould. And after the base is dried completely, tamping the filling soil around the base. Therefore, the cost is high, the construction period is long, and the influence on the surrounding environment is great.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned technical problem among the correlation technique, the utility model provides a street lamp ground that can install fast can solve street lamp ground construction cycle overlength, and construction cost is high, influences big problem to all ring edge borders.
In order to achieve the technical purpose, the technical scheme of the utility model is realized as follows: the utility model provides a street lamp ground that can install fast, includes stake type ground, twists device, cutting edge and direction helical blade, stake type ground includes the shaping steel pipe and sets up the foraminiferous ring flange in shaping steel pipe one end, the other end of shaping steel pipe is located to the cutting edge, the shaping steel pipe outer fringe is located to direction helical blade, it includes locating flange dish and sets up the handle on locating flange dish to twist the device, locating flange dish can dismantle with foraminiferous ring flange and be connected.
Furthermore, the positioning flange plate is connected with the flange plate with the hole through a positioning pin.
Further, the cutting edge includes a pointed edge and a tubular edge.
The utility model has the advantages that: the foundation structure can be simplified, the foundation is small in size, the influence on the environment is small, the material cost is reduced, civil construction is reduced or not needed, the construction cost is saved, and the construction period is shortened.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a pointed spiral foundation of a street lamp foundation capable of being quickly installed according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a tubular spiral foundation of a street lamp foundation capable of being quickly installed according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a pile type foundation of a street lamp foundation capable of being installed quickly according to an embodiment of the present invention.
In the figure: 1. a flange plate with holes; 2. forming a steel pipe; 3. a cutting edge; 4. a guide helical blade; 5. a handle; 6. positioning a flange plate; 7. and positioning the pin.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
The utility model discloses a prefabricated steel spiral ground makes the shaping in the mill, and the on-the-spot twist or squeeze into underground after, can the direct mount street lamp, spiral ground can adopt the carbon steel structure, and outside galvanization or japanning are handled, also can directly adopt resistant steel construction of waiting.
As shown in fig. 1, according to the utility model discloses a tip spiral ground of street lamp ground that can install fast: is suitable for soft ground. The head of the foundation is of a closed conical structure and consists of a flange plate 1 with a hole, a formed steel pipe 2, a head cutting edge 3 and a foundation guide helical blade 4. The screwing tool comprises a handle 5, a positioning flange 6 and a positioning pin 7. During construction, firstly the foundation is hammered and positioned, then the pins screwed into the flange plate of the tool are butted with the mounting holes in the flange plate of the spiral foundation, and then the spiral foundation is screwed into the ground by two persons through the rotating handle.
As shown in fig. 2, according to the utility model discloses a but tubular spiral ground of street lamp ground of quick installation: is suitable for common hard soil ground. The head of the foundation is of a tubular open structure and is relatively thick, and the foundation consists of a flange plate 1 with a hole, a formed steel pipe 2, a head cutting edge 3 and a foundation guide helical blade 4. During construction, after the pin screwed into the flange of the tool is butted with the mounting hole in the flange of the spiral foundation, two persons can screw the spiral foundation into the ground through the rotating handle.
As shown in fig. 3, according to the embodiment of the present invention, a pile type foundation of a street lamp foundation capable of being installed rapidly: is suitable for hard ground. The head of the foundation is of a bullet head type and is relatively slender, and the foundation consists of a flange plate 1 with a hole and a formed steel pipe 2. When in construction, the concrete is vertically driven into the ground.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. The utility model provides a street lamp ground that can install fast, its characterized in that, includes pile type ground, twists device, cutting edge (3) and direction helical blade (4), pile type ground includes shaping steel pipe (2) and sets up foraminiferous ring flange (1) in shaping steel pipe (2) one end, the other end of shaping steel pipe (2) is located in cutting edge (3), shaping steel pipe (2) outer fringe is located in direction helical blade (4), twist the device and include locating flange dish (6) and set up handle (5) on locating flange dish (6), locating flange dish (6) can be dismantled with foraminiferous ring flange (1) and be connected.
2. A street light foundation capable of being quickly installed according to claim 1, characterised in that the locating flange (6) is connected with the flange (1) with holes through locating pins (7).
3. A street light foundation as claimed in claim 1, characterised in that the cutting edge (3) comprises a pointed edge and a tubular edge.
CN201920220284.3U 2019-02-21 2019-02-21 Street lamp foundation capable of being installed quickly Active CN209837081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920220284.3U CN209837081U (en) 2019-02-21 2019-02-21 Street lamp foundation capable of being installed quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920220284.3U CN209837081U (en) 2019-02-21 2019-02-21 Street lamp foundation capable of being installed quickly

Publications (1)

Publication Number Publication Date
CN209837081U true CN209837081U (en) 2019-12-24

Family

ID=68903867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920220284.3U Active CN209837081U (en) 2019-02-21 2019-02-21 Street lamp foundation capable of being installed quickly

Country Status (1)

Country Link
CN (1) CN209837081U (en)

Similar Documents

Publication Publication Date Title
CN105155571B (en) Replaceable prestressed anchor bolt assembly and mounting and replacement construction method thereof
US9422687B2 (en) Flat plate foundation supports
CN201857613U (en) Bamboo joint type anchor rod
CN111608162B (en) Stratum monitoring device for tunnel and deep foundation pit construction
CN202247832U (en) Portable sounding machine
CN209837081U (en) Street lamp foundation capable of being installed quickly
CN203613817U (en) Base device for steel-structured safety protection fence
CN203813720U (en) Solar energy support and column fixing device thereof
CN206220114U (en) A kind of eight High-Rise Pile Cap Foundations
RU176898U1 (en) Hollow screw pile
CN109058583A (en) A kind of hand pick formula jacking construction tool pipe
CN203008925U (en) Shield barrier-free launching apparatus
CN202157321U (en) Screwing-in type large bearing steel pipe pile
RU158889U1 (en) PILOT SCREW
CN210888127U (en) High-rise building deep foundation pit enclosure structure
CN212175843U (en) Spiral anchor assembly type foundation of high-voltage transmission line iron tower
CN202865849U (en) Counter-guiding control device for one-column-one-pile perpendicularity in frame reverse building method
CN209760086U (en) Simple and easy installation fixed way stake
CN201473954U (en) Device for mounting large-scale concrete cylinder structure for construction
CN207998882U (en) A kind of dewatering well hole-forming device
CN214460327U (en) Hollow pile for civil construction
RU158887U1 (en) PILOT SCREW
CN213741046U (en) Anchoring device for geotechnical engineering
CN219434064U (en) Portable pile point positioning device
CN204162334U (en) The large pump peace of dark dewatering well tears jacking system open

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant