CN209726219U - A kind of control system that refuse furnace First air reheats - Google Patents

A kind of control system that refuse furnace First air reheats Download PDF

Info

Publication number
CN209726219U
CN209726219U CN201920230716.9U CN201920230716U CN209726219U CN 209726219 U CN209726219 U CN 209726219U CN 201920230716 U CN201920230716 U CN 201920230716U CN 209726219 U CN209726219 U CN 209726219U
Authority
CN
China
Prior art keywords
air
steam
heater
electric heater
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920230716.9U
Other languages
Chinese (zh)
Inventor
曾勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920230716.9U priority Critical patent/CN209726219U/en
Application granted granted Critical
Publication of CN209726219U publication Critical patent/CN209726219U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model discloses the control systems that a kind of refuse furnace First air reheats, including electric heater and First air steam regenerative air heater, the electric heater outlet side is connected with fire grate lower part ash bucket, the First air steam regenerative air heater upper end is equipped with electric heater, the First air steam regenerative air heater is by being connected with level-one steam extraction from steam turbine from steam turbine level-one steam main pipe, the First air steam regenerative air heater bottom end is connected with primary air fan, the primary air fan is connected with dump pit top air inlet, the electric heater includes fixed plate, pull rod, electric heating tube, tube sheet, temperature tube and terminal box, the side of the electric heating tube is equipped with terminal box, the terminal box is connected with temperature control cabinet.This system heats First air using high-power electric heater, the wind-warm syndrome of controllable boiler First air, make Stabilization Incineration for Garbage Incinerator, solves the problems, such as the burning not easy to control greatly of the big caused furnace temperature fluctuation of refuse thermal value fluctuation and furnace temperature low consumption great amount of fuel oil to stablize furnace temperature.

Description

A kind of control system that refuse furnace First air reheats
Technical field
The utility model relates to the control systems that technical field of combustion equipment more particularly to a kind of refuse furnace First air reheat System.
Background technique
Since house refuse universal water content in China's is high, cinder content is high, calorific value is low, especially Chinese north and south climate difference Greatly, there are also the imbalances of each place economic development, and there are biggish difference for the calorific value of house refuse.Especially north of China, In Winter, spring, since temperature is low, ash content is big (most places are dry and daily life still generallys use fire coal).On mountain Eastern Heze City Yuncheng County MSW Incineration Plant project, since winter-spring season refuse thermal value is low, low (cinder content reaches temperature 45%, calorific value reaches -10 DEG C in 4000kJ/kg or so, the lowest temperature), and the normal burning disposal heat of the rubbish of boiler producer design Value range is 4180~9200kJ/kg, therefore is because of the reduction of refuse thermal value and temperature in the March in annual November to next year Guarantee the stable qualified discharge with flue gas of the ignition temperature of boiler, it has to which a large amount of oil of throwing are combustion-supporting, although can guarantee to fire in this way Room exit gas temperature is burnt higher than 850 DEG C or more and the residence time is greater than 2 seconds (" consumer waste incineration contamination control standard " GB18485-2014), but it is difficult to ensure the full combustion of rubbish and clinker ignition loss≤5% of clinker, and can consumes big The fuel oil of amount leads to the waste of resource and influences the economic benefit in power plant, at present in country's refuse-burning plant actual motion, still The operation of waste incinerator cannot be stablized, to ensure flue gas qualified discharge.
Utility model content
The purpose of this utility model is to provide the control systems that a kind of refuse furnace First air reheats, and have control wind Temperature solves the problems of the prior art the characteristics of economizing on resources.
To achieve the above object, the utility model provides the following technical solutions: a kind of control that refuse furnace First air reheats System processed, including electric heater and First air steam regenerative air heater, the First air steam regenerative air heater upper end connect Saturated vapor machine is connected to from drum, the electric heater outlet side is connected with fire grate lower part ash bucket, the First air steam-type Air preheater upper end is equipped with electric heater, and the First air steam regenerative air heater is by from steam turbine level-one steam main pipe Level-one steam extraction is connected with from steam turbine, is connected with by the hydrophobic main pipe of low pressure to removing in the middle part of the First air steam regenerative air heater Oxygen device, the First air steam regenerative air heater lower end are connected with by high pressure draining main pipe to pressure hydrophobic development unit, institute It states First air steam regenerative air heater bottom end and is connected with primary air fan, the primary air fan is connected with the air draught of dump pit top Mouthful, the electric heater includes fixed plate, pull rod, electric heating tube, tube sheet, temperature tube and terminal box, the electric heating tube two sides Equipped with pull rod, the pull rod both ends are connected with fixed plate and tube sheet, are equipped with temperature tube in the middle part of one end of the electric heating tube, institute The side for stating electric heating tube is equipped with terminal box, and the terminal box is connected with temperature control cabinet.
Preferably, fire grate lower part ash bucket is divided into upper and lower part, and is arranged with first row and secondary series.
Preferably, between the primary air fan and dump pit top air inlet, between fire grate lower part ash bucket and electric heater It is equipped with combination air door.
Preferably, the temperature control cabinet connects electric heater by connecting terminal, and temperature control cabinet includes overtemperature alarm Instrument, temperature control instrument, triggering instrument, cooling fan and user's remote cabling end.
Preferably, power supply indicator, run indicator, overtemperature alarm lamp, heating control are equipped with outside the temperature control cabinet Button, divide-shut brake and local long-range switch processed.
Compared with prior art, the beneficial effects of the utility model are as follows:
The control system that the refuse furnace First air of the utility model reheats, on the basis of an original wind-warm syndrome, investment The electric heater of certain power, wind-warm syndrome can further increase, it is ensured that stable operation of the boiler, flue gas qualified discharge, in two furnaces, one machine Under operating condition (winter, January), First air air quantity is 50000m3/h, at 200 DEG C of wind-warm syndrome, puts into 4 groups of 50KW to 1# boiler Electric heater after, First air wind-warm syndrome can quickly increase about 15 DEG C (10 minutes or so), can according to First air uninterrupted into The power of row increase and decrease electric heater, i.e. furnace temperature change, and using SCR control output power, quickly adjust Power operation temperature, Boiler low-temperature and overtemperature are prevented, flue gas emission index and boiler operatiopn period are influenced, configures corresponding protection, interlocking and PLC A distant place and local operation are realized in control, it is ensured that heater safe and stable operation, wherein primary using the heating of high-power electric heater Wind can control the wind-warm syndrome of boiler First air, make Stabilization Incineration for Garbage Incinerator, solve the big caused furnace temperature wave of refuse thermal value fluctuation Dynamic big burning not easy to control and furnace temperature low consumption great amount of fuel oil are come the problem of stablizing furnace temperature.
Detailed description of the invention
Fig. 1 is the systematic schematic diagram of the utility model;
Fig. 2 is the electric heater structure figure of the utility model;
Fig. 3 is the temperature control cabinet electrical schematic diagram of the utility model;
Fig. 4 is the electric heater and temperature control cabinet catenation principle figure of the utility model;
Fig. 5 is the terminals subgraph of the utility model;
Fig. 6 is the temperature control cabinet outside drawing of the utility model.
In figure: 1, level-one steam extraction is from steam turbine;2, from steam turbine level-one steam main pipe;3, First air steam regenerative air heater; 4, electric heater;41, fixed plate;42, pull rod;43, electric heating tube;44, tube sheet;45, temperature tube;46, terminal box;5, steam-type The hydrophobic main pipe of air preheater low pressure;6, steam regenerative air heater high pressure draining main pipe;7, pressure hydrophobic development unit;8, deoxygenation Device;9, primary air fan;10, dump pit top air inlet;11, fire grate lower part ash bucket;12, saturated vapor machine comes from drum;13, warm Spend control cabinet;14, local long-range switch;15, overtemperature alarm lamp;16, run indicator;17, divide-shut brake;18, computer heating control Button;19, power supply indicator;20, cooling fan;21, user's remote cabling end;22, temperature control instrument;23, overtemperature alarm Instrument;24, instrument is triggered;25, connecting terminal.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-6, a kind of control system that refuse furnace First air reheats, including electric heater 4 and First air is please referred to steam Vapour regenerative air heater 3,3 upper end of First air steam regenerative air heater are connected with saturated vapor machine from drum 12, electric heating 4 outlet side of device is connected with fire grate lower part ash bucket 11, and the First air after heating enters fire grate lower part ash bucket 11, fire grate lower part ash bucket 11 It is divided into upper and lower part, and is arranged with first row and secondary series, 3 upper end of First air steam regenerative air heater is equipped with electric heating Device 4, First air steam regenerative air heater 3 is by being connected with level-one steam extraction from steam turbine 1, once from steam turbine level-one steam main pipe 2 It is connected with by the hydrophobic main pipe 5 of steam regenerative air heater low pressure to oxygen-eliminating device 8 in the middle part of wind steam regenerative air heater 3, once 3 lower end of wind steam regenerative air heater is connected with by steam regenerative air heater high pressure draining main pipe 6 to pressure dewatering capacity-enlarging Device 7,3 bottom end of First air steam regenerative air heater are connected with primary air fan 9, primary air fan 9 and dump pit top air inlet 10 Between, combination air door is equipped between fire grate lower part ash bucket 11 and electric heater 4, primary air fan 9 is connected with the suction of dump pit top Air port 10, electric heater 4 include fixed plate 41, pull rod 42, electric heating tube 43, tube sheet 44, temperature tube 45 and terminal box 46, and electricity adds 43 two sides of heat pipe are equipped with pull rod 42, and 42 both ends of pull rod are connected with fixed plate 41 and tube sheet 44, peace in the middle part of one end of electric heating tube 43 Equipped with temperature tube 45, the side of electric heating tube 43 is equipped with terminal box 46, and terminal box 46 is connected with temperature control cabinet 13, temperature control Cabinet 13 connects electric heater 4 by connecting terminal 25, and temperature control cabinet 13 includes overtemperature alarm instrument 23, temperature control instrument 22, instrument 24, cooling fan 20 and user's remote cabling end 21 are triggered, be equipped with outside temperature control cabinet 13 power supply indicator 19, Run indicator 16, overtemperature alarm lamp 15, computer heating control button 18, divide-shut brake 17 and local long-range switch 14.
Working principle: it is done because the main function of domestic waste incineration combustion air First air, Secondary Air is to provide rubbish Dry air quantity and wind-warm syndrome;The air that rubbish full combustion is provided and is burnt;Reinforce the disturbance of flue gas in burner hearth;Cooling fire grate etc., By increasing electric heater 4 in steam-type air preheater outlet, by the wind-warm syndrome of two-stage steam-type air preheater outlet into one Step improves, and accelerates the speed that rubbish is dried on fire grate, and be more advantageous to the burning of rubbish, it is ensured that boiler combustion temperature and cigarette Gas qualified discharge.
In summary: the control system that the refuse furnace First air of the utility model reheats, in the base of an original wind-warm syndrome On plinth, the electric heater 4 of certain power is put into, wind-warm syndrome can further increase, it is ensured that stable operation of the boiler, flue gas qualified discharge, Under two furnaces, one machine operating condition (winter, January), First air air quantity is 50000m3/h, at 200 DEG C of wind-warm syndrome, is thrown 1# boiler After the electric heater 4 for entering 4 groups of 50KW, First air wind-warm syndrome can quickly increase about 15 DEG C (10 minutes or so), can be according to First air Uninterrupted is increased and decreased the power of electric heater 4, i.e. furnace temperature changes, and using SCR control output power, quickly adjusts function Rate running temperature, prevents boiler low-temperature and overtemperature, influences flue gas emission index and boiler operatiopn period, configure corresponding protection, It interlocks and PLC is controlled, realize a distant place and local operation, it is ensured that heater safe and stable operation, wherein being added using high-power electricity Hot device 4 heats First air, can control the wind-warm syndrome of boiler First air, makes Stabilization Incineration for Garbage Incinerator, solves refuse thermal value fluctuation The burning not easy to control greatly of furnace temperature fluctuation caused by big and furnace temperature low consumption great amount of fuel oil are come the problem of stablizing furnace temperature.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. the control system that a kind of refuse furnace First air reheats, including electric heater (4) and First air steam-type air preheat Device (3), it is characterised in that: First air steam regenerative air heater (3) upper end is connected with saturated vapor machine from drum (12), electric heater (4) outlet side is connected with fire grate lower part ash bucket (11), the First air steam regenerative air heater (3) upper end is equipped with electric heater (4), and the First air steam regenerative air heater (3) is by from steam turbine level-one steam main pipe (2) it is pre- by steam-type air from the middle part of steam turbine (1), the First air steam regenerative air heater (3) to be connected with level-one steam extraction The hot hydrophobic main pipe of device low pressure (5) is connected with to oxygen-eliminating device (8), and First air steam regenerative air heater (3) lower end passes through steaming Vapour regenerative air heater high pressure draining main pipe (6) is connected with to pressure hydrophobic development unit (7), and the First air steam-type air is pre- Hot device (3) bottom end is connected with primary air fan (9), and the primary air fan (9) is connected with dump pit top air inlet (10), the electricity Heater (4) includes fixed plate (41), pull rod (42), electric heating tube (43), tube sheet (44), temperature tube (45) and terminal box (46), electric heating tube (43) two sides are equipped with pull rod (42), and pull rod (42) both ends are connected with fixed plate (41) and tube sheet (44), it is equipped with temperature tube (45) in the middle part of one end of the electric heating tube (43), the side of the electric heating tube (43), which is equipped with, to be connect Wire box (46), the terminal box (46) are connected with temperature control cabinet (13).
2. the control system that a kind of refuse furnace First air according to claim 1 reheats, it is characterised in that: the fire grate Lower part ash bucket (11) is divided into upper and lower part, and is arranged with first row and secondary series.
3. the control system that a kind of refuse furnace First air according to claim 1 reheats, it is characterised in that: described primary Combination is equipped between blower (9) and dump pit top air inlet (10), between fire grate lower part ash bucket (11) and electric heater (4) Air door.
4. the control system that a kind of refuse furnace First air according to claim 1 reheats, it is characterised in that: the temperature Control cabinet (13) by connecting terminal (25) connection electric heater (4), temperature control cabinet (13) include overtemperature alarm instrument (23), Temperature control instrument (22), triggering instrument (24), cooling fan (20) and user's remote cabling end (21).
5. the control system that a kind of refuse furnace First air according to claim 1 reheats, it is characterised in that: the temperature Power supply indicator (19), run indicator (16), overtemperature alarm lamp (15), computer heating control button are equipped with outside control cabinet (13) (18), divide-shut brake (17) and local long-range switch (14).
CN201920230716.9U 2019-02-22 2019-02-22 A kind of control system that refuse furnace First air reheats Expired - Fee Related CN209726219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920230716.9U CN209726219U (en) 2019-02-22 2019-02-22 A kind of control system that refuse furnace First air reheats

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920230716.9U CN209726219U (en) 2019-02-22 2019-02-22 A kind of control system that refuse furnace First air reheats

Publications (1)

Publication Number Publication Date
CN209726219U true CN209726219U (en) 2019-12-03

Family

ID=68683940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920230716.9U Expired - Fee Related CN209726219U (en) 2019-02-22 2019-02-22 A kind of control system that refuse furnace First air reheats

Country Status (1)

Country Link
CN (1) CN209726219U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109631049A (en) * 2019-02-22 2019-04-16 曾勇 A kind of control system that refuse furnace First air reheats

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109631049A (en) * 2019-02-22 2019-04-16 曾勇 A kind of control system that refuse furnace First air reheats

Similar Documents

Publication Publication Date Title
CN108105757A (en) A kind of novel anti-coking intelligent and high-efficiency type biomass heating furnace
CN102042598A (en) Horizontal garbage incinerator
CN109631049A (en) A kind of control system that refuse furnace First air reheats
CN209726219U (en) A kind of control system that refuse furnace First air reheats
Song et al. Application of automatic control furnace for combustion of biomass briquette fuel for tobacco curing
CN101324345A (en) Biomass semi-gasification heating and cooking high-efficiency energy-saving stove
CN205746866U (en) A kind of ground kiln formula refuse gasification combustion power generation device
CN108253458A (en) A kind of heating-cooking integral biomass combustion furnace
CN205579531U (en) Environment -friendly boiler
CN109990296A (en) Smoke gas circulating type coal and rubbish coupling combustion system
CN209116344U (en) A kind of disposition of garbage as resource and wind store up coupled system
CN204534595U (en) The progressive classification pyrolysis installation of the rubbish preventing bioxin from generating
CN107228369A (en) Material row's structure of biomass boiler
CN208205068U (en) A kind of heating-cooking integral biomass combustion furnace
CN203980295U (en) The combustion air temperature increase device of domestic waste incineration
CN106482333A (en) The garbage fired boiler hot-air system of burning biogas
CN208042119U (en) Parallel-connection type coal-burning powder heat medium heater
CN103953952A (en) Hearth device for biomass furnace
CN201909321U (en) Horizontal type waste incineration boiler
CN204757367U (en) Hot -air furnace
CN204923425U (en) High -efficient anti - enamelware pot stove
CN205878180U (en) City domestic waste innocent treatment complete sets
CN203848495U (en) High-efficiency safe environmental-friendly automatic combusting warming boiler combusting plant fuel
CN206073039U (en) A kind of boiler
CN202328139U (en) Boiler system special for closed circulating phase variable heat supply system of industrial boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

Termination date: 20210222

CF01 Termination of patent right due to non-payment of annual fee