CN209703511U - Grouting system is crept into advance in a kind of end - Google Patents

Grouting system is crept into advance in a kind of end Download PDF

Info

Publication number
CN209703511U
CN209703511U CN201920213427.8U CN201920213427U CN209703511U CN 209703511 U CN209703511 U CN 209703511U CN 201920213427 U CN201920213427 U CN 201920213427U CN 209703511 U CN209703511 U CN 209703511U
Authority
CN
China
Prior art keywords
grouting
grouting pipe
pipe
advance
crept
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920213427.8U
Other languages
Chinese (zh)
Inventor
温汉辉
张志坚
林玮鹏
韩丽杰
曲金才
陈芳芳
张龙轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingyuan Yuese Geological Engineering Co
Original Assignee
Qingyuan Yuese Geological Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingyuan Yuese Geological Engineering Co filed Critical Qingyuan Yuese Geological Engineering Co
Priority to CN201920213427.8U priority Critical patent/CN209703511U/en
Application granted granted Critical
Publication of CN209703511U publication Critical patent/CN209703511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a kind of end and creeps into grouting system in advance, the system comprises pre-grouting pipes, geological drilling rig, high-pressure injection pump, steel reinforcement cage, the pre-grouting pipe binding is on steel reinforcement cage, the drilling rod of the geological drilling rig, which is transferred through the pre-grouting pipe to stake end, to be contacted with rock stratum and creeps into the pre-grouting hole to be formed in the higher rock stratum of intensity, the high-pressure injection pump connects the pre-grouting pipe, pressure sensing alarm is set in the pre-grouting pipe, the pressure sensing alarm is arranged at the lower port of the pre-grouting pipe and the middle of the pre-grouting pipe.It solves the problems, such as that prior art high-pressure slip-casting is existing in the process and largely returns slurry, it is simple, reasonable to constitute;Rock stratum slurry injection technique more mature at present is combined with foundation pile pile end grouting technique, the intrinsic bearing capacity in rock stratum can be given full play to;While improving construction efficiency, control construction cost, basic pile bearing capacity is improved.

Description

Grouting system is crept into advance in a kind of end
Technical field
The utility model relates to a kind of grouting systems, and in particular to creep into grouting system in advance in a kind of end.
Background technique
The case where may require that the rock mass set depth such as weathering, gentle breeze in an end entrance in pile foundation engineering design, stake end is super Preceding drilling grouting system is a kind of a kind of technology for entering rock difficulty based on solution rock-socketed piles end in foundation pile construction field, is passed through Using after pile stake end drilling certain depth pre-grouting hole, formed slip casting channel, then by high-pressure injection pump along Slip casting channel is pressed into cement slurry into stake end rock stratum slight crack, consolidates rock crack, and an end rock stratum is made to form an entirety, improves single Pile bearing capacity.Advance borehole slip casting is crept into after foundation pile pile, will not generate any influence to the construction of foundation pile, and have Conducive to continuous productive process is formed in work progress, construction speed is faster.
103882858 A of CN discloses a kind of diameter 300mm miniature pile construction method, it is characterised in that including following step Rapid: a steel reinforcement cage and Grouting Pipe production, b drill setting-out, positioning, and c drilling machine drill in place, pore-forming, and d borehole cleaning buries steel reinforcement cage and note Slurry pipe, e fill out filling crushed stone aggregate, the preparation of f cement slurry, g primary cementing slurry, h recementing slurry and i pile.The invention it is straight Diameter 300mm miniature pile construction method, which has, effectively to be solved the problems, such as that construction site is narrow, not to be available big machinery, guarantees project Smoothly implement and cheap, the good in economic efficiency advantage of operating expenses.Existing 104631438 A of patent CN discloses a kind of long spiral shell Drilling & grouting piling concrete uplift pile construction method is revolved, step includes: preparation of construction;Unwrapping wire positioning;Drilling machine is in place;Drilling machine pore-forming; It mentions brill while pea gravel concreten is perfused;Sealing of hole mud jacking;It is inserted into steel reinforcement cage;Clear up drilling tool and the earthwork.Beneficial effects of the present invention exist In, by specific mud-jacking technology, by the soil body of concrete indentation bottom and side wall, and it is cementing integral with the soil body, increase The contact area of pile body and the soil body, compared with traditional uplift pile, the extraction-resistant behavior of stake significantly improves.
During slip casting, it may appear that the phenomenon that cement grout largely returns out from the stake other injected holes, in the prior art, General using pause slip casting, the mode that interval mends slurry carries out slip casting, until minimum grouting amount, which reaches, estimates grouting amount.But this skill Art scheme easily causes the significant wastage of resource, and claim for eot etc..
Utility model content
Slurry largely is returned to solve the problems, such as that prior art high-pressure slip-casting is existing in the process, the utility model provides a kind of stake The advanced drilling grouting system in end, specific technical solution are as follows:
Grouting system is crept at a kind of end in advance, the system comprises pre-grouting pipe, geological drilling rig, high-pressure injection pump, Steel reinforcement cage, pre-grouting pipe binding on steel reinforcement cage, the drilling rod of the geological drilling rig through the pre-grouting pipe transfer to Stake end contacts with rock stratum and creeps into the pre-grouting hole to be formed in the higher rock stratum of intensity, and the high-pressure injection pump connection is described advanced Grouting Pipe, which is characterized in that pressure sensing alarm is set in the pre-grouting pipe, and the pressure sensing alarm is at least set It sets at the lower port of the pre-grouting pipe and the middle of the pre-grouting pipe.
Specifically, the pressure sensing alarm is additionally arranged at the lower port 2/3 apart from the pre-grouting pipe.
Specifically, the pre-grouting pipe is seamless steel pipe.
Specifically, the internal diameter of the pre-grouting pipe is 110mm-140mm.
Specifically, the depth in the pre-grouting hole is 4-5m.
Specifically, the system also includes cement slurry or mixed serums, and the cement slurry or mixed serum are through high-pressure slip-casting Pump connects the pre-grouting pipe.
It is as follows that grouting system working procedure is crept at the stake end in advance: (1) foundation pile construction to target formation;(2) tripping in It is banded with the steel reinforcement cage after-pouring concrete of advanced drilling Grouting Pipe (port flexible sealing);(3) after pile concrete final set, ground Matter drilling machine (containing anchoring drilling machine, down-hole hammer drilling machine, knapsack drilling machine etc.) drilling rod is carried out along pre-grouting pipe tripping in foundation pile stake end Creep into pore-creating in stake end;(4) pre-grouting pipe upper port connects high pressure water, rinses, expansion foundation pile stake end rock crack;(5) it is arranged The warning value of pressure sensing alarm at different location;(6) pre-grouting pipe upper port connect high pressure water mud or mixed serum into Row slip casing by pressure;(7) alarm signal of real-time detection pressure sensing alarm adjusts the switch of high-pressure injection pump in time, avoids Largely return slurry phenomenon;(8) grouting amount of slip casting is crept at stake end in advance or grouting pressure reaches design requirement, terminates slip casting.
The utility model has the following beneficial effects:
One, caused by the setting of pressure sensing alarm is greatly alleviated because largely returning slurry phenomenon during high-pressure slip-casting The wasting of resources further shortens the construction period;
Two, the grouting system in the utility model constitutes simple, reasonable;By more mature rock stratum slurry injection technique at present with Foundation pile pile end grouting technique combines, and can give full play to the intrinsic bearing capacity in rock stratum;
Three, Grouting Pipe is bound in steel reinforcement cage in the utility model, eliminates the drilling insertion Grouting Pipe after foundation pile pile The step of, construction cost is greatly saved, while improving construction efficiency, control construction cost, improves basic pile bearing capacity.
Detailed description of the invention
Fig. 1 is the structure chart that grouting system is crept at a kind of end in advance described in the utility model embodiment 1.
Fig. 2 is the position that pressure sensing alarm described in the utility model embodiment 1 is arranged in the pre-grouting pipe It sets.
Appended drawing reference: 1- pre-grouting pipe, 2- pressure sensing alarm, 3- main reinforcement, 4- stirrup, 5- pile body sound detecting pipe.
Specific embodiment
Embodiment 1
Grouting system is crept at a kind of end in advance, the system comprises pre-grouting pipe 1, geological drilling rig, high-pressure injection pump, Steel reinforcement cage, cement slurry or mixed serum, the steel reinforcement cage include main reinforcement 3 and stirrup 4, and the stirrup 4 hangs down mutually with main ribs 3 Directly, on steel reinforcement cage, the drilling rod of the geological drilling rig is transferred through the pre-grouting pipe to stake end for the pre-grouting pipe binding It is contacted with rock stratum and creeps into the pre-grouting hole to be formed in the higher rock stratum of intensity, the high-pressure injection pump connects the pre-grouting Pipe, the pre-grouting pipe is interior to be arranged pressure sensing alarm 2, and the pressure sensing alarm 2 is arranged in the pre-grouting It is described at the lower port of the pipe 1 and middle of the pre-grouting pipe 2 and the lower port 2/3 apart from the pre-grouting pipe 1 Cement slurry or mixed serum connect the pre-grouting pipe 1 through high-pressure injection pump.The pre-grouting pipe 1 is seamless steel pipe, is held Pressure is big, and intensity is high, suitable for outdoor severe construction environment.The internal diameter of the pre-grouting pipe 1 is 110mm-140mm, with ground Subject to the matching of matter borer drill rod, internal diameter design science, and engineering pile arrangement of reinforcement can be counted, do not increase cost individually, is constructing at present It is easy to enter, and facilitates priming petock and slurries.The depth in the pre-grouting hole is 4-5m.
The system also includes pile body sound detecting pipes 5, can find out Construction Condition in time, carry out next step preparation of construction, and It learns unexpected situation in time, carries out emergency measure.
When creeping into grouting system in advance using the stake end, foundation pile construction to target formation first;Then on basis Tripping in is banded with the steel reinforcement cage after-pouring concrete of pre-grouting pipe 1 in stake, and the port of the pre-grouting pipe 1 is using flexible close Envelope;After pile concrete final set, geological drilling rig (containing anchoring drilling machine, down-hole hammer drilling machine, knapsack drilling machine etc.) drilling rod is along advanced 1 tripping in foundation pile stake end of Grouting Pipe carries out stake end and creeps into pore-creating;After hole to be drilled, high pressure is connect in 1 upper port of pre-grouting pipe Water rinses, expansion foundation pile stake end rock crack;Then at remotely located different location pressure sensing alarm 2 warning value; High pressure water mud is connect in 1 upper port of pre-grouting pipe later or mixed serum carries out slip casing by pressure;During slip casting, real-time detection The alarm signal of pressure sensing alarm 2 adjusts the switch of high-pressure injection pump in time, avoids largely returning slurry phenomenon;Until stake end The grouting amount or grouting pressure of advanced drilling slip casting reach designing points, terminate slip casting.
The preferable specific embodiment of embodiment described above, only the utility model, but the protection model of the utility model Enclose and be not limited thereto, anyone skilled in the art in the technical scope that the utility model discloses, according to The technical solution of the utility model and its inventive concept are subject to equivalent substitution or change, should all cover the protection in the utility model Within the scope of.

