CN209707554U - It exchanges prepared auto restart and switches debugging apparatus - Google Patents

It exchanges prepared auto restart and switches debugging apparatus Download PDF

Info

Publication number
CN209707554U
CN209707554U CN201920323301.6U CN201920323301U CN209707554U CN 209707554 U CN209707554 U CN 209707554U CN 201920323301 U CN201920323301 U CN 201920323301U CN 209707554 U CN209707554 U CN 209707554U
Authority
CN
China
Prior art keywords
binding posts
phase
outlet
prepared auto
switches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920323301.6U
Other languages
Chinese (zh)
Inventor
章国荣
黄育波
王永强
张涌波
周中晓
吴坚
潘勇
赵志恒
罗剑
叶俊
徐磊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Great Industry Co Ltd Power Construction Branch
Original Assignee
Zhejiang Great Industry Co Ltd Power Construction Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Great Industry Co Ltd Power Construction Branch filed Critical Zhejiang Great Industry Co Ltd Power Construction Branch
Priority to CN201920323301.6U priority Critical patent/CN209707554U/en
Application granted granted Critical
Publication of CN209707554U publication Critical patent/CN209707554U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses exchange prepared auto restarts to switch debugging apparatus, including a voltmeter, a phase-sequence meter, 7 outlet binding posts, 4 inlet wire binding posts and 2 air switches, 4 inlet wire binding posts are separately connected 4 wiring of three incoming powers, voltmeter and phase-sequence meter are connect with 4 inlet wire binding posts, then separated time is two-way and links to 7 outlet binding posts respectively again after 2 air switches respectively, and 7 outlet binding posts are connect with three power supplys of two-way outlet.The utility model ensure that the safety of equipment, substantially increase the practicability of prepared auto restart, reduce the workload of personnel, and it is easy to carry, prepared auto restart switching effective can be carried out by 2 air switches and checks voltage and Problem of phase sequence, so that do not have to remove calibration voltage and phase sequence again in temporary source access screen used, temporary source can also up to go into operation the electricity consumption cutover of when institute when remove again.

Description

It exchanges prepared auto restart and switches debugging apparatus
Technical field
The utility model relates to capital construction substation transformer corollary apparatus field, specially exchange prepared auto restart switching debugging Device.
Background technique
Since substation develops from normal station to Intelligent transformer station direction, ac panel also develops to AC/DC integrated. Howsoever develop, there is I, II two section of bus on ac panel always, and standby throwing mutually.When I section of bus loss of pressure, bar coupler It closes a floodgate, from II two sections of buses to I section of bus power transmission.On the contrary, bar coupler closes a floodgate, from I section of bus when II section of bus loss of pressure To II section of bus power transmission.But we during installation should debug this I, II two section of bus, see standby throw can be mutually whether each other Switching guarantees I, II two section of bus power supply not power loss.Realize that standby throw needs two-way inlet wire each other, but in installation and debugging, due to The problems such as temporary source and place, cannot lay two power supplys simultaneously, because temporary source will be used always after laying is good Substation, which is powered, to complete to remove.And the line footpath of temporary source is also required, commonly use 25MM2Power supply as Temporary source.If two power supplys of laying waste very much, and time-consuming and laborious.It, cannot but if only laying a power supply The ac panel standby debugging thrown each other is realized, so needing one has power supply all the way, the debugging apparatus of two-way outlet, to realize exchange Screen is standby each other to throw debugging, examines whether ac panel has the function of prepared auto restart.
Utility model content
The purpose of this utility model is to provide exchange prepared auto restarts to switch debugging apparatus, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: exchange prepared auto restart switches debugging apparatus, including One voltmeter, a phase-sequence meter, 7 outlet binding posts, 4 inlet wire binding posts and 2 air switches, 4 inlet wire wiring Column is separately connected 4 wiring of three incoming powers, and voltmeter and phase-sequence meter are connect with 4 inlet wire binding posts, and then separated time is Two-way and link to 7 outlet binding posts respectively again after 2 air switches respectively, 7 outlet binding posts and two-way outlet Three power supply connections.
Preferably, including a zero curve binding post in 4 inlet wire binding posts and 7 outlet binding posts.
Preferably, 4 inlet wire binding posts are respectively with yellow mark A phase, green mark B phase, red mark C phase, black Identify zero curve.
Preferably, 7 outlet binding posts are respectively with yellow mark A phase, green mark B phase, red mark C phase, black Identify zero curve.
Preferably, 7 outlet binding posts are respectively A1, B1, C1, zero curve, A2, B2, C2.Color can thus be passed through Whether each connector of difference three-phase electricity is installed correctly, if being labeled after being sequenced correctly after can not exchanging to color, Color is clear, and wiring is also very reliable.
Compared with prior art, the utility model has the beneficial effects that incoming power and two-way outlet power supply are connected, it will Power supply is sent into utility model device, it can be seen that voltmeter has voltage, and phase-sequence meter has phase sequence, if phase sequence mistake, can change Power supply wiring sequence, and realize that prepared auto restart switches by 2 air switches, the utility model ensure that the safety of equipment, greatly Improve the practicability of prepared auto restart greatly, reduce the workload of personnel, and easy to carry, can be effective pass through 2 Air switch carries out prepared auto restart switching and checks voltage and Problem of phase sequence, so that do not have to go again in temporary source access screen used Calibration voltage and phase sequence, temporary source can also up to go into operation the electricity consumption cutover of when institute when remove again.
Detailed description of the invention
Fig. 1 is Tthe utility model system entire block diagram.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of technical solution: exchange prepared auto restart switching debugging apparatus, including one Voltmeter, a phase-sequence meter, 7 outlet binding posts, 4 inlet wire binding posts and air switch 1 and 2,4 inlet wires of air switch Binding post is separately connected 4 wiring of three incoming powers, and voltmeter and phase-sequence meter connect with 4 inlet wire binding posts, then divide Line is two-way and links to 7 outlet binding posts, 7 outlet wiring respectively again after air switch 1 and air switch 2 respectively Column is connect with three power supplys of two-way outlet.
It include a zero curve binding post in 4 inlet wire binding posts and 7 outlet binding posts.
4 inlet wire binding posts are respectively with yellow mark A phase, green mark B phase, red mark C phase, logos zero curve.
7 outlet binding posts are respectively with yellow mark A phase, green mark B phase, red mark C phase, logos zero curve.
7 outlet binding posts are respectively A1, B1, C1, zero curve, A2, B2, C2.
Air switch 1 is connected with outlet binding post A1, B1, C1, and air switch 2 is connected with outlet binding post A2, B2, C2.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu Calmly ", the terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral; It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly, for this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. exchanging prepared auto restart switches debugging apparatus, it is characterised in that: including a voltmeter, a phase-sequence meter, 7 outlet wiring Column, 4 inlet wire binding posts and 2 air switches, 4 inlet wire binding posts be separately connected three incoming powers 4 connect Line, the voltmeter and phase-sequence meter are connect with 4 inlet wire binding posts, and then separated time is two-way and passes through 2 air switches respectively Link to 7 outlet binding posts respectively again afterwards, 7 outlet binding posts are connect with three power supplys of two-way outlet.
2. exchange prepared auto restart according to claim 1 switches debugging apparatus, it is characterised in that: 4 inlet wire binding posts With include a zero curve binding post in 7 outlet binding posts.
3. exchange prepared auto restart according to claim 1 switches debugging apparatus, it is characterised in that: 4 inlet wire binding posts Respectively with yellow mark A phase, green mark B phase, red mark C phase, logos zero curve.
4. exchange prepared auto restart according to claim 1 switches debugging apparatus, it is characterised in that: 7 outlet binding posts Respectively with yellow mark A phase, green mark B phase, red mark C phase, logos zero curve.
5. exchange prepared auto restart according to claim 4 switches debugging apparatus, it is characterised in that: 7 outlet binding posts Respectively A1, B1, C1, zero curve, A2, B2, C2.
CN201920323301.6U 2019-03-14 2019-03-14 It exchanges prepared auto restart and switches debugging apparatus Expired - Fee Related CN209707554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920323301.6U CN209707554U (en) 2019-03-14 2019-03-14 It exchanges prepared auto restart and switches debugging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920323301.6U CN209707554U (en) 2019-03-14 2019-03-14 It exchanges prepared auto restart and switches debugging apparatus

Publications (1)

Publication Number Publication Date
CN209707554U true CN209707554U (en) 2019-11-29

Family

ID=68646391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920323301.6U Expired - Fee Related CN209707554U (en) 2019-03-14 2019-03-14 It exchanges prepared auto restart and switches debugging apparatus

Country Status (1)

Country Link
CN (1) CN209707554U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112242666A (en) * 2020-09-29 2021-01-19 浙江大有实业有限公司带电作业分公司 Method for replacing outgoing cable of line with radial structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112242666A (en) * 2020-09-29 2021-01-19 浙江大有实业有限公司带电作业分公司 Method for replacing outgoing cable of line with radial structure

Similar Documents

Publication Publication Date Title
CN106374380B (en) GIS busbares standby spacing, which does not have a power failure, extends function module and enlargement method
CN103840439A (en) Power distribution automation protecting method achieved by matching of master station and distributed terminals
CN209707554U (en) It exchanges prepared auto restart and switches debugging apparatus
CN106451220A (en) Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower
CN107450019A (en) Handcart type breaker low-voltage motion test instrument
CN211063344U (en) Automatic interlocking control system of two incoming line cabinets and one bus-bar cabinet
CN209700697U (en) A kind of exchange goat track switch simulation manipulation device
CN210142411U (en) Universal power supply station practical training operating system and anti-electricity-stealing practical training circuit thereof
CN205811651U (en) A kind of switching circuit being beneficial to UPS off-line maintenance
CN108089144A (en) Electronic current mutual inductor field calibration system and method
CN104218457A (en) Power distribution device and electric master system thereof
CN201435357Y (en) Intelligent pressure plate
CN105375480B (en) A kind of maintenance pedestal and air switch
CN205911811U (en) Auxiliary power supply system is protected to EMUs multichannel intelligence dimension
CN208477096U (en) Electronic current mutual inductor field calibration system
CN203205979U (en) Intelligent pressure plate module
CN109066469A (en) A kind of generator car Quick access device for distribution network overhead line
CN202206125U (en) Portable protection device for electrification process after distribution system protection device failure
CN202166698U (en) Transformer protection matrix test device
WO2021109833A1 (en) Portable automatic phase sequence detection device
CN204992580U (en) Expanded not repeated fixed measuring equipment of dual power supply
CN210350851U (en) Medical distribution box
CN209329780U (en) A kind of plant-grid connection device
CN109941314A (en) A kind of exchange goat switch operating gear
CN110009959B (en) Practical training operation system of all-round power supply station and anti-electricity-stealing practical training circuit thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

Termination date: 20210314