CN209797235U - Test device convenient to transportation and hoist of bridge floor continuous structure test component - Google Patents
Test device convenient to transportation and hoist of bridge floor continuous structure test component Download PDFInfo
- Publication number
- CN209797235U CN209797235U CN201920534639.6U CN201920534639U CN209797235U CN 209797235 U CN209797235 U CN 209797235U CN 201920534639 U CN201920534639 U CN 201920534639U CN 209797235 U CN209797235 U CN 209797235U
- Authority
- CN
- China
- Prior art keywords
- continuous structure
- vertical
- tip
- girders
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a test device convenient to transportation of bridge floor continuous structure test component and hoist and mount, including two girders and be located the connecting plate on the adjacent tip of two girders, top, the below of the adjacent tip of two girders all are equipped with horizontal steel sheet, and left side, the right side of the adjacent tip of two girders all are equipped with vertical steel sheet, and two horizontal steel sheets are cramped connecting plate, two girder tip through vertical screw rod, and two vertical steel sheets are cramped two girder tip through horizontal screw rod. The test device convenient for transporting and hoisting the bridge deck continuous structure test member is simple in structure.
Description
Technical Field
The utility model relates to a test device convenient to transportation of bridge floor continuous structure test component and hoist and mount.
Background
The jumping caused by the expansion joints of the bridge and the secondary adverse effects (such as additional internal force of the structure, corrosion of the structure caused by water leakage and the like) caused by the damage of the expansion devices are the troublesome problems which are often encountered in the actual operation of the bridge at home and abroad at present. The jumping caused by the telescopic device not only causes great impact on the bridge, but also reduces the driving comfort of drivers and passengers. In addition, with the increasing of the traffic flow, the maintenance and replacement of the expansion joint device often cause serious traffic interruption, and further generate huge economic loss. Therefore, a series of problems brought by the bridge expansion joint are inevitable. In order to fundamentally solve the problem of the telescopic device, the bridge deck simply supports the bridge in succession and comes into force. The bridge deck continuous simply-supported girder bridge is a structure which is formed by combining adjacent girders together by adopting connecting plates to form a continuous integral structure of the bridge deck and simultaneously ensures the simple support of the girders. The bridge deck continuous simply-supported beam bridge has the mechanical characteristics of the simply-supported beam bridge, and is simple in structure and convenient to construct; and the expansion device is not arranged, so that the construction, maintenance and repair cost of the expansion device is saved, the driving stability is improved, and the impact load of a driving on a bridge is reduced. Because the expansion device between the adjacent main beams is cancelled, the expansion amount of the beam body generated by temperature deformation, concrete shrinkage and creep and the like is absorbed by the connecting plate.
The connecting plate in the bridge deck continuous simply-supported girder bridge is a weak link of the structure. As for the structure, because the girder is the simple beam, the connecting plate is located the beam-ends of girder, not only will bear the longitudinal axle that girder temperature breathing deformation transmitted and warp to warp, still need bear the main girder tip rotational deformation and the concentrated power and the impact of wheel that vertical load such as car produced, the atress is complicated, and design, construction and maintenance are improper, all can cause the fracture. At present, when a domestic scholars perform test research on a bridge deck continuous structure, a bridge deck continuous structure test component is usually required to be manufactured in a special test piece manufacturing field, and the bridge deck continuous structure test component comprises two main beams and a connecting plate between the main beams. And then transporting the bridge deck continuous structure test component to a test loading field for testing. And operations such as hoisting are required in the transportation process of the bridge deck continuous structure test member. In the bridge floor continuous structure, compare with the girder, the connecting plate belongs to the weak link, appears the phenomenon of connecting plate fracture very easily because the dislocation of horizontal position or elevation position appears in two girders in transportation or hoist and mount process, leads to the experiment to continue to develop.
SUMMERY OF THE UTILITY MODEL
In view of the not enough of prior art, the utility model aims to solve the technical problem that a test device convenient to transportation of bridge floor continuous structure test component and hoist is provided, not only simple structure, convenient high efficiency moreover.
In order to solve the technical problem, the technical scheme of the utility model is that: the utility model provides a test device convenient to transportation of bridge floor continuous structure test component and hoist and mount, includes two girders and is located the connecting plate on the adjacent tip of two girders, and top, the below of the adjacent tip of two girders all are equipped with horizontal steel sheet, and the left side of the adjacent tip of two girders, right side all are equipped with vertical steel sheet, and two horizontal steel sheets cramp connecting plate, two girder tip through vertical screw rod, and two vertical steel sheets cramp two girder tip through horizontal screw rod.
Preferably, the upper surfaces of the adjacent end parts of the two main beams are respectively provided with a step for embedding the connecting plate, and the upper surface of the connecting plate is flush with the upper surfaces of the main beams.
Preferably, the lower surface of the upper horizontal steel plate is tightly attached to the upper surface of the connecting plate, the upper surface of the lower horizontal steel plate is tightly attached to the lower surface of the main beam, the vertical screws are symmetrically distributed on the left side and the right side of the horizontal steel plates, and the end parts of the vertical screws penetrate through the mounting through holes in the horizontal steel plates on the same side and are locked through nuts.
Preferably, the right surface of the vertical steel plate on the left side is tightly attached to the left surface of the main beam, the left surface of the vertical steel plate on the right side is tightly attached to the right surface of the main beam, the transverse screws are symmetrically distributed on the front side and the rear side of the vertical steel plate, and the end parts of the transverse screws penetrate through the mounting through holes in the vertical steel plates on the same side and are locked through nuts.
Preferably, a plurality of transverse steel pipes are vertically pre-embedded in the adjacent end parts of the two main beams, and the transverse steel pipes are used for a transverse screw to penetrate through.
Preferably, the left side and the right side of the two main beams close to the connecting plate are both pre-embedded with hanging rings.
Compared with the prior art, the utility model discloses following beneficial effect has: the screw rods and the steel plates are arranged at the end parts of the main beams and the positions of the connecting plates for reinforcement, so that the phenomenon that the connecting plates crack due to dislocation of the horizontal positions or the elevation positions of the two main beams is avoided in the transportation and hoisting processes of the bridge deck continuous structure test member. After the bridge deck continuous structure test component reaches the test loading site, the screw and the steel plate are dismantled, and the bridge deck continuous structure test component can be loaded, so that smooth development of a bridge deck continuous structure test is guaranteed.
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Drawings
Fig. 1 is a top view of an embodiment of the present invention.
Fig. 2 is a front view of the embodiment of the present invention.
Fig. 3 is a side view of an embodiment of the present invention.
Fig. 4 is a first schematic view of a construction state according to an embodiment of the present invention.
Fig. 5 is a schematic view of a second construction state according to an embodiment of the present invention.
Fig. 6 is a third schematic view of a construction state according to an embodiment of the present invention.
Fig. 7 is a fourth schematic view of a construction state according to an embodiment of the present invention.
Fig. 8 is a schematic view of a first handling state of the embodiment of the present invention.
Fig. 9 is a schematic view of a second handling state of the embodiment of the present invention.
Detailed Description
In order to make the aforementioned and other features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below.
As shown in figure 1 ~ 9, a test device convenient to transportation and hoist of bridge floor continuous structure test component includes two girders 1 and is located the connecting plate 2 on the adjacent tip of two girders, the top of the adjacent tip of two girders, below all are equipped with horizontal steel sheet 3, the left side of the adjacent tip of two girders, right side all are equipped with vertical steel sheet 4, two horizontal steel sheets cramp connecting plate, two girder tip through vertical screw 5, two vertical steel sheets cramp two girder tip through horizontal screw 6.
The embodiment of the utility model provides an in, the adjacent tip upper surface of two girders all is equipped with inlays the step 7 of establishing the connecting plate, and the connecting plate upper surface flushes with the girder upper surface.
The embodiment of the utility model provides an in, top horizontal steel sheet lower surface pastes tightly with the connecting plate upper surface, and below horizontal steel sheet upper surface pastes tightly with the girder lower surface, and vertical screw rod symmetric distribution is in the left and right sides of horizontal steel sheet, and the tip of vertical screw rod all passes the installation through-hole on the horizontal steel sheet of homonymy to lock through nut 8.
The embodiment of the utility model provides an in, the vertical steel sheet right surface in left side pastes tightly with girder left surface, and the vertical steel sheet left surface in right side pastes tightly with girder right surface, and horizontal screw rod symmetric distribution is both sides around vertical steel sheet, and the tip of horizontal screw rod all passes the installation through-hole on the vertical steel sheet of homonymy to through nut locking.
The embodiment of the utility model provides an in, equal vertical pre-buried many horizontal steel pipes 9 that have on the adjacent tip of two girders, horizontal steel pipe is used for horizontal screw rod to pass.
In the embodiment of the present invention, two main beams are embedded with rings 10 near the left and right sides of the connection board.
A construction method of a test device convenient for transporting and hoisting a bridge deck continuous structure test component is carried out according to the following steps: (1) manufacturing a horizontal steel plate and a vertical steel plate with mounting through holes; (2) hanging rings and vertically arranged transverse steel pipes transversely penetrating through the main beams are embedded at the end parts of the two main beams; (3) concrete of two main beams and a connecting plate of the bridge deck continuous structure test member is cast in situ, and a transverse screw rod is inserted into a transverse steel pipe after the form is removed; (4) sleeving the vertical steel plates into the transverse screws from the left side and the right side of the main beam respectively, and screwing the two ends of the transverse screws by nuts; (5) the upper side and the lower side of the end part of the main beam are fixed by horizontal steel plates, a vertical screw penetrates through the horizontal steel plates, and the two ends of the vertical screw are screwed by nuts.
The embodiment of the utility model provides an in, be connected lifting device and rings on the girder during hoist and mount, will adopt screw rod and the reinforced bridge floor continuous structure test component whole hoist and mount of steel sheet and transport to experimental loading place to place on support 11 and concrete block 12. And (4) dismantling the screw and the steel plate, and loading the bridge deck continuous structure test component.
The utility model discloses not be limited to above-mentioned best mode, anyone can all derive the test device of the bridge floor continuous structure test component transportation of being convenient for and hoist and mount of other various forms under the enlightenment of the utility model. All the equivalent changes and modifications made according to the claims of the present invention shall fall within the scope of the present invention.
Claims (6)
1. The utility model provides a test device convenient to transportation of bridge floor continuous structure test component and hoist and mount, includes two girders and is located the connecting plate on the adjacent tip of two girders, its characterized in that: the top, the below of the adjacent tip of two girders all are equipped with horizontal steel sheet, and the left side of the adjacent tip of two girders, right side all are equipped with vertical steel sheet, and two horizontal steel sheets are through vertical screw rod with connecting plate, two girder tip cramps, and two vertical steel sheets are through horizontal screw rod with two girder tip cramps.
2. The test device for facilitating transportation and hoisting of a test member of a continuous structure of a bridge deck according to claim 1, wherein: the upper surfaces of the adjacent end parts of the two main beams are respectively provided with a step embedded with a connecting plate, and the upper surfaces of the connecting plates are flush with the upper surfaces of the main beams.
3. The test device for facilitating transportation and hoisting of a test member of a continuous structure of a bridge deck according to claim 1, wherein: the lower surface of the upper horizontal steel plate is tightly attached to the upper surface of the connecting plate, the upper surface of the lower horizontal steel plate is tightly attached to the lower surface of the main beam, the vertical screws are symmetrically distributed on the left side and the right side of the horizontal steel plates, and the end parts of the vertical screws penetrate through mounting through holes in the horizontal steel plates on the same side and are locked through nuts.
4. The test device for facilitating transportation and hoisting of a test member of a continuous structure of a bridge deck according to claim 1, wherein: the vertical steel plate right surface in left side pastes tightly with the girder left surface, and the vertical steel plate left surface in right side pastes tightly with the girder right surface, and horizontal screw rod symmetric distribution is both sides around vertical steel plate, and the tip of horizontal screw rod all passes the installation through-hole on the vertical steel plate of homonymy to lock through the nut.
5. The test device for facilitating transportation and hoisting of a test member of a continuous structure of a bridge deck according to claim 1, wherein: and a plurality of transverse steel pipes are vertically pre-embedded in the adjacent end parts of the two main beams and are used for a transverse screw to pass through.
6. The test device for facilitating transportation and hoisting of a test member of a continuous structure of a bridge deck according to claim 1, wherein: rings are embedded in the left side and the right side of the two main beams close to the connecting plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920534639.6U CN209797235U (en) | 2019-04-19 | 2019-04-19 | Test device convenient to transportation and hoist of bridge floor continuous structure test component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920534639.6U CN209797235U (en) | 2019-04-19 | 2019-04-19 | Test device convenient to transportation and hoist of bridge floor continuous structure test component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209797235U true CN209797235U (en) | 2019-12-17 |
Family
ID=68830197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920534639.6U Active CN209797235U (en) | 2019-04-19 | 2019-04-19 | Test device convenient to transportation and hoist of bridge floor continuous structure test component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209797235U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109911756A (en) * | 2019-04-19 | 2019-06-21 | 福州大学 | The experimental rig and method for transporting and lifting convenient for bridge floor continuous structure test component |
-
2019
- 2019-04-19 CN CN201920534639.6U patent/CN209797235U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109911756A (en) * | 2019-04-19 | 2019-06-21 | 福州大学 | The experimental rig and method for transporting and lifting convenient for bridge floor continuous structure test component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN103075020B (en) | A kind of steel tray supports actuating system | |
CN203947771U (en) | A kind of Bailey beam pendent form support system | |
CN107165056B (en) | Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof | |
CN209797235U (en) | Test device convenient to transportation and hoist of bridge floor continuous structure test component | |
CN102518300A (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN105173379B (en) | The band special Auxiliary support bar assembly of door opening prefabricated panel | |
CN107419916B (en) | Internal moment reinforcing and correcting device for beam structure | |
CN211773849U (en) | Installation abutment of counter-force calibration device of truck scale | |
CN107642013A (en) | A kind of subway route railway roadbed sleeper nylon sleeve crash handling construction method | |
CN108374350B (en) | Assembly jig frame of steel anchor beam and steel corbel unit and installation method | |
CN216184761U (en) | Adjustable transportation bed-jig of steel case roof beam | |
CN216338968U (en) | Railway double-track box girder static load bending test beam | |
CN205224073U (en) | Mould is fixed to contact net | |
CN107700824A (en) | Bar type wall-attached frame | |
CN210737351U (en) | Test device for transporting, hoisting and loading bridge deck continuous structure test components | |
CN103754791A (en) | Method for lifting water-tower 1000m<3> water tank by utilizing prestressed strands | |
CN203755167U (en) | Assistant mounting device of V-shaped steel pipe frame of tower bridge | |
CN106758881A (en) | Bridge maintenance rail steel structural support arm | |
CN206529710U (en) | Bridge maintenance track supporting steel cantilever | |
CN221052393U (en) | Temporary locking connecting component for assembled closure segment | |
CN202208603U (en) | Adjustable end beam fixing device for laminated mounting of vehicle frame of coke dry quenching hoisting machine | |
CN109911756A (en) | The experimental rig and method for transporting and lifting convenient for bridge floor continuous structure test component | |
CN204979712U (en) | Take special supplementary support rod assembly of prefabricated wallboard of door opening | |
CN211736262U (en) | Movable machining platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |