CN209723425U - One kind going out roof pipeline waterproof construction - Google Patents
One kind going out roof pipeline waterproof construction Download PDFInfo
- Publication number
- CN209723425U CN209723425U CN201920142441.3U CN201920142441U CN209723425U CN 209723425 U CN209723425 U CN 209723425U CN 201920142441 U CN201920142441 U CN 201920142441U CN 209723425 U CN209723425 U CN 209723425U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- protective plate
- angled piece
- backplate
- seal groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model relates to one kind to go out roof pipeline waterproof construction, pipeline including prominent roofing, the duct wrap is equipped with water string, the periphery of the water string is equipped with waterproof roll, circumferentially fixed first angled piece of the pipeline, the catch basin of opening upwards is formed between first angled piece and pipeline, the trench bottom that catchments offers conduction hole, and the conduction hole is sealedly connected with aqueduct;First angled piece connects the second angled piece far from one end of pipeline, Open Side Down seal groove is formed between second angled piece and the first angled piece, the protective plate for enclosing pipeline is provided in the seal groove, described protective plate one end is arranged in seal groove, the other end is connected on roofing, the perforation that protective plate is stretched out for aqueduct is offered on the protective plate, the aqueduct stretches out protective plate from perforation.The utility model has the advantages of construction is simple, good water-proof effect.
Description
Technical field
The utility model relates to the technical fields of buildings waterproof, go out roof pipeline waterproof construction more particularly, to one kind.
Background technique
Currently, pipeline usually needs to extend roofing, and pipeline is pierced by roofing and goes out more weakness in most of buildings,
The problems such as being easy to cause infiltration, for this reason, it may be necessary to improve the waterproof performance of roofing and pipeline junction.
Existing processing mode is, sets up defences jacket pipe in the duct wrap of roofing out, waterproof roll is laid with outside water string
Material, waterproof roll one end are arranged on casing, and the other end extends to roofing;Waterproof roll is fixed on pipeline by ferrule.
The processing mode can preferably solve the problems, such as roofing and pipeline junction infiltration.
Prior art among the above has the following deficiencies: due to using ferrule to carry out between waterproof roll and pipeline
It is fixed, it will cause ferrule and tightly destroy very much pipeline, too loose obturation effect is bad.Meanwhile water may be covered on pipeline and roofing
Contact position be easy to cause infiltration.
Utility model content
The purpose of the utility model is to provide one kind to go out roof pipeline waterproof construction, has construction is simple, good water-proof effect
The advantages of.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
One kind going out roof pipeline waterproof construction, and the pipeline including prominent roofing, the duct wrap is equipped with water string,
The periphery of the water string be equipped with waterproof roll, circumferentially fixed first angled piece of the pipeline, first angled piece with
The catch basin of opening upwards is formed between pipeline, the trench bottom that catchments offers conduction hole, and the conduction hole is sealedly connected with
Aqueduct;First angled piece connects the second angled piece, second angled piece and the first angled piece far from one end of pipeline
Between form Open Side Down seal groove, be provided with the protective plate for enclosing pipeline in the seal groove, described protective plate one end is set
It sets in seal groove, the other end is connected on roofing, and the perforation that protective plate is stretched out for aqueduct, institute are offered on the protective plate
It states aqueduct and stretches out protective plate from perforation.
By using above-mentioned technical proposal, the first angled piece is set on pipeline, the first angled piece is formed with pipe side wall
Water in conduit region can be collected by the catch basin of opening upwards, catch basin, then uniformly be discharged to roofing far from pipeline
With the position of the junction of roofing, it is therefore prevented that in the junction of pipeline and roofing, there are water, have the advantages that good water-proof effect;Together
When be sealed in one week setting protective plate of pipeline, prevent water from entering pipeline and roofing link position well, waterproof effect is more
It is good.It avoids due to being fixed between waterproof roll and pipeline using ferrule, will cause ferrule and tightly destroy very much pipeline, too
Loose obturation effect is bad.Meanwhile water may be covered on pipeline and roofing contact position, the problem of be easy to causeing infiltration.
The utility model is further arranged to: the protective plate, which puts on the two sidewalls of one end of seal groove to be provided with, to be had
The tooth engaged of elasticity, tooth engaged tooth tip direction tilt down, and the occlusal crib of inlay card tooth engaged is provided in the seal groove.
By using above-mentioned technical proposal, when installing protective plate, one end with tooth engaged is inserted into seal groove, In
When insertion, tooth engaged is squeezed meeting, and deformation occurs, and then protective plate is inserted into seal groove, and tooth engaged is being caught in occlusal crib
Afterwards, initial position can be reset to, protective plate inlay card is fixed in seal groove.
The utility model is further arranged to: the protective plate includes the first backplate, the second backplate, bolt and fastener,
First backplate and the second backplate are mutually spliced to form the structure for enclosing pipeline, first backplate and the second protective plate difference
It has been outwardly formed in stitching portion to lug, the fastener is fastened on two on lug, and the bolt passes through fastener and two right
Lug fixes the first backplate and the second backplate.
By using above-mentioned technical proposal, into two by protective plate setting, convenient for the installation of protective plate;Fastener is being protected
It is closed at plate docking, prevents water from infiltrating into pipeline external, waterproof effect from the stitching portion of the first protective plate and the second protective plate
Fruit is good.
The utility model is further arranged to: the waterproof roll pours one layer of mortar for one week in pipeline.
By using above-mentioned technical proposal, waterproof roll is fixed on pipeline by mortar, sealing effect is good, cost
It is low.
The utility model is further arranged to: the screed is laid with from pipeline to roofing, the thickness court of the screed
It is gradually risen to the direction of pipeline.
By using above-mentioned technical proposal, pipeline is made into the landform with certain slope, it can be smoothly by pipe
Rainwater at road is drained, and prevents rainwater from depositing at pipeline, pipeline is caused to leak.
The utility model is further arranged to: the aqueduct is to be threadedly coupled with conduction hole.
By using above-mentioned technical proposal, convenient for the transport and installation of pipeline, during installation, aqueduct is individually set up i.e.
Can, convenient transportation is easy to operate.
The utility model is further arranged to: the trench bottom that catchments is to gradually decreasing at conduction hole.
By using above-mentioned technical proposal, the bottom of catch basin is arranged to certain gradient, the gradient towards at conduction hole by
It gradually reduces, water can be timely discharged out of catch basin, prevent water from assembling in catch basin.
The utility model is further arranged to: fire proofing and dubbin are equipped between the pipeline and water string
Cream.
By using above-mentioned technical proposal, fire proofing and waterproofing unction, waterproof are set between pipeline and water string
Effect is more preferable.
In conclusion the advantageous effects of the utility model are as follows:
1. the rainwater in pipeline upper area is collected into catch basin by rainfall, then pass through aqueduct
Water is discharged, while being sealed in one week setting protective plate of pipeline on roofing for guidance, prevent well water enter pipeline with
Roofing link position has the advantages of construction is simple, good water-proof effect;
2. by the two halves for being arranged to mutually splice by protective plate, convenient for the installation of protective plate, while in the spelling of protective plate
The place's of connecing setting fastener is fastened, and waterproof effect is more preferable.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the enlarged diagram of part A in Fig. 1.
In figure, 1, roofing;2, pipeline;3, water string;4, waterproof roll;5, mortar;6, the first angled piece;61, it catchments
Slot;62, conduction hole;63, aqueduct;7, the second angled piece;71, seal groove;8, protective plate;81, tooth engaged;82, occlusal crib;
83, the first backplate;84, the second backplate;85, bolt;86, fastener;87, to lug.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Figures 1 and 2, is a kind of roof pipeline waterproof construction out disclosed by the utility model, including prominent roofing 1
Pipeline 2 is arranged with water string 3 outside pipeline 2, and water string 3 is made of rigid material, and 3 bottom of water string and roofing 1
Bottom is concordant, and the top of water string 3 is higher by 1 top surface certain distance of roofing, and water string 3, Neng Goubian is arranged in this way
In maintenance pipeline 2, good water-proof effect is practical.Waterproof roll 4,4 one end of waterproof roll are equipped in the periphery of water string 3
It is extended on roofing 1, water string 3 is wrapped in interior and is extended on pipeline 2 by the other end.Outside waterproof roll 4
It is laid with one layer of mortar 5 waterproof roll 4 is fixed on pipeline 2, mortar 5 wraps up the waterproof roll 4 being arranged on pipeline 2 close
Envelope.In fixed first angled piece 6 of the circumferential direction of pipeline 2, the first angled piece 6 and the catch basin 61 that opening upwards are formed before pipeline 2,
Conduction hole 62 is offered in the bottom of catch basin 61, conduction hole 62 is sealedly connected with aqueduct derived from water in catch basin 61
63.The second angled piece 7, shape between the second angled piece 7 and the first angled piece 6 are connected far from one end of pipeline 2 in the first angled piece 6
At the seal groove 71 that Open Side Down, protective plate 8 is inserted in seal groove 71,8 one end of protective plate is arranged in seal groove 71, separately
One end is connected on roofing 1, and the perforation that protective plate 8 is stretched out for aqueduct 63 is offered on protective plate 8, and aqueduct 63 is from perforation
Stretch out protective plate 8.In order to guarantee the sealing performance between the first angled piece 6 and the second angled piece 7, pipeline 2, by pipeline 2, first
Angled piece 6 and the second angled piece 7 are integrally machined molding.Further, timely drain for the ease of the water of surrounding catheter, by sand
Slurry 5 has pipeline 2 to extend laying to roofing 1, and 5 layers of mortar of thickness is gradually risen by the direction of roofing 1 towards pipeline 2, will be managed
It is made into the landform with certain slope around road 2, smoothly the rainwater at pipeline 2 can be drained, prevent rainwater at pipeline 2
Siltation, causes pipeline 2 to leak.With except this, by 61 bottom level of annular collecting vat to gradually decreasing at conduction hole 62, energy
Enough facilitate and catch basin 61 is timely discharged in the water in catch basin 61.
In rainfall, the rainwater in 2 upper area of pipeline is collected into catch basin 61, is then drawn by aqueduct 63
It is directed on roofing 1, water is discharged.It is sealed simultaneously in 2 one weeks setting protective plates 8 of pipeline, prevents water from entering pipeline 2 well
With 1 link position of roofing, waterproof effect is more preferable.
Referring to Fig. 3, stinging with certain elasticity is fixedly installed on one end two sidewalls that protective plate 8 puts in seal groove 71
Tooth 81 is closed, the tooth tip direction of tooth engaged 81 is diagonally downward.The occlusal crib 82 for inlay card tooth engaged 81 is opened up in seal groove 71,
When installing protective plate 8, by one end insertion seal groove 71 with tooth engaged 81, in insertion, tooth engaged 81 is squeezed
Deformation occurs for meeting, and then protective plate 8 is inserted into seal groove 71, and tooth engaged 81 can be reset to initial after being caught in occlusal crib 82
Position, 8 inlay card of protective plate is fixed in seal groove 71.
Referring to Fig. 2, protective plate 8 includes the first backplate 83, the second backplate 84, bolt 85 and fastener 86, the first protective plate 8
With 8 semicircular in shape arc plate of the second protective plate, the first protective plate 8 and the second protective plate 8 can mutually be spliced to form and enclose pipeline 2
Enclosed construction.First protective plate 8 and the second protective plate 8 have been extended outward to form outward respectively at stitching portion to lug 87.Fastener
86 are in U-shape, and when being mutually butted to lug 87, fastener 86 are fastened on two on lug 87, bolt 85 is passed through fastener 86
With two to lug 87, nut is then screwed on bolt 85 first backplate 83 and the second backplate 84 is fixed.
For the ease of the transport and installation of pipeline 2, aqueduct 63 and conduction hole 62 are set as being threadedly coupled, installed
When, aqueduct 63 is individually set up, convenient transportation is easy to operate.
Further, it is equipped with fire proofing and waterproofing unction, between pipeline 2 and water string 3 so as to preferably waterproof.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (8)
1. one kind goes out roof pipeline waterproof construction, the pipeline (2) including prominent roofing (1), it is arranged with outside the pipeline (2) anti-
The periphery of jacket pipe (3), the water string (3) is equipped with waterproof roll (4), it is characterised in that: the pipeline (2) is circumferentially solid
If the first angled piece (6), the catch basin (61) of opening upwards, the collection are formed between first angled piece (6) and pipeline (2)
Sink (61) bottom offers conduction hole (62), and the conduction hole (62) is sealedly connected with aqueduct (63);First right angle
Part (6) connects the second angled piece (7) far from the one end of pipeline (2), between second angled piece (7) and the first angled piece (6)
Open Side Down seal groove (71) is formed, the protective plate (8) for enclosing pipeline (2) is provided in the seal groove (71), it is described anti-
In seal groove (71), the other end is connected on roofing (1) setting of backplate (8) one end, is offered on the protective plate (8) for leading
Water pipe (63) stretches out the perforation of protective plate (8), and the aqueduct (63) stretches out protective plate (8) from perforation.
2. a kind of roof pipeline waterproof construction out according to claim 1, it is characterised in that: the protective plate (8) puts in
Be provided on the two sidewalls of one end of seal groove (71) flexible tooth engaged (81), tooth engaged (81) the tooth tip direction to
Lower inclination, the interior occlusal crib (82) for being provided with inlay card tooth engaged (81) of the seal groove (71).
3. it is according to claim 1 it is a kind of go out roof pipeline waterproof construction, it is characterised in that: the protective plate (8) includes
First backplate (83), the second backplate (84), bolt (85) and fastener (86), first backplate (83) and the second backplate (84)
It is mutually spliced to form the structure for enclosing pipeline (2), first backplate (83) and the second protective plate (8) are outside respectively at stitching portion
It is formed with to lug (87), the fastener (86) is fastened on two on lug (87), and the bolt (85) passes through fastener (86)
It is to lug (87) that the first backplate (83) and the second backplate (84) is fixed with two.
4. it is according to claim 1 it is a kind of go out roof pipeline waterproof construction, it is characterised in that: the waterproof roll (4) in
One week of pipeline (2) pours one layer of mortar (5).
5. a kind of roof pipeline waterproof construction out according to claim 4, it is characterised in that: mortar (5) layer is by pipe
Road (2) is laid with to roofing (1), and the direction of thickness towards the pipeline (2) of mortar (5) layer gradually rises.
6. it is according to claim 1 it is a kind of go out roof pipeline waterproof construction, it is characterised in that: the aqueduct (63) with draw
Discharge orifice (62) is to be threadedly coupled.
7. a kind of roof pipeline waterproof construction out according to claim 1, it is characterised in that: catch basin (61) bottom
It is gradually decreased to conduction hole (62).
8. it is according to claim 1 it is a kind of go out roof pipeline waterproof construction, it is characterised in that: the pipeline (2) and prevent
Fire proofing and waterproofing unction are equipped between jacket pipe (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920142441.3U CN209723425U (en) | 2019-01-25 | 2019-01-25 | One kind going out roof pipeline waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920142441.3U CN209723425U (en) | 2019-01-25 | 2019-01-25 | One kind going out roof pipeline waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209723425U true CN209723425U (en) | 2019-12-03 |
Family
ID=68681533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920142441.3U Active CN209723425U (en) | 2019-01-25 | 2019-01-25 | One kind going out roof pipeline waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209723425U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114961133A (en) * | 2022-05-29 | 2022-08-30 | 中国五冶集团有限公司 | Water-proof device for base of roof newly-built equipment |
CN115262873A (en) * | 2022-07-22 | 2022-11-01 | 中建一局集团第五建筑有限公司 | Go out roofing downspout pre-buried structure |
-
2019
- 2019-01-25 CN CN201920142441.3U patent/CN209723425U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114961133A (en) * | 2022-05-29 | 2022-08-30 | 中国五冶集团有限公司 | Water-proof device for base of roof newly-built equipment |
CN115262873A (en) * | 2022-07-22 | 2022-11-01 | 中建一局集团第五建筑有限公司 | Go out roofing downspout pre-buried structure |
CN115262873B (en) * | 2022-07-22 | 2024-03-26 | 中建一局集团第五建筑有限公司 | Go out pre-buried structure of roofing downspout |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209723425U (en) | One kind going out roof pipeline waterproof construction | |
CN209555955U (en) | Anti- row's integration underdrainage system | |
CN205669229U (en) | A kind of municipal administration gardens rain collector | |
CN209307984U (en) | A kind of novel plastic component for the efficient ecological that saves land | |
CN208472664U (en) | Unidirectional antiseepage composite geo-membrane and the unidirectional leakage preventing structure of composite geo-membrane | |
CN213086850U (en) | Prefabricated assembled hydraulic retaining wall | |
CN206360055U (en) | Di Ku tops H types gutter | |
CN206053156U (en) | A kind of architectural design roof cornice waterproof structure | |
CN209082577U (en) | The anti-row's integral system of shed deckhead | |
CN103726514B (en) | The anti-leakage structure of diaphragm wall and anti-seepage construction method | |
CN207176666U (en) | Drainage hole structure | |
CN206916904U (en) | A kind of flexible water sealing structure | |
CN212612938U (en) | Sealed leak-proof floor drain installation water-discharging treatment device | |
CN209653252U (en) | Drainpipe applied to curtain buildings secretly buries structure | |
CN207392262U (en) | A kind of basement roof waterproof structure for deformation seams | |
CN109610269A (en) | The water suction plank road in gardens | |
CN217710963U (en) | Dam pump house roof waterproof construction | |
CN216516946U (en) | Sealing grouting device for advanced water stop settlement post-cast strip | |
CN215105531U (en) | Socket joint formula antiseep apron | |
CN213390422U (en) | Arrange mouthful mounting structure who cuts dirty in secretly containing | |
CN217001844U (en) | Vertical shaft grouting pipe | |
CN109797668A (en) | A kind of culvert waterproof construction and its construction method | |
CN110397088A (en) | A kind of river shoal operating condition basement advanced water-stop post-pouring zone structure and construction method | |
CN214246347U (en) | Water leakage-proof roof | |
CN219450763U (en) | Soil slope seepage prevention structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |