CN209722922U - A kind of high-low pressure is two-sided to rush shoe manifold apparatus - Google Patents
A kind of high-low pressure is two-sided to rush shoe manifold apparatus Download PDFInfo
- Publication number
- CN209722922U CN209722922U CN201920307894.7U CN201920307894U CN209722922U CN 209722922 U CN209722922 U CN 209722922U CN 201920307894 U CN201920307894 U CN 201920307894U CN 209722922 U CN209722922 U CN 209722922U
- Authority
- CN
- China
- Prior art keywords
- pipe
- fixedly connected
- shoe
- connecting tube
- high pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 97
- 238000002347 injection Methods 0.000 claims abstract description 14
- 239000007924 injection Substances 0.000 claims abstract description 14
- 230000009194 climbing Effects 0.000 claims abstract description 10
- 241000156948 Aphantopus hyperantus Species 0.000 claims abstract description 7
- 239000002002 slurry Substances 0.000 claims description 30
- 230000001681 protective effect Effects 0.000 claims description 16
- 239000007787 solid Substances 0.000 claims description 4
- 239000007921 spray Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 11
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000004080 punching Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 10
- 238000009434 installation Methods 0.000 description 5
- 230000000903 blocking effect Effects 0.000 description 4
- 238000013016 damping Methods 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 238000009825 accumulation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000008400 supply water Substances 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 229910002804 graphite Inorganic materials 0.000 description 1
- 239000010439 graphite Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Nozzles (AREA)
Abstract
The utility model belongs to technology maritime platform pile punching apparatus field, in particular a kind of high-low pressure is two-sided to rush shoe manifold apparatus, including shoe, the upper surface of the shoe is equipped with spud leg, the lateral wall of the spud leg is fixed with main hull, the main hull is fixed with climbing gear close to the side of the spud leg, and the main hull is fixedly connected by the climbing gear with the spud leg, and the upper surface of the main hull is fixed with main deck;Because the injection direction of six of them lower surface nozzle is at a great circle, every 60 degree are equipped with a lower surface nozzle, the injection direction of other six lower surface nozzles is at a ringlet, every 60 degree are equipped with a lower surface nozzle, and then form annular water conservancy diversion, and it is good to rush stake effect, because the quantity and distribution mode of lower surface nozzle are identical as upper surface nozzle, lower surface nozzle cooperation pipe cap and open-work jet stream are injected into mud, are conducive to break up and remove mud, are conducive to pile pulling.
Description
Technical field
The utility model belongs to technology maritime platform pile punching apparatus field, and in particular to a kind of high-low pressure is two-sided to rush shoe pipe
Remittance device.
Background technique
Be supported on seabed by three legs and its shoe when jack up maritime platform operation, just need to rush when needing to shift stake and
Pile pulling, the power gear device first passed through between main hull and spud leg drop to sea by main hull, by rushing stake and pile pulling, receive
It returns spud leg and shoe is equal with main hull bottom to bottom, next operating location then can be dragged to by towboat.
Existing technology has the following problems:
1, existing maritime platform rushes stake design arrangement, and high pressure rushes pile pipe all the way and low pressure rushes pile pipe all the way for setting, respectively
It is independent, can not mutual backup, and two-way bottom rushes pile pipe and its nozzle, in certain sea area shoes upper surface deeper Shi Wufa of mud
Stake is rushed, pile pulling is difficult;
2, existing maritime platform rushes shoe manifold apparatus, rushes pile pipe using common u-shaped pipe clamp, rushes stake Shi Yizhen in high pressure
Dynamic, bolt and nut, which easily loosens, to be fallen, it is often necessary to be safeguarded.
Utility model content
To solve the problems mentioned above in the background art.The utility model provides that a kind of high-low pressure is two-sided to rush shoe pipe
Remittance device, it is time saving and energy saving to have, and rushes the feature that stake effect is good and maintenance is few.
