CN209805350U - building engineering water and electricity mounting structure - Google Patents
building engineering water and electricity mounting structure Download PDFInfo
- Publication number
- CN209805350U CN209805350U CN201920800734.6U CN201920800734U CN209805350U CN 209805350 U CN209805350 U CN 209805350U CN 201920800734 U CN201920800734 U CN 201920800734U CN 209805350 U CN209805350 U CN 209805350U
- Authority
- CN
- China
- Prior art keywords
- frame
- groove
- mounting
- installation structure
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a building engineering hydroelectric installation structure, which relates to the technical field of building engineering, and comprises an installation frame, wherein the installation frame is a U-shaped frame, the opening part of the installation frame is provided with a mounting plate, both sides of the mounting plate are welded with plugboards, and the plugboards are inserted in the plugboards, the plugboards are arranged on the outer frame walls at both sides of the installation frame, slots are arranged on the plugboards, locking blocks are arranged in the slots in a sliding way through sliders, jacks are arranged on the front side of the mounting plate, and threaded rods pass through the threads on the inner hole walls of the jacks, so that the utility model discloses a plurality of clamping plates are arranged, and a plurality of clamping grooves are arranged on the clamping plates, so that the installation structure can accommodate more hydroelectric pipelines, and the practicability is stronger; be provided with the insulation board between a plurality of draw-in grooves, the insulation board not only plays insulating effect, but also can be with cutting apart each other between the water and electricity pipeline of installation in this mounting structure, and the security is higher.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering water and electricity mounting structure.
Background
the building engineering refers to an engineering entity formed by the construction of various house buildings and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the house buildings, wherein the house buildings refer to the engineering which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of production, living, learning and public activities of people.
However, the current construction hydroelectric installation structure has limited number of installed hydroelectric pipelines and the disassembly work is complicated. Accordingly, those skilled in the art have provided a construction work hydroelectric installation structure to solve the problems set forth in the background art as described above.
Disclosure of Invention
an object of the utility model is to provide a building engineering water and electricity mounting structure to the current building engineering water and electricity mounting structure who proposes in solving above-mentioned background art is limited to the quantity of water and electricity pipeline installation, and its dismantlement work is also comparatively complicated problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering water and electricity mounting structure, includes the installing frame, the installing frame is "U" shape frame, the opening part of installing frame is provided with the mounting panel, the picture peg has all been welded to the both sides of mounting panel, just the picture peg is pegged graft in the slot, the slot is seted up on the both sides outline wall of installing frame, the fluting has been seted up on the picture peg, install the latch segment through the slider is gliding in the fluting, the jack has been seted up on the front of mounting panel, just the screw thread passes threaded rod on the interior pore wall of jack, be provided with splint in the installing frame, the both sides of splint are all fixed and are provided with the slider, the draw-in groove has been seted up on.
As a further aspect of the present invention: the clamping grooves are formed in a plurality of and are distributed at equal intervals, and rubber pads are bonded to the groove walls of the clamping grooves.
As a further aspect of the present invention: it is a plurality of all be provided with the insulating strip between the draw-in groove, just the insulating strip bonds on splint.
As a further aspect of the present invention: the splint are provided with many, many splint are all through the gliding installation of slider in the spout, just the spout is seted up on the inner frame wall of installing frame.
As a further aspect of the present invention: the threaded rod extends to one end of the mounting frame and is fixedly sleeved with the abutting disc, and the abutting disc is of a disc-shaped structure.
As a further aspect of the present invention: and a locking groove is formed in the bottom groove wall of the slot and communicated with the slot in the inserting plate, and the locking block in the slot slides into the locking groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. The utility model has the advantages that the installation structure can accommodate more water and electricity pipelines and has stronger practicability by arranging the plurality of clamping plates and arranging the plurality of clamping grooves on the clamping plates; be provided with the insulation board between a plurality of draw-in grooves, the insulation board not only plays insulating effect, but also can be with cutting apart each other between the water and electricity pipeline of installation in this mounting structure, and the security is higher.
2. The plug board of the utility model is locked in the locking groove by the locking block in a sliding way, and the plug board is fixedly connected with the mounting plate, thus realizing the mounting and locking work of the mounting plate, and simultaneously, the dismounting work of the mounting structure is simpler, and the installation of water and electricity pipelines is convenient; be provided with the threaded rod in the jack on the mounting panel to the fixed cover of one end of threaded rod connects and supports tight piece, and the disc supports tightly piece can be fine drip with supporting each other between the splint, makes this structure more firm to the fastening of water and electricity pipeline, avoids appearing the condition that drops.
Drawings
FIG. 1 is a schematic structural view of a hydroelectric installation structure for construction work;
FIG. 2 is a schematic structural view of a mounting frame in a hydroelectric installation structure in constructional engineering;
FIG. 3 is a schematic view of the construction of a mounting plate in a hydroelectric installation of construction;
Fig. 4 is an enlarged view of a structure at a in a hydroelectric installation structure of construction work.
In the figure: 1. installing a frame; 2. mounting a plate; 3. a jack; 4. a threaded rod; 5. inserting plates; 6. a splint; 7. a card slot; 8. a rubber pad; 9. an insulating strip; 10. a slot; 11. a locking groove; 12. a chute; 13. tightly abutting against the disc; 14. grooving; 15. and a locking block.
Detailed Description
Please refer to fig. 1-4, in the embodiment of the utility model, in an embodiment, a building engineering water and electricity mounting structure, including mounting frame 1, mounting frame 1 is "U" shape frame, the opening part of mounting frame 1 is provided with mounting panel 2, picture peg 5 has all been welded to mounting panel 2's both sides, and picture peg 5 pegs graft in slot 10, slot 10 is seted up on mounting frame 1's both sides frame wall, locking groove 11 has been seted up on slot 10's the bottom cell wall, and slot 14 intercommunication on locking groove 11 and the picture peg 5, locking block 15 slides to in the locking groove 11 among the slot 14, through sliding locking block 15 in slot 14, slide locking block 15 to locking groove 11 in, can realize the locking work to mounting panel 2, make this mounting structure's dismantlement work simpler, the convenience is installed the water and electricity pipeline.
The slotting 14 is arranged on the inserting plate 5, the locking block 15 is arranged in the slotting 14 in a sliding mode through the sliding block, the inserting hole 3 is arranged on the front face of the mounting plate 2, the threaded rod 4 penetrates through the inner hole wall of the inserting hole 3 in a threaded mode, the one end, extending into the mounting frame 1, of the threaded rod 4 is fixedly sleeved with the abutting disc 13, the abutting disc 13 is of a disc-shaped structure, the threaded rod 4 is rotated in the inserting hole 3, the locking disc 13 fixedly sleeved at one end of the threaded rod 4 can abut against the clamping plate 6 tightly, and therefore the water and electricity pipeline can be mounted more firmly.
Be provided with splint 6 in the installing frame 1, the both sides of splint 6 are all fixed and are provided with the slider, draw-in groove 7 has been seted up on splint 6, draw-in groove 7 has been seted up a plurality ofly, and equidistant distribution between a plurality of draw-in grooves 7, all bond on the cell wall of draw-in groove 7 has rubber pad 8, all be provided with insulating strip 9 between a plurality of draw-in grooves 7, and insulating strip 9 bonds on splint 6, splint 6 are provided with many, many splint 6 are all installed in spout 12 through the slider is gliding, and spout 12 sets up on the inner frame wall of installing frame 1, through setting up many splint 6, and a plurality of draw-in grooves 7 have been seted up on splint 6, make this mounting structure can hold more water and electricity pipelines, the practicality is stronger.
The utility model discloses a theory of operation is: when the hydropower installation is carried out on the building engineering, firstly, the hydropower pipelines to be installed are respectively inserted into the clamping grooves 7 of the clamping plates 6, the rubber pads 8 are bonded on the groove walls of the clamping grooves 7, the static friction between the hydropower pipelines is increased, so that the hydropower pipelines are not easy to slide off, the installation structure can contain more hydropower pipelines, the practicability is stronger, when the hydropower pipelines are all inserted into the clamping grooves 7, the inserting plates 5 on the installation plates 2 are inserted into the inserting grooves 10, the locking blocks 15 are slid in the grooves 14 of the inserting plates 5, the locking blocks 15 are slid into the locking grooves 11, the inserting plates 5 are fixed, the installation plates 2 seal the openings of the installation frames 1, then the threaded rods 4 are rotated in the inserting holes 3, the abutting discs 13 at one ends of the threaded rods 4 are abutted on the clamping plates 6, and the clamping plates 6 slide in the sliding grooves 12 through the sliding blocks, the clamping plates 6 are tightly abutted to each other, and water and electricity pipelines inserted into the clamping grooves 7 are locked and fixed, so that the installation work of water and electricity of the building engineering can be completed.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A water and electricity installation structure of building engineering comprises an installation frame (1) and is characterized in that, the mounting frame (1) is a U-shaped frame, the mounting plate (2) is arranged at the opening of the mounting frame (1), the inserting plates (5) are welded on the two sides of the mounting plate (2), the inserting plates (5) are inserted into the inserting grooves (10), the inserting grooves (10) are arranged on the outer frame walls at the two sides of the mounting frame (1), a slot (14) is arranged on the inserting plate (5), a locking block (15) is arranged in the slot (14) in a sliding way through a sliding block, the front surface of the mounting plate (2) is provided with an inserting hole (3), and the inner hole wall of the jack (3) is threaded through a threaded rod (4), be provided with splint (6) in installing frame (1), the both sides of splint (6) are all fixed and are provided with the slider, draw-in groove (7) have been seted up on splint (6).
2. The hydroelectric installation structure of building engineering as claimed in claim 1, wherein a plurality of slots (7) are provided, and a plurality of slots (7) are distributed at equal intervals, and rubber pads (8) are bonded on the walls of the slots (7).
3. The hydroelectric installation structure of construction engineering as claimed in claim 1, wherein an insulating strip (9) is arranged between a plurality of the clamping grooves (7), and the insulating strip (9) is adhered to the clamping plate (6).
4. A constructional engineering hydroelectric installation structure as claimed in claim 1, wherein said clamping plates (6) are provided with a plurality of strips, each of said plurality of strips (6) is slidably mounted in a sliding groove (12) through a sliding block, and said sliding groove (12) is opened on the inner frame wall of the mounting frame (1).
5. The hydroelectric installation structure of construction engineering as claimed in claim 1, wherein the end of the threaded rod (4) extending into the installation frame (1) is fixedly sleeved with a tightening disc (13), and the tightening disc (13) has a disc-shaped structure.
6. The hydroelectric installation structure of construction engineering as claimed in claim 1, wherein a locking groove (11) is formed on the bottom end groove wall of the slot (10), the locking groove (11) is communicated with a groove (14) formed on the inserting plate (5), and a locking block (15) in the groove (14) slides into the locking groove (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920800734.6U CN209805350U (en) | 2019-05-30 | 2019-05-30 | building engineering water and electricity mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920800734.6U CN209805350U (en) | 2019-05-30 | 2019-05-30 | building engineering water and electricity mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209805350U true CN209805350U (en) | 2019-12-17 |
Family
ID=68833274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920800734.6U Active CN209805350U (en) | 2019-05-30 | 2019-05-30 | building engineering water and electricity mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209805350U (en) |
-
2019
- 2019-05-30 CN CN201920800734.6U patent/CN209805350U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110528735B (en) | Indoor environmental protection partition wall system | |
CN206189811U (en) | Installation assembly | |
CN209805350U (en) | building engineering water and electricity mounting structure | |
CN212613207U (en) | Box-shaped yin-yang staggered special-shaped glass curtain wall | |
CN104453112A (en) | Building integrated solar panel roof component | |
CN205399708U (en) | Building panel gives sound insulation convenient to dismouting | |
CN111851807A (en) | Assembly type building curtain wall component connecting structure | |
CN209114692U (en) | A kind of modularization plaster tablet suspended ceiling | |
CN202509659U (en) | Wall unit and wall system comprising same | |
CN205063103U (en) | Partition wall | |
CN212153999U (en) | Floor assembled quickly and convenient to wire | |
CN215802428U (en) | Wallboard with heat insulation effect | |
CN210976424U (en) | Splicing structure for building decorative plate | |
CN219196582U (en) | Mounting structure of wall decorative board | |
CN207499301U (en) | A kind of modularization installs decorative wall panel | |
CN202299034U (en) | Split assembled plate of unit curtain wall | |
CN211597489U (en) | Building decorative panel convenient to equipment | |
CN206245760U (en) | A kind of modular partition wall quick assembling steel skeleton | |
CN205805053U (en) | A kind of communication iron tower assembly machine room | |
CN206034795U (en) | Assembled wall of detachable | |
CN212606509U (en) | Double-deck assembled finished product support | |
CN214195343U (en) | Energy-saving heat-preservation spliced decorative plate | |
CN215442850U (en) | Convenient and practical's assembled building decorative panel | |
CN214531673U (en) | Assembled building decoration wallboard | |
CN210177797U (en) | Environment-friendly polyurethane sandwich board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |