CN209760047U - Pier cap steel bar working frame - Google Patents

Pier cap steel bar working frame Download PDF

Info

Publication number
CN209760047U
CN209760047U CN201920367476.7U CN201920367476U CN209760047U CN 209760047 U CN209760047 U CN 209760047U CN 201920367476 U CN201920367476 U CN 201920367476U CN 209760047 U CN209760047 U CN 209760047U
Authority
CN
China
Prior art keywords
support body
connecting plate
pier cap
steel bar
working frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920367476.7U
Other languages
Chinese (zh)
Inventor
毛毳
朱敦辉
田小洪
曹广伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lidao Steel Structure Engineering Co.,Ltd.
Original Assignee
Zhejiang Li Dao Marine Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Li Dao Marine Equipment Co Ltd filed Critical Zhejiang Li Dao Marine Equipment Co Ltd
Priority to CN201920367476.7U priority Critical patent/CN209760047U/en
Application granted granted Critical
Publication of CN209760047U publication Critical patent/CN209760047U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Pier cap reinforcing bar work frame. The main problem of solving present reinforcement operation protection frame and need building at the scene, use comparatively inconvenient. The method is characterized in that: the support body is including first support body (2) and second support body (3) that can dismantle the connection, first support body is the U-shaped structure, the second support body is the U-shaped structure, enclose between first support body and the second support body and hold tank (4) that form and be used for pier (9) to put into. The utility model provides a pier cap reinforcing bar working frame can reach the destination and assemble indoor good back of putting up first support body and second support body, and it is more convenient to use, saves the time limit for a project.

Description

Pier cap steel bar working frame
Technical Field
The utility model relates to a road and bridge infrastructure field, concretely relates to pier cap reinforcing bar working frame.
Background
The method is characterized in that the pier body of the high-pier bridge is constructed in sections, the construction height of each section of pier body is generally 4-6m, and the steel bar of the next section of pier body is bound by adopting a conventional method, generally, a simple operation frame is temporarily erected by using a steel pipe and a fastener on an operation platform carried by a top section template of the upper section of pier body poured with concrete, and the operation platform is detached to install the template after the steel bar is bound.
There is one kind to be used for reinforcement operation protection frame on the market now, and this protection frame general formula structure as an organic whole need be built (or adopt equipment of lifting by crane) at the scene, and it is comparatively inconvenient to use.
SUMMERY OF THE UTILITY MODEL
In order to overcome the not enough of background art, the utility model provides a pier cap reinforcing bar work frame mainly solves present reinforcement operation protection frame and need build at the scene, uses comparatively inconvenient problem.
The utility model adopts the technical proposal that:
Pier cap reinforcing bar work frame, including the support body, the support body is including dismantling first support body and the second support body of connection, first support body is the U-shaped structure, the second support body is the U-shaped structure, enclose between first support body and the second support body and hold tank that the formation is used for the pier to put into.
The improved bicycle frame is characterized in that the first frame body is provided with a first square pipe, the first square pipe is provided with a fastening nut, the second frame body is provided with a second square pipe, the second square pipe is provided with a mounting hole corresponding to the fastening nut, and the improved bicycle frame further comprises a fastening screw, and the fastening screw penetrates through the mounting hole and is connected with the fastening nut.
Still be equipped with first connecting plate on the first side pipe, be equipped with the locating pin on the first connecting plate, be equipped with the second connecting plate on the second side pipe, be equipped with the locating hole on the second connecting plate.
The first connecting plate with fastening nut corresponds and is equipped with first waist shape hole, on the second connecting plate with first waist shape hole corresponds and is equipped with second waist shape hole, first waist shape hole with second waist shape hole is relative perpendicular setting.
the opposite surfaces of the first connecting plate and the second connecting plate are provided with rubber sheets.
A plurality of protective nets are circumferentially arranged on the first frame body.
A stair is arranged in the first frame body.
The utility model has the advantages that: the utility model provides a pier cap reinforcing bar working frame can reach the destination and assemble indoor good back of putting up first support body and second support body, and it is more convenient to use, saves the time limit for a project.
Drawings
Fig. 1 is a schematic top exploded view of an embodiment of the present invention.
Fig. 2 is a schematic side view of an embodiment of the present invention.
Fig. 3 is an enlarged schematic view of a portion a of fig. 1.
Fig. 4 is an enlarged schematic view of fig. 2 at B.
Fig. 5 is a schematic structural diagram of a first connecting plate according to an embodiment of the present invention.
Fig. 6 is a schematic structural diagram of a second connecting plate according to an embodiment of the present invention.
Detailed Description
The utility model is further explained with the following drawings: as shown in the figure, pier cap reinforcing bar work frame, including support body 1, the support body is including dismantling first support body 2 and the second support body 3 of connection, first support body is the U-shaped structure, the second support body is the U-shaped structure, enclose between first support body and the second support body and hold tank 4 that the formation is used for pier 9 to put into. This first support body and second support body are and control to correspond the setting, can be indoor build the back, pull to the building site, about control to piece together install after can, do not need the crane from last down to place. The utility model provides a pier cap reinforcing bar working frame can reach the destination and assemble indoor good back of putting up first support body and second support body, and it is more convenient to use, saves the time limit for a project.
In this embodiment, as shown in the figure, include first square pipe 21 on the first support body, be equipped with fastening nut 211 on the first square pipe, the second support body includes second square pipe 31, be equipped with on the second square pipe with fastening nut corresponds the mounting hole 311 that is equipped with, still includes fastening screw 313, fastening screw passes the mounting hole with fastening nut connects. The fastening nut can be arranged on the back of the first square pipe, the through hole is formed in the first square pipe and corresponds to the fastening nut, the mounting hole opposite to the fastening nut is formed in the second square pipe, and the fastening nut passes through the mounting hole to be mounted on the fastening nut during mounting.
In this embodiment, as shown in the figure, the first square pipe is further provided with a first connecting plate 212, the first connecting plate is provided with a positioning pin 2121, the second square pipe is provided with a second connecting plate 312, and the second connecting plate is provided with a positioning hole 3121. The positioning is convenient.
In this embodiment, as shown in the figure, a first waist-shaped hole 2122 is provided on the first connecting plate corresponding to the fastening nut, a second waist-shaped hole 3122 is provided on the second connecting plate corresponding to the first waist-shaped hole, and the first waist-shaped hole and the second waist-shaped hole are vertically arranged relatively. When the fastening nut is installed, the first waist-shaped hole and the second waist-shaped hole are aligned, and the fastening nut is coaxially arranged with the first waist-shaped hole and the second waist-shaped hole, so that a certain guiding and positioning effect is achieved.
In this embodiment, as shown in the figure, the first connecting plate and the second connecting plate are provided with rubber sheets on opposite surfaces. Reducing the impact force.
In this embodiment, as shown in the figure, a plurality of protective nets 5 are circumferentially arranged on the first frame body. The use is safer.
In this embodiment, as shown in the figure, a staircase 6 is provided in the first frame body.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
In the present application, unless expressly stated or limited otherwise, the terms "connected" and "fixed" are to be construed broadly, e.g., "fixed" may be fixedly connected or detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The embodiments described with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention. The examples should not be construed as limiting the present invention, but any modifications made based on the spirit of the present invention should be within the scope of the present invention.

Claims (7)

1. Pier cap reinforcing bar work frame, including support body (1), its characterized in that: the support body is including first support body (2) and second support body (3) that can dismantle the connection, first support body is the U-shaped structure, the second support body is the U-shaped structure, enclose between first support body and the second support body and hold tank (4) that form and be used for pier (9) to put into.
2. The pier cap steel bar working frame according to claim 1, wherein: including first side pipe (21) on the first support body, be equipped with fastening nut (211) on the first side pipe, the second support body includes second side pipe (31), be equipped with on the second side pipe with fastening nut corresponds mounting hole (311) that are equipped with, still includes fastening screw (313), fastening screw passes the mounting hole with fastening nut connects.
3. The pier cap steel bar working frame according to claim 2, wherein: still be equipped with first connecting plate (212) on the first side pipe, be equipped with locating pin (2121) on the first connecting plate, be equipped with second connecting plate (312) on the second side pipe, be equipped with locating hole (3121) on the second connecting plate.
4. The pier cap steel bar working frame according to claim 3, wherein: first waist shape hole (2122) is correspondingly arranged on the first connecting plate and the fastening nut, second waist shape hole (3122) is correspondingly arranged on the second connecting plate and the first waist shape hole, and the first waist shape hole and the second waist shape hole are arranged vertically relatively.
5. The pier cap steel bar working frame according to claim 4, wherein: the opposite surfaces of the first connecting plate and the second connecting plate are provided with rubber sheets.
6. The pier cap steel bar working frame according to claim 5, wherein: a plurality of protective nets (5) are circumferentially arranged on the first frame body.
7. The pier cap steel bar working frame according to claim 6, wherein: a stair (6) is arranged in the first frame body.
CN201920367476.7U 2019-10-31 2019-10-31 Pier cap steel bar working frame Active CN209760047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920367476.7U CN209760047U (en) 2019-10-31 2019-10-31 Pier cap steel bar working frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920367476.7U CN209760047U (en) 2019-10-31 2019-10-31 Pier cap steel bar working frame

Publications (1)

Publication Number Publication Date
CN209760047U true CN209760047U (en) 2019-12-10

Family

ID=68755737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920367476.7U Active CN209760047U (en) 2019-10-31 2019-10-31 Pier cap steel bar working frame

Country Status (1)

Country Link
CN (1) CN209760047U (en)

Similar Documents

Publication Publication Date Title
CN107675624B (en) Universal assembled telescopic buttress for disc buckle type cat ladder
CN210598199U (en) Accurate quick PC post mounting tool
CN209760047U (en) Pier cap steel bar working frame
CN210918296U (en) Square steel pipe sleeve fixing device
CN103075001A (en) Steel tube fastener slip form platform system
CN206034875U (en) Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device
CN101768925A (en) Mounting equipment of beam falling prevention stopping block and construction method thereof
CN205676918U (en) A kind of underlying structure of tower crane steel Platform pipe column foundation
CN101922244B (en) Folding portable stair for building construction working layer
CN210150645U (en) Wet seam construction formwork lifting device of bridge
CN210976550U (en) Adjustable fastening tool type externally-hung protection frame system
CN210658029U (en) Integral hoisting type steel bar construction platform
CN113202281A (en) Building templates operation platform
CN201714048U (en) Chrysanthemum clip connection type scaffold
CN219862417U (en) Safe cat ladder formula construction structures of bridge side mound
CN219930799U (en) Wave-shaped guardrail with labor-saving installation
CN218261702U (en) Thin-wall type assembled tower crane anchoring and drawknot device
CN213390911U (en) Node of hanging of shock attenuation stair
CN221321720U (en) Climb frame installation and attach wall auxiliary steel support for support
CN215717454U (en) Indoor elevator shaft protection device
CN213331119U (en) Template platform truck ladder platform structure
CN212671131U (en) Can promote inserted lift scaffold
CN213174745U (en) Support bracket device for climbing frame
CN220179787U (en) Auxiliary device for percussion drill construction
CN201722912U (en) Transverse support rod of scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 9, Changfeng 1st Branch Road, Industrial Park, Dinghai District, Zhoushan City, Zhejiang Province, 316000

Patentee after: Zhejiang Lidao Steel Structure Engineering Co.,Ltd.

Address before: 316000 No. 9, Changfeng 1st branch road, Dinghai Industrial Park, Dinghai District, Zhoushan City, Zhejiang Province

Patentee before: Zhejiang Lidao Marine Equipment Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Pier cap reinforcement work frame

Effective date of registration: 20230620

Granted publication date: 20191210

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Zhoushan Dinghai Chengnan small and micro enterprise franchise sub branch

Pledgor: Zhejiang Lidao Steel Structure Engineering Co.,Ltd.

Registration number: Y2023330001226

PE01 Entry into force of the registration of the contract for pledge of patent right