CN111851807A - A connection structure of prefabricated building curtain wall components - Google Patents
A connection structure of prefabricated building curtain wall components Download PDFInfo
- Publication number
- CN111851807A CN111851807A CN202010580533.7A CN202010580533A CN111851807A CN 111851807 A CN111851807 A CN 111851807A CN 202010580533 A CN202010580533 A CN 202010580533A CN 111851807 A CN111851807 A CN 111851807A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- aluminum alloy
- plate
- connection structure
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑幕墙领域,更具体地说,涉及一种装配式建筑幕墙组件连接构造。The invention relates to the field of building curtain walls, and more particularly, to a connection structure of assembled building curtain wall components.
背景技术Background technique
建筑幕墙指的是建筑物不承重的外墙围护,通常由面板(玻璃、金属板、石板、陶瓷板等)和后面的支承结构(铝横梁立柱、钢结构、玻璃肋等等)组成,建筑幕墙是由支承结构体系与面板组成的,可相对主体结构有一定位移能力,不分担主体结构所受作用的建筑外围护结构或装饰性结构,幕墙是建筑物的外墙护围,不承重,像幕布一样挂上去,故又称为悬挂墙,是现代大型和高层建筑常用的带有装饰效果的轻质墙体,由结构框架与镶嵌板材组成,不承担主体结构载荷与作用的建筑围护结构。The building curtain wall refers to the non-load-bearing exterior wall enclosure of the building, which is usually composed of panels (glass, metal plates, slate, ceramic plates, etc.) and supporting structures behind (aluminum beams, columns, steel structures, glass ribs, etc.). The building curtain wall is composed of a supporting structure system and panels. It can have a certain displacement capacity relative to the main structure, and does not share the building envelope or decorative structure that the main structure is subjected to. The curtain wall is the outer wall of the building. Load-bearing, hanging like a curtain, so it is also called a hanging wall. It is a lightweight wall with decorative effect commonly used in modern large and high-rise buildings. Enclosure.
现有的装配式建筑幕墙在安装时多是采用干挂式安装方式,在连接时,将预先组装好的幕墙组件安装到龙骨架上,但是在实际的使用过程中,幕墙组件组装需要耗费大量的时间,且组装好的幕墙组件固定到龙骨架上,将幕墙组件位置调正需要较多的时间,同时对位较为困难,影响幕墙组件的安装效果。Most of the existing prefabricated building curtain walls are installed in a dry-hanging installation method. When connecting, the pre-assembled curtain wall components are installed on the dragon skeleton. However, in the actual use process, the assembly of the curtain wall components requires a lot of money. And the assembled curtain wall components are fixed on the dragon frame, it takes more time to adjust the position of the curtain wall components, and the alignment is difficult, which affects the installation effect of the curtain wall components.
发明内容SUMMARY OF THE INVENTION
1.要解决的技术问题1. Technical problems to be solved
针对现有技术中存在的问题,本发明的目的在于提供一种装配式建筑幕墙组件连接构造,其优点在于幕墙组件的组装较为方便,同时幕墙组件的安装对位十分方便,大大缩短了幕墙组件的安装时长。In view of the problems existing in the prior art, the purpose of the present invention is to provide an assembled building curtain wall assembly connection structure. installation time.
2.技术方案2. Technical solutions
为解决上述问题,本发明采用如下的技术方案。In order to solve the above problems, the present invention adopts the following technical solutions.
