CN209780194U - Aerial construction work platform - Google Patents

Aerial construction work platform Download PDF

Info

Publication number
CN209780194U
CN209780194U CN201920124388.4U CN201920124388U CN209780194U CN 209780194 U CN209780194 U CN 209780194U CN 201920124388 U CN201920124388 U CN 201920124388U CN 209780194 U CN209780194 U CN 209780194U
Authority
CN
China
Prior art keywords
wire rope
steel wire
construction work
work platform
bearing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920124388.4U
Other languages
Chinese (zh)
Inventor
杜凯
梁建宏
何俊文
刘瑞权
贾俊杰
张建宇
闫小虎
赵晓丽
赵东旭
李志诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Bi Xuan Decoration Engineering Co Ltd
Original Assignee
Inner Mongolia Bi Xuan Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Bi Xuan Decoration Engineering Co Ltd filed Critical Inner Mongolia Bi Xuan Decoration Engineering Co Ltd
Priority to CN201920124388.4U priority Critical patent/CN209780194U/en
Application granted granted Critical
Publication of CN209780194U publication Critical patent/CN209780194U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a high altitude construction work platform, including connecting piece, straining piece, bearing wire rope, attachment strap, it is equipped with many to bear the wire rope parallel, and the both ends of bearing wire rope all are equipped with the straining piece, the straining piece is connected with the connecting piece, connecting piece and wall connection, the upper end of bearing wire rope is evenly located to the attachment strap, connects through the butt joint board between the adjacent attachment strap, and the attachment strap is connected through the hook rope device between with bearing wire rope. The bearing steel wire ropes are pulled on the two opposite wall bodies, and the butt straps are laid on the bearing steel wire ropes to form a temporary construction operation platform; the operation platform forms a simulation road, and the safety of construction operation on the platform is improved.

Description

Aerial construction work platform
Technical Field
The utility model relates to a high altitude construction platform technical field specifically is a high altitude construction work platform.
Background
When carrying out high altitude construction, the mode that adopts at present is to build the scaffold, and when carrying out high altitude construction indoor, the indoor structure of choosing empty, the top degree of difficulty is used greatly, consequently builds more difficultly of scaffold, and the speed of building of scaffold is relatively slow, and the capital expense that needs to drop into is great, has certain danger in the use, and later stage's dismantlement also consumes the manpower relatively.
SUMMERY OF THE UTILITY MODEL
The utility model provides a platform for high-altitude construction work, which aims at the defects of the prior art, and forms a temporary platform for construction work by pulling up the bearing steel wire rope on two opposite walls and laying the butt strap on the bearing steel wire rope, the whole device has simple structure, convenient construction, fast construction speed, low cost, a great deal of time and economy, simple and fast disassembly and assembly, and is more suitable for indoor high-altitude work; the operation platform forms a simulation road, and the safety of construction operation on the platform is improved.
In order to realize the purpose, the utility model provides the following technical scheme:
The high-altitude construction operation platform comprises connecting pieces, tensioning pieces, bearing steel wire ropes and butt straps, wherein the plurality of bearing steel wire ropes are arranged in parallel, the tensioning pieces are arranged at two ends of each bearing steel wire rope and connected with the connecting pieces, the connecting pieces are connected with a wall body, the butt straps are uniformly arranged at the upper ends of the bearing steel wire ropes, the adjacent butt straps are connected through the butt straps, and the butt straps are connected with the bearing steel wire ropes through the rope hooking devices.
Preferably, the connecting piece comprises a first connecting plate and a second connecting plate, the first connecting plate is connected with the wall body, the first connecting plate is provided with two parallel second connecting plates, a first connecting rod is arranged between the two second connecting plates, and the first connecting rod is connected with the tensioning piece.
preferably, the tensioning piece comprises a threaded rod, an adjusting ring and a rotating rod, one end of the adjusting ring is in threaded connection with the threaded rod, the other end of the adjusting ring is provided with the rotating rod, one end of the rotating rod is rotatably connected with the adjusting ring, the other end of the rotating rod is provided with a roller support, rollers are arranged in the roller support, two ends of each roller are connected with the roller support through a wheel shaft, and the bearing steel wire rope is wound on the rollers.
Preferably, a second connecting rod is arranged between the two second connecting plates, and the second connecting rod is connected with the wheel shaft through a reinforced steel wire rope.
Preferably, one end of the threaded rod is provided with a connecting ring, the connecting ring is connected with the first connecting rod, the other end of the threaded rod is provided with a limiting block, and the limiting block is arranged in the adjusting ring.
Preferably, the rotating rod is provided with a first retaining ring and a second retaining ring, and the adjusting ring is arranged between the first retaining ring and the second retaining ring.
Preferably, the lapping plate is provided with a rope hooking hole, the rope hooking device comprises a stud and a pressing plate, the pressing plate is provided with a through hole, two ends of the pressing plate are connected with the lapping plate through bolts, the stud is arranged in the through hole, the stud is provided with a locking nut, the locking nut is arranged above the pressing plate, the lower end of the stud is provided with a hook, the hook is arranged below the pressing plate, and the hook penetrates through the rope hooking hole and is connected with the bearing steel wire rope.
preferably, the butt plate is provided with a connecting hole, the butt plate is vertically provided with a tightening bolt, a nut of the tightening bolt is connected with the lower end face of the butt plate, the tightening bolt is provided with a tightening nut, and the tightening nut is arranged at the upper end of the butt plate.
Compared with the prior art, the beneficial effects of utility model are that:
1. The utility model forms a temporary construction operation platform by pulling up the bearing steel wire rope on the two opposite walls and laying the butt strap on the bearing steel wire rope, the whole device has simple structure, convenient construction, fast construction speed and lower cost, saves a large amount of time and economy, is simple and fast to disassemble and assemble, and is more suitable for indoor high-altitude operation; the operation platform forms a simulation road, and the safety of construction operation on the platform is improved.
2. The utility model discloses a taut can adjust the elasticity that bears wire rope, just can easily realize through rotating the go-between, it is convenient to adjust, has realized the connecting piece and has born the weight of being connected between the wire rope, has increased the convenience of connecting.
3. The utility model discloses a consolidate wire rope and come to drag the gyro wheel and draw fixedly, guarantee the fastness of taut piece and the stability of being connected, the security and the reliability of the use of increase.
4. the utility model discloses a hook rope device will bear wire rope through the couple taut, has not only realized the fixed to the attachment strap, prevents that the attachment strap from sliding, improves the fastness of connecting, can carry on bearing wire rope taut once more moreover, lets operation platform stable firm more.
drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the tension member;
FIG. 3 is a schematic top view of the connection of adjacent straps;
FIG. 4 is a schematic view of the construction of the leader device;
Fig. 5 is a schematic cross-sectional view of an adjacent strap connection.
In the figure: 1-a connector; 101-a first connection plate; 102-a second connecting plate; 103-a first connecting rod; 104-a second connecting rod; 2-a tensioning member; 201-connecting ring; 202-a threaded rod; 203-a limiting block; 204-an adjusting ring; 205-an axle; 206-a roller; 207-roller support; 208-a turn bar; 209-first baffle ring; 210-a second baffle ring; 3-carrying the steel wire rope; 4-reinforcing the steel wire rope; 5-a butt strap; 501-hooking rope holes; 502-connection hole; 6-a rope hooking device; 601-a stud; 602-a locking nut; 603-hanging hooks; 604-a platen; 7-a butt plate; 701-adjusting holes; 702-tightening the bolt; 703-tightening the nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 5, the aerial construction work platform comprises a connecting piece 1, a plurality of tensioning pieces 2, a bearing steel wire rope 3 and an access plate 5, wherein the bearing steel wire ropes 3 are arranged in parallel, the tensioning pieces 2 are arranged at two ends of the bearing steel wire rope 3, the tensioning pieces 2 are connected with the connecting piece 1, the connecting piece 1 is connected with a wall body, the access plates 5 are uniformly arranged at the upper end of the bearing steel wire rope 3, adjacent access plates 5 are connected through a butt joint plate 7, and the access plates 5 are connected with the bearing steel wire rope 3 through a rope hooking device 6.
The connecting piece 1 comprises a first connecting plate 101 and a second connecting plate 102, the first connecting plate 101 is connected with a wall, the first connecting plate 101 is provided with two parallel second connecting plates 102, a first connecting rod 103 is arranged between the two second connecting plates 102, and the first connecting rod 103 is connected with the tensioning piece 2.
The tensioning member 2 comprises a threaded rod 202, an adjusting ring 204 and a rotating rod 208, one end of the adjusting ring 204 is in threaded connection with the threaded rod 202, the other end of the adjusting ring 204 is provided with the rotating rod 208, one end of the rotating rod 208 is rotatably connected with the adjusting ring 204, the other end of the rotating rod 208 is provided with a roller bracket 207, a roller 206 is arranged in the roller bracket 207, two ends of the roller 206 are connected with the roller bracket 207 through a wheel shaft 205, and the bearing steel wire rope 3 is wound on the roller 206.
A second connecting rod 104 is arranged between the two second connecting plates 102, and the second connecting rod 104 is connected with the wheel shaft 205 through a reinforced steel wire rope 4.
One end of the threaded rod 202 is provided with a connecting ring 201, the connecting ring 201 is connected with the first connecting rod 103, the other end of the threaded rod 202 is provided with a limiting block 203, and the limiting block 203 is arranged in an adjusting ring 204.
The rotating rod 208 is provided with a first retaining ring 209 and a second retaining ring 210, and the adjusting ring 204 is arranged between the first retaining ring 209 and the second retaining ring 210.
The rope hooking device 6 comprises a stud 601 and a pressing plate 604, a through hole is formed in the pressing plate 604, the two ends of the pressing plate 604 are connected with the attachment strap 5 through bolts, the stud 601 is arranged in the through hole, a locking nut 602 is arranged on the stud 601, the locking nut 602 is arranged above the pressing plate 604, a hook 603 is arranged at the lower end of the stud 601, the hook 603 is arranged below the pressing plate 604, and the hook 603 penetrates through the rope hooking hole 501 to be connected with the bearing steel wire rope 3.
The butt plate is characterized in that a connecting hole 502 is formed in the butt plate 5, a tightening bolt 702 is vertically arranged on the butt plate 7, a nut of the tightening bolt 702 is connected with the lower end face of the butt plate 5, a tightening nut 703 is arranged on the tightening bolt 702, and the tightening nut 703 is arranged at the upper end of the butt plate 7.
When the device is used, firstly, a bearing steel wire rope is sleeved on the two rollers 206, the connecting ring 201 at one end of the tensioning piece 2 is connected with the first connecting rod 103, the wheel shaft 205 is connected with the second connecting rod 104 through the reinforced steel wire rope 4, the connecting piece 1 is connected with a wall body through a bolt, the bearing steel wire rope 3 is tensioned and fixed through the rotating adjusting ring 204, the butt plates 5 are arranged on the bearing steel wire 3 in parallel, the butt plates 7 are used for connecting and fixing the butt plates 5 and the bearing steel wire rope 3 through the hook rope device 6, and the adjacent butt plates 5 are connected through the butt plates 7. The utility model forms a temporary construction operation platform by pulling up the bearing steel wire rope on the two opposite walls and laying the butt strap on the bearing steel wire rope, the whole device has simple structure, convenient construction, fast construction speed and lower cost, saves a large amount of time and economy, is simple and fast to disassemble and assemble, and is more suitable for indoor high-altitude operation; the operation platform forms a simulation road, and the safety of construction operation on the platform is improved.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. The utility model provides an aerial construction work platform which characterized in that: the connecting piece comprises a connecting piece (1), tensioning pieces (2), a bearing steel wire rope (3) and butt straps (5), wherein the bearing steel wire rope (3) is parallelly provided with a plurality of pieces, the tensioning pieces (2) are arranged at two ends of the bearing steel wire rope (3), the tensioning pieces (2) are connected with the connecting piece (1), the connecting piece (1) is connected with a wall body, the butt straps (5) are uniformly arranged at the upper end of the bearing steel wire rope (3), adjacent butt straps (5) are connected through butt straps (7), and the butt straps (5) are connected with the bearing steel wire rope (3) through rope hooking devices (6).
2. An aerial construction work platform as defined in claim 1, wherein: the connecting piece (1) comprises a first connecting plate (101) and a second connecting plate (102), the first connecting plate (101) is connected with a wall, the first connecting plate (101) is provided with two parallel second connecting plates (102), a first connecting rod (103) is arranged between the two second connecting plates (102), and the first connecting rod (103) is connected with the tensioning piece (2).
3. an aerial construction work platform as defined in claim 1, wherein: the tensioning piece (2) comprises a threaded rod (202), an adjusting ring (204) and a rotating rod (208), one end of the adjusting ring (204) is in threaded connection with the threaded rod (202), the other end of the adjusting ring (204) is provided with the rotating rod (208), one end of the rotating rod (208) is rotatably connected with the adjusting ring (204), the other end of the rotating rod (208) is provided with a roller support (207), a roller (206) is arranged in the roller support (207), two ends of the roller (206) are connected with the roller support (207) through a wheel shaft (205), and the bearing steel wire rope (3) is wound on the roller (206).
4. An aerial construction work platform as defined in claim 2, wherein: a second connecting rod (104) is arranged between the two second connecting plates (102), and the second connecting rod (104) is connected with the wheel shaft (205) through a reinforced steel wire rope (4).
5. An aerial construction work platform as defined in claim 3, wherein: one end of the threaded rod (202) is provided with a connecting ring (201), the connecting ring (201) is connected with the first connecting rod (103), the other end of the threaded rod (202) is provided with a limiting block (203), and the limiting block (203) is arranged in the adjusting ring (204).
6. An aerial construction work platform as defined in claim 3, wherein: the rotating rod (208) is provided with a first retaining ring (209) and a second retaining ring (210), and the adjusting ring (204) is arranged between the first retaining ring (209) and the second retaining ring (210).
7. an aerial construction work platform as defined in claim 1, wherein: be equipped with on attachment strap (5) and hook rope hole (501), hook rope device (6) are including double-screw bolt (601), clamp plate (604), be equipped with the through-hole on clamp plate (604), the both ends of clamp plate (604) are passed through the bolt and are connected with attachment strap (5), in the through-hole was located to double-screw bolt (601), be equipped with lock nut (602) on double-screw bolt (601), the top of clamp plate (604) is located in lock nut (602), the lower extreme of double-screw bolt (601) is equipped with couple (603), the below of clamp plate (604) is located in couple (603), and couple (603) pass hook rope hole (501) and bear wire rope (3) and be connected.
8. An aerial construction work platform as defined in claim 1, wherein: be equipped with connecting hole (502) on access board (5), be equipped with on butt joint board (7) perpendicularly and screw up bolt (702), the nut of screwing up bolt (702) is connected with the lower terminal surface of access board (5), be equipped with on screwing up bolt (702) and screw up nut (703), the upper end of butt joint board (7) is located in screw up nut (703).
CN201920124388.4U 2019-01-24 2019-01-24 Aerial construction work platform Active CN209780194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920124388.4U CN209780194U (en) 2019-01-24 2019-01-24 Aerial construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920124388.4U CN209780194U (en) 2019-01-24 2019-01-24 Aerial construction work platform

Publications (1)

Publication Number Publication Date
CN209780194U true CN209780194U (en) 2019-12-13

Family

ID=68793408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920124388.4U Active CN209780194U (en) 2019-01-24 2019-01-24 Aerial construction work platform

Country Status (1)

Country Link
CN (1) CN209780194U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897287A (en) * 2021-01-28 2021-06-04 阿帕狮龙电梯科技(苏州)有限公司 Screen mounting tension device for platform elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897287A (en) * 2021-01-28 2021-06-04 阿帕狮龙电梯科技(苏州)有限公司 Screen mounting tension device for platform elevator

Similar Documents

Publication Publication Date Title
CN202745400U (en) Adjustable inclined strut with vertical prefabricated part
CN209780194U (en) Aerial construction work platform
CN205170156U (en) Heavy object lift -over device
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN103541557B (en) For the easy device of vertical steel pipe
CN208329672U (en) A kind of industrial construction protective device
CN207609232U (en) A kind of holding pole structure and lamp stand communication tower
CN110565541A (en) Self-anchored construction hanging basket suspension mechanism based on existing structure
CN204877236U (en) Multi -functional house ornamentation
CN113975705A (en) Large-scale trampoline of high bearing capacity adjustable
CN211007557U (en) Novel scaffold
CN210459705U (en) Detachable steel bar truss floor support plate supporting structure
CN208416000U (en) A kind of construction aisle
CN207312923U (en) A kind of heavy-duty steel component hanging apparatus
CN207314892U (en) One kind aids in huge pillar height sky to face side construction external hanging type protective platform
CN208150829U (en) Spandrel girder transporting device is climbed in one kind
CN218320395U (en) Tower crane driver passageway drawknot device
CN219753929U (en) Adjustable wall connecting piece
CN220766339U (en) Curtain wall unit plate traction device
CN213359349U (en) Attached lifting scaffold protective device
CN209175726U (en) Movable stand
CN204876520U (en) A gallows and safety net combination construction platform that is used for complicated net shell roofing
CN219115322U (en) Tensioning device for cargo binding rope for truck
CN219387068U (en) Anti-drop's assembled scaffold
CN208915190U (en) A kind of transport device for construction site Secondary Transport large diameter pipeline