CN209835409U - Combined hanging row for hoisting super-long pipe gallery land modules - Google Patents

Combined hanging row for hoisting super-long pipe gallery land modules Download PDF

Info

Publication number
CN209835409U
CN209835409U CN201920571282.9U CN201920571282U CN209835409U CN 209835409 U CN209835409 U CN 209835409U CN 201920571282 U CN201920571282 U CN 201920571282U CN 209835409 U CN209835409 U CN 209835409U
Authority
CN
China
Prior art keywords
sliding sleeve
slide rail
lifting hook
hole
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920571282.9U
Other languages
Chinese (zh)
Inventor
王武
杨琼
郭志彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wison Clean Energy Technology Group Co ltd
Original Assignee
Wison Nantong Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wison Nantong Heavy Industry Co Ltd filed Critical Wison Nantong Heavy Industry Co Ltd
Priority to CN201920571282.9U priority Critical patent/CN209835409U/en
Application granted granted Critical
Publication of CN209835409U publication Critical patent/CN209835409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a combined row of hanging for overlength piping lane land module hoist and mount, including one-level roof beam and second grade roof beam, the one-level roof beam comprises main lug, sliding sleeve, slide rail and portable lifting hook, main lug welding is on the sliding sleeve, be provided with the through-hole on the sliding sleeve, the sliding sleeve suit is on the slide rail, evenly be provided with the through-hole on the slide rail, through-hole phase-match on through-hole and the slide rail on the sliding sleeve, portable lifting hook sets up respectively at the slide rail both ends, the coupler body of portable lifting hook is the disc structure, and the symmetry is provided with the wire rope handling hole in the lower half left and right sides of disc structure, the second grade roof beam passes through wire rope and connects on portable lifting hook. The combined hanging row has the characteristics of strong site adaptability, lower cost, simple manufacture, convenient assembly and convenient storage.

Description

Combined hanging row for hoisting super-long pipe gallery land modules
Technical Field
The utility model relates to a hanging row of piping lane land module hoist and mount, in particular to combined hanging row of overlength piping lane module hoist and mount belongs to land chemical industry module and builds field
Background
The pipe gallery land module is a complex steel structure for arranging a large number of pipe systems in the project of land chemical plant construction; the device is mainly constructed by upright columns, cross beams and longitudinal beams in a welding or bolt connection mode, and various pipe systems are fully arranged on the upright columns. The pipe gallery is usually divided into modules with different sizes to be independently built according to the site or the installation requirement during the building, and the total assembly is carried out on the installation site by adopting a hoisting mode after the building is finished. Because the pipe gallery module design time sharing, the size is long and thin usually, and the bulk strength is relatively weak, need guarantee structure atress as far as possible even and the deformation is controllable in hoist and mount in-process, consequently need adopt suitable instrument to satisfy these requirements in the construction process. In the same project, the sizes of pipe gallery modules, the structural characteristics, the arrangement of lifting lugs and the like have great differences, so that the lifting rows for lifting different modules need to be designed.
The hanging row that different sizes and lug were arranged can be designed according to the characteristics of different piping lane modules in general construction process for the integral hoisting of piping lane has safe and reliable's characteristics. The disadvantages are that: the types of the hanging rows required to be manufactured are various; can not be disassembled and assembled; the storage is inconvenient; the flexibility is poor; is costly and is generally disposable.
Disclosure of Invention
The utility model aims to solve the technical problem that it is single to overcome current piping lane and hang row specification, shortcoming that can not used repeatedly.
In order to solve the technical problem, the combined hanging row for hoisting the ultra-long pipe gallery land modules in the scheme comprises
One-level roof beam and second grade roof beam, the one-level roof beam comprises main lug, sliding sleeve, slide rail and portable lifting hook, the welding of main lug is on the sliding sleeve, be provided with the through-hole on the sliding sleeve, the sliding sleeve suit is on the slide rail, evenly be provided with the through-hole on the slide rail, through-hole phase-match on sliding sleeve and the slide rail, portable lifting hook sets up respectively at slide rail both ends, the coupler body of portable lifting hook is the disc structure, and the bilateral symmetry is provided with the wire rope handling hole in the lower half left and right sides of disc structure, the second grade roof beam passes through wire rope and connects on portable lifting hook, the second grade roof.
In the technical scheme, the secondary beam is composed of more than two connecting pipe sections, fixing plates are arranged at two ends of each connecting pipe section, bolt holes are formed in the periphery of each fixing plate, the connecting pipe sections are connected through bolts, and lifting lugs are arranged on the connecting pipe sections.
In the above technical scheme, the movable lifting hook is sleeved on the slide rail, and a through hole matched with the slide rail is formed in the hook body of the movable lifting hook.
The utility model discloses a row is hung to combination formula has the characteristics of place strong adaptability, the cost is lower, simple manufacture, equipment are convenient, are convenient for deposit.
Drawings
FIG. 1 is a block diagram of a primary beam;
FIG. 2 is a cross-sectional view A-A of the traveling hook of FIG. 1;
FIG. 3 is a block diagram of a primary beam suspension secondary beam;
FIG. 4 is a view of a secondary beam structure;
fig. 5 is a cross-sectional view of fig. 4A-a.
Detailed Description
Referring to fig. 1 to 5, the combined hanging bar for hoisting the ultra-long pipe gallery land module comprises a primary beam and a secondary beam, wherein the primary beam comprises a main lifting lug 1, a sliding sleeve 7, a sliding rail 2 and a movable lifting hook 3, and the main lifting lug 1 is used for connecting a hanging hook of a crane. The main lifting lug 1 is welded on the sliding sleeve 7, the sliding sleeve 7 is provided with 2 to 3 through holes, the through hole on the sliding sleeve 7 is parallel to the central axis of the sliding sleeve 7, the sliding sleeve 7 is sleeved on the sliding rail 2, the sliding rail 2 is provided with a through hole 4, the through hole on the sliding rail 2 is parallel to the central axis of the sliding rail 2, and the sliding sleeve 7 is fixed with the sliding rail 2 through a bolt.
The both ends of slide rail 2 are equipped with portable lifting hook 3 respectively, be provided with on the hook body of portable lifting hook 3 with slide rail 2 assorted through-hole, slide rail 2 and portable lifting hook 3 pass through the bolt fixed. The hook body of the movable lifting hook 3 is of a disc structure, a group of rope penetrating holes are symmetrically formed in the left side and the right side of the lower half portion of the disc structure respectively, and the group of rope penetrating holes are 2-4 holes.
The second-level beam is composed of more than two connecting pipe sections 5, fixing plates 8 are arranged at two ends of each connecting pipe section 5, bolt holes 6 are formed in the peripheries of the fixing plates 8, the connecting pipe sections 5 are connected through bolts, and 3-5 lifting lugs 9 are arranged on the connecting pipe sections 5.
And (3) connecting the steel wire rope to a lifting lug 9 on the secondary beam by penetrating the rope penetrating hole, so that the secondary beam and the primary beam are in a vertical state.
The combined hanging row is characterized in that a method of firstly considering the whole size of the hanging row integrally and then optimizing the part is adopted, then the unit design of the hanging row is carried out, and finally the detailed design is carried out, and the combined hanging row can be combined into the combined hanging row with the length of 50 meters and the width of 6 meters by adjusting the position of the movable hanging hook 3 and the length of the connecting pipe section 5. Firstly, determining the main scale of a hanging row according to the size of a pipe gallery module and the arrangement of lifting lugs, namely determining the position of a movable lifting hook 3 and fixing the position by using a bolt to form a primary beam, and fixing the number of pipe sections 5 to be connected and the number of fixing bolts, and then fixing the pipe sections 5 to be connected by using the fixing bolts to form a secondary beam structure. The primary beam and the secondary beam are connected through a steel wire rope and a shackle, and when the module is hoisted and hung in a trial mode, the module is modulated to be horizontal through the fine-adjustment type main lifting lug 1. The combined type hanging row is easy to assemble and disassemble, strong in site adaptability, low in manufacturing cost, fast in assembling speed, convenient to transport, wide in application range and the like, saves a large amount of manpower and materials, and can be widely applied to manufacturing enterprises of various ultra-long pipe gallery modules.

Claims (3)

1. A combined row of hanging for hoisting of overlength pipe gallery land module, including one-level roof beam and second grade roof beam, its characterized in that: the one-level roof beam comprises main lug, sliding sleeve, slide rail and portable lifting hook, the welding of main lug is on the sliding sleeve, be provided with the through-hole on the sliding sleeve, the sliding sleeve suit is on the slide rail, evenly be provided with the through-hole on the slide rail, through-hole phase-match on sliding sleeve and the slide rail, portable lifting hook sets up respectively at slide rail both ends, the coupler body of portable lifting hook is disc structure, and the symmetry is provided with the wire rope handling hole in disc structure's lower half left and right sides, the second grade roof beam passes through wire rope and connects on portable lifting hook, the second grade roof beam sets up with the one-.
2. The combined boom for hoisting ultra-long pipe gallery land modules according to claim 1, characterized in that: the second-level beam is composed of more than two connecting pipe sections, fixing plates are arranged at two ends of each connecting pipe section, bolt holes are formed in the periphery of each fixing plate, the connecting pipe sections are connected through bolts, and lifting lugs are arranged on the connecting pipe sections.
3. The combined hoist row for hoisting of overlength pipe gallery land modules according to claim 1 or 2, characterized in that: the movable lifting hook is sleeved on the sliding rail, and a through hole matched with the sliding rail is formed in the hook body of the movable lifting hook.
CN201920571282.9U 2019-04-25 2019-04-25 Combined hanging row for hoisting super-long pipe gallery land modules Active CN209835409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920571282.9U CN209835409U (en) 2019-04-25 2019-04-25 Combined hanging row for hoisting super-long pipe gallery land modules

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920571282.9U CN209835409U (en) 2019-04-25 2019-04-25 Combined hanging row for hoisting super-long pipe gallery land modules

Publications (1)

Publication Number Publication Date
CN209835409U true CN209835409U (en) 2019-12-24

Family

ID=68913604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920571282.9U Active CN209835409U (en) 2019-04-25 2019-04-25 Combined hanging row for hoisting super-long pipe gallery land modules

Country Status (1)

Country Link
CN (1) CN209835409U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255356A (en) * 2019-04-25 2019-09-20 惠生(南通)重工有限公司 A kind of combined hanging row for super long type piping lane land module hoisting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255356A (en) * 2019-04-25 2019-09-20 惠生(南通)重工有限公司 A kind of combined hanging row for super long type piping lane land module hoisting

Similar Documents

Publication Publication Date Title
CN102070071B (en) Steel reinforcement cage hoisting method
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN202465025U (en) Sling special for prefabricated panel
CN205012629U (en) Assembled modularization platform of unloading of encorbelmenting
CN209835409U (en) Combined hanging row for hoisting super-long pipe gallery land modules
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN109095343A (en) Assembled hanger
CN203715054U (en) 3,000t combinable lifting balance beam
CN202449737U (en) Main girder of electric single-girder crane
CN201217602Y (en) Combined sling for manufacturing box-shaped steel construction member
CN204455858U (en) A kind of hanger of large sections steel box-girder
CN203781677U (en) Trial mass device of crane
CN201746222U (en) Installation lifting device of cooling wall of furnace shell
CN208948679U (en) Assembled hanger
CN103738852A (en) Weight testing device of crane
CN204569122U (en) Building tower crane cargo hook gear
CN203754232U (en) Simple steel rail lifting tool
CN208916608U (en) A kind of prefabricated superimposed sheet Special-purpose hanger grid beam
CN110255356A (en) A kind of combined hanging row for super long type piping lane land module hoisting
CN201099586Y (en) Crane lifting device
CN209367649U (en) A kind of superimposed sheet hanger
CN217535150U (en) Lifting appliance for integral hoisting of steel reinforcement framework of prefabricated part
CN211283419U (en) Self-balancing tool system for hoisting PC component
CN218201744U (en) Assembled hoisting distribution beam
CN218664964U (en) A hoisting structure for lifting by crane prefabricated superimposed sheet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226000 port industrial zone 3, Nantong Economic and Technological Development Zone, Jiangsu Province

Patentee after: Wison Clean Energy Technology Group Co.,Ltd.

Country or region after: China

Address before: 226009 Jianghai Road 189, Nantong Economic and Technological Development Zone, Nantong City, Jiangsu Province

Patentee before: WISON(NANTONG) HEAVY INDUSTRY Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address