CN209831079U - Integral base water collector of machining center - Google Patents
Integral base water collector of machining center Download PDFInfo
- Publication number
- CN209831079U CN209831079U CN201920629622.9U CN201920629622U CN209831079U CN 209831079 U CN209831079 U CN 209831079U CN 201920629622 U CN201920629622 U CN 201920629622U CN 209831079 U CN209831079 U CN 209831079U
- Authority
- CN
- China
- Prior art keywords
- machining center
- water
- fixedly installed
- integral base
- fixed mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
Abstract
The utility model relates to a machining center accessory technical field just discloses an integral base water collector of machining center. This integral base water collector of machining center, including base, support column, machining center, water circle device and flow control device, the equal fixed mounting in both sides of base has the support column, and one side fixed mounting that the support column is relative has machining center, and machining center's bottom is provided with water circle device, and machining center's top is provided with flow control device, and water circle device includes the backwash tank. This integral base water collector of machining center through the water circle device that sets up in the bottom of machining center for this integral base water collector of machining center can recycle the water recovery who washs machining center when using, has practiced thrift the water consumption greatly, through the flow control device who sets up in the relative one side of flow pipe, makes it when using, can carry out flow control with the water resource of retrieving.
Description
Technical Field
The utility model relates to a machining center accessory technical field specifically is an integral base water collector of machining center.
Background
Machining centers have evolved from numerically controlled milling machines. The numerical control milling machine is mainly different from a numerical control milling machine in that a machining center has the capability of automatically exchanging machining tools, the machining tools on a main shaft can be changed through an automatic tool changing device in one-time clamping by installing tools with different purposes on a tool magazine, and multiple machining functions are realized, and the numerical control machining center is a high-efficiency automatic machine tool which is composed of mechanical equipment and a numerical control system and is suitable for machining complex parts. The numerical control machining center is one of numerical control machines with highest yield and most extensive application in the world at present. The comprehensive processing capacity is strong, a workpiece can finish more processing contents after being clamped once, the processing precision is high, batch workpieces with medium processing difficulty are processed, the efficiency is 5-10 times that of common equipment, especially, the batch processing method can finish processing which cannot be finished by a plurality of common equipment, and the batch processing method is more suitable for single-piece processing or medium-small batch multi-variety production with complex shapes and high precision requirements. The functions of milling, boring, drilling, tapping, cutting threads and the like are integrated on one device, so that the device has multiple technological means. The machining center is classified according to the spatial position of the main shaft during machining into: horizontal and vertical machining centers.
The base water receiving device commonly used only sets up a water storage device in base department when using, can not carry out the circulation to the water that connects and use, and the water resource has been spent to the volume greatly, can not adapt to the production and processing theory of modernization saving, environmental protection.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides an integral base water collector of machining center possesses the cyclic utilization water resource, conveniently adjusts advantages such as the size of clean rivers, has solved the problem that base water collector commonly used can not recycle the water that connects and can't adjust washing water flow.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides an integral base water collector of machining center, includes base, support column, machining center, water circle device and flow control device, the equal fixed mounting in both sides of base has the support column, one side fixed mounting that the support column is relative has machining center, machining center's bottom is provided with water circle device, machining center's top is provided with flow control device.
The water circulation device comprises a backflow tank, a sewer pipe, a water storage tank, a filter layer, a water pump, a main pipeline, a water feeding pipe and a pipeline fixing piece, wherein the backflow tank is fixedly installed at the bottom of the machining center, the sewer pipe is fixedly installed at the bottom of the backflow tank, the water storage tank is fixedly installed at the bottom of the sewer pipe, the filter layer is fixedly installed inside the water storage tank, the water pump is fixedly installed inside the base, the main pipeline is fixedly installed at a water outlet of the water pump, the water feeding pipe is fixedly installed at two ends of the main pipeline, and the pipeline fixing piece is fixedly installed on the.
Flow regulation apparatus includes regulating box, movable rod, sealed piece, expanding spring, adjusting screw and shower nozzle, the relative one side fixed mounting of flow pipe has the regulating box, the inside swing joint of regulating box has the movable rod, the left end fixed mounting of movable rod has sealed piece, the top fixed mounting of movable rod has expanding spring, the inside swing joint of regulating box has adjusting screw, the bottom fixed mounting of regulating box has the shower nozzle.
Furthermore, one side opposite to the supporting column is fixedly provided with a bearing block, and the machining center is fixedly arranged at the top of the bearing block.
Furthermore, a sewer pipe is fixedly installed at the bottom of the backflow groove, and the backflow groove is communicated with the water storage tank through the sewer pipe.
Further, the trunk line passes through stopper fixed mounting in the inside of base, and leads to the pipe switch-on between water pump, storage water tank, the trunk line three.
Furthermore, a push-pull plate is fixedly installed at the bottom of the movable rod, a bearing seat is fixedly installed on the right side of the push-pull plate, and the adjusting screw rod is movably connected with the push-pull plate through the bearing seat.
Furthermore, the right end of the adjusting screw is fixedly provided with a rotating handle, and a threaded hole matched with the adjusting screw is formed in the adjusting box.
The utility model has the advantages that:
1. this integral base water collector of machining center through the water circle device that sets up in the bottom of machining center for this integral base water collector of machining center, when using, can retrieve the water recycle who washs machining center, practiced thrift the water consumption greatly, saved manual operation's trouble simultaneously, satisfied the requirement of modernized production to energy-concerving and environment-protective, had wide development space.
2. This integral base water collector of machining center through the flow control device that sets up in the relative one side of flow pipe for this integral base water collector of machining center can carry out flow control with the water resource of retrieving when using, and its simple structure, mostly is current structure and part, and easily realization has avoided follow-up artifical clear trouble, and labour saving and time saving has practiced thrift the human cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below.
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged view of a portion a in fig. 1 according to the present invention.
Description of reference numerals: 1-base, 2-support column, 3-machining center, 4-water circulation device, 401-reflux tank, 402-sewer pipe, 403-water storage tank, 404-filter layer, 405-water pump, 406-main pipe, 407-water supply pipe, 408-pipeline fixing piece, 5-flow regulating device, 501-regulating box, 502-movable rod, 503-sealing block, 504-telescopic rod, 505-regulating screw rod and 506 spray head.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-2, an integral base water pan of a machining center comprises a base 1, support columns 2, a machining center 3, a water circulation device 4 and a flow adjusting device 5, wherein the support columns 2 are fixedly mounted on two sides of the base 1, the machining center 3 is fixedly mounted on one side, opposite to the support columns 2, of the support columns 2, a bearing block is fixedly mounted on one side, opposite to the support columns 2, the machining center 3 is fixedly mounted at the top of the bearing block, the water circulation device 4 is arranged at the bottom of the machining center 3, and the flow adjusting device 5 is arranged at the top of the machining center 3.
The water circulation device 4 comprises a return tank 401, a sewer pipe 402, a water storage tank 403, a filter layer 404, a water pump 405, a main pipeline 406, a water supply pipe 407 and a pipeline fixing piece 408, wherein the return tank 401 is fixedly installed at the bottom of the machining center 3, the sewer pipe 402 is fixedly installed at the bottom of the return tank 401, the water storage tank 403 is fixedly installed at the bottom of the sewer pipe 402, the sewer pipe 402 is fixedly installed at the bottom of the return tank 401, the return tank 401 is communicated with the water storage tank 403 through the sewer pipe, the filter layer 404 is fixedly installed inside the water storage tank 403, the water pump 405 is fixedly installed inside the base 1, the main pipeline 406 is fixedly installed at a water outlet of the water pump 405, the main pipeline 406 is fixedly installed inside the base 1 through a limiting block, the water pump 405, the water storage tank 403 and the main pipeline 406 are communicated through, through the water circle device 4 that sets up in the bottom of machining center 3 for this integral base water collector of machining center, when using, can retrieve the water recycle who washs machining center 3, practiced thrift the water consumption greatly, saved manual operation's trouble simultaneously, satisfied the requirement of modern production to energy-concerving and environment-protective, had wide development space.
The flow regulating device 5 comprises a regulating box 501, a movable rod 502, a sealing block 503, a telescopic spring 504, a regulating screw 505 and a spray nozzle 506, wherein the regulating box 501 is fixedly installed on one side opposite to the water feeding pipe 407, the inside of the regulating box 501 is movably connected with the movable rod 502, the sealing block 503 is fixedly installed at the left end of the movable rod 502, the telescopic spring 504 is fixedly installed at the top of the movable rod 502, the regulating screw 505 is movably connected with the inside of the regulating box 501, a rotating handle is fixedly installed at the right end of the regulating screw 505, a threaded hole matched with the regulating screw 505 is formed in the regulating box 501, a push-pull plate is fixedly installed at the bottom of the movable rod 502, a bearing seat is fixedly installed at the right side of the push-pull plate, the regulating screw 505 is movably connected with the push-pull plate through the bearing seat, the spray nozzle 506 is fixedly installed at the bottom of the regulating, make this integral base water collector of machining center, when using, can carry out flow control with the water resource of retrieving, and its simple structure is mostly current structure and part, easily realizes, has avoided follow-up artifical clear trouble, and labour saving and time saving has practiced thrift the human cost.
When the water cleaning device is used, water for cleaning the machining center 3 enters the water storage tank 403 through collection of the return tank 401, the water is filtered under the action of the filter layer 404, the filtered water is divided into the water delivery pipe 407 through the main pipe 406 under the action of the water pump 405, the movable rod 502 is driven to move by rotating the adjusting screw 505, the distance between the sealing block 503 and the water delivery pipe 407 is further adjusted, water flow control is achieved, finally, the machining center 3 is cleaned through spraying of the spray head 506, and the bearing seat is arranged so that the movable rod 502 cannot rotate together with the adjusting screw 505.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (6)
1. The utility model provides an integral base water collector of machining center, includes base (1), support column (2), machining center (3), water circle device (4) and flow control device (5), its characterized in that: the support columns (2) are fixedly mounted on two sides of the base (1), the machining center (3) is fixedly mounted on one side opposite to the support columns (2), the water circulation device (4) is arranged at the bottom of the machining center (3), and the flow adjusting device (5) is arranged at the top of the machining center (3);
the water circulation device (4) comprises a return tank (401), a sewer pipe (402), a water storage tank (403), a filtering layer (404), a water pump (405), a main pipeline (406), a water feeding pipe (407) and a pipeline fixing piece (408), wherein the return tank (401) is fixedly installed at the bottom of the machining center (3), the sewer pipe (402) is fixedly installed at the bottom of the return tank (401), the water storage tank (403) is fixedly installed at the bottom of the sewer pipe (402), the filtering layer (404) is fixedly installed inside the water storage tank (403), the water pump (405) is fixedly installed inside the base (1), the main pipeline (406) is fixedly installed at a water outlet of the water pump (405), the water feeding pipes (407) are fixedly installed at two ends of the main pipeline (406), and the pipeline fixing piece (408) is fixedly installed on the surface of;
flow regulation apparatus (5) are including regulating box (501), movable rod (502), sealed piece (503), expanding spring (504), adjusting screw (505) and shower nozzle (506), one side fixed mounting that delivery pipe (407) is relative has regulating box (501), the inside swing joint of regulating box (501) has movable rod (502), the left end fixed mounting of movable rod (502) has sealed piece (503), the top fixed mounting of movable rod (502) has expanding spring (504), the inside swing joint of regulating box (501) has adjusting screw (505), the bottom fixed mounting of regulating box (501) has shower nozzle (506).
2. The integral base water pan of a machining center of claim 1, characterized in that: one side that support column (2) is relative fixed mounting has the bearing block, and machining center (3) fixed mounting is at the top of bearing block.
3. The integral base water pan of a machining center of claim 1, characterized in that: the bottom of the backflow groove (401) is fixedly provided with a sewer pipe (402), and the backflow groove (401) is communicated with the water storage tank (403) through the sewer pipe.
4. The integral base water pan of a machining center of claim 1, characterized in that: the main pipeline (406) is fixedly arranged in the base (1) through a limiting block, and the water pump (405), the water storage tank (403) and the main pipeline (406) are communicated through water pipes.
5. The integral base water pan of a machining center of claim 1, characterized in that: the bottom of the movable rod (502) is fixedly provided with a push-pull plate, the right side of the push-pull plate is fixedly provided with a bearing seat, and the adjusting screw rod (505) is movably connected with the push-pull plate through the bearing seat.
6. The integral base water pan of a machining center of claim 1, characterized in that: the right end of the adjusting screw rod (505) is fixedly provided with a rotating handle, and a threaded hole matched with the adjusting screw rod (505) is formed in the adjusting box (501).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920629622.9U CN209831079U (en) | 2019-05-06 | 2019-05-06 | Integral base water collector of machining center |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920629622.9U CN209831079U (en) | 2019-05-06 | 2019-05-06 | Integral base water collector of machining center |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209831079U true CN209831079U (en) | 2019-12-24 |
Family
ID=68915241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920629622.9U Expired - Fee Related CN209831079U (en) | 2019-05-06 | 2019-05-06 | Integral base water collector of machining center |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209831079U (en) |
-
2019
- 2019-05-06 CN CN201920629622.9U patent/CN209831079U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209831079U (en) | Integral base water collector of machining center | |
CN216542235U (en) | Cooling device of high-speed numerical control lathe | |
CN216858492U (en) | A formula of can lowering temperature tapping mechanism for single face tapping | |
CN216656365U (en) | Numerical control machining lathe | |
CN216802523U (en) | Bearing frame bottom surface processing equipment | |
CN212824252U (en) | Cooling device for machining of numerical control machine tool | |
CN213764033U (en) | Cooling device of precision lathe | |
CN212192725U (en) | Water supply installation of usefulness is polished to digit control machine tool | |
CN210281621U (en) | Ultra-precise numerical control machining center | |
CN209439866U (en) | A kind of numerical control drilling machine coolant liquid recycling plant | |
CN210452039U (en) | Motor housing processing lathe | |
CN209110696U (en) | A kind of machine tooling waste material collection device | |
CN220463172U (en) | Lathe | |
CN220839252U (en) | Numerical control lathe circulation cooling structure | |
CN211867271U (en) | Water pan of machining center base | |
CN212824247U (en) | Novel digit control machine tool processing is with water spray mechanism | |
CN211490733U (en) | Machining center self-cooling tool bit | |
CN213917060U (en) | Numerical control machine tool convenient for drainage | |
CN214213109U (en) | Sheet metal water tank with chip removal function for intelligent machining center | |
CN210524603U (en) | Water cooling device of numerical control drilling machine | |
CN218837021U (en) | Digit control machine tool processing is with water spray mechanism | |
CN218503390U (en) | 7-station drilling machine tool | |
CN215917792U (en) | Lathe cooling oil filter equipment | |
CN218284784U (en) | Lathe that possesses sweeps and collect function | |
CN214444492U (en) | Slewing bearing numerical control drilling and milling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191224 |