To achieve the above object, the utility model provides the following technical solutions: a kind of high-low pressure is two-sided to rush shoe manifold dress
It sets, including shoe, the upper surface of the shoe is equipped with spud leg, and the lateral wall of the spud leg is fixed with main hull, the master
Hull is fixed with climbing gear close to the side of the spud leg, and the main hull is solid by the climbing gear and the spud leg
Fixed connection, the upper surface of the main hull are fixed with main deck, and the upper surface of the main deck is fixed with from high-pressure slurry
Pump, described to be fixedly connected with the first connecting tube from the efferent duct of high pressure slurry pump, first connecting tube is far from described from high pressure
One end of slush pump is fixed with the second high pressure valve, and the output end of second high pressure valve is fixedly connected with the second connecting tube, institute
It states and is fixed with first pressure gauge in the second connecting tube, second connecting tube is set far from one end fixation of second high pressure valve
There is the first high pressure valve, the output end of first high pressure valve is fixedly connected with third connecting tube, and the third connecting tube is far from institute
The one end for stating the first high pressure valve is equipped with the first water supplying pipe, one end of first water supplying pipe and the fixed company of the third connecting tube
It connects, the other end of the third connecting tube is fixedly connected with the first hose, and first hose is far from first water supplying pipe
One end is fixedly connected with the second water supplying pipe, and second water supplying pipe is fixedly connected with the shoe, and second water supplying pipe is separate
One end of first hose is fixedly connected with upper surface nozzle, and the upper surface nozzle is located at the upper surface of the spud leg, institute
Main deck is stated to be equipped with from the side of high pressure slurry pump from low pressure slush pump far from described, it is described separate described from high pressure slurry pump
The side of first connecting tube is fixedly connected with the 4th connecting tube, and the 4th connecting tube is far from described from one end of high pressure slurry pump
It is fixed with the 4th high pressure valve, the 4th high pressure valve is fixedly connected with the 5th far from the side lateral wall of the 4th connecting tube
Connecting tube, the 5th connecting tube are fixedly connected with described from low pressure slush pump, and the efferent duct from low pressure slush pump is fixed
It is connected with the 6th connecting tube, the 6th connecting tube is fixedly connected with check-valves from one end of low pressure slush pump far from described, institute
The output end for stating check-valves is fixedly connected with the 7th connecting tube, is fixed with second pressure gauge in the 7th connecting tube, described
7th connecting tube is fixedly connected with third high pressure valve far from one end of the check-valves, and the third high pressure valve is far from the described 7th
The side of connecting tube is fixedly connected with the 8th connecting tube, and the 8th connecting tube is equipped with the far from one end of the third high pressure valve
Three water supplying pipes, one end of the third water supplying pipe are fixedly connected with the 8th connecting tube, the other end of the third water supplying pipe
It is fixedly connected with the second hose, second hose is fixedly connected with the 4th water supplying pipe far from one end of the third water supplying pipe,
4th water supplying pipe is fixedly connected with the spud leg, and the one end of the 4th water supplying pipe far from second hose is through described
Spud leg is simultaneously fixedly connected with lower surface nozzle, and the lower surface nozzle is located at the lower surface of the spud leg, the 4th water supplying pipe
One end far from second hose is fixedly connected with first jet branch pipe, and the lateral wall of the first jet branch pipe is fixed with
First crossing cabin wall casing, the first crossing cabin wall casing run through the shoe, and the lower surface nozzle passes through the first jet
Branch pipe and the first crossing cabin wall casing are fixedly connected with the shoe, lateral wall of the shoe close to the lower surface nozzle
It is fixed with protective plate, second water supplying pipe is fixedly connected with second nozzle branch pipe, institute far from one end of first hose
The lateral wall for stating second nozzle branch pipe is fixed with the second crossing cabin wall casing, and the second crossing cabin wall casing runs through the shoe,
The upper surface nozzle is fixedly connected by the second nozzle branch pipe and the second crossing cabin wall casing with the shoe, described
Shoe is fixed with pipe cap close to the lateral wall of the upper surface nozzle, and the first jet branch pipe is close to one end of the shoe
Lateral wall is fixed with pipe clamp, and the inner sidewall of the pipe clamp is fixed with lining, and the lateral wall of the pipe clamp is fixed with support
Pipe, the pipe clamp is fixedly connected by the support tube with the shoe, described from high pressure slurry pump and described from low pressure mud
Pump is electrically connected with external power supply.
Preferably, the protective plate is semi-circular shape, the quantity phase of the quantity of the protective plate and the lower surface nozzle
Deng.
Preferably, the surface of the pipe cap offers open-work, and the quantity of the open-work is three, and three open-works are uniform
It is distributed in the surface of the pipe cap.
Preferably, the quantity of the lower surface nozzle is 12, the injection direction of lower surface nozzle described in six of them
At a great circle, every 60 degree be equipped with a lower surface nozzle, in addition the injection direction of six lower surface nozzles at
One ringlet, every 60 degree are equipped with a lower surface nozzle, and the quantity and distribution mode of the upper surface nozzle are and institute
It is identical to state lower surface nozzle.
Preferably, the lateral wall of second water supplying pipe is fixed with union female connector, the inside of the union female connector
Wall is equipped with union pin end, and first hose is fixedly connected by the union female connector with second water supplying pipe, institute
It is identical with the structure of the 4th water supplying pipe to state the second water supplying pipe.
Preferably, the pipe clamp is mainly made of first clamping plate and second clamping plate and screw, the first clamping plate and described
Second clamping plate is U-shaped.
Preferably, the lateral wall of the second nozzle branch pipe is equipped with the pipe clamp, and the second nozzle branch pipe passes through described
Pipe clamp is fixedly connected with the shoe.
Compared with prior art, the utility model has the beneficial effects that
1, high-low pressure manifold is set in main deck, the 4th high pressure valve is intermediate isolating valve, and then realizes that high pressure and low pressure are mutual
Be it is spare, do not have to dismounting hose, time saving and energy saving, two-way rushes pile pipe and is respectively connected to shoe upper and lower surfaces, upper surface nozzle
For washing out the mud of accumulation, it is easier pile pulling, because protective plate is semi-circular shape, is protected conducive to first jet branch pipe
And there is diversion function, it is not easy to damage and blocking, because the quantity of lower surface nozzle is 12, six of them lower surface nozzle
For injection direction at a great circle, every 60 degree are equipped with a lower surface nozzle, in addition the injection direction of six lower surface nozzles at
One ringlet, every 60 degree are equipped with a lower surface nozzle, and then form annular water conservancy diversion, and it is good to rush stake effect, because of lower surface nozzle
Quantity and distribution mode it is identical as upper surface nozzle, lower surface nozzle cooperation pipe cap and open-work jet stream be injected into mud,
Be conducive to break up and remove mud, be conducive to pile pulling.
2, it is equipped with pipe clamp in first jet branch pipe and second nozzle branch pipe lateral wall, and is set respectively in pipe clamp outboard sidewalls
There are lining and support tube, in fixed first jet branch pipe and second nozzle branch pipe, because pipe clamp is mainly by first clamping plate and second
Clamping plate and screw composition, first clamping plate and second clamping plate are U-shaped, double-U-shaped pipe clamp, so that pipe clamp and first jet branch pipe
Stable connection between second nozzle branch pipe, lining reduces the gap between pipe clamp and nozzle branch pipe, and lining is with good
Good damping effect so that when high pressure rushes stake nozzle branch pipe be not easy to shake and pipe clamp on bolt and nut be not easy pine
Dynamic to fall, maintenance is few.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this
Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is prior art construction figure;
Fig. 2 is enlarged diagram at the A in Fig. 1;
Fig. 3 is the structural schematic diagram of the utility model;
Fig. 4 is the highest operation sponge structures schematic diagram of the utility model;
Fig. 5 is enlarged diagram at B in the utility model Fig. 3, Fig. 4;
Fig. 6 is the flow chart of the utility model;
Fig. 7 is shoe and lower surface nozzle installation diagram in the utility model;
Fig. 8 is shoe and upper surface nozzle installation diagram in the utility model;
Fig. 9 is union female connector and the second water supplying pipe connection figure in the utility model;
Figure 10 is the union pin end structural schematic diagram in the utility model;
Figure 11 is the first jet branch pipe and protective plate figure in the utility model;
Figure 12 is the left view of Fig. 8 in the utility model;
Figure 13 is the pipe cap and shoe installation diagram in the utility model;
Figure 14 is the top view of Figure 10 in the utility model;
Figure 15 is the pipe clamp and first jet branch pipe installation diagram in the utility model;
Figure 16 is the support tube and shoe installation diagram in the utility model;
In figure: 1- shoe, 2- spud leg, 3- main hull, 4- climbing gear, 5- main deck, 6- are from high pressure slurry pump, 7- first
Connecting tube, the second high pressure valve of 8-, the second connecting tube of 9-, 10- first pressure gauge, the first high pressure valve of 11-, 12- third connecting tube,
The first water supplying pipe of 13-, the first hose of 14-, the second water supplying pipe of 15-, the upper surface 16- nozzle, the 4th connecting tube of 17-, 18- the 4th are high
Pressure valve, the 5th connecting tube of 19-, 20- are from low pressure slush pump, the 6th connecting tube of 21-, 22- check-valves, the 7th connecting tube of 23-, 24-
Second pressure gauge, 25- third high pressure valve, the 8th connecting tube of 26-, 27- third water supplying pipe, the second hose of 28-, 29- the 4th supply water
Pipe, the lower surface 30- nozzle, 31- first jet branch pipe, 32- the first crossing cabin wall casing, 33- protective plate, 34- second nozzle branch pipe,
35- the second crossing cabin wall casing, 36- pipe cap, 37- pipe clamp, 38- lining, 39- support tube, 40- open-work, 41- union female connector, 42-
Union pin end.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " up/down end ", "inner", "outside" " front end ", " after
The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed
System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition,
Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " be arranged/be arranged with ", " socket ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, can also
To be to be detachably connected, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also
Indirectly connected through an intermediary, can be the connection inside two elements.For the ordinary skill in the art,
The concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment 1
Fig. 1-16 is please referred to, the utility model rushes shoe manifold apparatus the following technical schemes are provided: a kind of high-low pressure is two-sided,
Including shoe 1, the upper surface of shoe 1 is equipped with spud leg 2, and the lateral wall of spud leg 2 is fixed with main hull 3, and main hull 3 is close to stake
The side of leg 2 is fixed with climbing gear 4, and main hull 3 is fixedly connected by climbing gear 4 with spud leg 2, the upper table of main hull 3
Face is fixed with main deck 5, and the upper surface of main deck 5 is fixed with from high pressure slurry pump 6, from the efferent duct of high pressure slurry pump 6
Be fixedly connected with the first connecting tube 7, the first connecting tube 7 far from being fixed with the second high pressure valve 8 from one end of high pressure slurry pump 6,
The output end of second high pressure valve 8 is fixedly connected with the second connecting tube 9, and first pressure gauge 10 is fixed in the second connecting tube 9, the
Two connecting tubes 9 are fixed with the first high pressure valve 11 far from one end of the second high pressure valve 8, and the output end of the first high pressure valve 11 is fixed to be connected
It is connected to third connecting tube 12, third connecting tube 12 is equipped with the first water supplying pipe 13 far from one end of the first high pressure valve 11, and first supplies water
One end of pipe 13 is fixedly connected with third connecting tube 12, and the other end of third connecting tube 12 is fixedly connected with the first hose 14, the
One hose 14 is fixedly connected with the second water supplying pipe 15 far from one end of the first water supplying pipe 13, and the second water supplying pipe 15 and shoe 1 are fixed
Connection, the second water supplying pipe 15 are fixedly connected with upper surface nozzle 16 far from one end of the first hose 14, and upper surface nozzle 16 is located at
The upper surface of spud leg 2, main deck 5 from the side of high pressure slurry pump 6 far from being equipped with from low pressure slush pump 20, from high pressure slurry pump
6 sides far from the first connecting tube 7 are fixedly connected with the 4th connecting tube 17, and the 4th connecting tube 17 is separate from high pressure slurry pump 6
One end is fixed with the 4th high pressure valve 18, and the 4th high pressure valve 18 is fixedly connected with far from the side lateral wall of the 4th connecting tube 17
Five connecting tubes 19, the 5th connecting tube 19 are fixedly connected with from low pressure slush pump 20, are connected from the efferent duct of low pressure slush pump 20 is fixed
It is connected to the 6th connecting tube 21, the 6th connecting tube 21 is far from being fixedly connected with check-valves 22, non-return from one end of low pressure slush pump 20
The output end of valve 22 is fixedly connected with the 7th connecting tube 23, and second pressure gauge 24 is fixed in the 7th connecting tube 23, and the 7th connects
Adapter tube 23 is fixedly connected with third high pressure valve 25 far from one end of check-valves 22, and third high pressure valve 25 is far from the 7th connecting tube 23
Side is fixedly connected with the 8th connecting tube 26, and the 8th connecting tube 26 is equipped with third water supplying pipe far from one end of third high pressure valve 25
27, one end of third water supplying pipe 27 is fixedly connected with the 8th connecting tube 26, and the other end of third water supplying pipe 27 is fixedly connected with
Two hoses 28, the second hose 28 are fixedly connected with the 4th water supplying pipe 29, the 4th water supplying pipe 29 far from one end of third water supplying pipe 27
It is fixedly connected with spud leg 2, the one end of the 4th water supplying pipe 29 far from the second hose 28 is through spud leg 2 and is fixedly connected with lower surface spray
Mouth 30, lower surface nozzle 30 are located at the lower surface of spud leg 2, and the 4th water supplying pipe 29 is fixedly connected with far from one end of the second hose 28
First jet branch pipe 31, the lateral wall of first jet branch pipe 31 are fixed with the first crossing cabin wall casing 32, the first crossing cabin wall casing
32 run through shoe 1, and lower surface nozzle 30 is fixedly connected by first jet branch pipe 31 and the first crossing cabin wall casing 32 with shoe 1,
Shoe 1 is fixed with protective plate 33 close to the lateral wall of lower surface nozzle 30, the second water supplying pipe 15 far from the first hose 14 one
End is fixedly connected with second nozzle branch pipe 34, and the lateral wall of second nozzle branch pipe 34 is fixed with the second crossing cabin wall casing 35, the
Two crossing cabin wall casings 35 run through shoe 1, and upper surface nozzle 16 passes through second nozzle branch pipe 34 and the second crossing cabin wall casing 35 and stake
Boots 1 are fixedly connected, and shoe 1 is fixed with pipe cap 36 close to the lateral wall of upper surface nozzle 16, and first jet branch pipe 31 is close to stake
One end lateral wall of boots 1 is fixed with pipe clamp 37, and the inner sidewall of pipe clamp 37 is fixed with lining 38, and the lateral wall of pipe clamp 37 is fixed
Equipped with support tube 39, pipe clamp 37 is fixedly connected by support tube 39 with shoe 1, from high pressure slurry pump 6 and from low pressure slush pump 20
It is electrically connected with external power supply.
In the present embodiment: the water supplying pipe P1 in attached drawing 3,4 and 5 is the first water supplying pipe 13 of attached drawing 6, attached drawing 3,4 and 5
The first hose 14 and the second hose 28 that stake hose is attached drawing 6 are rushed, the nozzle supplies water pipe P1 in attached drawing 3,4 and 5 is attached drawing 6
The second water supplying pipe 15, attached drawing 3,4 and 5 water supplying pipe P2 are the third water supplying pipe 27 of attached drawing 6, and the nozzle in attached drawing 3,4 and 5 supplies
Water pipe P2 is the 4th water supplying pipe 29 of attached drawing 6, high pressure valve 1, high pressure valve 2, high pressure valve 3,4 and of high pressure valve in attached drawing 3,4 and 5
High-pressure stop check-valves 1 is the first high pressure valve 11, the second high pressure valve 8, the third high pressure valve 25, the 4th high pressure valve 18 of attached drawing 6
With check-valves 22.
In the present embodiment: from the model ZJQ100-25-22 of high pressure slurry pump 6, from the model of low pressure slush pump 20
NSQ800-45-200 provides power resources for pipe flushing mud.
In the present embodiment: the first high pressure valve 11, the second high pressure valve 8, third high pressure valve 25, the model of the 4th high pressure valve 18 are equal
For Y42X-16P, control from 6 pipeline of high pressure slurry pump and opening or closing from 20 pipeline of low pressure slush pump.
In the present embodiment: the model HC42X of check-valves 22 avoids high pressure water from misleading into from 20 pipeline of low pressure slush pump,
Damage its pipeline.
In the present embodiment: the model of first pressure gauge 10 and second pressure gauge 24 is YTX-160B, passes through first pressure
Table 10 checks that the pressure value from 6 pipeline of high pressure slurry pump, second pressure gauge 24 are used to check the pressure from 20 pipeline of low pressure slush pump
Force value.
In the present embodiment: lining 38 is three mm of thickness graphite resilient cushions, has good damping effect, so that
When high pressure rushes stake, first jet branch pipe 31 and second nozzle branch pipe 34 are not easy to shake.
In the present embodiment: the first clamping plate and second clamping plate of pipe clamp 37 are the zinc-plated material of steel, have good corrosion resistant
Property, it is conducive to improve its service life.
In the present embodiment: when carrying out rushing stake work, because the 4th high pressure valve 18 is intermediate isolating valve, closing can be passed through
First high pressure valve 11, opens third high pressure valve 25, and the 4th high pressure valve 18 is realized from 6 pipeline of high pressure slurry pump to from low pressure slush pump
20 pipelines can also be realized and be supplied water from 20 pipeline of low pressure slush pump to from 6 pipeline of high pressure slurry pump for high pressure water, and then be realized
High pressure and low pressure mutual backup do not have to dismounting hose, time saving and energy saving, pass through the 6th connecting tube 21 and the 7th from low pressure slush pump 20
Check-valves 22 is arranged in connecting tube 23, avoids high pressure water from misleading into from 20 pipeline of low pressure slush pump, damages its pipeline, the first water supplying pipe
13, the connection between the first hose 14 and the second water supplying pipe 15 and third water supplying pipe 27, the second hose 28 and the 4th water supplying pipe
29 are all made of union female connector 41 and the connection of union pin end 42, as hit union connection, hammering union connection, with hammer
Operation, connection is simple and reliable, time saving and energy saving, needs to dismount many and diverse operation of eight groups of bolt and nuts instead of original every group of valve, because
First water supplying pipe 13, the first hose 14, the second water supplying pipe 15, second nozzle branch pipe 34, the second crossing cabin wall casing 35 and upper surface
Nozzle 16, can be rinsed work to 1 upper surface of shoe, and upper surface nozzle 16 is used to wash out the mud of accumulation, holds that pile pulling more
Easily, because protective plate 33 be semi-circular shape, conducive to being protected first jet branch pipe 31 and having diversion function, it is not easy to damage and
Blocking, because third water supplying pipe 27, the second hose 28, the 4th water supplying pipe 29, first jet branch pipe 31, the first crossing cabin wall casing 32 are matched
Lower surface nozzle 30 is closed, work can be rinsed to 1 lower surface of shoe, because the quantity of lower surface nozzle 30 is 12, wherein
For the injection direction of six lower surface nozzles 30 at a great circle, every 60 degree are equipped with a lower surface nozzle 30, in addition under six
For the injection direction of surface nozzle 30 at a ringlet, every 60 degree are equipped with a lower surface nozzle 30, and then form annular water conservancy diversion,
Rush that stake effect is good, because the quantity and distribution mode of lower surface nozzle 30 are identical as upper surface nozzle 16, lower surface nozzle 30 is matched
It closes pipe cap 36 and 40 jet stream of open-work is injected into mud, be conducive to break up and remove mud, be conducive to pile pulling, in fixed first jet
When branch pipe 31 and second nozzle branch pipe 34, because pipe clamp 37 is mainly made of first clamping plate and second clamping plate and screw, first clamping plate
It is U-shaped with second clamping plate, double-U-shaped pipe clamp 37, so that pipe clamp 37 and first jet branch pipe 31 and second nozzle branch pipe 34
Between stable connection, and first jet branch pipe 31 and second nozzle branch pipe 34 are fixed to by the upper of shoe 1 by support tube 39
Stability is improved on surface, and lining 38 reduces the gap between pipe clamp 37 and nozzle branch pipe, and lining 38 has good damping
Effect so that when high pressure rushes stake, first jet branch pipe 31 and second nozzle branch pipe 34 be not easy to shake and pipe clamp 37 on
Bolt and nut be not easy to loosen and fall, maintenance is few.
Specifically, protective plate 33 is semi-circular shape, the quantity of protective plate 33 and the quantity of lower surface nozzle 30 are equal;Pass through
Protective plate 33 is conducive to protect first jet branch pipe 31, and has diversion function, it is not easy to damage and blocking, conducive to stake is rushed,
Each protective plate 33 protects each lower surface nozzle 30.
Specifically, the surface of pipe cap 36 offers open-work 40, the quantity of open-work 40 is three, and three open-works 40 are uniformly distributed
On the surface of pipe cap 36;The diameter of three open-works 40 is 25 millimeters, is injected into mud by 40 jet stream of open-work, favorably
In breaking up and remove mud.
Specifically, the quantity of lower surface nozzle 30 is 12, the injection direction of six of them lower surface nozzle 30 is at one
A great circle, every 60 degree are equipped with a lower surface nozzle 30, and in addition the injection direction of six lower surface nozzles 30 is at a ringlet,
Every 60 degree be equipped with a lower surface nozzle 30, the quantity and distribution mode of upper surface nozzle 16 with 30 phase of lower surface nozzle
Together;So that lower surface nozzle 30 forms two annular water conservancy diversion, conducive to uniformly mud is broken up, it is good to rush stake effect, upper surface
The diversion effect of nozzle 16 is identical as lower surface nozzle 30, reaches identical purpose.
Specifically, the lateral wall of the second water supplying pipe 15 is fixed with union female connector 41, the inner sidewall of union female connector 41
Union pin end 42 is installed, the first hose 14 is fixedly connected by union female connector 41 with the second water supplying pipe 15, and second supplies water
Pipe 15 is identical with the structure of the 4th water supplying pipe 29;It in proper height, is usually blocked with plug, sea removes when rushing stake, connection the
One hose 14 or the second hose 28, can be operated with hammer, and connection is simple and reliable, time saving and energy saving.
Specifically, pipe clamp 37 is mainly made of first clamping plate and second clamping plate and screw, first clamping plate and second clamping plate are equal
For U-shaped;The first clamping plate and second clamping plate of U-shaped, so that pipe clamp 37 is close to first jet branch pipe 31 and second nozzle branch pipe
34 lateral wall is conducive to stable connection.
Specifically, the lateral wall of second nozzle branch pipe 34 is equipped with pipe clamp 37, second nozzle branch pipe 34 passes through pipe clamp 37 and stake
Boots 1 are fixedly connected;The connection side of second nozzle branch pipe 34 and the connection type of shoe 1 with first jet branch pipe 31 and shoe 1
Formula is identical, in order to enable being less prone to the case where second nozzle branch pipe 34 loosens when high pressure rushes stake.
The working principle and process for using of the utility model: when carrying out rushing stake work, because main hull 3 passes through climbing gear
4 is fixed with spud leg 2, drives spud leg 2 and shoe 1 mobile by main hull 3, by the 4th connecting tube 17 and the 5th connecting tube 19,
25 He of third high pressure valve is connected by the 8th connecting tube 26, by the 4th high pressure valve 18 and from high pressure slurry pump 6 and from low pressure mud
20 connection third water supplying pipe 27 of pump can be opened because the 4th high pressure valve 18 is intermediate isolating valve by closing the first high pressure valve 11
Third high pressure valve 25, the 4th high pressure valve 18 realize from 6 pipeline of high pressure slurry pump to from 20 pipeline of low pressure slush pump for high pressure water, instead
Can also realize from 20 pipeline of low pressure slush pump to from 6 pipeline of high pressure slurry pump supply water, and then realize high pressure and low pressure it is standby each other
With, do not have to dismounting hose, it is time saving and energy saving, from low pressure slush pump 20 by the 6th connecting tube 21 and the 7th connecting tube 23, non-return is set
Valve 22 avoids high pressure water from misleading into from 20 pipeline of low pressure slush pump, damages its pipeline, passes through the first connecting tube 7, the second connecting tube
9 and third connecting tube 12, for the second high pressure valve 8 and the first high pressure valve 11 to be connect with from high pressure slurry pump 6, and pass through first
Pressure gauge 10 checks the pressure value from 6 pipeline of high pressure slurry pump, likewise, second pressure gauge 24 is for checking from low pressure slush pump
The pressure value of 20 pipelines, connection and third water supplying pipe between the first water supplying pipe 13, the first hose 14 and the second water supplying pipe 15
27, the second hose 28 and the 4th water supplying pipe 29 are all made of union female connector 41 and union pin end 42 connects, and as hit union company
It connecing, hammering union connection can be operated with hammer, and connection is simple and reliable, and it is time saving and energy saving, it needs to dismount instead of original every group of valve
Many and diverse operation of eight groups of bolt and nuts, because the first water supplying pipe 13, the first hose 14, the second water supplying pipe 15, second nozzle branch pipe 34,
Second crossing cabin wall casing 35 and upper surface nozzle 16 can be rinsed work to 1 upper surface of shoe, and upper surface nozzle 16 is for rushing
The mud for falling accumulation, is easier pile pulling, because protective plate 33 is semi-circular shape, is protected simultaneously conducive to first jet branch pipe 31
There is diversion function, it is not easy to damage and blocking, because of third water supplying pipe 27, the second hose 28, the 4th water supplying pipe 29, first jet branch
Pipe 31, the first crossing cabin wall casing 32 cooperate lower surface nozzle 30, can be rinsed work to 1 lower surface of shoe, because lower surface is sprayed
The quantity of mouth 30 is 12, and for the injection direction of six of them lower surface nozzle 30 at a great circle, every 60 degree are equipped with one
Lower surface nozzle 30, in addition the injection direction of six lower surface nozzles 30 is equipped with a lower surface at a ringlet, every 60 degree
Nozzle 30, and then form annular water conservancy diversion, rushes that stake effect is good, because the quantity and distribution mode of lower surface nozzle 30 are sprayed with upper surface
Mouth 16 is identical, and lower surface nozzle 30 cooperates pipe cap 36 and 40 jet stream of open-work to be injected into mud, is conducive to break up and remove mud,
Conducive to pile pulling, in fixed first jet branch pipe 31 and second nozzle branch pipe 34, because pipe clamp 37 is mainly by first clamping plate and second
Clamping plate and screw composition, first clamping plate and second clamping plate are U-shaped, double-U-shaped pipe clamp 37, so that pipe clamp 37 and first jet
Stable connection between branch pipe 31 and second nozzle branch pipe 34, and pass through support tube 39 for first jet branch pipe 31 and second nozzle
Branch pipe 34 is fixed to the upper surface of shoe 1, improves stability, and lining 38 reduces the gap between pipe clamp 37 and nozzle branch pipe,
And lining 38 has good damping effect, so that when high pressure rushes stake, first jet branch pipe 31 and second nozzle branch pipe
34 be not easy to shake and pipe clamp 37 on bolt and nut be not easy to loosen and fall, maintenance is few.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (7)
1. a kind of high-low pressure is two-sided to rush shoe manifold apparatus, including shoe (1), the upper surface of the shoe (1) is equipped with spud leg
(2), the lateral wall of the spud leg (2) is fixed with main hull (3), and the main hull (3) is solid close to the side of the spud leg (2)
Fixed to be equipped with climbing gear (4), the main hull (3) is fixedly connected by the climbing gear (4) with the spud leg (2), described
The upper surface of main hull (3) is fixed with main deck (5), it is characterised in that: the upper surface of the main deck (5) be fixed with from
High pressure slurry pump (6), the efferent duct from high pressure slurry pump (6) are fixedly connected with the first connecting tube (7), first connection
Pipe (7) is fixed with the second high pressure valve (8) far from described from one end of high pressure slurry pump (6), second high pressure valve (8) it is defeated
Outlet is fixedly connected with the second connecting tube (9), is fixed with first pressure gauge (10) on second connecting tube (9), and described
Two connecting tubes (9) are fixed with the first high pressure valve (11) far from one end of second high pressure valve (8), first high pressure valve
(11) output end is fixedly connected with third connecting tube (12), and the third connecting tube (12) is far from first high pressure valve (11)
One end be equipped with the first water supplying pipe (13), one end of first water supplying pipe (13) and the third connecting tube (12) are fixed to be connected
It connects, the other end of the third connecting tube (12) is fixedly connected with the first hose (14), and first hose (14) is far from described
One end of first water supplying pipe (13) is fixedly connected with the second water supplying pipe (15), second water supplying pipe (15) and the shoe (1)
It is fixedly connected, second water supplying pipe (15) is fixedly connected with upper surface nozzle far from one end of first hose (14)
(16), the upper surface nozzle (16) is located at the upper surface of the spud leg (2), and the main deck (5) is far from described from high pressure mud
The side of stock pump (6) is equipped with from low pressure slush pump (20), described from high pressure slurry pump (6) separate first connecting tube (7)
Side be fixedly connected with the 4th connecting tube (17), the 4th connecting tube (17) is far from described from the one of high pressure slurry pump (6)
End is fixed with the 4th high pressure valve (18), side lateral wall of the 4th high pressure valve (18) far from the 4th connecting tube (17)
It is fixedly connected with the 5th connecting tube (19), the 5th connecting tube (19) is fixedly connected with described from low pressure slush pump (20), institute
It states from the efferent duct of low pressure slush pump (20) and is fixedly connected with the 6th connecting tube (21), the 6th connecting tube (21) is far from described
It is fixedly connected with check-valves (22) from one end of low pressure slush pump (20), the output end of the check-valves (22) is fixedly connected with
7th connecting tube (23) is fixed with second pressure gauge (24) on the 7th connecting tube (23), the 7th connecting tube (23)
It is fixedly connected with third high pressure valve (25) far from the one end of the check-valves (22), the third high pressure valve (25) is far from described the
The side of seven connecting tubes (23) is fixedly connected with the 8th connecting tube (26), and the 8th connecting tube (26) is far from the third high pressure
One end of valve (25) is equipped with third water supplying pipe (27), and one end of the third water supplying pipe (27) and the 8th connecting tube (26) are solid
Fixed connection, the other end of the third water supplying pipe (27) are fixedly connected with the second hose (28), and second hose (28) is separate
One end of the third water supplying pipe (27) is fixedly connected with the 4th water supplying pipe (29), the 4th water supplying pipe (29) and the spud leg
(2) it is fixedly connected, the one end of the 4th water supplying pipe (29) far from second hose (28) is through the spud leg (2) and fixed
It is connected with lower surface nozzle (30), the lower surface nozzle (30) is located at the lower surface of the spud leg (2), the 4th water supplying pipe
(29) one end far from second hose (28) is fixedly connected with first jet branch pipe (31), the first jet branch pipe (31)
Lateral wall be fixed with the first crossing cabin wall casing (32), the first crossing cabin wall casing (32) runs through the shoe (1), described
Lower surface nozzle (30) is solid by the first jet branch pipe (31) and the first crossing cabin wall casing (32) and the shoe (1)
Fixed connection, the shoe (1) are fixed with protective plate (33) close to the lateral wall of the lower surface nozzle (30), and described second supplies
Water pipe (15) is fixedly connected with second nozzle branch pipe (34) far from one end of first hose (14), the second nozzle branch pipe
(34) lateral wall is fixed with the second crossing cabin wall casing (35), and the second crossing cabin wall casing (35) runs through the shoe (1),
The upper surface nozzle (16) passes through the second nozzle branch pipe (34) and the second crossing cabin wall casing (35) and the shoe
(1) it being fixedly connected, the shoe (1) is fixed with pipe cap (36) close to the lateral wall of the upper surface nozzle (16), and described the
One end lateral wall of the one nozzle branch pipe (31) close to the shoe (1) is fixed with pipe clamp (37), the inside of the pipe clamp (37)
Wall is fixed with lining (38), and the lateral wall of the pipe clamp (37) is fixed with support tube (39), and the pipe clamp (37) passes through institute
Support tube (39) is stated to be fixedly connected with the shoe (1), it is described from high pressure slurry pump (6) and described equal from low pressure slush pump (20)
It is electrically connected with external power supply.
2. a kind of high-low pressure according to claim 1 is two-sided to rush shoe manifold apparatus, it is characterised in that: the protective plate
It (33) is semi-circular shape, the quantity of the protective plate (33) and the quantity of the lower surface nozzle (30) are equal.
3. a kind of high-low pressure according to claim 1 is two-sided to rush shoe manifold apparatus, it is characterised in that: the pipe cap (36)
Surface offer open-work (40), the quantity of the open-work (40) is three, and three open-works (40) are evenly distributed on described
The surface of pipe cap (36).
4. a kind of high-low pressure according to claim 1 is two-sided to rush shoe manifold apparatus, it is characterised in that: the lower surface spray
The quantity of mouth (30) is 12, and the injection direction of lower surface nozzle (30) described in six of them is at a great circle, every 60 degree
Equipped with a lower surface nozzle (30), in addition the injection direction of six lower surface nozzles (30) is at a ringlet, often
60 degree be equipped with a lower surface nozzle (30), the quantity and distribution mode of the upper surface nozzle (16) with it is described under
Surface nozzle (30) is identical.
5. a kind of high-low pressure according to claim 1 is two-sided to rush shoe manifold apparatus, it is characterised in that: described second supplies water
The lateral wall of pipe (15) is fixed with union female connector (41), and the inner sidewall of the union female connector (41) is equipped with union public access
Head (42), first hose (14) are fixedly connected by the union female connector (41) with second water supplying pipe (15), institute
It is identical with the structure of the 4th water supplying pipe (29) to state the second water supplying pipe (15).
6. a kind of high-low pressure according to claim 1 is two-sided to rush shoe manifold apparatus, it is characterised in that: the pipe clamp (37)
It is mainly made of first clamping plate and second clamping plate and screw, the first clamping plate and the second clamping plate are U-shaped.
7. a kind of high-low pressure according to claim 1 is two-sided to rush shoe manifold apparatus, it is characterised in that: the second nozzle
The lateral wall of branch pipe (34) is equipped with the pipe clamp (37), and the second nozzle branch pipe (34) passes through the pipe clamp (37) and the stake
Boots (1) are fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920307894.7U CN209722922U (en) | 2019-03-12 | 2019-03-12 | A kind of high-low pressure is two-sided to rush shoe manifold apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920307894.7U CN209722922U (en) | 2019-03-12 | 2019-03-12 | A kind of high-low pressure is two-sided to rush shoe manifold apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209722922U true CN209722922U (en) | 2019-12-03 |
Family
ID=68686022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920307894.7U Withdrawn - After Issue CN209722922U (en) | 2019-03-12 | 2019-03-12 | A kind of high-low pressure is two-sided to rush shoe manifold apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209722922U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763471A (en) * | 2019-03-12 | 2019-05-17 | 友联船厂(蛇口)有限公司 | A kind of high-low pressure is two-sided to rush shoe manifold apparatus |
-
2019
- 2019-03-12 CN CN201920307894.7U patent/CN209722922U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763471A (en) * | 2019-03-12 | 2019-05-17 | 友联船厂(蛇口)有限公司 | A kind of high-low pressure is two-sided to rush shoe manifold apparatus |
CN109763471B (en) * | 2019-03-12 | 2024-03-15 | 友联船厂(蛇口)有限公司 | High-low pressure double-sided pile shoe manifold punching device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108945315B (en) | L NG ship board side water curtain protection device | |
CN109763471A (en) | A kind of high-low pressure is two-sided to rush shoe manifold apparatus | |
CN209722922U (en) | A kind of high-low pressure is two-sided to rush shoe manifold apparatus | |
WO2022007637A1 (en) | Wind-water linkage pulping system for thickener, and damaged nozzle positioning method based on system | |
CN205347468U (en) | Blast furnace stave prosthetic devices | |
CN214839157U (en) | Leakage-proof structure of black water pipeline | |
CN215089567U (en) | Double-vertical-pipe type floating roof storage tank mechanical cleaning system and device | |
CN214694257U (en) | Dust removal cyclone dust collector for coal gas discharged from blast furnace top charging bucket | |
CN201643918U (en) | Wet type self-actuated water bath dust remover | |
CN115199253A (en) | Self-adaptive sand removing and washing device for wellhead gathering and transportation pipeline | |
CN103196030B (en) | Natural gas steam trap led by a kind of high pressure list | |
CN212730774U (en) | Novel fixed compressed gas foam automatic fire extinguishing system | |
CN219469826U (en) | Detachable water distribution system of sewage anaerobic reactor | |
CN212375988U (en) | Sludge discharge system in sewage treatment system | |
CN215057210U (en) | Pressure vessel rapid water injection emptying device of power-free dust removal device of down-the-hole drill | |
CN213684367U (en) | Drainage device for hydraulic engine | |
CN113187417B (en) | Water injection and differential pressure water supply system of wet dust removal system of down-the-hole rock drilling equipment and control method | |
CN218174650U (en) | Novel diesel tank pry for ocean platform | |
CN212107326U (en) | Convenient and durable pipeline | |
CN216640719U (en) | But quick replacement's spraying and suction integration desilting head | |
CN212297126U (en) | Vertical mill hydraulic system connecting device | |
CN216198239U (en) | Hand-held type pneumatic drill gas-water separation, dust device | |
CN211284417U (en) | Novel pressure relief pipeline for blast furnace injection | |
CN209753130U (en) | Gas and solid-liquid separation's flotation column air feeder | |
CN215674788U (en) | 480m horizontal static pressure water main pipeline bypass valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20191203 Effective date of abandoning: 20240315 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20191203 Effective date of abandoning: 20240315 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |