CN209723045U - Pavement Manhole cover assembly - Google Patents

Pavement Manhole cover assembly Download PDF

Info

Publication number
CN209723045U
CN209723045U CN201920183509.2U CN201920183509U CN209723045U CN 209723045 U CN209723045 U CN 209723045U CN 201920183509 U CN201920183509 U CN 201920183509U CN 209723045 U CN209723045 U CN 209723045U
Authority
CN
China
Prior art keywords
well lid
reinforcing rib
cover assembly
manhole cover
pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920183509.2U
Other languages
Chinese (zh)
Inventor
刘雅民
温志亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huamu Co ltd
Original Assignee
Guangzhou Flower And Wood Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Flower And Wood Co filed Critical Guangzhou Flower And Wood Co
Priority to CN201920183509.2U priority Critical patent/CN209723045U/en
Application granted granted Critical
Publication of CN209723045U publication Critical patent/CN209723045U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to municipal works fields, relate to a kind of pavement Manhole cover assembly, its hollow bearing frame is mounted on hoistway mouth, well lid pallet is removably buckled in bearing frame, the reinforcing rib of domed structure is equipped in well lid pallet, the both ends of reinforcing rib are connected to the two sides of the bottom wall of well lid pallet, reinforcing rib is towards arching upward above well lid pallet, to prevent the depression in centre deformation of well lid pallet, the first finish coat is successively arranged in well lid pallet from top to bottom, first cement sand bed and pea gravel concreten layer, first finish coat and the paving of hoistway mouth surrounding are consistent, reinforcing rib is located in pea gravel concreten layer, the density of pea gravel concreten is higher, it is higher with the conjugation of reinforcing rib, further promote the rigidity of the well lid pallet.

Description

Pavement Manhole cover assembly
Technical field
The utility model relates to municipal works fields, more particularly to a kind of pavement Manhole cover assembly.
Background technique
Existing pavement well lid can generally use metal tray+paving group to pursue the uniformity mated formation It closes, i.e. paving (such as floor tile) is laid in metal tray, then metal tray is covered in hoistway mouth.And current metal support Disk only by bottom plate and is located at the side plate of bottom plate surrounding and constitutes, and bearing capacity is limited, and especially bottom plate is after long-term use It is easy to produce deformation, well lid is caused to be recessed, is extremely easy to happen the falling accident of personnel or object.
Utility model content
To solve the above-mentioned problems, existing to solve the purpose of the utility model is to provide a kind of pavement Manhole cover assembly Formula well lid bearing capacity of mating formation it is lower and the problem of be easy to produce deformation.
Based on this, the utility model provides a kind of pavement Manhole cover assembly, including hollow bearing frame and is embedded at The well lid pallet of the bearing frame, the interior reinforcing rib for being equipped with domed structure of the well lid pallet, the both ends point of the reinforcing rib It is not connected to the two sides of the bottom wall of the well lid pallet, is successively arranged the first finish coat, in the well lid pallet from top to bottom One cement sand bed and pea gravel concreten layer, the reinforcing rib are located in the pea gravel concreten layer.
Preferably, being additionally provided with the deep floor perpendicular with it, the ribs on the bottom wall of the well lid pallet The top of plate is connected to the reinforcing rib.
Preferably, the reinforcing rib includes the first rib and the second rib, first rib and the second rib phase Vertically.
Preferably, further including the hoistway seat frame in back-shaped structure, the bearing frame is located in the hoistway seat frame.
Preferably, further include the pavement structure set on the bearing frame surrounding, the pavement structure include from upper and Under the second finish coat, the second cement sand bed and the concrete cushion that set gradually.
Preferably, the top surface of first finish coat and the top surface of the second finish coat keep flushing.
Preferably, being additionally provided with cement stone dust bed course below the concrete cushion.
Preferably, being equipped with elastic buffering pad between the bearing frame and well lid pallet.
The pavement Manhole cover assembly of the utility model, hollow bearing frame are mounted on hoistway mouth, and well lid pallet is removable It is buckled in bearing frame with unloading, the reinforcing rib of domed structure is equipped in well lid pallet, the both ends of reinforcing rib are connected to well lid The two sides of the bottom wall of pallet, reinforcing rib is towards arching upward above well lid pallet, to prevent the depression in centre deformation of well lid pallet, well lid The first finish coat, the first cement sand bed and pea gravel concreten layer, the first finish coat and well are successively arranged in pallet from top to bottom The paving of road junction surrounding is consistent, and reinforcing rib is located in pea gravel concreten layer, and the density of pea gravel concreten is higher, It is higher with the conjugation of reinforcing rib, further promote the rigidity of the well lid pallet.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the pavement Manhole cover assembly of the utility model embodiment;
Fig. 2 is the partial structural diagram of the pavement Manhole cover assembly of the utility model embodiment.
Wherein, 1, bearing frame;11, elastic buffering pad;2, well lid pallet;21, the first finish coat;22, the first cement mortar Layer;23, pea gravel concreten layer;24, deep floor;3, reinforcing rib;31, the first rib;32, the second rib;4, hoistway seat frame;5, Pavement structure;51, the second finish coat;52, the second cement sand bed;53, concrete cushion;54, cement stone dust bed course.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
Referring to figs. 1 and 2, the pavement Manhole cover assembly for schematically showing the utility model, including hollow Bearing frame 1 and the well lid pallet 2 for being embedded at bearing frame 1.The reinforcing rib 3 of domed structure, reinforcing rib are equipped in well lid pallet 2 3 both ends are connected to the two sides of the bottom wall of well lid pallet 2, and the top of reinforcing rib 3 towards well lid pallet 2 is arched upward, to prevent well The depression in centre deformation of covered tray 2.The first finish coat 21, the first cement sand bed are successively arranged in well lid pallet 2 from top to bottom 22 and pea gravel concreten layer 23, reinforcing rib 3 be located in pea gravel concreten layer 23, the road surface of the first finish coat 21 and hoistway mouth surrounding Mat formation and be consistent, the first cement sand bed 22 is for levelling, and pea gravel concreten is since its density is higher, and microlith is mixed Solidifying soil is higher with the being tightly combined property of reinforcing rib 3, further improves the rigidity of the well lid pallet 2.
The deep floor 24 perpendicular with it is additionally provided on the bottom wall of well lid pallet 2, the top of deep floor 24 is connected to Reinforcing rib 3, deep floor 24 increase the tie point of well lid pallet 2 and reinforcing rib 3.Reinforcing rib 3 includes the first rib 31 and the Two ribs 32, the first rib 31 and the second rib 32 are perpendicular, it is to be understood that the number of the first rib 31 and the second rib 32 Amount is equipped with multiple, and multiple first ribs 31 and multiple second ribs 32 are criss-cross, further winding shaft covered tray 2 it is rigid Degree.
Such as Fig. 2, which further includes in the hoistway seat frame 4 of back-shaped structure, set on the pavement structure 5 of 1 surrounding of bearing frame.It holds It carries frame 1 to be located in hoistway seat frame 4, hoistway seat frame 4 is Reinforced Concrete Materials, for hoistway seat frame made of support metal material 4.Pavement structure 5 includes the second finish coat 51, the second cement sand bed 52 and the concrete cushion 53 set gradually from top to bottom, The material of certain first finish coat 21 and the second finish coat 51 should be consistent, and the top surface of the first finish coat 21 and the second facing The top surface of layer 51 keeps flushing, to ensure the uniformity of paving.Cement stone dust bed course is additionally provided with below concrete cushion 53 54, cement stone dust bed course 54 has good water penetration, and the rainwater permeated from road surface can be flowed to by cement stone dust bed course 54 (concrete cushion 53 and the second cement sand bed 52 actually also have a large amount of hole to soil layer below, and rainwater can be downward Infiltration).
Well lid pallet 2 issues abnormal sound because trampling in order to prevent, and it is slow that elasticity is additionally provided between bearing frame 1 and well lid pallet 2 Rush pad 11.
In conclusion the pavement Manhole cover assembly of the utility model, hollow bearing frame 1 is mounted on hoistway mouth, well Covered tray 2 is removably buckled in bearing frame 1, and the reinforcing rib 3 of domed structure, the both ends of reinforcing rib 3 are equipped in well lid pallet 2 The two sides of the bottom wall of well lid pallet 2 are connected to, the top of reinforcing rib 3 towards well lid pallet 2 is arched upward, to prevent well lid pallet 2 Depression in centre deformation, be successively arranged the first finish coat 21, the first cement sand bed 22 and microlith from top to bottom in well lid pallet 2 Concrete layer 23, the first finish coat 21 and the paving of hoistway mouth surrounding are consistent, and reinforcing rib 3 is located at pea gravel concreten layer In 23, the density of pea gravel concreten is higher, higher with the conjugation of reinforcing rib 3, further promotes the rigid of the well lid pallet 2 Degree.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these change It also should be regarded as the protection scope of the utility model into replacement.

Claims (8)

1. a kind of pavement Manhole cover assembly, which is characterized in that including hollow bearing frame and be embedded at the well of the bearing frame Covered tray, the interior reinforcing rib for being equipped with domed structure of the well lid pallet, the both ends of the reinforcing rib are connected to the well The two sides of the bottom wall of covered tray, be successively arranged in the well lid pallet from top to bottom the first finish coat, the first cement sand bed and Pea gravel concreten layer, the reinforcing rib are located in the pea gravel concreten layer.
2. pavement Manhole cover assembly according to claim 1, which is characterized in that be additionally provided on the bottom wall of the well lid pallet The deep floor perpendicular with it, the top of the deep floor are connected to the reinforcing rib.
3. pavement Manhole cover assembly according to claim 1, which is characterized in that the reinforcing rib includes the first rib and the Two ribs, first rib and the second rib are perpendicular.
4. pavement Manhole cover assembly according to claim 1, which is characterized in that further include the hoistway seat in back-shaped structure Frame, the bearing frame are located in the hoistway seat frame.
5. pavement Manhole cover assembly according to claim 1, which is characterized in that further include being set to the bearing frame surrounding Pavement structure, the pavement structure include the second finish coat, the second cement sand bed and concrete set gradually from top to bottom Bed course.
6. pavement Manhole cover assembly according to claim 5, which is characterized in that the top surface and second of first finish coat The top surface of finish coat keeps flushing.
7. pavement Manhole cover assembly according to claim 5, which is characterized in that be additionally provided with water below the concrete cushion Mud stonework road cutting.
8. pavement Manhole cover assembly according to claim 1, which is characterized in that set between the bearing frame and well lid pallet Flexible cushion.
CN201920183509.2U 2019-02-01 2019-02-01 Pavement Manhole cover assembly Active CN209723045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920183509.2U CN209723045U (en) 2019-02-01 2019-02-01 Pavement Manhole cover assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920183509.2U CN209723045U (en) 2019-02-01 2019-02-01 Pavement Manhole cover assembly

Publications (1)

Publication Number Publication Date
CN209723045U true CN209723045U (en) 2019-12-03

Family

ID=68682547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920183509.2U Active CN209723045U (en) 2019-02-01 2019-02-01 Pavement Manhole cover assembly

Country Status (1)

Country Link
CN (1) CN209723045U (en)

Similar Documents

Publication Publication Date Title
JP3653083B2 (en) Road construction method
CN100434598C (en) Retaining wall in lightweight, and construction method
KR102111114B1 (en) Artificial turf structure using permeable elastic mat with antistatic function and excellent drainage property and construction method thereof
HUT74233A (en) Structure of a walking surface for horses, in particular for a riding area and a method of producing the same
CN105089069B (en) Pipeline foundation and construction method thereof
CN110578290A (en) Abutment back backfilling structure of bridgehead and construction method thereof
KR101370102B1 (en) Cast-in-place type top-pile and construction process of the same
CN205804068U (en) Town road structure
CN209723045U (en) Pavement Manhole cover assembly
JP2005264718A (en) Ground foundation reinforcing structure
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
WO2009053185A2 (en) A self-supporting paving for outdoor use
JP2006274657A (en) Construction method of building foundation structure
CN211079810U (en) Avoid pitch highway of ponding
RU143210U1 (en) DEVELOPMENT OF ROAD CLOTHING
CN216141831U (en) Pavement road using old stone
JP2012207384A (en) Precast foundation plate, precast structure, foundation of precast structure, and construction method of earth retaining structure
US20060213146A1 (en) Method of making a flat foundation for a floor without substantial excavation and foundation made by said method
CN216551410U (en) SBS modified asphalt pavement capable of being broken and recycled
JPH10183642A (en) Method for constructing structure foundation in viscous soil ground
CN206448289U (en) It is provided with the large tank basis of connection raceway groove
CN216640811U (en) Drainage ditch structure of gravel bin of mixing station
CN208280184U (en) Round manhole cover paving structure on a kind of ground brick paving
JP3196470U (en) Seismic isolation structure
CN208517855U (en) A kind of plant pit structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510000 102 Shuiyin Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Huamu Co.,Ltd.

Address before: 510000 102 Shuiyin Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU HUAMU Co.