CN209747972U - A distribution box installation structure - Google Patents
A distribution box installation structure Download PDFInfo
- Publication number
- CN209747972U CN209747972U CN201920336291.XU CN201920336291U CN209747972U CN 209747972 U CN209747972 U CN 209747972U CN 201920336291 U CN201920336291 U CN 201920336291U CN 209747972 U CN209747972 U CN 209747972U
- Authority
- CN
- China
- Prior art keywords
- cooling water
- side plate
- distribution box
- plate
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及配电箱安装的技术领域,尤其是涉及一种配电箱安装结构。The utility model relates to the technical field of distribution box installation, in particular to a distribution box installation structure.
背景技术Background technique
配电柜,广泛适用于变电站、发电厂、工矿企业等,是照明及配电的电能转换及控制之用,具有分断能力强,动热稳定性好,电气方案引灵活,组合方便,系列性、实用性强,结构新颖等特点。Power distribution cabinet is widely used in substations, power plants, industrial and mining enterprises, etc. It is used for power conversion and control of lighting and power distribution. It has strong breaking capacity, good dynamic and thermal stability, flexible electrical scheme, convenient combination, and series , Strong practicability, novel structure and so on.
配电柜通常包括配电箱本体,配电箱本体内设置有电气元件、仪表、开关和线路,配电柜通常安装于地面,在地面上设置多个底角螺丝,在配电柜下面安装底板,底板上设置有多个螺纹孔,底角螺丝穿过底板与地面螺纹连接,从而将配电柜安装于地面。The power distribution cabinet usually includes a distribution box body, which is equipped with electrical components, instruments, switches and lines. The power distribution cabinet is usually installed on the ground, and a plurality of bottom corner screws are set on the ground, and installed under the power distribution The base plate is provided with a plurality of threaded holes, and the bottom corner screws pass through the base plate and are threadedly connected with the ground, so that the power distribution cabinet is installed on the ground.
但是,配电柜在使用过程中,电器元件将发热,从而导致配电柜内整体温度较高,而配电柜本身又是密封式结构,不便于散热。However, during the use of the power distribution cabinet, the electrical components will generate heat, resulting in a higher overall temperature in the power distribution cabinet, and the power distribution cabinet itself is a sealed structure, which is not easy to dissipate heat.
实用新型内容Utility model content
本实用新型的目的是提供一种便于散热的配电箱安装结构。The purpose of the utility model is to provide a distribution box installation structure which is convenient for heat dissipation.
本实用新型的上述实用新型目的是通过以下技术方案得以实现的:The above-mentioned utility model purpose of the utility model is achieved by the following technical solutions:
一种配电箱安装结构,包括配电箱本体,所述配电箱本体的外侧设置有壳体,壳体为中空形的长方体状,壳体包括顶板、侧板、底板和安装门,安装门及侧板位于底板和顶板之间,侧板为导热性材质的侧板且内壁与配电箱本体的外壁贴合,侧板连通有冷却水循环装置,壳体的底端连接有安装座,安装座与地面之间设置有锁紧结构。A distribution box installation structure, comprising a distribution box body, the outer side of the distribution box body is provided with a shell, the shell is a hollow cuboid shape, the shell includes a top plate, a side plate, a bottom plate and an installation door, and the installation The door and the side plate are located between the bottom plate and the top plate. The side plate is made of thermally conductive material and the inner wall is attached to the outer wall of the distribution box body. The side plate is connected with a cooling water circulation device, and the bottom end of the shell is connected with a mounting seat. A locking structure is arranged between the mounting base and the ground.
通过采用上述技术方案,壳体通过安装座安装于地面,从而将配电箱本体安装于壳体内,壳体的侧板与配电箱本体的侧壁贴合,且侧板连通有冷却水循环装置,通过冷却水循环装置降低侧板表面的温度,从而降低配电箱本体侧壁的温度,有助于配电箱本体的散热。By adopting the above technical solution, the housing is installed on the ground through the mounting seat, so that the distribution box body is installed in the housing, the side plate of the housing is attached to the side wall of the distribution box body, and the side plate is connected with a cooling water circulation device , through the cooling water circulation device to reduce the temperature of the surface of the side plate, thereby reducing the temperature of the side wall of the distribution box body, which helps the heat dissipation of the distribution box body.
本实用新型进一步设置为:所述冷却水循环装置包括冷却水箱,冷却水箱内放置有冰块,冷却水箱与侧板之间连通有冷却水管,冷却水管与冷却水箱之间设置有水泵。The utility model is further configured as follows: the cooling water circulation device includes a cooling water tank, ice cubes are placed in the cooling water tank, a cooling water pipe is connected between the cooling water tank and the side plate, and a water pump is arranged between the cooling water pipe and the cooling water tank.
通过采用上述技术方案,冰块的设置可确保冷却水箱内的水流为冷水,水泵带动水流由冷却水箱流至冷却水管,再由冷却水管流至侧板内,通过侧板降低配电箱侧壁的温度,冷却水箱及冷水泵的设置比较简单,便于安装与使用。By adopting the above technical scheme, the setting of ice cubes can ensure that the water flow in the cooling water tank is cold water, and the water pump drives the water flow from the cooling water tank to the cooling water pipe, and then flows from the cooling water pipe to the side plate, and lowers the side wall of the distribution box through the side plate The setting of the cooling water tank and the cooling water pump is relatively simple, which is convenient for installation and use.
本实用新型进一步设置为:所述冷却水管远离冷却水箱的一端延伸至侧板的内部并沿侧板的表面由下而上环绕设置,端头处与冷却水箱连通形成闭合回路。The utility model is further set as: the end of the cooling water pipe away from the cooling water tank extends to the inside of the side plate and surrounds the surface of the side plate from bottom to top, and the end communicates with the cooling water tank to form a closed loop.
通过采用上述技术方案,冷却水管延伸至侧板的内部,可减少冷水的循环量,节约水资源,同时,水管具有导向作用,可加快冷水于侧板内部的流动速度,冷却水管环绕设置即可实现对配电箱本体侧壁的降温功能。By adopting the above technical solution, the cooling water pipe extends to the inside of the side plate, which can reduce the circulation of cold water and save water resources. At the same time, the water pipe has a guiding function, which can speed up the flow of cold water inside the side plate, and the cooling water pipe can be arranged around it. Realize the cooling function of the side wall of the distribution box body.
本实用新型进一步设置为:所述配电箱本体的顶端及顶板的底端开设有多个散热孔,顶板连通有吸风装置,转动门上开设有多个用于平衡气压的通气孔。The utility model is further configured as follows: the top of the distribution box body and the bottom of the top plate are provided with a plurality of cooling holes, the top plate is connected with a suction device, and the revolving door is provided with a plurality of ventilation holes for balancing the air pressure.
通过采用上述技术方案,吸风装置将壳体内的热气抽出,空气再由通气孔进入壳体内,以平衡壳体内的气压,吸风装置的设置可将配电箱本体内的热气抽出,从而加速配电箱本体的散热,进一步保护配电箱本体,延长配电箱本体的使用寿命。By adopting the above-mentioned technical scheme, the air suction device draws out the hot air in the casing, and the air enters the casing through the vent hole to balance the air pressure in the casing. The setting of the air suction device can extract the hot air in the distribution box body, thereby accelerating The heat dissipation of the distribution box body further protects the distribution box body and prolongs the service life of the distribution box body.
本实用新型进一步设置为:所述吸风装置包括吸风机,吸风机与顶板之间连通有吸风管。The utility model is further configured as follows: the air suction device includes a suction fan, and a suction pipe is connected between the suction fan and the top plate.
通过采用上述技术方案,吸风机主要由电动机、风叶、机壳、进风滤网、风嘴等组成,电动机转动,带动风叶高速旋转,从而将壳体内的热气抽出,有助于配电柜的散热;吸风机的结构及原理简单,便于安装与使用。By adopting the above technical scheme, the suction fan is mainly composed of a motor, fan blades, casing, air inlet filter, air nozzle, etc. The rotation of the motor drives the fan blades to rotate at a high speed, thereby extracting the hot air in the casing, which is helpful for power distribution The heat dissipation of the cabinet; the structure and principle of the suction fan are simple, easy to install and use.
本实用新型进一步设置为:所述顶板开设有容置腔,容置腔内设置有吸尘棉。The utility model is further configured as follows: the top plate is provided with an accommodating cavity, and dust-absorbing cotton is arranged in the accommodating cavity.
通过采用上述技术方案,当吸风机将壳体内的热气抽走时,吸尘棉对热气进行初步过滤,以减少灰尘进入吸风机内,减小灰尘对吸风机的影响,延长吸风机的使用寿命。By adopting the above technical scheme, when the suction fan sucks away the hot air in the casing, the dust-absorbing cotton performs preliminary filtration on the hot air to reduce the dust entering into the suction fan, reduce the influence of dust on the suction fan, and prolong the service life of the suction fan.
本实用新型进一步设置为:所述吸尘棉的一端凸出容置腔。The utility model is further configured as: one end of the dust-absorbing cotton protrudes from the accommodating cavity.
通过采用上述技术方案,在长期使用下,吸尘棉将吸附过多的灰尘,此时,可用手抓住吸尘棉凸出的部分,从而将吸尘棉由容置腔内取出,便于对吸尘棉进行清理或更换,提高使用的便利性。By adopting the above-mentioned technical scheme, the dust-absorbing cotton will absorb too much dust under long-term use. The vacuum cotton is cleaned or replaced to improve the convenience of use.
本实用新型进一步设置为:所述安装座的顶端的表面积大于壳体底端的表面积,锁紧结构包括设置于安装座上的多个锁紧螺栓,锁紧螺栓穿过安装座并与地面螺纹连接。The utility model is further set as: the surface area of the top of the mounting seat is greater than the surface area of the bottom of the housing, the locking structure includes a plurality of locking bolts arranged on the mounting seat, the locking bolts pass through the mounting seat and are threadedly connected with the ground .
通过采用上述技术方案,拧紧锁紧螺栓即可将安装座临时固定于地面,需要拆卸时,也只需拧松锁紧螺栓即可,锁紧螺栓的结构简单,使用方便。By adopting the above technical scheme, the mounting base can be temporarily fixed on the ground by tightening the locking bolt, and only need to loosen the locking bolt when it needs to be disassembled. The locking bolt has a simple structure and is easy to use.
本实用新型进一步设置为:所述底板的顶端开设有滑槽,滑槽内设置有滑块,滑块与配电柜本体的底端连接。The utility model is further configured as follows: a chute is provided on the top of the bottom plate, a slider is arranged in the chute, and the slider is connected to the bottom of the power distribution cabinet body.
通过采用上述技术方案,需要对配电柜本体进行维修时,可将滑块沿滑槽的长度方向滑动,从而将配电柜本体由滑槽内滑出,滑块与滑槽的设置可减小配电柜本体的底端与壳体底端接触的面积,减小摩擦力,便于将配电柜本体滑出,从而便于实现对配电柜本体的维修。By adopting the above technical scheme, when the main body of the power distribution cabinet needs to be maintained, the slider can be slid along the length direction of the chute, so that the main body of the power distribution cabinet can be slid out of the chute, and the setting of the slider and the chute can reduce the The contact area between the bottom end of the power distribution cabinet body and the bottom end of the shell is small, which reduces the frictional force and facilitates the sliding out of the power distribution cabinet body, thereby facilitating the maintenance of the power distribution cabinet body.
本实用新型进一步设置为:所述侧板为铝合金材质的侧板。The utility model is further configured as follows: the side plate is a side plate made of aluminum alloy.
通过采用上述技术方案,铝合金材质具有良好的导热系数,从而将冷却水管内冷水较低的温度传至配电箱本体的侧壁,实现对配电箱本体的散热过程。By adopting the above technical solution, the aluminum alloy material has a good thermal conductivity, so that the lower temperature of the cold water in the cooling water pipe is transmitted to the side wall of the distribution box body to realize the heat dissipation process of the distribution box body.
综上所述,本实用新型的有益技术效果为:In summary, the beneficial technical effects of the utility model are:
1.侧板的内壁与配电箱本体的外壁贴合,侧板连通有冷却水循环装置,水泵带动冷却水由冷却水箱流动至冷却管内,再于侧板内环绕,从而将配电箱本体的侧壁进行包裹,以实现对配电箱本体的降温过程,达到便于配电箱本体散热的效果;1. The inner wall of the side plate is attached to the outer wall of the distribution box body. The side plate is connected with a cooling water circulation device. The water pump drives the cooling water to flow from the cooling water tank to the cooling pipe, and then surrounds the side plate, so that the distribution box body The side wall is wrapped to realize the cooling process of the distribution box body and achieve the effect of facilitating the heat dissipation of the distribution box body;
2.吸风装置可将配电箱本体内的热气抽出,加快配电箱的散热过程;2. The air suction device can extract the hot air in the distribution box body to speed up the heat dissipation process of the distribution box;
3.吸尘棉的设置可减小灰尘进入吸风机的可能性,从而减小灰尘对吸风机的干扰,延长吸风机的使用寿命。3. The setting of dust-absorbing cotton can reduce the possibility of dust entering the suction fan, thereby reducing the interference of dust on the suction fan and prolonging the service life of the suction fan.
附图说明Description of drawings
图1是本实用新型的整体结构示意图;Fig. 1 is the overall structural representation of the utility model;
图2是壳体隐藏安装门后的结构示意图;Fig. 2 is a schematic diagram of the structure behind the hidden installation door of the housing;
图3是本实用新型体现冷却水管排布的结构示意图。Fig. 3 is a structural schematic diagram of the utility model embodying the arrangement of cooling water pipes.
图中,1、安装座;11、锁紧螺栓;2、壳体;21、底板;22、侧板;221、安装门;2211、通气孔;222、滑槽;23、顶板;231、容置腔;2311、吸尘棉;3、配电箱本体;31、滑块;32、散热孔;4、冷却水循环装置;41、冷却水箱;411、箱盖;42、冷却水管;43、水泵;5、吸风装置;51、吸风机;52、吸风管;6、地面。In the figure, 1, installation base; 11, locking bolt; 2, shell; 21, bottom plate; 22, side plate; 221, installation door; 2311, dust-absorbing cotton; 3, distribution box body; 31, slider; 32, cooling holes; 4, cooling water circulation device; 41, cooling water tank; 411, box cover; 42, cooling water pipe; 43, water pump ; 5, suction device; 51, suction fan; 52, suction pipe; 6, ground.
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.
参照图1,为本实用新型公开的一种配电箱安装结构,包括安装座1,安装座1的顶端连接有壳体2,壳体2内设置有配电箱本体3,壳体2连通有冷却水循环装置4,壳体2的顶端连接有吸风装置5。Referring to Fig. 1, it is a distribution box installation structure disclosed by the utility model, which includes a mounting base 1, a housing 2 is connected to the top of the mounting base 1, a distribution box body 3 is arranged inside the housing 2, and the housing 2 communicates with A cooling water circulation device 4 is provided, and a suction device 5 is connected to the top of the casing 2 .
安装座1为水平设置的长方体板状结构,底端与地面6抵接,顶端设置有多个锁紧螺栓11,锁紧螺栓11穿过安装座1且端头与地面6螺纹连接,从而将安装座1临时固定于地面6。The mounting base 1 is a rectangular parallelepiped plate structure arranged horizontally, the bottom end is in contact with the ground 6, and a plurality of locking bolts 11 are arranged on the top end, the locking bolts 11 pass through the mounting base 1 and the ends are screwed to the ground 6, thereby The mounting base 1 is temporarily fixed on the ground 6 .
