CN209779637U - Deep foundation pit steel pipe supporting device of PRC tubular pile supporting structure - Google Patents
Deep foundation pit steel pipe supporting device of PRC tubular pile supporting structure Download PDFInfo
- Publication number
- CN209779637U CN209779637U CN201920377818.3U CN201920377818U CN209779637U CN 209779637 U CN209779637 U CN 209779637U CN 201920377818 U CN201920377818 U CN 201920377818U CN 209779637 U CN209779637 U CN 209779637U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- tubular pile
- prc
- prc tubular
- circular arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a PRC tubular pile supporting construction's deep basal pit steel pipe strutting arrangement, locate the circular arc steel sheet at steel pipe both ends with the branch including the steel pipe, the convex surface fixed connection of steel pipe and circular arc steel sheet, the circular arc steel sheet passes through fastener and PRC tubular pile fixed connection. The utility model discloses a circular arc steel sheet realizes that the steel pipe is connected with the PRC tubular pile, has formed effectual support system between two PRC tubular piles, and it is high to have solved tubular pile concrete intensity, and the curved surface supports the difficult problem that is difficult to fix.
Description
Technical Field
The utility model relates to a deep basal pit supporting construction system especially relates to a PRC tubular pile supporting construction's deep basal pit steel pipe strutting arrangement.
Background
when municipal water conservancy box culvert foundation ditch steel pipe supports were installed, because foundation ditch supporting construction PRC (prestressed reinforced concrete) tubular pile intensity is high, and the surface is the arc surface, influenced this steel pipe support and can't be connected with the tubular pile, formed effective support system. In the prior art, the bracket is required to be connected with the tubular pile, and the rear support tubular pile is in lap joint with the bracket, so that the problems of long operation time, high labor intensity, low adaptability and the like are caused.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's is not enough, provides a knot simple structure, convenient operation, low cost, safe and reliable's PRC tubular pile supporting construction's deep basal pit steel pipe strutting arrangement.
In order to solve the technical problem, the utility model discloses a following technical scheme:
The utility model provides a PRC tubular pile supporting construction's deep basal pit steel pipe strutting arrangement, includes the steel pipe and divides the circular arc steel sheet of locating the steel pipe both ends, the convex surface fixed connection of steel pipe and circular arc steel sheet, circular arc steel sheet passes through fastener and PRC tubular pile fixed connection.
As a further improvement of the technical scheme, the steel pipe is connected with the convex surface of the arc steel plate in a welding mode.
As a further improvement of the above technical solution, the fastening member is an expansion bolt.
As a further improvement of the technical scheme, the expansion bolts are arranged in a plurality and are symmetrically arranged at two ends of the arc steel plate.
Compared with the prior art, the utility model has the advantages of:
The utility model discloses a PRC tubular pile supporting construction's deep basal pit steel pipe strutting arrangement has simple structure, convenient operation, low cost, safe and reliable, and characteristics such as the construction is torn open in ann is simple practical realize the steel pipe through the circular arc steel sheet and are connected with the PRC tubular pile, have formed effectual support system between two PRC tubular piles 3, have solved tubular pile concrete intensity height, and the curved surface supports the difficult problem that is difficult to fix.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
fig. 2 is a top view of the steel pipe supporting device of the present invention.
Fig. 3 is the connection relation schematic diagram between the middle arc steel plate and the PRC tubular pile.
The reference numerals in the figures denote:
1. A steel pipe; 2. a circular arc steel plate; 3. PRC tubular pile; 4. an expansion bolt.
Detailed Description
The invention is described in further detail below with reference to the drawings and specific examples.
As shown in fig. 1, the deep foundation pit steel pipe supporting device of the PRC tubular pile supporting structure of this embodiment includes a steel pipe 1 and arc steel plates 2 respectively disposed at two ends of the steel pipe 1, each end of the steel pipe 1 is fixedly connected to the convex surfaces of the two arc steel plates 2, and each arc steel plate 2 is fixedly connected to a PRC tubular pile 3 through a fastening member. During the use, laminate the concave surface of an circular arc steel sheet 2 on the outer wall of a PRC tubular pile 3, fix circular arc steel sheet 2 and PRC tubular pile 3 through the fastener, then laminate the concave surface of another circular arc steel sheet 2 on the outer wall of a PRC tubular pile 3, fix circular arc steel sheet 2 and PRC tubular pile 3 through the fastener, realized that steel pipe 1 is connected with two PRC tubular piles 3, formed effectual support system between two PRC tubular piles 3, as shown in FIG. 2.
In this embodiment, specifically, the steel pipe 1 and the convex surface of the arc steel plate 2 are connected by welding. Besides this embodiment, other connection methods, such as the connection between the steel pipe 1 and the arc steel plate 2, can be used under the condition of ensuring the connection strength between the steel pipe 1 and the arc steel plate 2
As shown in fig. 3, a specific fastener in this embodiment is an expansion bolt 4. Expansion bolts 4 are equipped with four, and two bisymmetry branches are located the both ends of circular arc steel sheet 2, realize through expansion bolts 4 that circular arc steel sheet 2 and PRC tubular pile 3's are fixed, have safe and reliable, dismantle convenient advantage, and two circular arc steel sheets 2 all are connected with PRC tubular pile 3 through four expansion bolts 4.
Although the present invention has been described with reference to the preferred embodiments, it is not intended to limit the present invention. The technical solution of the present invention can be used by anyone skilled in the art to make many possible variations and modifications, or to modify equivalent embodiments, without departing from the scope of the technical solution of the present invention, using the technical content disclosed above. Therefore, any simple modification, equivalent change and modification made to the above embodiments by the technical entity of the present invention should fall within the protection scope of the technical solution of the present invention.
Claims (4)
1. The utility model provides a PRC tubular pile supporting construction's deep basal pit steel pipe strutting arrangement which characterized in that: the steel pipe pile fixing device comprises steel pipes (1) and arc steel plates (2) which are arranged at two ends of each steel pipe (1) in a divided mode, wherein the steel pipes (1) are fixedly connected with the arc steel plates (2) in a convex mode, and the arc steel plates (2) are fixedly connected with PRC pipe piles (3) through fasteners.
2. The deep foundation pit steel pipe supporting device of the PRC tubular pile supporting structure according to claim 1, characterized in that: the steel pipe (1) is connected with the convex surface of the arc steel plate (2) in a welding mode.
3. The deep foundation pit steel pipe supporting device of the PRC tubular pile supporting structure according to claim 1 or 2, characterized in that: the fastener is an expansion bolt (4).
4. The deep foundation pit steel pipe supporting device of the PRC tubular pile supporting structure according to claim 3, characterized in that: the expansion bolts (4) are arranged in a plurality, and the expansion bolts (4) are symmetrically arranged at two ends of the arc steel plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920377818.3U CN209779637U (en) | 2019-03-22 | 2019-03-22 | Deep foundation pit steel pipe supporting device of PRC tubular pile supporting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920377818.3U CN209779637U (en) | 2019-03-22 | 2019-03-22 | Deep foundation pit steel pipe supporting device of PRC tubular pile supporting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209779637U true CN209779637U (en) | 2019-12-13 |
Family
ID=68799273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920377818.3U Active CN209779637U (en) | 2019-03-22 | 2019-03-22 | Deep foundation pit steel pipe supporting device of PRC tubular pile supporting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209779637U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045291A (en) * | 2022-06-28 | 2022-09-13 | 山东大学 | Subway station foundation pit assembled tubular pile support and construction method |
-
2019
- 2019-03-22 CN CN201920377818.3U patent/CN209779637U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045291A (en) * | 2022-06-28 | 2022-09-13 | 山东大学 | Subway station foundation pit assembled tubular pile support and construction method |
CN115045291B (en) * | 2022-06-28 | 2023-03-10 | 山东大学 | Subway station foundation pit assembled tubular pile support and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209779637U (en) | Deep foundation pit steel pipe supporting device of PRC tubular pile supporting structure | |
CN110629792B (en) | Splicing construction method for corrugated steel pipe gallery | |
CN207659956U (en) | A kind of device improving diaphram wall steel reinforcement cage radial direction verticality | |
CN213539093U (en) | Supporting bearing capacity detection structure for front-supporting type grouting steel pipe | |
CN106320365B (en) | Assembly type foundation combining cylindrical supporting body and base | |
CN211547694U (en) | Bored concrete pile steel reinforcement cage location centering device | |
CN210118137U (en) | Shield constructs quick-witted chamber device that starts | |
CN207901085U (en) | Multiplexing combined pipeline support bracket for installing large-diameter steel pipe | |
CN209084163U (en) | A kind of concrete ground pump line support frame device | |
CN202390844U (en) | Detachable reinforcing device for supporting pile of deep foundation pit | |
CN218236408U (en) | Multilayer pipeline assembled bearing support | |
CN211973584U (en) | Water stopping device | |
CN215442273U (en) | Water conservancy and hydropower engineering's drain pipe reinforced structure | |
CN220978891U (en) | Fixing and positioning device for steel structure steel column foundation bolt | |
CN209066284U (en) | Cantilever cast-in-place end bay closure segment inclined tube stake support in river profundal zone stablizes sectional shelf-unit with rear anchoring pile | |
CN211922647U (en) | Safe type underground structure | |
CN218845306U (en) | Pipeline protection structure for excavation of foundation pit below pressure pipeline | |
CN217003437U (en) | Large-diameter HDPE pressure-resistant drain pipe | |
CN215942703U (en) | Water level gauge fixing device of trapezoidal channel | |
CN216867712U (en) | Support arrangement for erect pipeline in aquatic | |
CN208039309U (en) | A kind of corrugated steel installation pedestal of corrugated steel piping lane | |
NL2030527B1 (en) | All-in-one anti-floating device with open prestressed high-strength concrete pipe pile and anti-floating anchor rod | |
CN111827271B (en) | Assembled steel-pipe pile fixing device | |
CN216040765U (en) | Culvert | |
CN203113526U (en) | Temporary fixing structure of rubber waterstop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |