CN209703334U - A kind of road and bridge crack reparation fixed structure - Google Patents
A kind of road and bridge crack reparation fixed structure Download PDFInfo
- Publication number
- CN209703334U CN209703334U CN201920313163.3U CN201920313163U CN209703334U CN 209703334 U CN209703334 U CN 209703334U CN 201920313163 U CN201920313163 U CN 201920313163U CN 209703334 U CN209703334 U CN 209703334U
- Authority
- CN
- China
- Prior art keywords
- layer
- crack
- fixedly connected
- bridge
- loading plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to road and bridge technical fields, and disclose a kind of road and bridge crack reparation fixed structure, including bridge, crack is offered at the top of the bridge, the inside in the crack is filled with concrete layer, the internal activity in the crack is connected with loading plate, the loading plate is movably connected in the top of concrete layer, the inside of the loading plate is fixedly connected with reinforcing bar fixed frame, the inside of the loading plate is fixedly connected with gag lever post, threaded hole is offered at the top of the bridge, gag lever post is fixedly connected on the inside of threaded hole, waterproof layer is fixedly connected at the top of the reinforcing bar fixed frame.It repairs fixed structure and passes through setting loading plate, concrete layer and bitumen layer in the road and bridge crack, the repairing to Bridge Crack can effectively be enhanced, using loading plate and reinforcing bar fixed frame as support, both the repair efficiency of concrete layer had been ensure that, the packing material inside fracture is supported simultaneously, guarantees that packing material reaches normal use.
Description
Technical field
The utility model relates to road and bridge technical field, fixed structure is repaired in specially a kind of road and bridge crack.
Background technique
For bridge after use year after year, its structural behaviour is had much in degeneration slowly
Side the problem of damage, the structural crack occurred on bridge is the crack as caused by external load, distribution and width with outside
Load is related, and this crack occurs, and implies the possible deficiency of structural bearing capacity or there are other serious problems, active fissure is
Fracture width cannot be stablized under existing environment and operating condition, always easily with the stress of structural elements, deformation or environment temperature
Degree, humidity variation and when, when the crack closed.
Existing road surface is repaired, and completes repairing by simply filling, such repairing method, the duration is short, can not keep away
Exempt from the expansion in crack, while the effect that prevents water penetration is poor.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of road and bridge crack reparation fixed structure, solves
Existing road surface is repaired, and completes repairing by simply filling, such repairing method, the duration is short, not can avoid crack
Expansion, while the problem for the effect difference that prevents water penetration.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of road and bridge crack reparation fixed knot
Structure, including bridge offer crack at the top of the bridge, and the inside in the crack is filled with concrete layer, the crack
Internal activity is connected with loading plate, and the loading plate is movably connected in the top of concrete layer, and the inside of the loading plate is fixed
It is connected with reinforcing bar fixed frame, the inside of the loading plate is fixedly connected with gag lever post, offers threaded hole at the top of the bridge,
The gag lever post is fixedly connected on the inside of threaded hole, and waterproof layer is fixedly connected at the top of the reinforcing bar fixed frame, described anti-
Adhesive layer is fixedly connected at the top of water layer, the waterproof layer is located at reinforcing bar fixed frame and adhesive layer, the waterproof layer and bonding
The inside of layer is threaded with threaded rod, and fixation steel plate is fixedly connected at the top of the adhesive layer, and the fixation steel plate is solid
Surely it is connected to the inside in crack, surface filled layer, the top of the surface filled layer are fixedly connected at the top of the fixation steel plate
Portion is fixedly connected with waterproof coating, the surface filled layer between waterproof coating and fixation steel plate, the waterproof coating
Top is fixedly connected with insulating layer, and loading end is fixedly connected at the top of the insulating layer, and the top of the loading end is fixed to be connected
It is connected to bitumen layer, the bitumen layer is fixedly connected on the top of bridge.
Preferably, the loading plate is fixedly connected on the inside in crack by gag lever post.
Preferably, the threaded rod runs through and extends to the outside of waterproof layer, and threaded rod is respectively and movably connected to reinforcing bar
The inside of fixed frame and concrete layer.
Preferably, the gag lever post is skewed, and the quantity of gag lever post is two.
Preferably, the loading end is between bitumen layer and insulating layer, and loading end is fixedly connected on the inside in crack.
Preferably, the quantity of the threaded rod be two, and two threaded rods with the middle line of loading plate be symmetrical axial symmetry
It is distributed in the inside of loading plate.
(3) beneficial effect
The utility model provides a kind of road and bridge crack and repairs fixed structure, have it is following the utility model has the advantages that
(1), the utility model can effectively be enhanced and be split to bridge by setting loading plate, concrete layer and bitumen layer
The repairing of seam both ensure that the repair efficiency of concrete layer, while fracture using loading plate and reinforcing bar fixed frame as support
Internal packing material is supported, and guarantees that packing material reaches normal use, crack is made to be not easy to expand, solve existing
Road surface is repaired, and completes repairing by simply filling, such repairing method, the duration is short, not can avoid the expansion in crack, together
When prevent water penetration the problem of effect difference.
(2), the utility model can effectively avoid the influence of environment by setting waterproof layer, adhesive layer and insulating layer
And the case where gull, occurs, and is completely cut off moisture and moisture using waterproof layer and waterproof coating, avoids moisture and moisture
Influence concrete layer inside crack, insulating layer avoids the filling material inside external ambient temperature effect crack
Material.
Detailed description of the invention
Fig. 1 is the utility model front elevational view;
Fig. 2 is the utility model reinforcing bar fixed frame top view;
Fig. 3 is the utility model loading end front elevational view.
In figure: Bridge 1 beam, 2 cracks, 3 concrete layers, 4 loading plates, 5 reinforcing bar fixed frames, 6 gag lever posts, 7 threaded holes, 8 waterproofs
Layer, 9 adhesive layers, 10 threaded rods, 11 fixation steel plates, 12 surface filled layers, 13 waterproof coatings, 14 insulating layers, 15 loading ends, 16 drips
Cyan layer.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of road and bridge crack reparation fixed structure,
Including bridge 1, the top of bridge 1 offers crack 2, and crack 2 is to be used to be formed by 1 long-time of road and bridge, staff
Crack 2 is subjected to cleaning processing, is repaired carrying out crack 2, the inside in crack 2 is filled with concrete layer 3, and concrete layer 3 is to repair
Complex radical layer achievees the effect that repairing by the filling of concrete layer 3, guarantees the quality after crack 2 is repaired, the internal activity in crack 2
It is connected with loading plate 4, loading plate 4 is movably connected in the top of concrete layer 3, and it is solid that the inside of loading plate 4 is fixedly connected with reinforcing bar
Determine frame 5, reinforcing bar fixed frame 5 and loading plate 4 both play the role of support, also play isolation, and the inside of loading plate 4 is solid
Surely it is connected with gag lever post 6, the top of bridge 1 offers threaded hole 7, and gag lever post 6 is fixedly connected on the inside of threaded hole 7, carrying
Plate 4 is fixedly connected on the inside in crack 2 by gag lever post 6, and gag lever post 6 is skewed, and the quantity of gag lever post 6 is two, In
When needs using loading plate 4 and reinforcing bar fixed frame 5, first loading plate 4 and reinforcing bar fixed frame 5 are put into inside crack 2, incited somebody to action
Gag lever post 6 is inserted into inside bridge 1, and is directed at loading plate 4, so that gag lever post 6 is entered the inside of loading plate 4, is reached and support and fix
The effect of loading plate 4 uses loading plate 4 in 2 internal stability of crack, and the top of reinforcing bar fixed frame 5 is fixedly connected with anti-
Water layer 8, waterproof layer 8 are made of polymer cement waterproof paint, and polymer cement waterproof paint has synthesising macromolecule copolymer
Elastic properties of materials height, the again good feature of organic and/or inorganic materials durability can carry out the function of waterproof, and the top of waterproof layer 8 is fixed to be connected
It is connected to adhesive layer 9, waterproof layer 8 is located at reinforcing bar fixed frame 5 and adhesive layer 9, and adhesive layer 9 is added on a small quantity by the mixture of cement and sand
Water stirring is made, and the inside of waterproof layer 8 and adhesive layer 9 is threaded with threaded rod 10, and the quantity of threaded rod 10 is two, and
Two threaded rods 10 are symmetrically distributed in the inside of loading plate 4 using the middle line of loading plate 4 as symmetry axis, and threaded rod 10 runs through and extends
To the outside of waterproof layer 8, and threaded rod 10 is respectively and movably connected to the inside of reinforcing bar fixed frame 5 and concrete layer 3, threaded rod 10
Effect be stability in order to enhance waterproof layer 8 and adhesive layer inside crack 2, threaded rod 10 is fixed on concrete layer 3
Inside with loading plate 4 is the fixation in order to further strengthen threaded rod 10, and the top of adhesive layer 9 is fixedly connected with fixation steel plate
11, fixation steel plate 11 is fixedly connected on the inside in crack 2, and the top of fixation steel plate 11 is fixedly connected with surface filled layer 12, table
The top of face filled layer 12 is fixedly connected with waterproof coating 13, and waterproof coating 13 is made of polyurethane water-proof paint, and polyurethane is anti-
Water paint has the characteristics that intensity is high, elongation percentage is big, water resistance is good, and the waterproof effect of waterproof coating 13 can be enhanced, and cooperates
Waterproof layer 8 has completely cut off extraneous moisture and moisture, so that the repair materials inside crack 2 is in drying regime, extends crack 2 and repair
The time is used after multiple, for surface filled layer 12 between waterproof coating 13 and fixation steel plate 11, the top of waterproof coating 13 is solid
Surely it is connected with insulating layer 14, setting insulating layer 14 is the function in order to make to have insulation inside crack 2, can both make crack
2 are not influenced by ambient temperature, can also keep the temperature inside crack 2, pass through setting waterproof layer 8, adhesive layer 9 and insulating layer
14, the case where capable of effectively avoiding the influence of environment and gull 2 generation will be damp using waterproof layer 8 and waterproof coating 13
Gas is completely cut off with moisture, and moisture and moisture is avoided influence on concrete layer 3, insulating layer 14 avoids inside crack 2
Packing material inside external ambient temperature effect crack 2, the top of insulating layer 14 is fixedly connected with loading end 15, loading end
15 be in order to play support vehicle driving, when vehicle driving being avoided to cross crack 2, crack 2 there is a situation where collapsing, loading end 15
Top is fixedly connected with bitumen layer 16, and bitumen layer 16 is fixedly connected on the top of bridge 1, and the effect of bitumen layer 16 is both to guarantee
Closure inside crack 2, or for the aesthetics at the top of bridge 1, loading end 15 be located at bitumen layer 16 and insulating layer 14 it
Between, and loading end 15 is fixedly connected on the inside in crack 2, passes through setting loading plate 4, concrete layer 3 and bitumen layer 16, Neng Gouyou
Repairing of the enhancing of effect to 1 crack 2 of bridge both ensure that concrete layer 3 using loading plate 4 and reinforcing bar fixed frame 5 as support
Repair efficiency, while the packing material inside fracture 2 is supported, and is guaranteed that packing material reaches normal use, is made to split
Seam 2 is not easy to expand.
It can to sum up obtain, the utility model can effectively be enhanced by setting loading plate 4, concrete layer 3 and bitumen layer 16
Repairing to 1 crack 2 of bridge both ensure that the repairing effect of concrete layer 3 using loading plate 4 and reinforcing bar fixed frame 5 as support
Fruit, while the packing material inside fracture 2 is supported, and guarantees that packing material reaches normal use, crack 2 is made to be not easy to expand
Greatly, concrete layer 3 is to repair base, by the filling of concrete layer 3, achievees the effect that repairing, guarantees the matter after crack 2 is repaired
Amount, loading end 15 be in order to play support vehicle driving, when vehicle driving being avoided to cross crack 2, crack 2 there is a situation where collapsing,
The effect of bitumen layer 16 is both or for the aesthetics at the top of bridge 1, to pass through setting to guarantee the closure inside crack 2
Waterproof layer 8, adhesive layer 9 and insulating layer 14 can effectively avoid the influence of environment and generation the case where gull 2, utilize
Waterproof layer 8 and waterproof coating 13 completely cut off moisture and moisture, avoid moisture and moisture from carrying out inside crack 2, to concrete
Layer 3 is influenced, and insulating layer 14 avoids the packing material inside external ambient temperature effect crack 2, and waterproof layer 8 is by polymer
Cement waterproof paint is made, and polymer cement waterproof paint has synthesising macromolecule copolymer elastic properties of materials height, has inorganic material again
Expect the good feature of durability, the function of waterproof can be carried out, waterproof coating 13 is made of polyurethane water-proof paint, polyurethane water-proof
Coating has the characteristics that intensity is high, elongation percentage is big, water resistance is good, and the waterproof effect of waterproof coating 13 can be enhanced, and cooperation is anti-
Water layer 8 has completely cut off extraneous moisture and moisture, and the repair materials inside crack 2 is made to be in drying regime, extends the reparation of crack 2
Use time afterwards, adhesive layer 9 add a small amount of water stirring to be made by the mixture of cement and sand, and setting insulating layer 14 is to make
Have the function of insulation inside crack 2, both crack 2 can be made not influenced by ambient temperature, can also keep in crack 2
The temperature in portion, solves existing road surface and repairs, and completes repairing by simply filling, and such repairing method, the duration is short,
The expansion in crack 2 is not can avoid, while the problem for the effect difference that prevents water penetration.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. fixed structure, including bridge (1) are repaired in a kind of road and bridge crack, it is characterised in that: opened at the top of the bridge (1)
Equipped with crack (2), the inside of the crack (2) is filled with concrete layer (3), and the internal activity of the crack (2), which is connected with, to be held
Support plate (4), the loading plate (4) are movably connected in the top of concrete layer (3), and the inside of the loading plate (4) is fixedly connected
Have reinforcing bar fixed frame (5), the inside of the loading plate (4) is fixedly connected with gag lever post (6), is opened up at the top of the bridge (1)
Have threaded hole (7), the gag lever post (6) is fixedly connected on the inside of threaded hole (7), and the top of the reinforcing bar fixed frame (5) is solid
Surely it is connected with waterproof layer (8), is fixedly connected with adhesive layer (9) at the top of the waterproof layer (8), the waterproof layer (8) is located at steel
The inside of muscle fixed frame (5) and adhesive layer (9), the waterproof layer (8) and adhesive layer (9) is threaded with threaded rod (10),
It is fixedly connected with fixation steel plate (11) at the top of the adhesive layer (9), the fixation steel plate (11) is fixedly connected on crack (2)
Inside is fixedly connected with surface filled layer (12) at the top of the fixation steel plate (11), the top of the surface filled layer (12)
It being fixedly connected with waterproof coating (13), the surface filled layer (12) is located between waterproof coating (13) and fixation steel plate (11),
It is fixedly connected with insulating layer (14) at the top of the waterproof coating (13), is fixedly connected with carrying at the top of the insulating layer (14)
Face (15) is fixedly connected with bitumen layer (16) at the top of the loading end (15), and the bitumen layer (16) is fixedly connected on bridge
(1) top.
2. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the loading plate
(4) inside of crack (2) is fixedly connected on by gag lever post (6).
3. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the threaded rod
(10) run through and extend to the outside of waterproof layer (8), and threaded rod (10) is respectively and movably connected to reinforcing bar fixed frame (5) and coagulation
The inside of soil layer (3).
4. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the gag lever post
It (6) is skewed, and the quantity of gag lever post (6) is two.
5. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the loading end
(15) between bitumen layer (16) and insulating layer (14), and loading end (15) is fixedly connected on the inside of crack (2).
6. fixed structure is repaired in a kind of road and bridge crack according to claim 1, it is characterised in that: the threaded rod
(10) quantity is two, and two threaded rods (10) are symmetrically distributed in loading plate (4) by symmetry axis of the middle line of loading plate (4)
Inside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920313163.3U CN209703334U (en) | 2019-03-13 | 2019-03-13 | A kind of road and bridge crack reparation fixed structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920313163.3U CN209703334U (en) | 2019-03-13 | 2019-03-13 | A kind of road and bridge crack reparation fixed structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209703334U true CN209703334U (en) | 2019-11-29 |
Family
ID=68646116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920313163.3U Expired - Fee Related CN209703334U (en) | 2019-03-13 | 2019-03-13 | A kind of road and bridge crack reparation fixed structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209703334U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719442A (en) * | 2020-03-21 | 2020-09-29 | 东莞市大乘建筑工程技术有限公司 | Construction process for reinforcing concrete-bonded steel plate |
-
2019
- 2019-03-13 CN CN201920313163.3U patent/CN209703334U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719442A (en) * | 2020-03-21 | 2020-09-29 | 东莞市大乘建筑工程技术有限公司 | Construction process for reinforcing concrete-bonded steel plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206553864U (en) | A kind of road and bridge crack bracing means | |
CN106223212B (en) | A kind of reinforcement means by fired damage bridge | |
CN209703332U (en) | A kind of road and bridge crack ruggedized construction | |
CN111119073B (en) | Road and bridge crack reinforcing apparatus | |
CN105178203B (en) | A kind of method utilizing polyurethane cement composite and bar-mat reinforcement reinforcement bridge component | |
CN209703334U (en) | A kind of road and bridge crack reparation fixed structure | |
Valluzzi et al. | Behaviour of multi-leaf stone masonry walls strengthened by different intervention techniques | |
CN106149554A (en) | A kind of prefabricated bridge expansion joint connecting elements, preparation method and construction method thereof | |
CN103291082A (en) | Wood beam reinforcing body external pre-stress construction method | |
CN110593600B (en) | Beam slab reinforcement construction method of existing building | |
CN107858912A (en) | Hyperbolic arch bridge bracket erection method and hyperbolic arch bridge bracket | |
CN209482103U (en) | A kind of highway pavement crack repairing structure | |
CN105064153A (en) | Method for treating cracks at seam positions of CRTS II ballastless track plates | |
CN209260588U (en) | A kind of Bridge Crack filling clamping device | |
CN204919376U (en) | Assembled beam bridge board embedment seam glues steel sheet reinforced structure | |
CN205035739U (en) | A device that is used for waterproof repair of bridge floor crackle | |
CN208649865U (en) | A kind of road and bridge crack ruggedized construction | |
CN208777143U (en) | A kind of oblique prestressing force cement concrete cracks repairing structure | |
CN205348011U (en) | Bridge crack reinforced structure | |
CN208379760U (en) | A kind of aluminium alloy truss node and concrete connecting structure | |
CN208104991U (en) | A kind of fixed device of road and bridge crack reparation | |
CN205975966U (en) | Beam column with steel structure | |
CN208267239U (en) | A kind of log cabin resistance to compression pin based on concreting | |
CN219568601U (en) | Paving structure for trestle | |
CN206128673U (en) | High ductility fibre concrete strengthening roof beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191129 Termination date: 20210313 |