参照图1,安装座1的顶端设置有壳体2,壳体2为长方体壳状结构,壳体2的顶端即为顶板23,底端为底板21,底板21的表面积小于安装座1的表面积,底板21的底端与安装座1的顶端固定连接。底板21与顶板23之间设置有安装门221,安装门221的两侧及相对侧均为侧板22,侧板22为铝合金材质,安装门221与侧板22铰接,铰接轴位于竖直平面内。Referring to Fig. 1, a housing 2 is provided on the top of the mounting base 1, the housing 2 is a rectangular parallelepiped shell structure, the top of the housing 2 is the top plate 23, and the bottom end is the bottom plate 21, the surface area of the bottom plate 21 is smaller than the surface area of the mounting base 1 , the bottom end of the bottom plate 21 is fixedly connected with the top end of the mounting seat 1 . An installation door 221 is arranged between the base plate 21 and the top board 23. Both sides and the opposite side of the installation door 221 are side panels 22. The side panels 22 are made of aluminum alloy. in plane.
参照图1,壳体2内设置有配电箱本体3,配电箱本体3为长方体壳状结构,靠近安装门221的一侧呈缺口状,底端与底板21的顶端滑移连接。参照图2,配电箱本体3的底端连接有滑块31,底板21的顶端开设有与滑块31相适配的滑槽222。Referring to FIG. 1 , the housing 2 is provided with a distribution box body 3 . The distribution box body 3 is a rectangular parallelepiped shell-shaped structure. Referring to FIG. 2 , the bottom end of the distribution box body 3 is connected with a slide block 31 , and the top end of the bottom plate 21 is provided with a slide groove 222 matching with the slide block 31 .
需要安装配电柜时,首先将安装座1安装于地面6,即可将壳体2临时固定于地面6,再将配电箱本体3沿滑槽222滑入壳体2内,即可将配电箱本体3临时固定于壳体2内,实现配电箱本体3的初步安装,并且,需要维修时,也只需将配电箱本体3由滑槽222内滑出即可,便于安装与维修。When the power distribution cabinet needs to be installed, first install the mounting base 1 on the ground 6, then temporarily fix the housing 2 on the ground 6, then slide the distribution box body 3 into the housing 2 along the chute 222, and then the The distribution box body 3 is temporarily fixed in the housing 2 to realize the preliminary installation of the distribution box body 3, and when maintenance is required, it is only necessary to slide the distribution box body 3 out of the chute 222, which is convenient for installation and maintenance.
参照图1,侧板22连通有冷却水循环装置4,冷却水循环装置4包括冷却水箱41。冷却水箱41连通有冷却水管42,冷却水管42远离冷却水箱41的一端延伸至侧板22的内部,并沿三个侧板22的内部由下而上环绕设置,结合图3为冷却水管42的环绕方式,最终,冷却水管42的端头再延伸至冷却水箱41的顶端。Referring to FIG. 1 , the side plate 22 communicates with a cooling water circulation device 4 , and the cooling water circulation device 4 includes a cooling water tank 41 . The cooling water tank 41 is communicated with a cooling water pipe 42, and the cooling water pipe 42 extends from one end away from the cooling water tank 41 to the inside of the side plate 22, and is arranged around the inside of the three side plates 22 from bottom to top. In a circular manner, finally, the end of the cooling water pipe 42 extends to the top of the cooling water tank 41 .
可于冷却水箱41内加入冰块,冰块可降低冷却水箱41内水流的温度。冷却水箱41的顶端铰接有箱盖411,铰接轴位于水平面内。冰块融化后,可打开箱盖411,再于冷却水箱41内补加冰块。Ice cubes can be added in the cooling water tank 41 , and the ice cubes can reduce the temperature of the water flow in the cooling water tank 41 . The top of the cooling water tank 41 is hinged with a case cover 411, and the hinge axis is located in the horizontal plane. After the ice cubes melted, the case cover 411 could be opened, and ice cubes could be added in the cooling water tank 41 again.
参照图2,冷却水箱41与冷却水管42之间设置有水泵43。水泵43带动水流由冷却水箱41流至冷却水管42,再沿冷却水管42环绕配电箱本体3的外壁流动,最终流回至冷却水箱41内,在冰块的作用下,冷却水箱41内水流的温度始终较低。Referring to FIG. 2 , a water pump 43 is provided between the cooling water tank 41 and the cooling water pipe 42 . The water pump 43 drives the water flow from the cooling water tank 41 to the cooling water pipe 42, then flows around the outer wall of the distribution box body 3 along the cooling water pipe 42, and finally flows back into the cooling water tank 41. Under the action of ice cubes, the water flow in the cooling water tank 41 temperature is always low.
参照图2,顶板23内开设有容置腔231,容置腔231为长方体状的空腔,长度方向的一端贯穿顶板23的一侧,容置腔231内设置有吸尘棉2311,吸尘棉2311长度方向的一端凸出容置腔231。顶板23的底端及配电箱本体3的顶端开设有多个散热孔32,散热孔32为条状的通孔。Referring to Fig. 2, there is an accommodation chamber 231 in the top plate 23, the accommodation chamber 231 is a cuboid cavity, one end of the lengthwise direction runs through one side of the top plate 23, and a dust-absorbing cotton 2311 is arranged in the accommodation chamber 231 to absorb dust. One end of the cotton 2311 in the length direction protrudes from the accommodating cavity 231 . The bottom end of the top plate 23 and the top end of the distribution box body 3 are provided with a plurality of cooling holes 32 , and the cooling holes 32 are strip-shaped through holes.
回看图1,顶板23的顶端连通有吸风装置5。吸风装置5包括吸风机51,吸风机51连通有吸风管52,吸风管52与顶板23连通。当配电箱本体3在使用过程中,内部的电气元件将发热,吸风机51可通过散热孔32将配电箱本体3内的热气抽出,从而加快配电箱本体3的散热过程。吸尘棉2311的设置可减小灰尘被吸入吸风机51的可能性,减小灰尘对吸风机51的干扰,延长吸风机51的使用寿命。当吸尘棉2311吸收的灰尘较多时,可用手握住吸尘棉2311凸出的一端并向外拉动,即可将吸尘棉2311由容置腔231内抽出,以便对吸尘棉2311进行清理或更换。Referring back to FIG. 1 , the top of the top plate 23 is communicated with a suction device 5 . The suction device 5 includes a suction fan 51 , the suction fan 51 communicates with a suction pipe 52 , and the suction pipe 52 communicates with the top plate 23 . When the distribution box body 3 is in use, the internal electrical components will generate heat, and the suction fan 51 can extract the hot air in the distribution box body 3 through the cooling holes 32, thereby speeding up the heat dissipation process of the distribution box body 3 . The setting of the dust-absorbing cotton 2311 can reduce the possibility of dust being sucked into the suction fan 51, reduce the interference of the dust on the suction fan 51, and prolong the service life of the suction fan 51. When the dust-absorbing cotton 2311 absorbs a lot of dust, you can hold the protruding end of the dust-absorbing cotton 2311 and pull it outward, so that the dust-absorbing cotton 2311 can be drawn out from the accommodating cavity 231, so as to clean the dust-absorbing cotton 2311 Clean or replace.
参照图1,安装门221的表面开设有多个通气孔2211,通气孔2211的设置用于平衡壳体2及配电箱本体3内的压力,当吸风机51将热气抽走时,空气中的气流将由通气孔2211进入壳体2内,以实现气体的交换。Referring to Fig. 1, the surface of the installation door 221 is provided with a plurality of ventilation holes 2211, and the ventilation holes 2211 are arranged to balance the pressure in the casing 2 and the distribution box body 3, when the suction fan 51 takes away the hot air, the air in the The air flow will enter the casing 2 through the air hole 2211 to realize gas exchange.
本实施例的实施原理为:The implementation principle of this embodiment is:
首先将安装座1安装于地面6,再将滑块31沿滑槽222的长度方向移动,以将配电箱本体3滑动至壳体2内,即可实现配电箱本体3的安装;长期使用下,配电箱本体3的侧壁将发热,此时,可由冷却水泵43带动水流由冷却水箱41流至冷却水管42,再沿冷却水管42环绕侧板22设置,从而将配电箱本体3的侧壁包裹,实现降温功能;吸风机51还可通过散热孔32将配电箱本体3内的热气抽出,从而加快配电箱本体3的降温速度;冷却水循环装置4及吸风装置5的设置有助于配电箱本体3的散热。First install the mounting base 1 on the ground 6, and then move the slider 31 along the length direction of the chute 222 to slide the distribution box body 3 into the housing 2, and then the installation of the distribution box body 3 can be realized; long-term Under use, the side wall of the distribution box body 3 will generate heat. At this time, the cooling water pump 43 can drive the water flow from the cooling water tank 41 to the cooling water pipe 42, and then surround the side plate 22 along the cooling water pipe 42, so that the distribution box body The side wall of 3 is wrapped to realize the cooling function; the suction fan 51 can also extract the hot air in the distribution box body 3 through the cooling hole 32, thereby accelerating the cooling speed of the distribution box body 3; the cooling water circulation device 4 and the suction device 5 The setting helps the heat dissipation of the distribution box body 3.
本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model accordingly: all equivalent changes made according to the structure, shape and principle of the present utility model are all applicable. Should be covered within the protection scope of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920336291.XU CN209747972U (en) | 2019-03-15 | 2019-03-15 | A distribution box installation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920336291.XU CN209747972U (en) | 2019-03-15 | 2019-03-15 | A distribution box installation structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209747972U true CN209747972U (en) | 2019-12-06 |
Family
ID=68717194
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920336291.XU Expired - Fee Related CN209747972U (en) | 2019-03-15 | 2019-03-15 | A distribution box installation structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209747972U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111223372A (en) * | 2020-01-16 | 2020-06-02 | 滨州学院 | A flexible HVDC converter valve inspection and training platform |
-
2019
- 2019-03-15 CN CN201920336291.XU patent/CN209747972U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111223372A (en) * | 2020-01-16 | 2020-06-02 | 滨州学院 | A flexible HVDC converter valve inspection and training platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206851234U (en) | A power equipment cabinet with cooling function | |
| CN209747972U (en) | A distribution box installation structure | |
| CN203934197U (en) | A kind of outdoor communication cabinet that heat abstractor is housed | |
| CN208316138U (en) | A kind of weak current engineering heat dissipating device for distribution box | |
| CN104080320A (en) | Outdoor communication equipment cabinet provided with heat removal device | |
| CN209929734U (en) | A combined high-voltage ring network cabinet | |
| CN210379945U (en) | Heat radiator for synthesize switch board | |
| CN209658649U (en) | A kind of power distribution cabinet mounting structure | |
| CN220956115U (en) | Explosion-proof exhaust fan | |
| CN220956162U (en) | A shell structure of air suspension centrifugal blower | |
| CN217307049U (en) | A UPS power cabinet with good heat dissipation effect | |
| CN216218318U (en) | Electric automatization cabinet cooling dehydrating unit | |
| CN218006860U (en) | Liquid cooling equipment, integrated cabinet and container | |
| CN206149711U (en) | A cooling device for network communication equipment | |
| CN211743235U (en) | A safety protection structure for a new energy battery | |
| CN203934261U (en) | A kind of outdoor communication cabinet that heat removal apparatus is housed | |
| CN210723820U (en) | Direct current traction substation relay protection device | |
| CN211210356U (en) | Novel load extrinsic cycle heat dissipation device | |
| CN211017956U (en) | Dustproof energy-conserving switch board of high-efficient heat dissipation | |
| CN211351402U (en) | A transformer box with heat dissipation function | |
| CN107807596A (en) | Electric-power metering goods and materials week switch cabinet supervising device | |
| CN218549122U (en) | Novel power distribution cabinet | |
| CN220042754U (en) | Safe heat dissipation type block terminal | |
| CN207908934U (en) | Electric-power metering goods and materials week switch cabinet monitoring device | |
| CN223781522U (en) | High-performance heat-insulating material mute cabinet |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191206 |