CN209767041U - High-stability combined cable bridge - Google Patents

High-stability combined cable bridge Download PDF

Info

Publication number
CN209767041U
CN209767041U CN201920658672.XU CN201920658672U CN209767041U CN 209767041 U CN209767041 U CN 209767041U CN 201920658672 U CN201920658672 U CN 201920658672U CN 209767041 U CN209767041 U CN 209767041U
Authority
CN
China
Prior art keywords
sides
bridge
crane span
span structure
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920658672.XU
Other languages
Chinese (zh)
Inventor
包正国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Gome Steel Mesh Frame Co Ltd
Original Assignee
Jiangsu Gome Steel Mesh Frame Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Gome Steel Mesh Frame Co Ltd filed Critical Jiangsu Gome Steel Mesh Frame Co Ltd
Priority to CN201920658672.XU priority Critical patent/CN209767041U/en
Application granted granted Critical
Publication of CN209767041U publication Critical patent/CN209767041U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high-stability combined cable bridge, which solves the problems that the existing combined cable bridge has more parts, complicated and tedious installation and increases the workload of workers, the bridge is of a U-shaped structure, the size is large and is not beneficial to storage, and the bridge can not arrange cables laid in the bridge, and comprises a bridge body, wherein both sides of one end of the bridge body are provided with clamping grooves, both sides of the other end of the bridge body are provided with buckles, and both sides of the inner part of the bridge body are provided with screw rods, the utility model discloses a bridge body is connected with the bridge body through the buckles, which is convenient for the installation of workers, a bottom plate and a side plate are connected through hinges, the size of the bridge body is reduced due to the plate shape of the bridge body, the cable is convenient to be stored and transported, and the cables are fixed by arranging a cable fixing device in the bridge body, the cable is convenient to overhaul.

Description

High-stability combined cable bridge
Technical Field
The utility model relates to a cable testing bridge field specifically is a high stability combination cable testing bridge.
Background
The cable testing bridge divide into the slot type, tray formula and ladder formula, latticed isotructure, by the support, composition such as trailing arm and installation annex, the bridge can independently erect in the building, also can attach and establish on various building (structure) and piping lane support, should embody simple structure, handsome in appearance, dispose characteristics such as nimble and easy maintenance, all parts all need carry out the galvanizing treatment, install the outer open-air crane span structure of building, the spare part that uses when current combination cable crane span structure installation is more, it is loaded down with trivial details to install complicacy, the problem of increase staff's work load, the crane span structure is U type structure, the great problem of depositing that is unfavorable for of volume, and the crane span structure can not be to laying the problem of putting in order at crane span structure inside cable.
Therefore, how to design a high-stability combined cable bridge becomes a problem to be solved currently.
SUMMERY OF THE UTILITY MODEL
To the above situation, for overcoming prior art's defect, the utility model provides a high stability combination cable crane span structure, the effectual spare part that uses when having solved current combination cable crane span structure installation is more, and the installation is complicated loaded down with trivial details, increases the problem of staff's work load, and the crane span structure is U type structure, and the great problem of depositing that is unfavorable for of volume to and the crane span structure can not carry out the problem of arranging to laying at crane span structure inside cable.
In order to achieve the above object, the utility model provides a following technical scheme: the cable fixing device comprises a bridge body, wherein clamping grooves are arranged on two sides of one end of the bridge body, buckles are arranged on two sides of the other end of the bridge body, screw rods are arranged on two sides of the inside of the bridge body, a cable fixing device is arranged on the middle of the inner side of the bridge body, and a baffle is arranged on the upper portion of the inner side of the bridge body.
Preferably, the crane span structure body includes bottom plate, curb plate, hinge, mounting hole and spout, and the curb plate is all installed through the hinge in the bottom plate both sides, and the mounting hole has all been seted up at the curb plate both ends, and the spout has been seted up to curb plate one side.
Preferably, cable fixing device includes fixing base, mounting groove, screw hole, apron, fixture block and constant head tank, and the mounting groove has been seted up on fixing base both sides upper portion, and fixing base both sides lower part is located mounting groove bottom position department and has seted up the screw hole, and the fixing base top is provided with the apron, and apron bottom both sides are located mounting groove one side position department and are fixed with the fixture block, and the constant head tank has evenly been seted up on fixing base top and apron bottom.
Preferably, the metal zinc layer is coated on the outer sides of the bottom plate and the side plates, and heat dissipation holes are uniformly formed in the bottom end of the bottom plate.
Preferably, the nuts are installed at two ends of the screw rod, and the gasket is installed on one side of each nut.
Preferably, a handle is arranged in the middle of the top end of the cover plate.
The utility model discloses be connected through the buckle between crane span structure body and the crane span structure body, make things convenient for the staff to install, bottom plate and curb plate pass through hinge erection joint, and the crane span structure body is platelike has reduced the volume of crane span structure body, is convenient for deposit and transport, and it is fixed to arrange in the same direction as the cable through at crane span structure body internally mounted cable fixing device, is convenient for overhaul the cable.
drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
Fig. 2 is a schematic structural view of the bridge frame body of the present invention;
fig. 3 is a schematic structural view of the cable fixing device of the present invention;
Reference numbers in the figures: 1. a bridge frame body; 2. a card slot; 3. buckling; 4. a screw; 5. a cable fixing device; 6. a baffle plate; 11. a base plate; 12. a side plate; 13. a hinge; 14. mounting holes; 15. a chute; 51. a fixed seat; 52. mounting grooves; 53. a screw hole; 54. a cover plate; 55. a clamping block; 56. and (6) positioning a groove.
Detailed Description
The following describes the present invention in further detail with reference to the accompanying fig. 1-3.
In the first embodiment, as shown in fig. 1, the utility model comprises a bridge frame body 1, wherein, both sides of one end of the bridge frame body 1 are provided with a clamping groove 2, both sides of the other end of the bridge frame body 1 are provided with a buckle 3, both sides of the interior of the bridge frame body 1 are provided with a screw rod 4, the middle part of the interior of the bridge frame body 1 is provided with a cable fixing device 5, the upper part of the interior of the bridge frame body 1 is provided with a baffle 6, the prior combined cable bridge frame has more parts used during installation, the installation is complicated and the workload of workers is increased, the bridge frame is in a U-shaped structure, the size is larger and is not beneficial to storage, and the cable laid in the bridge frame cannot be arranged, the screw rod 4 is used for penetrating through the installation holes 14 on both sides of the side plate 12 to install the bridge frame body 1 in a three-dimensional, insert the buckle 3 of one of them crane span structure body 1 one end in the draw-in groove 2 of another crane span structure body 1 one end, analogize in proper order, fix with cable fixing device 5 behind the cable reason, cover baffle 6 at last.
embodiment two, on the basis of embodiment one, given by fig. 2, crane span structure body 1 includes bottom plate 11, curb plate 12, hinge 13, mounting hole 14 and spout 15, curb plate 12 has all been installed through hinge 13 in bottom plate 11 both sides, mounting hole 14 has all been seted up at curb plate 12 both ends, spout 15 has been seted up to curb plate 12 one side, bottom plate 11 and curb plate 12 pass through hinge 13 erection joint, crane span structure body 1 is platelike, the volume of crane span structure body 1 has been reduced, be convenient for deposit and transport, spout 15 is used for installing baffle 6.
Third embodiment, on the basis of the first embodiment, as shown in fig. 3, the cable fixing device 5 includes a fixing base 51, a mounting groove 52, a screw hole 53, a cover plate 54, a fixture block 55 and a positioning groove 56, the mounting groove 52 is formed on the upper portion of each of the two sides of the fixing base 51, the screw hole 53 is formed in the lower portion of each of the two sides of the fixing base 51 at the bottom end of the mounting groove 52, the cover plate 54 is disposed above the fixing base 51, the fixture block 55 is fixed to each of the two sides of the bottom end of the cover plate 54 at one side of the mounting groove 52, the positioning grooves 56 are uniformly formed in the top end of the fixing base 51 and the bottom end of the cover plate 54, the fixing base 51 is mounted inside the bridge body 1 by screws penetrating through the screw holes 53, the.
Fourth embodiment, on the basis of second embodiment, the bottom plate 11 and the curb plate 12 outside scribble the metal zinc layer, and the metal zinc layer is plated in the bottom plate 11 and the curb plate 12 outside, protects bottom plate 11 and curb plate 12 not corroded, and the louvre has evenly been seted up to bottom plate 11 bottom, and the louvre prevents that the inboard high temperature of crane span structure body 1 from having radiating effect.
Fifth embodiment, on the basis of the first embodiment, nuts are installed at both ends of the screw rod 4, a gasket is installed on one side of each nut, the screw rod 4 is inserted into the installation hole 14, and the nuts and the gaskets are matched with the screw rod 4 to assemble the bridge frame body 1.
In the sixth embodiment, on the basis of the third embodiment, a handle is arranged in the middle of the top end of the cover plate 54, and the handle is convenient for opening the cover plate 54.
The working principle is as follows: when the utility model is used, the existing combined cable bridge frame is installed by using more parts, the installation is complicated and tedious, the workload of workers is increased, the bridge frame is in a U-shaped structure, the size is large, the storage is not facilitated, and the bridge frame can not arrange cables laid in the bridge frame, a bottom plate 11 and a side plate 12 are installed and connected through a hinge 13, a bridge frame body 1 is in a plate shape, the size of the bridge frame body 1 is reduced, the bridge frame body is convenient to store and transport, a sliding groove 15 is used for installing a baffle 6, a screw rod 4 penetrates through an installation hole 14 at two sides of the side plate 12, the bridge frame body 1 is installed in a three-dimensional state, a suspender is installed at two sides of the screw rod 4 and is hoisted to the bridge frame body 1, when the cable bridge frame is assembled, a buckle 3 at one end of one bridge frame body 1 is inserted into a clamping groove 2 at one end of the other bridge frame body, the fixing seat 51 is installed inside the bridge frame body 1 by screws penetrating through the screw holes 53, the cable is evenly placed into the positioning groove 56 after being straightened, the clamping block 55 on the cover plate 54 is aligned with the installation groove 52, the cover plate 54 is covered to fix the cable, and finally the baffle 6 is covered.
Compared with the prior art, the utility model has the following benefits: 1) the bridge frame body is connected with the bridge frame body through a buckle, so that the installation of workers is facilitated; 2) the bottom plate and the side plates are connected through hinges, and the bridge frame body is plate-shaped, so that the size of the bridge frame body is reduced, and the bridge frame is convenient to store and transport; 3) the cable is fixed in order through arranging the cable fixing device in the bridge body, so that the cable is convenient to overhaul.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a high stability combination cable testing bridge, includes crane span structure body (1), its characterized in that: draw-in groove (2) are all installed to crane span structure body (1) one end both sides, and buckle (3) are all installed to crane span structure body (1) other end both sides, and screw rod (4) are all installed to crane span structure body (1) inside both sides, and cable fixing device (5) are all installed at crane span structure body (1) inboard middle part, and baffle (6) are installed on crane span structure body (1) inboard upper portion.
2. The high stability composite cable tray of claim 1, wherein: the bridge frame body (1) comprises a bottom plate (11), side plates (12), hinges (13), mounting holes (14) and sliding grooves (15), the side plates (12) are mounted on two sides of the bottom plate (11) through the hinges (13), the mounting holes (14) are formed in two ends of each side plate (12), and the sliding grooves (15) are formed in one side of each side plate (12).
3. The high stability composite cable tray of claim 1, wherein: cable fixing device (5) are including fixing base (51), mounting groove (52), screw hole (53), apron (54), fixture block (55) and constant head tank (56), mounting groove (52) have been seted up on fixing base (51) both sides upper portion, fixing base (51) both sides lower part is located mounting groove (52) bottom position department and has seted up screw hole (53), fixing base (51) top is provided with apron (54), apron (54) bottom both sides are located mounting groove (52) one side position department and are fixed with fixture block (55), constant head tank (56) have evenly been seted up to fixing base (51) top and apron (54) bottom.
4. The high stability composite cable tray of claim 2, wherein: the bottom plate (11) and the lateral plate (12) are coated with metal zinc layers, and heat dissipation holes are uniformly formed in the bottom end of the bottom plate (11).
5. The high stability composite cable tray of claim 1, wherein: nuts are mounted at two ends of the screw rod (4), and a gasket is mounted on one side of each nut.
6. The high stability composite cable tray of claim 3, wherein: the middle part of the top end of the cover plate (54) is provided with a handle.
CN201920658672.XU 2019-05-09 2019-05-09 High-stability combined cable bridge Active CN209767041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920658672.XU CN209767041U (en) 2019-05-09 2019-05-09 High-stability combined cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920658672.XU CN209767041U (en) 2019-05-09 2019-05-09 High-stability combined cable bridge

Publications (1)

Publication Number Publication Date
CN209767041U true CN209767041U (en) 2019-12-10

Family

ID=68761100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920658672.XU Active CN209767041U (en) 2019-05-09 2019-05-09 High-stability combined cable bridge

Country Status (1)

Country Link
CN (1) CN209767041U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112186666A (en) * 2020-09-11 2021-01-05 莱芜职业技术学院 Temporary pipeline protection device for building
CN113097949A (en) * 2021-04-22 2021-07-09 江苏奥凯电气有限公司 Combined cable bridge based on buckle structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112186666A (en) * 2020-09-11 2021-01-05 莱芜职业技术学院 Temporary pipeline protection device for building
CN112186666B (en) * 2020-09-11 2022-03-01 莱芜职业技术学院 Temporary pipeline protection device for building
CN113097949A (en) * 2021-04-22 2021-07-09 江苏奥凯电气有限公司 Combined cable bridge based on buckle structure

Similar Documents

Publication Publication Date Title
CN209767041U (en) High-stability combined cable bridge
CN108417746A (en) A kind of pole power supply
CN205447185U (en) Pole setting linkage of outdoor case
CN209516509U (en) Wire casing
CN215498089U (en) Fast assembly type wire and cable bridge
CN210659354U (en) Assembly type building edge protective frame
CN212581324U (en) Top cover waterproof structure of outdoor equipment
CN208299367U (en) A kind of radial type opening and closing bracket for cable
CN209482584U (en) A kind of light steel building floor steelframe module
CN206211913U (en) A kind of carrier for installing connecting element on solar panel
CN208209447U (en) A kind of sky shade for cable bearer
CN217081702U (en) Triangular anti-seismic support and hanger for small installation space
CN208078609U (en) A kind of weak-current cable holder device applied in subway tunnel
CN208241212U (en) A kind of composite carrier being used to support cable
CN208316250U (en) A kind of new structural pipe bus bar fixing hardware of substation
CN208516682U (en) A kind of cable accommodating device
CN214696620U (en) Novel connecting piece
CN217001431U (en) Integrated connecting device arranged between passive door and concrete
CN210898395U (en) Photovoltaic wire casing for W-shaped water guide groove support
TWM482608U (en) Aluminum frame having fast dismantle type solar roof tile retained thereto
CN214424849U (en) Upper connecting piece
CN214626217U (en) Novel high zinc layer environmental protection galvanized sheet material cable testing bridge
US9634306B2 (en) Battery tray and cover for underground mining equipment
CN213584980U (en) High-strength light tray type cable bridge
CN214204715U (en) Groove type aluminum alloy cable bridge convenient to disassemble and assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant