CN209799024U - Pre-buried structure for steel construction - Google Patents
Pre-buried structure for steel construction Download PDFInfo
- Publication number
- CN209799024U CN209799024U CN201920306493.XU CN201920306493U CN209799024U CN 209799024 U CN209799024 U CN 209799024U CN 201920306493 U CN201920306493 U CN 201920306493U CN 209799024 U CN209799024 U CN 209799024U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- embedded
- steel
- concrete structure
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a pre-buried structure for a steel structure, which comprises a pre-buried part pre-buried in a concrete structure and a connecting part connected with the steel structure; the connecting portion includes at least two high-strength bolts; the embedded part comprises a steel plate, a plurality of anchor bars and embedded nuts corresponding to the high-strength bolts; one side and the side of the steel plate are both embedded in the concrete structure, and the other side is flush with the concrete structure; a plurality of anchor bars are annularly and uniformly distributed on one surface of the steel plate embedded in the concrete structure along the center, and each anchor bar is vertically arranged with the steel plate; the steel plate is provided with at least two mounting holes, and one surface of the steel plate embedded in the concrete structure is provided with an embedded nut corresponding to each mounting hole; the steel structure is fixed with the steel plate by the way that each bolt penetrates through the steel plate to be connected with the corresponding embedded nut. The utility model discloses being connected steel construction and built-in fitting by high strength bolt, the built-in fitting passes through the dowel to be connected with concrete structure, and the atress is reliable, and the construction is quick, environment friendly.
Description
Technical Field
The utility model relates to a steel-concrete building technical field, in particular to pre-buried structure for steel construction.
Background
The connection problem of a steel structure and a concrete structure is often encountered in the existing steel concrete construction engineering. Concrete structures are usually cast at the construction site, while steel structures are often shipped to the site after being manufactured at the factory.
generally, the connection between steel structure and concrete structure is achieved by the following methods:
1) Pre-burying a steel plate in the concrete structure, wherein the steel structure is connected with the steel plate in a welding manner;
2) And embedding an anchor bolt in the concrete structure, wherein the steel structure is connected with the anchor bolt by adopting a nut.
Aiming at the first connection method, the welding operation needs to be carried out on site, the construction speed is low, the operation environment is poor, the generated toxic and harmful gas is not beneficial to the health of constructors, and the high temperature generated by the welding operation easily causes the quality defects of deformation of a steel structure, damage of a concrete structure and the like;
In the second connection method, the foundation bolt is difficult to accurately position, the mechanical property of the connection node of the foundation bolt and the steel structure is poor, and the foundation bolt is not suitable for complex stress connection with large stress or bending, shearing and twisting.
Therefore, an embedded part which is rapid in construction, environment-friendly and reliable in stress is urgently needed to solve the problem of connection between a steel structure and a concrete structure in engineering.
SUMMERY OF THE UTILITY MODEL
in view of prior art's above-mentioned defect, the utility model provides a pre-buried structure for steel construction, one of the purpose of realization is connected steel construction and built-in fitting through high strength bolt, and the built-in fitting passes through the anchor bar to be connected with concrete structure, can carry out the atress according to standard formula and calculate, and the theory of calculation is ripe, passes power clearly, and the atress is reliable, and the construction is quick, environment friendly.
In order to achieve the above object, the utility model discloses a pre-buried structure for steel construction, including pre-buried part in concrete structure, and with the coupling part that the steel construction is connected.
wherein the connecting portion comprises at least two high strength bolts;
the embedded part comprises a steel plate, a plurality of anchor bars and embedded nuts corresponding to the high-strength bolts;
One side and the side edge of the steel plate are embedded in the concrete structure, and the other side of the steel plate is flush with the concrete structure;
a plurality of anchor bars are annularly and uniformly distributed on one surface of the steel plate embedded in the concrete structure along the center, and each anchor bar is vertically arranged with the steel plate;
the steel plate is provided with at least two mounting holes, and one surface of the steel plate, which is embedded in the concrete structure, is provided with embedded nuts corresponding to each mounting hole;
the steel structure is fixed with the steel plate by the way that each bolt penetrates through the steel plate to be connected with the corresponding embedded nut.
preferably, one surface of the steel plate, which is embedded in the concrete structure, is provided with at least 4 anchor bars.
More preferably, each anchor bar is connected with the steel plate in a welding mode.
preferably, each embedded nut is provided with a plastic protective sleeve.
The utility model has the advantages that:
The utility model discloses being connected steel construction and built-in fitting by high strength bolt, the built-in fitting passes through the dowel and is connected with concrete structure, can carry out the atress according to standard formula and calculate, and it is ripe to calculate the theory, passes power clearly, and the atress is reliable, and the construction is quick, environment friendly.
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings, so as to fully understand the objects, the features and the effects of the present invention.
drawings
Fig. 1 shows a schematic structural diagram of an embodiment of the present invention.
Fig. 2 shows a schematic end face structure diagram of an embodiment of the present invention.
Detailed Description
examples
As shown in fig. 1 and 2, the embedded structure for the steel structure includes an embedded portion embedded in the concrete structure, and a connection portion connected to the steel structure 7.
wherein the connecting portion comprises at least two high-strength bolts 4;
The embedded part comprises a steel plate 1, a plurality of anchor bars 2 and embedded nuts 5 corresponding to the high-strength bolts 4;
one side and the side of the steel plate 1 are embedded in the concrete structure, and the other side is flush with the concrete structure;
A plurality of anchor bars 2 are uniformly distributed on one surface of the steel plate 1 embedded in the concrete structure along the Zhongxing ring, and each anchor bar 2 is vertically arranged with the steel plate 1;
The steel plate 1 is provided with at least two mounting holes 3, and one surface of the steel plate 1 embedded in the concrete structure is provided with embedded nuts 5 corresponding to each mounting hole 3;
The steel structure 7 is fixed with the steel plate 1 by means of each bolt 4 penetrating through the steel plate 1 and being connected with a corresponding embedded nut 5.
the utility model discloses in the in-service use, connect into holistic anchor bar 2, steel sheet 1, high strength bolt 4 and pour together in concrete structure, when steel construction 7 is connected with concrete structure, can lift high strength bolt 4 off, treat that steel construction 7 aligns the back with bolt hole 3, twist high strength bolt 4 again to realize steel construction 7 and concrete structure's being connected.
Preferably, one side of the steel plate 1 embedded in the concrete structure is provided with at least 4 anchor bars 2.
more preferably, each anchor bar 2 is connected to the steel plate 1 by welding.
Preferably, each embedded nut 5 is provided with a plastic protective sleeve.
the foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.
Claims (4)
1. The pre-buried structure for the steel structure comprises a pre-buried part pre-buried in the concrete structure and a connecting part connected with the steel structure (7); the method is characterized in that:
The connecting portion comprises at least two high-strength bolts (4);
The embedded part comprises a steel plate (1), a plurality of anchor bars (2) and embedded nuts (5) corresponding to the high-strength bolts (4);
One side and the side edge of the steel plate (1) are embedded in the concrete structure, and the other side is flush with the concrete structure;
A plurality of anchor bars (2) are annularly and uniformly distributed on one surface of the steel plate (1) which is pre-embedded in the concrete structure along the center, and each anchor bar (2) is vertically arranged with the steel plate (1);
the steel plate (1) is provided with at least two mounting holes (3), and one surface of the steel plate (1) which is embedded in the concrete structure is provided with an embedded nut (5) corresponding to each mounting hole (3);
The steel structure (7) is fixed with the steel plate (1) by means that each bolt (4) penetrates through the steel plate (1) and is connected with the corresponding embedded nut (5).
2. The pre-buried structure for the steel structure according to claim 1, wherein the surface of the steel plate (1) pre-buried in the concrete structure is provided with not less than 4 anchor bars (2).
3. A pre-buried structure for a steel structure according to claim 2, wherein each anchor bar (2) is connected with the steel plate (1) in a welding manner.
4. a pre-buried structure for steel structure according to claim 1, characterized in that each pre-buried nut (5) is provided with a plastic protective sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920306493.XU CN209799024U (en) | 2019-03-12 | 2019-03-12 | Pre-buried structure for steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920306493.XU CN209799024U (en) | 2019-03-12 | 2019-03-12 | Pre-buried structure for steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209799024U true CN209799024U (en) | 2019-12-17 |
Family
ID=68824472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920306493.XU Active CN209799024U (en) | 2019-03-12 | 2019-03-12 | Pre-buried structure for steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209799024U (en) |
-
2019
- 2019-03-12 CN CN201920306493.XU patent/CN209799024U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631851B (en) | A kind of pre-stressed carbon fiber plate tensioning equipment and the method for pre-stressed carbon fiber plate stretch-draw thereof | |
CN104652422B (en) | For the device and method of pile foundation steel bar cage bar connecting | |
CN204491425U (en) | A kind of external prestressing strengthening structure of T-shaped bridge diaphragm | |
CN204040209U (en) | A kind of syndeton of replaceable steel coupling beam | |
CN204435929U (en) | A kind of pre-stressed carbon fiber plate tensioning equipment | |
CN203820287U (en) | Composite steel carrying pole for hoisting roof tiles of steel structure workshops | |
CN209799024U (en) | Pre-buried structure for steel construction | |
JP4506969B2 (en) | Bonding structure between concrete and pile head of foundation or footing and structure having the bonding structure | |
CN204475533U (en) | Built-in fitting high-accuracy mounting device in a kind of concrete | |
CN203977709U (en) | A kind of rear combination grip formula prestressed anchor | |
CN202209046U (en) | Wall connecting rod for external scaffold | |
CN201706145U (en) | Replaceable anchor bolt | |
CN104805910A (en) | Embedded part for cast-in-place concrete component and construction method of embedded part | |
CN204662937U (en) | A kind of fixture being fixed on steel structure girder | |
CN105155485A (en) | Gate pier prestress anchor cable sleeve installation device and construction method thereof | |
CN211202567U (en) | Pin structure for aligning hole positions of mounting bolts | |
CN204081468U (en) | A kind of shear-wall strengthening formwork structure | |
CN207827724U (en) | A kind of steel bracket structure for inner climbing crane tower | |
CN206721916U (en) | Underground pipe gallery support trough of belt built-in fitting component | |
CN205804923U (en) | A kind of scaffold wall connecting piece | |
CN211285074U (en) | High-speed railway base groove construction template | |
CN205421317U (en) | Assembled basis mounting adjustment ware | |
CN219906667U (en) | Crane beam circulation hoisting sling | |
CN211548091U (en) | Extension prosthetic devices of buried bolt in advance | |
CN207419709U (en) | For the attachment device on concrete column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |