CN209709601U - A kind of power transformation engineering cable laying bracket - Google Patents
A kind of power transformation engineering cable laying bracket Download PDFInfo
- Publication number
- CN209709601U CN209709601U CN201920875088.XU CN201920875088U CN209709601U CN 209709601 U CN209709601 U CN 209709601U CN 201920875088 U CN201920875088 U CN 201920875088U CN 209709601 U CN209709601 U CN 209709601U
- Authority
- CN
- China
- Prior art keywords
- plate
- support
- fixedly connected
- support frame
- fixed pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a kind of power transformation engineering cable laying brackets, including fixed pedestal, support plate is fixedly installed at the top of the surface side of the fixed pedestal, the middle top of the support plate and two sides are fixedly installed with support base, the first support frame is fixedly connected at the top of the support base, side at the top of first support frame is rotatably connected to the second support frame by shaft, and the utility model relates to cable laying technical fields.The power transformation engineering cable laying bracket; pass through support base, the first support frame, the second support frame, the mating reaction for connecting frame, connecting rod, adjustable spring, spring, clamping plate, link block and fixing bolt; fixation can be clamped to the cable of different size; and cable can be played a certain protective role; by the mating reaction of fixed plate, fastening bolt, pin, pin hole, screw rod, rotating bar and screw, convenient for carrying out transport carrying to the cable laying bracket.
Description
Technical field
The utility model relates to cable laying technical field, specially a kind of power transformation engineering cable laying bracket.
Background technique
Cable laying, which refers to the process of, to be laid along the routing for being surveyed Check, installs cable to form cable run, according to using
Occasion can be divided into several system of laying such as aerial, underground, the bottom, wall and tunnel, reasonably select the system of laying of cable to guarantor
Card route transmission quality, reliability and construction maintenance etc. be all it is highly important, toll cable be guarantee its communication peace
It is complete reliable, directly buried installation mode is generally used, city main cable is to guarantee that its communication security is reliable, installation and replacement are convenient and city
Hold beauty etc., generally use pipeline laying mode, and need to be arranged when power transformation engineering cable laying specific bracket to cable into
Row support.
Power transformation engineering cable laying supporting structure is simple at present, has a single function, and usually uses the fixture pair of specific standard
Cable is fixed, narrow scope of application, and when fixed to cable, not certain buffer protection measure easily causes cable
Because excessive extrusion damages, meanwhile, cable laying bracket is integral type, it is non-dismountable, to be not easy to transport it
Defeated carrying increases the labor intensity of staff.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of power transformation engineering cable laying bracket, solves logical
It is often that cable is fixed using the fixture of specific standard, narrow scope of application and cable laying bracket are integral types, no
Detachably, to be not easy to carry out it the problem of transport carries.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of power transformation engineering cable paving
If bracket, including fixed pedestal, support plate is fixedly installed at the top of the surface side of the fixed pedestal, the support plate
Middle top and two sides are fixedly installed with support base, are fixedly connected with the first support frame at the top of the support base, and described first
Side at the top of support frame is rotatably connected to the second support frame, first support frame and the second support frame phase by shaft
To connection frame is fixedly connected in the middle part of the side of surface, the inner wall of the connection frame is fixedly connected with spring, and the spring is remote
One end from connection frame is fixedly connected with connecting rod, and the connecting rod is fixedly connected with clamping plate far from one end of spring, described
The side of support plate runs through fixed pedestal and extends to the inside of fixed pedestal, has offered support plate inside the fixed pedestal
Compatible card slot, is fixedly connected to fixed plate at the top and bottom of the support plate surface side, the fixed plate it is interior
The top and bottom in portion, which are run through, fastening bolt, and one end of the fastening bolt sequentially passes through fixed plate, fixed pedestal
And the inside of fixed pedestal is extended to, the interior bottom portion of the side of the fixed pedestal offers pin hole, the inside of the pin hole
It is connected with pin, one end of the pin is fixedly connected with support rod, and the one end of the support rod far from pin is fixed to be connected
It is connected to stiffening plate, and the stiffening plate is fixedly installed in the bottom of support plate, side of the support plate far from fixed pedestal
Internal whorl be connected with screw rod, and one end of the screw rod sequentially passes through support plate, stiffening plate and extends to stiffening plate
It is internal.
Preferably, the support plate is rotatably connected to rotor plate by shaft far from the outer wall surface middle part of fixed pedestal,
Running through in the middle part of the inside of the rotor plate has screw, and one end of the screw sequentially passes through rotor plate, stiffening plate and extends
To the inside of stiffening plate.
Preferably, it is fixedly connected between side and clamping plate far from connection frame of first support frame and the second support frame
There is adjustable spring, and the clamping plate is fixedly installed with foam-rubber cushion far from the side of adjustable spring.
Preferably, the side of first support frame and the second support frame is fixedly connected to link block, and the company
It connects and is threaded with fixing bolt between block.
Preferably, the screw rod is fixedly connected with swivel becket, and the surface setting of swivel becket far from one end of stiffening plate
There is anti-skid chequer.
(3) beneficial effect
The utility model provides a kind of power transformation engineering cable laying bracket.Have it is following the utility model has the advantages that
(1), the power transformation engineering cable laying bracket is fixedly installed with support by the middle top and two sides of support plate
Seat is fixedly connected with the first support frame at the top of support base, and the side at the top of the first support frame is rotatably connected to the by shaft
It is fixedly connected to connection frame in the middle part of two support frames, the first support frame and the second support frame apparent surface side, connects frame
Inner wall is fixedly connected with spring, and spring is fixedly connected with connecting rod, the one end of connecting rod far from spring far from one end of connection frame
Be fixedly connected with clamping plate, the side of the first support frame and the second support frame is fixedly connected to link block, and link block it
Between be threaded with fixing bolt, the first support frame and the second support frame are fixed between side and clamping plate far from connection frame to be connected
It is connected to adjustable spring, and clamping plate is fixedly installed with foam-rubber cushion far from the side of adjustable spring, passes through support base, the first support
Frame, the second support frame, the mating reaction for connecting frame, connecting rod, adjustable spring, spring, clamping plate, link block and fixing bolt,
It can be clamped fixation to the cable of different size, and cable can be played a certain protective role, avoid cable because squeezing
Surging excessive the phenomenon that causing cable bad, the scope of application are wider.
(2), power transformation engineering cable laying bracket, by having offered the compatible card of support plate inside fixed pedestal
Slot supports and is fixedly connected to fixed plate at the top and bottom of plate surface side, and the top and bottom of the inside of fixed plate are passed through
It is installed with fastening bolt, and one end of fastening bolt sequentially passes through fixed plate, fixed pedestal and the inside for extending to fixed pedestal,
The interior bottom portion of the side of fixed pedestal offers pin hole, and the internal activity of pin hole is connected with pin, and one end of pin is fixed to be connected
It is connected to support rod, support rod is fixedly connected with stiffening plate far from one end of pin, and stiffening plate is fixedly installed in support plate
Bottom, the internal whorl of side of the support plate far from fixed pedestal is connected with screw rod, and one end of screw rod sequentially passes through support
Plate, stiffening plate and the inside for extending to stiffening plate, support plate pass through shaft far from the outer wall surface middle part of fixed pedestal and rotate company
It is connected to rotor plate, running through in the middle part of the inside of rotor plate has screw, and one end of screw sequentially passes through rotor plate, stiffening plate and prolongs
The inside for extending to stiffening plate is made by the mating reaction of fixed plate, fastening bolt, pin, pin hole, screw rod, rotating bar and screw
Obtaining support plate and support rod can take apart from the inside of fixed pedestal, and support plate is square compared with dismantling between support rod
Just, consequently facilitating carrying out transport carrying to the cable laying bracket.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is partial enlarged view at A in Fig. 1;
Fig. 3 is partial enlarged view at B in Fig. 1.
In figure: 1 fixed pedestal, 2 support plates, 3 card slots, 4 fixed plates, 5 support rods, 6 pins, 7 pin holes, 8 fastening bolts, 9
First support frame, 10 second support frames, 11 adjustable springs, 12 link blocks, 13 clamping plates, 14 fixing bolts, 15 support bases, 16 connect
Connect frame, 17 connecting rods, 18 springs, 19 screw rods, 20 stiffening plates, 21 rotor plates, 22 screws.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of power transformation engineering cable laying bracket, including
Fixed pedestal 1 is fixedly installed with support plate 2, the middle top of support plate 2 and two sides at the top of the surface side of fixed pedestal 1
It is fixedly installed with support base 15, the top of support base 15 is fixedly connected with the first support frame 9, the side at 9 top of the first support frame
It is rotatably connected to the second support frame 10 by shaft, the middle part of 10 apparent surface side of the first support frame 9 and the second support frame is equal
It is fixedly connected with connection frame 16, the inner wall of connection frame 16 is fixedly connected with spring 18, and the one end of spring 18 far from connection frame 16 is solid
Surely it is connected with connecting rod 17, connecting rod 17 is fixedly connected with clamping plate 13 far from one end of spring 18, can be to different size
Cable is clamped fixation, solid between the first support frame 9 and the second side and clamping plate 13 of the support frame 10 far from connection frame 16
Surely it is connected with adjustable spring 11, and clamping plate 13 is fixedly installed with foam-rubber cushion far from the side of adjustable spring 11, foam-rubber cushion is stretched
The mating reaction of contracting spring 11 and spring 18 can play a certain protective role cable, avoid because extruding force it is excessive caused by
The side of the phenomenon that cable bad, the first support frame 9 and the second support frame 10 is fixedly connected to link block 12, and link block
Fixing bolt 14 is threaded between 12, convenient for cable to be placed into the top of clamping plate 13, the side of support plate 2 is through solid
Determine pedestal 1 and extend to the inside of fixed pedestal 1, the compatible card slot 3 of support plate 2 has been offered inside fixed pedestal 1, supports
Plate is fixedly connected to fixed plate 4 at the top and bottom of 2 surface side, and the top and bottom of the inside of fixed plate 4, which are run through, to be had
Fastening bolt 8, and one end of fastening bolt 8 sequentially passes through fixed plate 4, fixed pedestal 1 and extends to the interior of fixed pedestal 1
Portion, the interior bottom portion of the side of fixed pedestal 1 offer pin hole 7, and the internal activity of pin hole 7 is connected with pin 6, and the one of pin 6
End is fixedly connected with support rod 5, and support rod 5 is fixedly connected with stiffening plate 20 far from one end of pin 6, and stiffening plate 20 is fixed
It is installed on the bottom of support plate 2, the internal whorl of side of the support plate 2 far from fixed pedestal 1 is connected with screw rod 19, and screw rod
19 one end sequentially passes through support plate 2, stiffening plate 20 and the inside for extending to stiffening plate 20, screw rod 19 far from stiffening plate 20 one
End is fixedly connected with swivel becket, and the surface of swivel becket is provided with anti-skid chequer, outer wall table of the support plate 2 far from fixed pedestal 1
Middle face is rotatably connected to rotor plate 21 by shaft, and running through in the middle part of the inside of rotor plate 21 has screw 22, and screw 22
One end sequentially passes through rotor plate 21, stiffening plate 20 and the inside for extending to stiffening plate 20, so that the cable laying bracket is detachable,
Consequently facilitating being transported to it.
In use, user rotates fixing bolt 14, until fixing bolt 14 is detached from the inside of link block 12, turn
The cable of different size, is placed into the top of clamping plate 13 by dynamic second support frame 10, fixing bolt 14 is then rotated, by first
Support frame 9 and the second support frame 10 are installed together, and cable can squeeze clamping plate 13, and clamping plate 13 can be press-connected bar
17, connecting rod 17 can squeeze spring 18, and adjustable spring 11, and sponge can be squeezed while clamping plate 13 is press-connected bar 17
Pad can play a certain protective role cable, the elastic force effect of adjustable spring 11 and spring 18, can be further to cable
It is protected, fixation can be clamped to the cable of different size, and can play a certain protective role to cable, avoided
Cable because extruding force spend it is big caused by cable bad the phenomenon that, the scope of application is wider, when needing to transport to cable laying bracket
When defeated, fastening bolt 8 is rotated, until fastening bolt 8 is detached from the inside of fixed pedestal 1, completes support plate 2 and fixed base
Disassembly between seat 1 then rotates screw rod 19, until screw rod 19 is detached from the inside of stiffening plate 20, at the same time, turns
Dynamic screw 22, detaches screw 22 from the inside of stiffening plate 20, completes the disassembly between support plate 2 and support rod 5, most
Afterwards, the pin 6 being fixedly connected with support rod 5 is pulled out from the pin hole 7 inside fixed pedestal 1 come, i.e., completion support rod 5 with
Disassembly between fixed pedestal 1, consequently facilitating being transported to the cable laying bracket, so that the power transformation engineering cable laying branch
Frame practicability is stronger.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions.By sentence " element limited including one ..., it is not excluded that
There is also other identical elements in the process, method, article or apparatus that includes the element ".
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of power transformation engineering cable laying bracket, including fixed pedestal (1), it is characterised in that: the table of the fixed pedestal (1)
It is fixedly installed at the top of the side of face support plate (2), the middle top of the support plate (2) and two sides are fixedly installed with support base
(15), it is fixedly connected with the first support frame (9) at the top of the support base (15), the side at the top of first support frame (9)
It is rotatably connected to the second support frame (10) by shaft, first support frame (9) and the second support frame (10) apparent surface one
Connection frame (16) is fixedly connected in the middle part of side, the inner wall of connection frame (16) is fixedly connected with spring (18), the bullet
Spring (18) is fixedly connected with connecting rod (17) far from one end of connection frame (16), and the one of the connecting rod (17) separate spring (18)
End is fixedly connected with clamping plate (13), and the side of the support plate (2) through fixed pedestal (1) and extends to fixed pedestal (1)
Inside, has offered the compatible card slot (3) of support plate (2), support plate (2) surface inside the fixed pedestal (1)
It is fixedly connected at the top and bottom of side fixed plate (4), the top and bottom of the inside of the fixed plate (4), which are run through, to be had
Fastening bolt (8), and one end of the fastening bolt (8) sequentially passes through fixed plate (4), fixed pedestal (1) and extends to solid
Determine the inside of pedestal (1), the interior bottom portion of the side of the fixed pedestal (1) offers pin hole (7), the pin hole (7) it is interior
Portion is connected with pin (6), and one end of the pin (6) is fixedly connected with support rod (5), and the support rod (5) is far from pin
One end of nail (6) is fixedly connected with stiffening plate (20), and the stiffening plate (20) is fixedly installed in the bottom of support plate (2),
The internal whorl of side of the support plate (2) far from fixed pedestal (1) is connected with screw rod (19), and the screw rod (19)
One end sequentially passes through support plate (2), stiffening plate (20) and the inside for extending to stiffening plate (20).
2. a kind of power transformation engineering cable laying bracket according to claim 1, it is characterised in that: the support plate (2) is remote
It is rotatably connected to rotor plate (21) in the middle part of outer wall surface from fixed pedestal (1) by shaft, the inside of the rotor plate (21)
Middle part, which is run through, to be had screw (22), and one end of the screw (22) sequentially passes through rotor plate (21), stiffening plate (20) and extends
To the inside of stiffening plate (20).
3. a kind of power transformation engineering cable laying bracket according to claim 1, it is characterised in that: first support frame
(9) adjustable spring is fixedly connected between side and clamping plate (13) of the second support frame (10) far from connection frame (16)
(11), and the side of the clamping plate (13) separate adjustable spring (11) is fixedly installed with foam-rubber cushion.
4. a kind of power transformation engineering cable laying bracket according to claim 1, it is characterised in that: first support frame
(9) it is fixedly connected to link block (12) with the side of the second support frame (10), and screw thread connects between the link block (12)
It is connected to fixing bolt (14).
5. a kind of power transformation engineering cable laying bracket according to claim 1, it is characterised in that: the screw rod (19) is separate
One end of stiffening plate (20) is fixedly connected with swivel becket, and the surface of swivel becket is provided with anti-skid chequer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920875088.XU CN209709601U (en) | 2019-06-12 | 2019-06-12 | A kind of power transformation engineering cable laying bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920875088.XU CN209709601U (en) | 2019-06-12 | 2019-06-12 | A kind of power transformation engineering cable laying bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209709601U true CN209709601U (en) | 2019-11-29 |
Family
ID=68650596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920875088.XU Expired - Fee Related CN209709601U (en) | 2019-06-12 | 2019-06-12 | A kind of power transformation engineering cable laying bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209709601U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111030030A (en) * | 2019-12-25 | 2020-04-17 | 安徽鑫铂铝业股份有限公司 | High-strength light high-speed rail tunnel cable support frame aluminum profile and preparation process thereof |
CN111689445A (en) * | 2020-06-03 | 2020-09-22 | 黑龙江祥辉通信工程有限公司 | Communication engineering construction device capable of positioning cable placement position |
CN111740363A (en) * | 2020-07-15 | 2020-10-02 | 国家电网有限公司 | Can carry out threading pipe installing support for electric power that adjusts according to different pipelines |
CN111917083A (en) * | 2020-08-27 | 2020-11-10 | 衡阳和众信息技术有限责任公司 | Cable tube bank fixing device for network engineering wiring |
-
2019
- 2019-06-12 CN CN201920875088.XU patent/CN209709601U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111030030A (en) * | 2019-12-25 | 2020-04-17 | 安徽鑫铂铝业股份有限公司 | High-strength light high-speed rail tunnel cable support frame aluminum profile and preparation process thereof |
CN111030030B (en) * | 2019-12-25 | 2021-02-19 | 安徽鑫铂铝业股份有限公司 | High-strength light high-speed rail tunnel cable support frame aluminum profile and preparation process thereof |
CN111689445A (en) * | 2020-06-03 | 2020-09-22 | 黑龙江祥辉通信工程有限公司 | Communication engineering construction device capable of positioning cable placement position |
CN111689445B (en) * | 2020-06-03 | 2021-07-13 | 深圳市赛讯线缆科技有限公司 | Communication engineering construction device capable of positioning cable placement position |
CN111740363A (en) * | 2020-07-15 | 2020-10-02 | 国家电网有限公司 | Can carry out threading pipe installing support for electric power that adjusts according to different pipelines |
CN111917083A (en) * | 2020-08-27 | 2020-11-10 | 衡阳和众信息技术有限责任公司 | Cable tube bank fixing device for network engineering wiring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209709601U (en) | A kind of power transformation engineering cable laying bracket | |
CN107295768A (en) | A kind of instrument and meter case fixing device | |
CN203932871U (en) | A kind of Novel cable fixture | |
CN209298741U (en) | A kind of 220kV line tension connecting plate hanging point lifter device | |
CN207588352U (en) | For the ground wire suspension clamp Overbridge device of transmission line polling robot | |
CN207834936U (en) | Operating device for parallel groove clamp livewire work | |
CN207513288U (en) | A kind of Portable supporting device for electric pole | |
CN205877422U (en) | Tuber pipe gallows | |
CN213185346U (en) | High-stability combined cable bridge | |
CN212480759U (en) | Natural gas meter support | |
CN212338433U (en) | Quick detach formula tuber pipe support | |
CN209555751U (en) | It is built bridge convenient for the road construction of fast assembling-disassembling with interim | |
CN204858482U (en) | Simple and easy high -voltage line cable clamp with adjustable | |
CN203900028U (en) | PCB clamping and blowing fixture | |
CN205544141U (en) | Distribution rack ground connection wire sleeve fixing device | |
CN209217574U (en) | A kind of glass insulator replacement fixture | |
CN203674590U (en) | Stand construction platform | |
CN208891116U (en) | A kind of tool-free apparatus mounting plate for communication cabinet | |
CN207149363U (en) | A kind of electric pole transformer carrier member device | |
CN217897359U (en) | A safety rope mount for building piping lane overhauls construction | |
CN206018184U (en) | A kind of TV hanger for being easy to connecting line to insert | |
CN220719300U (en) | Civil engineering pipeline puts frame | |
CN211690558U (en) | Water supply equipment mounting rack convenient to install | |
CN203297877U (en) | Displayer connection device for exhibition device | |
CN213177071U (en) | Natural gas line strutting arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191129 Termination date: 20200612 |