CN209820191U - Cooling tower with but quick assembly disassembly clearance outlet - Google Patents

Cooling tower with but quick assembly disassembly clearance outlet Download PDF

Info

Publication number
CN209820191U
CN209820191U CN201822203048.9U CN201822203048U CN209820191U CN 209820191 U CN209820191 U CN 209820191U CN 201822203048 U CN201822203048 U CN 201822203048U CN 209820191 U CN209820191 U CN 209820191U
Authority
CN
China
Prior art keywords
water
tower
pipe
cooling tower
filter screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822203048.9U
Other languages
Chinese (zh)
Inventor
张强
杨龙山
王斌
段旭松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Aerospace Aerodynamics CAAA
Original Assignee
China Academy of Aerospace Aerodynamics CAAA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Aerospace Aerodynamics CAAA filed Critical China Academy of Aerospace Aerodynamics CAAA
Priority to CN201822203048.9U priority Critical patent/CN209820191U/en
Application granted granted Critical
Publication of CN209820191U publication Critical patent/CN209820191U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to a cooling water tower with a quick-detachable cleaning outlet, wherein a filter screen (12) is square and is arranged at the top of a groove of a water accumulation plate, the filter screen (12) is divided into two parts, each part is provided with a filter hole, the two parts take a water feeding pipe (11) of the water tower as the center, and after the two parts of the filter screen (12) are installed, a frame with an area larger than that of the groove of the water accumulation plate is formed; the center of the frame is fixed with the water feeding pipe through the fixture, the water feeding pipe is used as a main support frame to fix the center of the frame, the edge of the frame is arranged on the slope of the water collecting disc, the slope of the water collecting disc supports the frame for the auxiliary support, the filter screen (12) can be quickly disassembled, assembled and cleaned, and the design of a cooling circulation flow is not influenced. The original circulating cooling system fully exerts the performance, achieves the aim, reduces the times of disassembling and assembling the water filter, saves the cost and improves the production efficiency.

Description

Cooling tower with but quick assembly disassembly clearance outlet
Technical Field
The utility model relates to a cooling tower with but quick assembly disassembly clearance outlet belongs to the high-efficient technical field that promotes of cooling tower.
Background
Original cooling water tower, water filter (7) undertake cooling water and purify before getting into the equipment cooler, prevent that debris from getting into the equipment cooler, lead to the cooling surface to be covered, cause the cooling capacity to reduce, influence the equipment heat dissipation.
When the water filter is in operation, the filter screen of the water filter is gradually blocked. The water filter is provided with a backflushing device, backflushing is carried out for 2-3 days generally, impurities on the filter screen are cleaned and removed, and the filter screen can keep a filtering function; when the water filter normally operates for 6 months, the water filter is thoroughly disassembled and cleaned, and impurities which cannot be cleaned by back flushing are cleaned.
In the above process, most of the processes are carried out in closed pipes or equipment.
The cooling tower part is completely open to the atmosphere due to the evaporation and heat dissipation; meanwhile, in order to ensure good heat dissipation, the gaps of the heat dissipation grids are large, and surrounding fallen leaves, catkins and the like can easily enter the grids. When the impurities enter the water filter through the pipeline, the impurities are intercepted and simultaneously block a filter screen of the water filter, so that the flow passing through the water filter is reduced, and the cooling efficiency is seriously influenced.
When catkins and the like appear in the cooling water, the filter is backflushed by using a backflushing device, and the effect is basically not achieved. The cooler can only be opened, the filter screen is cleaned manually, and the water filter needs to be thoroughly disassembled and cleaned every 5-6 days, so that the normal operation of the main equipment is seriously influenced while the maintenance workload is increased.
After the water filter blocks up, has influenced the cooling system circulation, and the circulating water that flows to cooling tower reduces, causes the cooling efficiency serious not enough, and cooling tower's water supply is not enough, leads to cooling tower's cooling efficiency on the low side, and the temperature of circulating water lasts the rising, shows that cooling tower does not have sufficient cooling efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem do: overcome prior art not enough, provide a but have quick assembly disassembly clearance outlet's cooling tower, fully consider its use, maintain, function such as regulation, solve the cooling system circulation, the circulating water that flows to cooling tower reduces, causes the cooling efficiency seriously not enough, and cooling tower's the not enough problem of supplying water improves cooling tower's cooling efficiency, and the temperature of circulating water lasts stably, and cooling tower reaches sufficient cooling efficiency.
The utility model provides a technical scheme do: a cooling tower with a quick-release clean-up outlet, comprising: the device comprises fan blades (1), a spraying water-dispersing pipe (2), water tower fillers (3), a water tower water-collecting disc (4), a cold water pool (5), a circulating water pump (6), a water filter (7), an equipment cooler (8), a water return pool (9), an upper tower water pump (10), a water tower upper water pipe (11), a filter screen (12) and a motor;
the fan blades (1) are arranged on an output shaft of the motor, and the motor is hung above an opening at the top of the cooling tower;
the sprinkling and water-spreading pipe (2) is arranged at the top of the cooling tower and is positioned below the fan blades (1); the water tower filling (3) is positioned below the sprinkling and water-dispersing pipe (2); the water tower water accumulation disc (4) is positioned at the bottom of the cooling tower;
one end of an upper water pipe (11) of the water tower is connected with the spraying and water-dispersing pipe (2), and the other end of the upper water pipe passes through a filter screen (12) arranged in a water-collecting disc (4) of the water tower and the water-collecting disc (4) of the water tower and is connected with an outlet of an upper water pump (10) of the water tower; an inlet of the upper tower water pump (10) is connected with an outlet of the water return pool; the inlet of the water return pool is connected with the outlet of an equipment cooler (8), and the inlet of the equipment cooler (8) is connected with the outlet of a circulating water pump (6) through a water filter (7); the inlet of the circulating water pump (6) is connected with the outlet of the cold water pool (5); the inlet of the cold water pool (5) is connected with the water outlet of the water tower water collecting disc (4).
The fan blade (1) is specifically as follows: the diameter of the fan is 1500MM, the material of the fan blades is aluminum alloy, the strength is reliable, the surface is smooth and clean, the transition of each section is uniform, gaps, burrs and the like do not exist, the working angle is adjustable, the fan generally works at a middle angle, the operation is stable and reliable, and the efficiency is high.
The spraying and water-dispersing pipe (2) is specifically as follows: the water distributor consists of a shunt pipe and a water dispersion head, is designed for fixed position installation, is made of 20 steel, is subjected to surface hot galvanizing, and is sprayed with an anticorrosive material; the water dispersing head is made of hard plastic, and the water retaining structure is designed at the outlet and is responsible for scattering water flow and improving cooling efficiency
The water tower filling (3) is specifically as follows: the water tower filler is made of PVC, adopts Belgian Hamon technology, has the characteristics of high strength, small wind resistance, high cooling efficiency, high temperature resistance, long service life, blockage resistance and the like, and has the functions of flow guiding, heat exchange and the like.
Water tower water-retention tray (4) comprising: the water accumulation tray comprises a water accumulation tray slope and a water accumulation tray groove, the water accumulation tray groove is a water accumulation container with an opening at the upper end, and a water outlet is formed in the side wall of the water accumulation tray groove, close to the bottom, and is connected with an inlet of the cold water pool (5); the side wall of the groove of the water collecting tray is also provided with a through hole which can pass through a water feeding pipe (11) of the water tower; the slope of the water accumulation plate is wide at the top and narrow at the bottom and is in a quadrangular frustum pyramid shape; ponding dish slope bottom and ponding dish recess top seamless connection, ponding dish slope top and cooling tower bottom are connected.
The cold water pool (5) is specifically as follows: the rated volume is 300 cubic meters, the underground structure is built by reinforced concrete, and the lowest water level is higher than the water taking level of the circulating water pump.
The circulating water pump (6) is specifically as follows: model number 12x14SD, power 160KW of water pump motor and flow 1140M3And the delivery lift is 37m, the diameter of an inlet pipe is DN350, and the diameter of an outlet pipe is DN 300. The water pump has the advantages of good starting performance, reliable operation, low noise, small vibration, high efficiency and durability.
The water filter (7) is specifically: the BLT-A360 stainless steel cylinder type filter can be matched and connected in a pipeline system with certain pressure, and the flow rate is 100-140M3H, working pressure less than 6kgf/cm2, filter cartridge diameter 800MM, inlet and outlet pipe diameter DN 150.
The equipment cooler (8) is specifically: in order to reduce the whole volume and improve the cooling efficiency of each stage of cooler of the medium-pressure compressor, compact design and accurate measurement are adopted, the minimum is not more than 6MM through the pipe wall spacing structure of cooling water, so that solid impurities in the cooling water are required to be as small and few as possible, otherwise, the impurities cover the cooling surface or block the water flow channel of the cooling water, and the required cooling effect cannot be achieved.
The water return pool (9) is specifically as follows: the rated volume is 800 cubic meters, the underground structure is built by reinforced concrete, and the highest water level is lower than the lowest return water level of all equipment.
The upper tower water pump (10) is specifically as follows: the model (same circulating water pump) is 12x14SD, the power of a water pump motor is 160KW, and the flow rate is 1140M3And the delivery lift is 37m, the diameter of an inlet pipe is DN350, and the diameter of an outlet pipe is DN 300. The water pump has the advantages of good starting performance, reliable operation, low noise, small vibration, high efficiency and durability.
The filter screen (12) is square and is arranged at the top of the groove of the water accumulation disc, the filter screen (12) is divided into two parts, each part is provided with a filter hole, the two parts take the water tower water supply pipe (11) as the center, and after the two parts of the filter screen (12) are installed, a frame with the area larger than that of the groove of the water accumulation disc is formed; the center of the frame is fixed with a water feeding pipe through a fixture, the water feeding pipe is used as a main supporting frame to fix the center of the frame, the edge of the frame is arranged on the slope of a water collecting disc, and the slope of the water collecting disc supports the frame for an auxiliary support.
The motor specifically is: the motor model YSCL is 720r/min of rotating speed, 3KW of power, 380V of voltage, 50HZ of 3 phases, the bearing is ZKF, the protection grade IP55 and the insulation grade F. The motor is a special motor for the cooling tower, is a Y-series all-weather outdoor moisture-proof and waterproof motor, has the advantages of small volume, light weight, attractive appearance, practicality and the like, also has the advantages of good starting performance, reliable operation, low noise, small vibration, high efficiency, moisture resistance, water resistance and durability, and can continuously operate for 24 hours in an open-air state.
The water tower water supply pipe (11) specifically comprises: the size specification is DN300, the material is 20 steel, the surface is hot-dip galvanized, and the anti-corrosion material is sprayed;
compared with the prior art, the utility model the advantage lie in:
(1) the utility model relates to a but cooling tower with quick assembly disassembly clearance outlet fully considers its function such as use, maintenance, regulation, solves the cooling system circulation, and the circulating water that flows to cooling tower reduces, causes cooling efficiency serious not enough, and cooling tower's the not enough problem of supplying water, improves cooling tower's cooling efficiency, and the temperature of circulating water lasts stably, and cooling tower reaches sufficient cooling efficiency.
(2) The utility model discloses not destroying original system equipment and transforming, utilize original equipment structure, install corresponding filter screen subassembly additional, and the system combination reaches purpose mode method.
(3) The utility model discloses do not destroy, easy dismouting clearance, can not stop the aspect such as production clearance, guarantee operating duration to original equipment.
(4) The utility model discloses possible under the condition of not stopping production, repeated dismouting, repeated clean filter screen do not have special requirement to operational environment, job stabilization, safe and reliable.
(5) The utility model discloses filter the protection to water filter (7) front end, simultaneously for guaranteeing the cooling efficiency to the main equipment, the flow that will guarantee to pass through water filter can not reduce or reduce very little, in addition, the minimize is to having the destruction to equipment.
(6) The utility model reduces the times of assembling and disassembling the water filter (7) under severe conditions, greatly reduces the operation cost and improves the operation efficiency;
drawings
FIG. 1 is a diagram of the water tower structure of the present invention;
fig. 2 is the structure and assembly mode schematic diagram of the water tower filter screen of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
The utility model relates to a cooling water tower with a quick-detachable cleaning outlet, wherein a filter screen (12) is square and is arranged at the top of a groove of a water accumulation plate, the filter screen (12) is divided into two parts, each part is provided with a filter hole, the two parts take a water feeding pipe (11) of the water tower as the center, and after the two parts of the filter screen (12) are installed, a frame with an area larger than that of the groove of the water accumulation plate is formed; the center of the frame is fixed with the water feeding pipe through the fixture, the water feeding pipe is used as a main support frame to fix the center of the frame, the edge of the frame is arranged on the slope of the water collecting disc, the slope of the water collecting disc supports the frame for the auxiliary support, the filter screen (12) can be quickly disassembled, assembled and cleaned, and the design of a cooling circulation flow is not influenced. The original circulating cooling system fully exerts the performance, achieves the aim, reduces the times of disassembling and assembling the water filter, saves the cost and improves the production efficiency.
As shown in fig. 1, the utility model relates to a cooling tower with but quick assembly disassembly clearance outlet, include: the device comprises fan blades (1), a spraying water-dispersing pipe (2), water tower fillers (3), a water tower water-collecting disc (4), a cold water pool (5), a circulating water pump (6), a water filter (7), an equipment cooler (8), a water return pool (9), an upper tower water pump (10), a water tower upper water pipe (11), a filter screen (12) and a motor;
the fan blades (1) are arranged on an output shaft of the motor, and the motor is hung above an opening at the top of the cooling tower;
the sprinkling and water-spreading pipe (2) is arranged at the top of the cooling tower and is positioned below the fan blades (1); the water tower filling (3) is positioned below the sprinkling and water-dispersing pipe (2); the water tower water accumulation disc (4) is positioned at the bottom of the cooling tower;
one end of an upper water pipe (11) of the water tower is connected with the spraying and water-dispersing pipe (2), and the other end of the upper water pipe passes through a filter screen (12) arranged in a water-collecting disc (4) of the water tower and the water-collecting disc (4) of the water tower and is connected with an outlet of an upper water pump (10) of the water tower; an inlet of the upper tower water pump (10) is connected with an outlet of the water return pool; the inlet of the water return pool is connected with the outlet of an equipment cooler (8), and the inlet of the equipment cooler (8) is connected with the outlet of a circulating water pump (6) through a water filter (7); the inlet of the circulating water pump (6) is connected with the outlet of the cold water pool (5); the inlet of the cold water pool (5) is connected with the water outlet of the water tower water collecting disc (4).
The fan blade (1) is particularly preferably: the diameter of the fan is 1500MM, the material of the fan blades is aluminum alloy, the strength is reliable, the surface is smooth and clean, the transition of each section is uniform, gaps, burrs and the like do not exist, the working angle is adjustable, the fan generally works at a middle angle, the operation is stable and reliable, and the efficiency is high.
The spraying and water dispersing pipe (2) is particularly preferably as follows: the water distributor consists of a shunt pipe and a water dispersion head, is designed for fixed position installation, is made of 20 steel, is subjected to surface hot galvanizing, and is sprayed with an anticorrosive material; the water dispersing head is made of hard plastic, and the water retaining structure is designed at the outlet and is responsible for scattering water flow and improving cooling efficiency
The water tower filling (3) is particularly preferably: the water tower filler is made of PVC, adopts Belgian Hamon technology, has the characteristics of high strength, small wind resistance, high cooling efficiency, high temperature resistance, long service life, blockage resistance and the like, and has the functions of flow guiding, heat exchange and the like.
Water tower water-collecting tray (4), preferably comprising: the water accumulation tray comprises a water accumulation tray slope and a water accumulation tray groove, the water accumulation tray groove is a water accumulation container with an opening at the upper end, and a water outlet is formed in the side wall of the water accumulation tray groove, close to the bottom, and is connected with an inlet of the cold water pool (5); the side wall of the groove of the water collecting tray is also provided with a through hole which can pass through a water feeding pipe (11) of the water tower; the slope of the water accumulation plate is wide at the top and narrow at the bottom and is in a quadrangular frustum pyramid shape; ponding dish slope bottom and ponding dish recess top seamless connection, ponding dish slope top and cooling tower bottom are connected.
The cold water tank (5) is particularly preferably: the rated volume is 300 cubic meters, the underground structure is built by reinforced concrete, and the lowest water level is higher than the water taking level of the circulating water pump.
The circulating water pump (6) is specifically as follows: model number 12x14SD, power 160KW of water pump motor and flow 1140M3And the delivery lift is 37m, the diameter of an inlet pipe is DN350, and the diameter of an outlet pipe is DN 300. The water pump has the advantages of good starting performance, reliable operation, low noise, small vibration, high efficiency and durability.
The water filter (7) is particularly preferably: the BLT-A360 stainless steel cylinder type filter can be matched and connected in a pipeline system with certain pressure, and the flow rate is 100-140M3The working pressure is less than 6kgf/cm2, the diameter of the filter cartridge is 800MM, and the pipe diameter of an inlet and an outlet is DN 150.
The plant cooler (8) is particularly preferably: in order to reduce the whole volume and improve the cooling efficiency of each stage of cooler of the medium-pressure compressor, compact design and accurate measurement are adopted, the minimum is not more than 6MM through the pipe wall spacing structure of cooling water, so that solid impurities in the cooling water are required to be as small and few as possible, otherwise, the impurities cover the cooling surface or block the water flow channel of the cooling water, and the required cooling effect cannot be achieved.
The water return pool (9) is particularly preferably: the rated volume is 800 cubic meters, the underground structure is built by reinforced concrete, and the highest water level is lower than the lowest return water level of all equipment.
The upper tower water pump (10) is particularly preferably as follows: the model (same circulating water pump) is 12x14SD, the power of a water pump motor is 160KW, and the flow rate is 1140M3And the delivery lift is 37m, the diameter of an inlet pipe is DN350, and the diameter of an outlet pipe is DN 300. The water pump has the advantages of good starting performance, reliable operation, low noise, small vibration, high efficiency and durability.
As shown in fig. 2, the filter screen (12) is square, and is arranged at the top of the groove of the water accumulation disc, the filter screen (12) is divided into two parts, each part is provided with a filter hole, the two parts take the water supply pipe (11) of the water tower as the center, and after the two parts of the filter screen (12) are installed, a frame with the area larger than the groove of the water accumulation disc is formed; the center of the frame is fixed with a water feeding pipe through a fixture, the water feeding pipe is used as a main supporting frame to fix the center of the frame, the edge of the frame is arranged on the slope of a water collecting disc, and the slope of the water collecting disc supports the frame for an auxiliary support.
The motor is particularly preferably: the motor model YSCL is 720r/min of rotating speed, 3KW of power, 380V of voltage, 50HZ of 3 phases, the bearing is ZKF, the protection grade IP55 and the insulation grade F. The motor is a special motor for the cooling tower, is a Y-series all-weather outdoor moisture-proof and waterproof motor, has the advantages of small volume, light weight, attractive appearance, practicality and the like, also has the advantages of good starting performance, reliable operation, low noise, small vibration, high efficiency, moisture resistance, water resistance and durability, and can continuously operate for 24 hours in an open-air state.
The water tower water supply pipe (11) specifically comprises: the size specification is DN300, the material is 20 steel, the surface is hot-dip galvanized, and the anti-corrosion material is sprayed;
the filter screen is additionally arranged in a water accumulation disc of the cooling water tower, the water supply pipe is used as a main support frame fixing frame, the water accumulation disc supports the frame for an auxiliary support, the filter screen is placed in the frame, positioning is completed by means of self gravity, and the frame and the filter screen are combined into a filter screen assembly. This design, in with cooling tower, rely on filter (7) to remove great debris (such as catkin, leaf etc.) by interception in this filter screen (12), in addition, the position of filter screen (12) installation is placed for open air, if necessary, can directly take out the filter screen clean, compares clean water filter (7), just relatively complicated. The addition of this filter screen (12) has solved spring autumn two seasons, and impurity gets into the circulation system after in a large number in the air, leads to frequent jam of water filter (7), all needs the shutdown and disintegrates clear problem weekly for cooling tower can long-time continuous operation, has improved cooling tower's cooling efficiency.
The central part of frame utilizes the angle steel to make the shape of clamp according to the external diameter of water-supply line, fixes to the water-supply line on, and the filter screen is lifted in the outside of clamp.
The support frame of the filter screen is made into two symmetrical halves, the upper water pipe is used as the center, after the installation is completed, a frame which is larger than the sinking part of the water accumulation plate is formed, the central part is fixed on the upper water pipe, and the periphery of the frame is arranged on the slope of the water accumulation plate. In a similar way, the filter screen is also made into two symmetrical half parts, so that the filter screen is convenient to install and dismantle.
In order to meet the requirement of repeatedly disassembling and assembling and cleaning the filter screen, a fixed connection point is not arranged between the filter screen assembly and the frame, the filter screen assembly is fixed in the frame by the gravity of the filter screen assembly, the filter screen assembly is convenient to take out and clean in time, and meanwhile, because the assembly is arranged at an open environment part, when the extreme requirement is met, the filter screen assembly can be disassembled and cleaned in a cooling cycle.
The filter screen is required to be repeatedly cleaned and used for many times, and the stainless steel mesh is preferably selected for manufacturing, so that the condition that the filter screen is cleaned for many times and cannot be damaged is guaranteed.
The cold water pool stores circulating water radiated by the cooling tower → the circulating water pump sixthly absorbs water in the cold water pool, the water is pressurized and enters the circulation → the water filter to remove impurities in the water, the equipment cooler (8) is prevented from being blocked, the cleanness of a heat exchange surface is kept effectively → the equipment cooler absorbs heat generated by the operation of the equipment into the circulating water through the heat exchange surface, the equipment is ensured to work in a normal temperature range → the water return pool adopts natural return water, and in all the coolers, enough circulating water is enabled to pass through the → upper tower water pump to absorb water in the water return pool (9), the water enters the water supply pipe of the water tower → the water supply pipe of the water tower is responsible for conveying the water to the spray water dispersion pipe (2) at the top end of the cooling tower → the spray water dispersion pipe is responsible for water flow reaching the top end of the cooling tower and is dispersed as far as possible, the circulating water finally entering the groove portion → the filter screen is filtered → the circulating water after being stored and cooled is subjected to the next cooling cycle through a self-directed slope. "→" indicates "then".
Because the installation position of the filter screen (12) is in the open air part of the cooling water tower, on the water collecting disc (4) of the water tower, when the filter screen (12) is taken out and put in, only the interference of water flow is generated, and the actual operation is not influenced.
Present cooling tower with the utility model discloses the water tower is in the filter screen of clearance impurity difference (before reforming transform, need disintegrate clearance water filter (7), reforms transform the back, only needs the filter part of clearance filter screen (12):
by comparison of the tables above, it is clear that: no matter the manpower, the time, or the simplicity and the multiplicity of the flow, the structure of the water tower of the utility model is obviously superior.
In addition, the filter screen eliminates the production stop caused by the blockage of the filter screen, and the operation of the cooling water tower can be continuous, thereby playing a powerful guarantee for improving the effective operation time of the equipment.
The utility model discloses fully consider its function such as use, maintenance, regulation, solve the cooling system circulation, flow direction cooling tower's circulating water reduces, causes cooling efficiency seriously not enough, and cooling tower's the not enough problem of supplying water improves cooling tower's cooling efficiency, and the temperature of circulating water lasts stably, and the cooling tower reaches sufficient cooling efficiency.
The utility model discloses not destroying original system equipment and transforming, utilize original equipment structure, install corresponding filter screen subassembly additional, and the system combination reaches purpose mode method, the utility model discloses do not destroy, easy dismouting clearance, can not the aspect such as the clearance of not stopping production, guarantee operating duration to original equipment. The utility model discloses possible under the condition of not stopping production, repeated dismouting, repeated clean filter screen do not have special requirement to operational environment, job stabilization, safe and reliable.
The utility model carries out filtering protection on the front end of the water filter, and simultaneously ensures that the flow passing through the water filter can not be reduced or is very small to ensure the cooling efficiency of the main equipment, and in addition, the damage to the existing equipment is reduced as much as possible; the utility model discloses reduced under the adverse conditions, the dismouting number of times of water filter (7), running cost also compresses greatly, has improved cooling tower operating efficiency.

Claims (10)

1. A cooling tower with a quick-detachable cleaning outlet is characterized by comprising: the device comprises fan blades (1), a spraying water-dispersing pipe (2), water tower fillers (3), a water tower water-collecting disc (4), a cold water pool (5), a circulating water pump (6), a water filter (7), an equipment cooler (8), a water return pool (9), an upper tower water pump (10), a water tower upper water pipe (11), a filter screen (12) and a motor;
the fan blades (1) are arranged on an output shaft of the motor, and the motor is hung above an opening at the top of the cooling tower;
the sprinkling and water-spreading pipe (2) is arranged at the top of the cooling tower and is positioned below the fan blades (1); the water tower filling (3) is positioned below the sprinkling and water-dispersing pipe (2); the water tower water accumulation disc (4) is positioned at the bottom of the cooling tower;
one end of an upper water pipe (11) of the water tower is connected with the spraying and water-dispersing pipe (2), and the other end of the upper water pipe passes through a filter screen (12) arranged in a water-collecting disc (4) of the water tower and the water-collecting disc (4) of the water tower and is connected with an outlet of an upper water pump (10) of the water tower; an inlet of the upper tower water pump (10) is connected with an outlet of the water return pool; the inlet of the water return pool is connected with the outlet of an equipment cooler (8), and the inlet of the equipment cooler (8) is connected with the outlet of a circulating water pump (6) through a water filter (7); the inlet of the circulating water pump (6) is connected with the outlet of the cold water pool (5); the inlet of the cold water pool (5) is connected with the water outlet of the water tower water collecting disc (4).
2. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the fan blade (1) is specifically as follows: the diameter of the fan is 1500 MM-1800 MM, the material of the fan blades is aluminum alloy, and the working angle can be adjusted.
3. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the spraying and water-dispersing pipe (2) is specifically as follows: the water distributor consists of a shunt pipe and a water distributing head, wherein the water distributing head is arranged on the shunt pipe at a fixed position.
4. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the water tower filling (3) is specifically as follows: the water tower filler is made of PVC and has the functions of flow guiding and heat exchange.
5. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: water tower water-retention tray (4) comprising: the water accumulation tray comprises a water accumulation tray slope and a water accumulation tray groove, the water accumulation tray groove is a water accumulation container with an opening at the upper end, and a water outlet is formed in the side wall of the water accumulation tray groove, close to the bottom, and is connected with an inlet of the cold water pool (5); the side wall of the groove of the water collecting tray is also provided with a through hole which can pass through a water feeding pipe (11) of the water tower; the slope of the water accumulation plate is wide at the top and narrow at the bottom and is in a quadrangular frustum pyramid shape; ponding dish slope bottom and ponding dish recess top seamless connection, ponding dish slope top and cooling tower bottom are connected.
6. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the cold water pool (5) is specifically as follows: the rated volume of the cold water pool is 300 cubic meters, and the cold water pool is a buried structure and is built by reinforced concrete.
7. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the specific model of the circulating water pump (6) is 12x14SD, the power of a water pump motor is 160KW, the flow rate is 1140M 3H, the lift is 37M, the inlet pipe diameter is DN350, and the outlet pipe diameter is DN 300; the water filter (7) is a stainless steel cylinder filter of model BLT-A360.
8. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the equipment cooler (8) comprises: the coolers of the stages of the medium-pressure compressor itself.
9. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the rated volume of the water return pool (9) is 800 cubic meters, the water return pool is of a buried structure and is built by reinforced concrete, and the highest water level is lower than the lowest water return level of all equipment.
10. The cooling tower with the quick-detachable cleaning water outlet according to claim 1, wherein: the filter screen (12) is square and is arranged at the top of the groove of the water accumulation disc, the filter screen (12) is divided into two parts, each part is provided with a filter hole, the two parts take the water tower water supply pipe (11) as the center, and after the two parts of the filter screen (12) are installed, a frame with the area larger than that of the groove of the water accumulation disc is formed; the center of the frame is fixed with a water feeding pipe through a fixture, the water feeding pipe is used as a main supporting frame to fix the center of the frame, the edge of the frame is arranged on the slope of a water collecting disc, and the slope of the water collecting disc supports the frame for an auxiliary support.
CN201822203048.9U 2018-12-26 2018-12-26 Cooling tower with but quick assembly disassembly clearance outlet Active CN209820191U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822203048.9U CN209820191U (en) 2018-12-26 2018-12-26 Cooling tower with but quick assembly disassembly clearance outlet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822203048.9U CN209820191U (en) 2018-12-26 2018-12-26 Cooling tower with but quick assembly disassembly clearance outlet

Publications (1)

Publication Number Publication Date
CN209820191U true CN209820191U (en) 2019-12-20

Family

ID=68870155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822203048.9U Active CN209820191U (en) 2018-12-26 2018-12-26 Cooling tower with but quick assembly disassembly clearance outlet

Country Status (1)

Country Link
CN (1) CN209820191U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238254A (en) * 2020-03-06 2020-06-05 郑州夙烟新能源科技有限公司 Automatically cleaning fountain cooling tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238254A (en) * 2020-03-06 2020-06-05 郑州夙烟新能源科技有限公司 Automatically cleaning fountain cooling tower
CN111238254B (en) * 2020-03-06 2020-12-11 江苏蓝电环保股份有限公司 Automatically cleaning fountain cooling tower

Similar Documents

Publication Publication Date Title
CN209820191U (en) Cooling tower with but quick assembly disassembly clearance outlet
CN109025082A (en) A kind of solar energy green building with water saving fixtures
CN110565741A (en) Spontaneous air water trap device based on aerodynamics
CN109067319A (en) A kind of solar energy photovoltaic panel mounting bracket assembly
CN108718179A (en) Photovoltaic waterborne automatic pumping cleaning at times and cooling device
CN107084627B (en) Winter anti-freezing water distribution device for large-scale countercurrent cooling tower
CN114121425B (en) Emergent heat sink of transformer on pole
CN215542208U (en) Novel artificial waterfall of landscape architecture
CN213242128U (en) Automatic spraying cooling device for oil-immersed transformer
CN210746337U (en) Do benefit to potato of cooling and breed and use big-arch shelter
CN211631206U (en) A monitoring devices for hydro-fluctuation district vegetation
CN108088276B (en) Water-saving cooling process and device for north industrial circulating water
CN113405373A (en) Novel anti-freezing cooling tower and deicing method thereof
CN208055103U (en) A kind of water quality purification device for plant landscape
CN210689281U (en) Novel seawater cooling tower structure
CN112710164A (en) Energy-saving and efficiency-increasing method and device combining photovoltaic power generation and mechanical ventilation cooling tower
CN213455013U (en) Recirculated cooling water system for power generation facility
CN219714157U (en) Air cooling island tube bank washing unit
CN221263759U (en) Protective device for photovoltaic module and photovoltaic module
CN216620724U (en) Noise reduction structure for cooling tower
CN214792628U (en) Water circulation device for cooling tower
CN211739939U (en) Dry and wet dual-purpose closed cooling water tower
CN220230201U (en) Energy-saving system of liquid oxygen gasifier
CN215890479U (en) Sewage pump with anti-blocking structure
CN219118572U (en) Green building roof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant