CN209814434U - Filling equipment for paint production - Google Patents

Filling equipment for paint production Download PDF

Info

Publication number
CN209814434U
CN209814434U CN201920669883.3U CN201920669883U CN209814434U CN 209814434 U CN209814434 U CN 209814434U CN 201920669883 U CN201920669883 U CN 201920669883U CN 209814434 U CN209814434 U CN 209814434U
Authority
CN
China
Prior art keywords
fixed
step motor
plate
riser
paint production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920669883.3U
Other languages
Chinese (zh)
Inventor
胡豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920669883.3U priority Critical patent/CN209814434U/en
Application granted granted Critical
Publication of CN209814434U publication Critical patent/CN209814434U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a paint production is with filling equipment, including base, riser and roof, the riser is installed through the mounting groove to base top one end, the fixed bin is installed through the fixed slot to the base top other end, the roof is installed through the bolt in the riser top, the electron measuring pump is installed through the mount pad in the roof top, the formaldehyde detector is installed through the mounting panel to roof bottom one end, first step motor is installed through the fixed plate in riser one side, the baffle is installed through the connecting block to riser one end, baffle tip one side is provided with the second rolling disc, the fixed arm is installed through the bolt to second rolling disc periphery. The utility model discloses can make things convenient for the centre gripping jar body, can conveniently detect the formaldehyde content of leaking in the filling process, area is little, can also conveniently adjust the angle of shower nozzle, is fit for being extensively promoted and used.

Description

Filling equipment for paint production
Technical Field
The utility model relates to a paint production technical field, in particular to filling equipment is used in paint production.
Background
In the paint production field, in order to carry out the filling to paint, so filling equipment is very necessary, and filling equipment in the past can not conveniently centre gripping jar body, can not conveniently detect the formaldehyde content of leaking in the filling process, adopts the conveyer belt mode to carry out continuous conveying, and area is great, can not conveniently adjust the angle of shower nozzle, for this reason, we provide a filling equipment for paint production.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a filling equipment is used in paint production, through setting up splint and compression spring, the convenience carries out the centre gripping to the paint jar body, through setting up first step motor and second rolling disc, conveniently carry out continuous filling, owing to take the rotation cycle mode, compare conveyer belt conveying in the past, area has been saved greatly, through setting up the convenient angle that changes the shower nozzle of second step motor, prevent to cause to block to the installation framed panel that advances on next step after the shower nozzle filling, through setting up the formaldehyde detector, conveniently indicate operating personnel to pay attention to taking precautions against the formaldehyde poisoning, can effectively solve the problem in the technical background.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a filling device for paint production comprises a base, a vertical plate and a top plate, wherein the vertical plate is installed at one end of the top of the base through an installation groove, a fixed bin is installed at the other end of the top of the base through a fixed groove, the top of the vertical plate is provided with the top plate through a bolt, an electronic metering pump is installed at the top of the top plate through an installation seat, a formaldehyde detector is installed at one end of the bottom of the top plate through an installation plate, a first stepping motor is installed at one side of the vertical plate through a fixed plate, a baffle is installed at one end of the vertical plate through a connecting block, a second rotating disc is arranged at one side of the end part of the baffle, a fixed arm is installed at the periphery of the second rotating disc through a bolt, a bearing is installed between the fixed arms through a rotating shaft, an installation frame plate is arranged between the bearings, one end of the first rotating disc is connected with a spray head through a connecting support rod.
Furthermore, a balancing weight is fixed at the bottom of the mounting frame plate through screws.
Furthermore, clamping plates are fixedly connected to two sides of the inner wall of the installation frame plate through compression springs.
Furthermore, a conveyor belt is sleeved on the periphery of the rotating shaft of the first stepping motor, the conveyor belt is positioned in the baffle, and one end of the conveyor belt is sleeved on the periphery of the rotating shaft of the second rotating disc.
Furthermore, a discharging port of the electronic metering pump is connected with a feeding port of the spray head through a conveying hose.
Further, a first stepping motor controller and a first stepping motor controller are installed on one side of the bottom end of the vertical plate through bolts and are electrically connected with the first stepping motor, and a second stepping motor controller are installed on one end of the fixed bin through bolts and are electrically connected with the second stepping motor.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. through setting up splint and compression spring, the personnel will paint the jar body and place in splint, utilize compression spring to the inboard pressure of splint to the convenience carries out the centre gripping to the paint jar body.
2. Through setting up first step motor and second rolling disc, the personnel open first step motor, and the during operation output shaft drives the drive belt and rotates to drive the second rolling disc and rotate, and then conveniently drive the paint tank body of centre gripping in the installation deckle board and rotate, thereby conveniently carry out continuous filling, owing to take the rotation circulation mode, compare the conveyer belt conveying in the past, saved area greatly.
3. Through setting up second step motor, open second step motor, utilize second step motor's positive and negative rotation, can conveniently change the angle of shower nozzle, prevent that the shower nozzle from causing to block the installation framed panel that advances on next step after the filling.
4. Through setting up the formaldehyde detector, utilize the formaldehyde detector conveniently to detect the formaldehyde content in near this filling equipment air to effectively indicate operating personnel to notice and take precautions against formaldehyde poisoning.
Drawings
Fig. 1 is the utility model relates to a paint production is with filling equipment's overall structure schematic diagram.
Fig. 2 is the utility model relates to a paint production is with drive belt schematic diagram of filling equipment.
Fig. 3 is the utility model relates to a paint production is with installation deckle board schematic diagram of filling equipment.
In the figure: 1. a base; 2. a vertical plate; 3. a top plate; 4. a first stepper motor; 5. an electronic metering pump; 6. a formaldehyde detector; 7. a baffle plate; 8. a splint; 9. fixing the bin; 10. a second stepping motor; 11. a first rotating disk; 12. a spray head; 13. a second rotating disk; 14. a fixed arm; 15. a rotating shaft; 16. installing a frame plate; 17. a balancing weight; 18. a bearing; 19. a compression spring; 20. a transmission belt; 21. a first stepper motor controller; 22. and a second step motor controller.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-3, a filling device for paint production comprises a base 1, a vertical plate 2 and a top plate 3, wherein the vertical plate 2 is installed at one end of the top of the base 1 through an installation groove, a fixed bin 9 is installed at the other end of the top of the base 1 through a fixed groove, the top of the vertical plate 2 is provided with the top plate 3 through a bolt, an electronic metering pump 5 is installed at the top of the top plate 3 through an installation seat, a formaldehyde detector 6 is installed at one end of the bottom of the top plate 3 through an installation plate, a first stepping motor 4 is installed at one side of the vertical plate 2 through a fixed plate, a baffle 7 is installed at one end of the vertical plate 2 through a connecting block, a second rotating disc 13 is arranged at one side of the end part of the baffle 7, a fixed arm 14 is installed at the periphery of, second step motor 10 is installed through the mount pad to the bottom in the fixed storehouse 9, the output shaft of second step motor 10 runs through fixed storehouse 9 top and has first rotation dish 11 through the fix with screw, 11 one end of first rotation dish is connected with shower nozzle 12 through connecting branch.
Wherein, a balancing weight 17 is fixed at the bottom of the mounting frame plate 16 through screws.
In the present embodiment, as shown in fig. 1 and 3, the mating block 17 can be used to keep the installation frame plate 16 always vertical.
Wherein, the inner wall of the installation frame plate 16 is fixedly connected with the clamping plate 8 through the compression spring 19.
In this embodiment, as shown in fig. 3, a person places the paint can body in the clamping plate 8, and utilizes the compression spring 19 to press the clamping plate 8 inwards, so as to conveniently clamp the paint can body.
The periphery of the rotating shaft of the first stepping motor 4 is sleeved with a conveyor belt 20, the conveyor belt 20 is located in the baffle 7, and one end of the conveyor belt is sleeved on the periphery of the rotating shaft of the second rotating disc 13.
In this embodiment, as shown in fig. 2, the personnel open first step motor 4, and the during operation output shaft drives drive belt 20 and rotates to drive second rolling disc 13 and rotate, and then conveniently drive the paint tank body of centre gripping in the installation deckle board 16 and rotate, thereby conveniently carry out continuous filling.
Wherein, the blanking port of the electronic metering pump 5 is connected with the feeding port of the spray head 12 through a delivery hose.
In this embodiment, as shown in fig. 1, after the electronic metering pump 5 is turned on to conveniently and accurately weigh paint of a certain mass, the paint is conveyed to the spray head 12 through the conveying hose to be sprayed out, so that the paint can body is filled.
Wherein, 2 bottom one side of riser is installed first step motor controller 21 and first step motor 4 electrical property through the bolt and is linked to each other, fixed 9 one end of storehouse is installed second step motor controller 22 and second step motor 10 electrical property through the bolt and is linked to each other.
In this embodiment, as shown in fig. 1, a person sets the set values of the first stepping motor controller 21 and the second stepping motor controller 22 in advance to realize the rotation of the first stepping motor 4 and the second stepping motor 10 by a desired angle.
It should be noted that, the utility model relates to a filling equipment for paint production, during operation, the personnel realize the angle required by the rotation of the first step motor 4 and the second step motor 10 by presetting the set values of the first step motor controller 21 and the second step motor controller 22 (manufactured by shanghai four-transverse motor manufacturing company, model AKS-01Z), the first step motor 4, the second step motor 10 and the electronic metering pump 5 are all provided with independent switches and power plugs, during operation, the personnel are connected with nearby power for use, the personnel place the paint tank body in the clamping plate 8, utilize the compression spring 19 to clamp the inward pressure of the clamping plate 8, thereby conveniently clamping the paint tank body, the personnel open the first step motor 4, during operation, the output shaft drives the transmission belt 20 to rotate, thereby driving the second rotating disc 13 to rotate, and further conveniently drive the paint tank body clamped in the installation frame plate 16 to rotate, thereby facilitating continuous filling, greatly saving occupied area compared with the prior conveying belt conveying due to the adoption of a rotary circulation mode, opening an electronic metering pump 5 (model DJZ-60 produced by Wenzhou Weiwang Pump valve manufacturing Limited company), conveniently and accurately weighing paint with certain mass, conveying the paint to a spray head 12 through a conveying hose for spraying, thereby filling the paint can body, opening the second stepping motor 22, utilizing the positive and negative rotation of the second stepping motor 22, can conveniently change the angle of shower nozzle 12, prevent that the installation framed panel 16 that advances next step from causing after 12 filling of shower nozzle from blockking, utilize formaldehyde detector 6 (the production of north boat environmental protection science and technology limited in Shanghai, model GT58A-API) to conveniently detect the formaldehyde content in near this filling equipment air to effectively indicate operating personnel to notice taking precautions against formaldehyde poisoning.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a paint produce is with filling equipment, includes base (1), riser (2) and roof (3), its characterized in that: the device is characterized in that a vertical plate (2) is installed at one end of the top of a base (1) through an installation groove, a fixed bin (9) is installed at the other end of the top of the base (1) through a fixed groove, a top plate (3) is installed at the top of the vertical plate (2) through a bolt, an electronic metering pump (5) is installed at the top of the top plate (3) through an installation seat, a formaldehyde detector (6) is installed at one end of the bottom of the top plate (3) through an installation plate, a first stepping motor (4) is installed at one side of the vertical plate (2) through a fixed plate, a baffle (7) is installed at one end of the vertical plate (2) through a connecting block, a second rotating disc (13) is arranged at one side of the end part of the baffle (7), a fixed arm (14) is installed at the periphery of the second rotating, second step motor (10) are installed through the mount pad to the bottom in fixed storehouse (9), the output shaft of second step motor (10) runs through fixed storehouse (9) top and has first rotation dish (11) through the fix with screw, first rotation dish (11) one end is connected with shower nozzle (12) through connecting branch.
2. The filling apparatus for paint production according to claim 1, wherein: and a balancing weight (17) is fixed at the bottom of the mounting frame plate (16) through a screw.
3. The filling apparatus for paint production according to claim 1, wherein: and clamping plates (8) are fixedly connected to the two sides of the inner wall of the mounting frame plate (16) through compression springs (19).
4. The filling apparatus for paint production according to claim 1, wherein: the periphery of the rotating shaft of the first stepping motor (4) is sleeved with a conveyor belt (20), the conveyor belt (20) is positioned in the baffle (7), and one end of the conveyor belt is sleeved on the periphery of the rotating shaft of the second rotating disc (13).
5. The filling apparatus for paint production according to claim 1, wherein: the blanking port of the electronic metering pump (5) is connected with the feeding port of the spray head (12) through a delivery hose.
6. The filling apparatus for paint production according to claim 1, wherein: first step motor controller (21) and first step motor (4) electrical property link to each other are installed through the bolt to riser (2) bottom one side, fixed storehouse (9) one end is installed second step motor controller (22) and second step motor (10) electrical property and is linked to each other through the bolt.
CN201920669883.3U 2019-05-11 2019-05-11 Filling equipment for paint production Expired - Fee Related CN209814434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920669883.3U CN209814434U (en) 2019-05-11 2019-05-11 Filling equipment for paint production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920669883.3U CN209814434U (en) 2019-05-11 2019-05-11 Filling equipment for paint production

Publications (1)

Publication Number Publication Date
CN209814434U true CN209814434U (en) 2019-12-20

Family

ID=68883083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920669883.3U Expired - Fee Related CN209814434U (en) 2019-05-11 2019-05-11 Filling equipment for paint production

Country Status (1)

Country Link
CN (1) CN209814434U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114476222A (en) * 2022-02-22 2022-05-13 浙江古思建筑科技有限公司 Filling device of heat preservation plaster mortar that plasters

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114476222A (en) * 2022-02-22 2022-05-13 浙江古思建筑科技有限公司 Filling device of heat preservation plaster mortar that plasters

Similar Documents

Publication Publication Date Title
CN205040151U (en) Multistation LED light source plate kludge
CN209814434U (en) Filling equipment for paint production
CN203853917U (en) Vehicle door assembling fixture
CN209118247U (en) A kind of numerical control deaeration machine of handset touch panel
CN217050229U (en) High-efficient inspection cardboard device of level
CN208554686U (en) A kind of part sealing automatic spray apparatus
CN208018836U (en) A kind of cross 360 degree of automatic turntables
CN211688182U (en) Mechanical automation packing closing device
CN210994908U (en) Spraying device for antioxidant panel
CN219426120U (en) Intelligent assembly fixture with leak protection detects function
CN111632857A (en) Vibration assembly for semiconductor test sorting
CN112227721A (en) Multi-screw concrete spiral distributing machine with power compensation module
CN219253344U (en) Rectifier bridge electrical property test sorting unit
CN216678774U (en) Automatic internal coating machine for aluminum bottle
CN216643265U (en) Material measurement conveyor becomes more meticulous
CN103538741B (en) A kind of energy-efficient aerosol can capped system
CN216546927U (en) Full-automatic weighing vacuum packaging machine for five cereals
CN216151109U (en) Automatic feeding device of numerically controlled lathe with adjustable feeding angle
CN220880268U (en) Positioning component for bending mechanism
CN219801238U (en) Full-automatic lifting negative pressure device of lead-acid storage battery
CN203544414U (en) High-efficiency energy-saving spray can capping system
CN215626745U (en) A multi-functional filling spiral cover all-in-one for pharmaceutical production
CN206904545U (en) A kind of bearing grease stirs evenly tool
CN218571282U (en) Pastry sauce applying machine
CN220549246U (en) Quantitative filling device of electrophoretic paint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191220