Claims (6)

1. grouting system is crept at a kind of end in advance, the system comprises pre-grouting pipe, geological drilling rig, high-pressure injection pump, steel Muscle cage, on steel reinforcement cage, the drilling rod of the geological drilling rig is transferred through the pre-grouting pipe to stake for the pre-grouting pipe binding End contacts with rock stratum and creeps into the pre-grouting hole to be formed in the higher rock stratum of intensity, and the high-pressure injection pump connects the advanced note Slurry pipe, which is characterized in that pressure sensing alarm is set in the pre-grouting pipe, and the pressure sensing alarm is at least arranged At the lower port of the pre-grouting pipe and the middle of the pre-grouting pipe.
2. grouting system is crept at according to claim 1 end in advance, which is characterized in that the pressure sensing alarm is also It is arranged at the lower port 2/3 apart from the pre-grouting pipe.
3. grouting system is crept at according to claim 1 end in advance, which is characterized in that the pre-grouting pipe is seamless Steel pipe.
4. grouting system is crept at according to claim 1 end in advance, which is characterized in that the internal diameter of the pre-grouting pipe For 110mm-140mm.
5. grouting system is crept at according to claim 1 end in advance, which is characterized in that the depth in the pre-grouting hole For 4-5m.
6. grouting system is crept at according to claim 1 end in advance, which is characterized in that the system also includes cement slurries Or mixed serum, the cement slurry or mixed serum connect the pre-grouting pipe through high-pressure injection pump.
CN201920213427.8U 2019-02-15 2019-02-15 Grouting system is crept into advance in a kind of end Expired - Fee Related CN209703511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920213427.8U CN209703511U (en) 2019-02-15 2019-02-15 Grouting system is crept into advance in a kind of end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920213427.8U CN209703511U (en) 2019-02-15 2019-02-15 Grouting system is crept into advance in a kind of end

Publications (1)

Publication Number Publication Date
CN209703511U true CN209703511U (en) 2019-11-29

Family

ID=68641868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920213427.8U Expired - Fee Related CN209703511U (en) 2019-02-15 2019-02-15 Grouting system is crept into advance in a kind of end

Country Status (1)

Country Link
CN (1) CN209703511U (en)

Similar Documents

Publication Publication Date Title
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN105350584A (en) Construction method of anti-floating anchor rod
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN102877470B (en) Combined soil nailing construction method for supporting
CN110761265A (en) Karst cave disposal method for deep foundation pit pile foundation construction in karst area
CN106638578A (en) High-pressure circulation grouting minitype steel pipe pile and construction method thereof
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN102011591A (en) Grouting process for working surface of deep well
CN105040695A (en) Anchor rod structure capable of integrally working and construction method
CN114319388A (en) Construction method of foundation pit enclosure structure in existing building in karst area
CN103498478B (en) Rock curtain grouting in foundation of dam construction method
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN101358529A (en) Short tube and short tube sand consolidation agent strengthening construction process
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN205576957U (en) Stake end pilework
CN202430723U (en) Horizontal jacking pipe and rigid pile composite supporting structure
CN209703511U (en) Grouting system is crept into advance in a kind of end
CN101603311B (en) Jet grouting pile construction method adopting heavy hammer-tamping compaction soil preformed hole
CN100396854C (en) Column-hammer strong-tamper displacing base kit supporting construction method
CN103015430A (en) Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN106567382B (en) A kind of pit curtain construction method in metalling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129