一种装配式建筑幕墙组件连接构造,包括铝合金横梁、幕墙板组件和至少为一组的镀锌钢板,每组所述镀锌钢板均由上下两个L型钢板构成,两个所述L型钢板均通过膨胀螺栓对称设置在建筑物墙面上,所述铝合金横梁通过不锈钢螺栓固定在两个L型钢板之间,所述铝合金横梁的一侧设置有用于安装幕墙板组件的安装模块,且所述幕墙板组件卡接于安装模块的内部,所述安装模块的一侧设置有用于密封幕墙板组件的压块,且压块的一侧卡接有铝合金盖板,所述铝合金横梁的顶部还通过螺栓固定连接有铝合金边框,所述幕墙板组件的置入于铝合金边框的内部。A prefabricated building curtain wall component connection structure, comprising aluminum alloy beams, curtain wall panel components and at least one group of galvanized steel plates, each group of the galvanized steel plates is composed of two upper and lower L-shaped steel plates, two L-shaped steel plates The profiled steel plates are symmetrically arranged on the wall of the building through expansion bolts, the aluminum alloy beams are fixed between two L-shaped steel plates by stainless steel bolts, and one side of the aluminum alloy beams is provided with an installation for installing the curtain wall panel assembly. module, and the curtain wall panel assembly is clamped inside the installation module, one side of the installation module is provided with a pressing block for sealing the curtain wall panel assembly, and one side of the pressing block is clamped with an aluminum alloy cover plate, the The top of the aluminum alloy beam is also fixedly connected with an aluminum alloy frame by bolts, and the curtain wall panel assembly is placed inside the aluminum alloy frame.
进一步的,所述幕墙板组件包括至少两个的面板,两个所述面板之间设置有金属隔条。Further, the curtain wall panel assembly includes at least two panels, and metal spacers are arranged between the two panels.
进一步的,相邻的两个所述铝合金横梁之间通过机制螺栓固定连接有竖龙骨。Further, a vertical keel is fixedly connected between two adjacent aluminum alloy beams through a mechanism bolt.
进一步的,所述安装模块包括安装座,所述安装座一侧的顶部和底部均设置有胶槽,所述胶槽的内部卡接有胶条,所述胶条紧贴在与其接触的面板表面,所述安装座的顶部和底部均固定连接有山字型托座,两个所述面板分别置于山字型托座的内部,所述安装座的另一侧设置有数量为三个的连接板,所述铝合金横梁的一侧设置有与连接板配合使用的方孔,所述连接板通过方孔延伸至铝合金横梁的内部。Further, the installation module includes an installation seat, the top and the bottom of one side of the installation seat are provided with glue grooves, and glue strips are clamped inside the glue grooves, and the glue strips are closely attached to the panel in contact with them. On the surface, the top and bottom of the mounting seat are fixedly connected with a gable-shaped bracket, two of the panels are respectively placed inside the gable-shaped bracket, and the other side of the mounting seat is provided with three in number. A connecting plate, one side of the aluminum alloy beam is provided with a square hole for use with the connecting plate, and the connecting plate extends to the interior of the aluminum alloy beam through the square hole.
进一步的,所述压块通过机制螺栓与安装座固定连接,所述压块的一侧设置有凹槽,所述凹槽的内壁设置有胶垫,所述安装座的一侧设置有与凹槽配合使用的凸块,所述凸块与凹槽过盈配合,所述压块靠近安装座的一侧也设置有胶槽,且胶槽的内部也设置有胶条。Further, the pressure block is fixedly connected to the mounting seat through a mechanism bolt, a groove is provided on one side of the pressure block, an inner wall of the groove is provided with a rubber pad, and one side of the mounting seat is provided with a groove. The protrusion is used in conjunction with the groove. The protrusion is in an interference fit with the groove. A glue groove is also provided on the side of the pressing block close to the mounting seat, and a glue strip is also provided inside the glue groove.
进一步的,所述山字型托座的顶部两侧均设置有与胶条相匹配的弧形槽。Further, both sides of the top of the chevron-shaped bracket are provided with arc-shaped grooves matching the rubber strips.
进一步的,所述铝合金盖板的内壁顶部和内壁底部均设置有弧形卡块,所述压块的顶部和底部均开设有与弧形卡块配合使用的卡槽。Further, the top of the inner wall and the bottom of the inner wall of the aluminum alloy cover plate are provided with arc-shaped clamping blocks, and the top and bottom of the pressing block are provided with clamping grooves for cooperating with the arc-shaped clamping blocks.
进一步的,所述铝合金边框的内壁正面和内壁背面均设置有插座,所述铝合金边框的顶部和底部均开设有缺口,所述铝合金边框的底部通过缺口设置有位于幕墙板组件两侧的L型锁紧板,所述L型锁紧板的一端卡合于插座的内部,位于所述幕墙板组件一侧的L型锁紧板通过自攻螺丝固定在铝合金盖板上,位于所述幕墙板组件另一侧的L型锁紧板通过螺栓固定在铝合金横梁上,且螺栓依次贯穿铝合金横梁和三个连接板。Further, sockets are provided on the front and back of the inner wall of the aluminum alloy frame, the top and bottom of the aluminum alloy frame are provided with gaps, and the bottom of the aluminum alloy frame is provided with holes on both sides of the curtain wall panel assembly through the gap. The L-shaped locking plate, one end of the L-shaped locking plate is engaged with the inside of the socket, and the L-shaped locking plate located on one side of the curtain wall panel assembly is fixed on the aluminum alloy cover by self-tapping screws, located at the The L-shaped locking plate on the other side of the curtain wall panel assembly is fixed on the aluminum alloy beam by bolts, and the bolts pass through the aluminum alloy beam and the three connecting plates in sequence.
进一步的,所述铝合金边框与面板的连接处设置有密封垫。Further, a gasket is provided at the connection between the aluminum alloy frame and the panel.
进一步的,所述面板为玻璃型材,铝塑板,陶土板和阳光板中的任意一种。Further, the panel is any one of glass profiles, aluminum-plastic panels, terracotta panels and sunlight panels.
3.有益效果3. Beneficial effects
相比于现有技术,本发明的优点在于:Compared with the prior art, the advantages of the present invention are:
(1)本方案通过设置安装模块,在进行幕墙组件的组装时,可将幕墙组件上下的两侧置入到安装模块内,然后使用压块配合安装模块将接缝处堵死,紧接着使用铝合金边框对压块进行遮盖,进一步保证了接缝处的密封性能,紧接着使用铝合金边框与幕墙组件的两侧组装好,整个过程中不需要其他精密的设备,只需要预先测定好尺寸,现场安装即可,安装较为方便;(1) In this scheme, by setting the installation module, when assembling the curtain wall assembly, the upper and lower sides of the curtain wall assembly can be placed in the installation module, and then the joints are blocked with the pressure block and the installation module, and then use The aluminum alloy frame covers the pressing block, which further ensures the sealing performance of the joints. Then the aluminum alloy frame is used to assemble the two sides of the curtain wall assembly. No other precise equipment is required in the whole process, and only the size needs to be measured in advance. , it can be installed on site, and the installation is more convenient;
(2)本方案通过在铝合金横梁上设置方孔,在进幕墙组件的安装时,将L型锁紧板置入到插座内部,并将连接板插接到方孔内部,即可快速完成定位,无需对其在进行调整,然后使用螺栓将L型锁紧板固定在铝合金横梁上,且螺钉在安装的过程中,会依次将三个连接板固定住,此时即可使安装模块、铝合金横梁和铝合金边框之间得到固定,安装十分方便快捷,且较传动的单一式固定,固定效果更好;(2) This scheme can be quickly completed by setting square holes on the aluminum alloy beams, and inserting the L-shaped locking plate into the socket and inserting the connecting plate into the square hole when installing the curtain wall assembly. Positioning, there is no need to adjust it, and then use bolts to fix the L-shaped locking plate on the aluminum alloy beam, and the screws will fix the three connecting plates in turn during the installation process, and the module can be installed at this time. , The aluminum alloy beam and the aluminum alloy frame are fixed, the installation is very convenient and fast, and the fixed effect is better than the single type of transmission;
(3)本方案通过将一侧的L型锁紧板使用自攻螺丝固定在铝合金盖板上,通过自攻螺丝对L型锁紧板、铝合金盖板以及压块之间进行固定,在增强铝合金盖板稳定性的同时,对铝合金边框也具有较好的支撑效果,使用更加安全。(3) In this scheme, the L-shaped locking plate on one side is fixed on the aluminum alloy cover plate with self-tapping screws, and the L-shaped locking plate, the aluminum alloy cover plate and the pressing block are fixed by self-tapping screws. While enhancing the stability of the aluminum alloy cover, it also has a better supporting effect on the aluminum alloy frame, making it safer to use.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is the structural representation of the present invention;
图2为本发明的剖视图;Fig. 2 is a sectional view of the present invention;
图3为本发明的图1中A处的放大图;Fig. 3 is the enlarged view of A place in Fig. 1 of the present invention;
图4为本发明的图2中B处的放大图;Fig. 4 is the enlarged view of B place in Fig. 2 of the present invention;
图5为本发明安装模块、压块和铝合金压板的爆炸图;Fig. 5 is the exploded view of the installation module, pressing block and aluminum alloy pressing plate of the present invention;
图6为本发明铝合金边框的侧视图。FIG. 6 is a side view of the aluminum alloy frame of the present invention.
图中标号说明:Description of the labels in the figure:
1、镀锌钢板;2、铝合金横梁;3、安装模块;301、安装座;302、胶槽;303、胶条;304、山字型托座;305、连接板;4、幕墙板组件;401、面板;402、金属隔条;5、压块;6、铝合金盖板;601、弧形卡块;7、铝合金边框;701、插座;702、L型锁紧板;8、竖龙骨;9、凹槽;10、凸块;11、卡槽;12、方孔。1. Galvanized steel sheet; 2. Aluminum alloy beam; 3. Mounting module; 301, Mounting seat; 302, Glue groove; 303, Rubber strip; 304, Gable bracket; 305, Connecting plate; 4. Curtain wall panel assembly ;401, panel; 402, metal spacer; 5, pressing block; 6, aluminum alloy cover plate; 601, arc block; 7, aluminum alloy frame; 701, socket; 702, L-shaped locking plate; 8, Vertical keel; 9, groove; 10, bump; 11, card slot; 12, square hole.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例,基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. The embodiments of the present invention, and all other embodiments obtained by those of ordinary skill in the art without creative work, fall within the protection scope of the present invention.
请参阅图1-6,本发明实施例中,一种装配式建筑幕墙组件连接构造,包括铝合金横梁2、幕墙板组件4和至少为一组的镀锌钢板1,每组镀锌钢板1均由上下两个L型钢板构成,两个L型钢板均通过膨胀螺栓对称设置在建筑物墙面上,铝合金横梁2通过不锈钢螺栓固定在两个L型钢板之间,铝合金横梁2的一侧设置有用于安装幕墙板组件4的安装模块3,且幕墙板组件4卡接于安装模块3的内部,安装模块3的一侧设置有用于密封幕墙板组件4的压块5,且压块5的一侧卡接有铝合金盖板6,铝合金横梁2的顶部还通过螺栓固定连接有铝合金边框7,幕墙板组件4的置入于铝合金边框7的内部。Please refer to FIGS. 1-6. In the embodiment of the present invention, a connection structure of a prefabricated building curtain wall assembly includes an
参阅图2至图3,幕墙板组件4包括至少两个的面板401,面板401为玻璃型材,铝塑板,陶土板和阳光板中的任意一种,双层面板401隔音降噪效果更好,两个面板401之间设置有金属隔条402,用于对两个面板401进行支撑,增强两个面板401之间的稳定性,使其与安装模块3之间的接触更加紧密。2 to 3, the curtain
参阅图2,相邻的两个铝合金横梁2之间通过机制螺栓固定连接有竖龙骨8,用于增强铝合金横梁2的稳定性。Referring to FIG. 2 , a
参阅图2至图4,安装模块3包括安装座301,安装座301一侧的顶部和底部均设置有胶槽302,胶槽302的内部卡接有胶条303,胶条303紧贴在与其接触的面板401表面,安装座301的顶部和底部均固定连接有山字型托座304,两个面板401分别置于山字型托座304的内部,山字型托座304用于对两个面板401进行分隔限位,同时胶条303紧贴在一侧的面板401上,用于对面板401与山字型托座304之间的间隙进行密封,安装座301的另一侧设置有数量为三个的连接板305,铝合金横梁2的一侧设置有与连接板305配合使用的方孔12,连接板305通过方孔12延伸至铝合金横梁2的内部,通过将连接板305插入到铝合金横梁2的内部,用于快速完成幕墙板组件4的对位,后续只需使用锁紧件固定即可。Referring to FIGS. 2 to 4 , the
参阅图3至图4,压块5通过机制螺栓与安装座301固定连接,压块5的一侧设置有凹槽9,凹槽9的内壁设置有胶垫,安装座301的一侧设置有与凹槽9配合使用的凸块10,凸块10与凹槽9过盈配合,通过凸块10卡在凹槽9的内部,配合胶垫的增阻效果,使压块5能够初步卡在安装座301上,便于后续使用机制螺栓对其进行定位,同时压块5靠近安装座301的一侧也设置有胶槽302,且胶槽302的内部也设置有胶条303。Referring to FIGS. 3 to 4 , the
参阅图4,山字型托座304的顶部两侧均设置有与胶条303相匹配的弧形槽,增大山字型托座304与胶条303之间的接触面积,使其密封的范围更大,密封效果更好。Referring to FIG. 4 , both sides of the top of the chevron-shaped
参阅图3至图4,铝合金盖板6的内壁顶部和内壁底部均设置有弧形卡块601,压块5的顶部和底部均开设有与弧形卡块601配合使用的卡槽11,通过弧形卡块601卡在卡槽11的内部,使铝合金盖板6能够固定在安装座301上,起到了固定的效果。Referring to FIGS. 3 to 4 , the top and bottom of the inner wall of the aluminum
参阅4、图6,铝合金边框7的内壁正面和内壁背面均设置有插座701,铝合金边框7的顶部和底部均开设有缺口,铝合金边框7的底部通过缺口设置有位于幕墙板组件4两侧的L型锁紧板702,L型锁紧板702的一端卡合于插座701的内部,位于幕墙板组件4一侧的L型锁紧板702通过自攻螺丝固定在铝合金盖板6上,将一侧的L型锁紧板702使用自攻螺丝固定在铝合金盖板6上,通过自攻螺丝对L型锁紧板702、铝合金盖板6以及压块5之间进行固定,在增强铝合金盖板6稳定性的同时,对铝合金边框7也具有较好的支撑效果,使用更加安全,位于幕墙板组件4另一侧的L型锁紧板702通过螺栓固定在铝合金横梁2上,且螺栓依次贯穿铝合金横梁2和三个连接板305,在进幕墙板组件4的安装时,将L型锁紧板702置入到插座701内部,并将连接板305插接到方孔12内部,即可快速完成定位,无需对其在进行调整,然后使用螺栓将L型锁紧板702固定在铝合金横梁2上,且螺钉在安装的过程中,会依次将三个连接板305固定住,此时即可使安装模块3、铝合金横梁2和铝合金边框7之间得到固定,安装十分方便快捷,且较传动的单一式固定,固定效果更好。Referring to FIG. 4 and FIG. 6 ,
参阅图4,铝合金边框7与面板401的连接处设置有密封垫,密封垫用于对铝合金边框7与面板401之间的间隙进行密封,防止面板401内部进水。Referring to FIG. 4 , a gasket is provided at the connection between the
本发明的工作原理是:在进行幕墙组件的组装时,可将幕墙组件上下的两侧置入到安装模块3内,然后使用压块5配合安装模块3将接缝处堵死,紧接着使用铝合金边框7对压块5进行遮盖,进一步保证了接缝处的密封性能,再将铝合金边框7与幕墙组件的两侧组装好,整个过程中不需要其他精密的设备,只需要预先测定好尺寸,现场安装即可,安装较为方便,在进行幕墙板组件4的安装时,将L型锁紧板702置入到插座701内部,并将连接板305插接到方孔12内部,即可快速完成定位,无需对其在进行调整,然后使用螺栓将L型锁紧板702固定在铝合金横梁2上,且螺钉在安装的过程中,会依次将三个连接板305固定住,此时即可使安装模块3、铝合金横梁2和铝合金边框7之间得到固定,安装十分方便快捷,且较传动的单一式固定,固定效果更好。The working principle of the present invention is as follows: when assembling the curtain wall assembly, the upper and lower sides of the curtain wall assembly can be placed into the
以上所述,仅为本发明较佳的具体实施方式;但本发明的保护范围并不局限于此。任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其改进构思加以等同替换或改变,都应涵盖在本发明的保护范围内。The above description is only a preferred embodiment of the present invention; however, the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical scope of the present invention, according to the technical solution of the present invention and its improvement concept, equivalently replaces or changes, should be covered within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010580533.7A CN111851807B (en) | 2020-06-23 | 2020-06-23 | A connection structure of prefabricated building curtain wall components |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010580533.7A CN111851807B (en) | 2020-06-23 | 2020-06-23 | A connection structure of prefabricated building curtain wall components |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111851807A true CN111851807A (en) | 2020-10-30 |
| CN111851807B CN111851807B (en) | 2021-08-06 |
Family
ID=72988094
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010580533.7A Expired - Fee Related CN111851807B (en) | 2020-06-23 | 2020-06-23 | A connection structure of prefabricated building curtain wall components |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111851807B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112575942A (en) * | 2020-12-08 | 2021-03-30 | 蒋庆峰 | Installation method of integrally-assembled multifunctional rigid integrated stone curtain wall |
| CN113431228A (en) * | 2021-06-10 | 2021-09-24 | 深圳海外装饰工程有限公司 | Novel no crossbeam broken line glass curtain wall structure |
| CN115822143A (en) * | 2022-12-16 | 2023-03-21 | 江苏城略智能科技有限公司 | A prefabricated low-carbon building curtain wall installation structure and method |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20080110390A (en) * | 2007-06-15 | 2008-12-18 | 해안 주식회사 | Fair glass and window frame fixing structure for curtain wall |
| CN203361418U (en) * | 2013-07-16 | 2013-12-25 | 武汉创高幕墙装饰工程有限责任公司 | Intelligent hollow, vacuum automatic conversion thermal insulation, heat preservation glass curtain wall |
| CN205046723U (en) * | 2015-09-30 | 2016-02-24 | 重庆科创职业学院 | Glass curtain wall node installation connection structure |
| KR20160002950U (en) * | 2015-02-16 | 2016-08-24 | 주식회사 빛나시스템창호 | Insulation wall frame |
| CN105888111A (en) * | 2016-05-31 | 2016-08-24 | 上海中建东孚投资发展有限公司 | Glass curtain wall frame system |
| CN207646968U (en) * | 2017-11-18 | 2018-07-24 | 江苏恒龙装饰工程有限公司 | A kind of curtain wall joint structure |
| CN209837410U (en) * | 2019-03-27 | 2019-12-24 | 上海方大勍瓴科技有限公司 | Frame curtain wall erection joint structure in entrance to a cave and system thereof |
| CN210713422U (en) * | 2019-09-27 | 2020-06-09 | 无锡恒尚装饰工程有限公司 | Connecting structure for preventing curtain wall cross beam from overturning |
-
2020
- 2020-06-23 CN CN202010580533.7A patent/CN111851807B/en not_active Expired - Fee Related
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20080110390A (en) * | 2007-06-15 | 2008-12-18 | 해안 주식회사 | Fair glass and window frame fixing structure for curtain wall |
| CN203361418U (en) * | 2013-07-16 | 2013-12-25 | 武汉创高幕墙装饰工程有限责任公司 | Intelligent hollow, vacuum automatic conversion thermal insulation, heat preservation glass curtain wall |
| KR20160002950U (en) * | 2015-02-16 | 2016-08-24 | 주식회사 빛나시스템창호 | Insulation wall frame |
| CN205046723U (en) * | 2015-09-30 | 2016-02-24 | 重庆科创职业学院 | Glass curtain wall node installation connection structure |
| CN105888111A (en) * | 2016-05-31 | 2016-08-24 | 上海中建东孚投资发展有限公司 | Glass curtain wall frame system |
| CN207646968U (en) * | 2017-11-18 | 2018-07-24 | 江苏恒龙装饰工程有限公司 | A kind of curtain wall joint structure |
| CN209837410U (en) * | 2019-03-27 | 2019-12-24 | 上海方大勍瓴科技有限公司 | Frame curtain wall erection joint structure in entrance to a cave and system thereof |
| CN210713422U (en) * | 2019-09-27 | 2020-06-09 | 无锡恒尚装饰工程有限公司 | Connecting structure for preventing curtain wall cross beam from overturning |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112575942A (en) * | 2020-12-08 | 2021-03-30 | 蒋庆峰 | Installation method of integrally-assembled multifunctional rigid integrated stone curtain wall |
| CN113431228A (en) * | 2021-06-10 | 2021-09-24 | 深圳海外装饰工程有限公司 | Novel no crossbeam broken line glass curtain wall structure |
| CN115822143A (en) * | 2022-12-16 | 2023-03-21 | 江苏城略智能科技有限公司 | A prefabricated low-carbon building curtain wall installation structure and method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111851807B (en) | 2021-08-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111851807A (en) | A connection structure of prefabricated building curtain wall components | |
| CN213979410U (en) | Double-layer heat-insulation structure wall and house | |
| CN203821651U (en) | Steel frame unit type glass curtain wall | |
| CN209924747U (en) | Window system with drainage and decoration functions | |
| CN219327265U (en) | Close-joint waterproof connecting structure of building aluminum plate | |
| CN217379390U (en) | Integrated wall structure of standard section member bar | |
| CN216810490U (en) | Special-shaped glass curtain wall node splicing structure | |
| CN214117199U (en) | Assembled furred ceiling curtain | |
| CN210797995U (en) | Assembled construction is with stone curtain wall | |
| CN208884785U (en) | A kind of glass curtain wall connection structure | |
| CN210507963U (en) | Detachable panel unit curtain wall | |
| CN222936306U (en) | A glass awning combined with curtain wall | |
| CN218990743U (en) | Novel multifunctional assembled wall system | |
| CN221441841U (en) | Curtain wall with waterproof structure | |
| CN214035276U (en) | Energy-saving waterproof fireproof window sleeve | |
| CN221372612U (en) | Environment-friendly curtain wall convenient to install | |
| CN217949483U (en) | Mounting structure of ceramic sheet | |
| CN215108438U (en) | Novel aluminum alloy profile structure suitable for ultra-large glass plate | |
| CN211037443U (en) | Large-span vertical hidden horizontal exposed glass curtain wall | |
| CN111305430A (en) | Metal wall panel and curtain wall with the same | |
| CN215977918U (en) | Curtain wall sandwich board window node system structure | |
| CN221277090U (en) | Assembly structure of external wall insulation integrated board | |
| CN219138074U (en) | Novel installation structure of bridge cut-off heat insulation sandwich board | |
| CN219654140U (en) | Prefabricated wallboard assembly external corner structure | |
| CN221236241U (en) | Leveling installation structure of indoor double-layer glass partition |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A connection structure of prefabricated building curtain wall components Effective date of registration: 20211028 Granted publication date: 20210806 Pledgee: Shenzhen hi tech investment small loan Co.,Ltd. Pledgor: Shenzhen Zhongzhuang Construction Group Co.,Ltd. Registration number: Y2021980011492 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20221222 Granted publication date: 20210806 Pledgee: Shenzhen hi tech investment small loan Co.,Ltd. Pledgor: Shenzhen Zhongzhuang Construction Group Co.,Ltd. Registration number: Y2021980011492 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |