CN209260588U - A kind of Bridge Crack filling clamping device - Google Patents

A kind of Bridge Crack filling clamping device Download PDF

Info

Publication number
CN209260588U
CN209260588U CN201822085484.0U CN201822085484U CN209260588U CN 209260588 U CN209260588 U CN 209260588U CN 201822085484 U CN201822085484 U CN 201822085484U CN 209260588 U CN209260588 U CN 209260588U
Authority
CN
China
Prior art keywords
crack
bridge
mounting groove
mounting plate
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822085484.0U
Other languages
Chinese (zh)
Inventor
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Dongjiao Reinforcement Engineering Co Ltd
Original Assignee
Nanjing Dongjiao Reinforcement Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Dongjiao Reinforcement Engineering Co Ltd filed Critical Nanjing Dongjiao Reinforcement Engineering Co Ltd
Priority to CN201822085484.0U priority Critical patent/CN209260588U/en
Application granted granted Critical
Publication of CN209260588U publication Critical patent/CN209260588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of Bridge Crack filling clamping device, belong to bridge recovery technique field, including bridge and crack, crack is embedded in the upper surface that bridge is arranged in, crack has been internally embedded mounting groove, filling slot is provided in mounting groove, the top in crack is fixedly connected with mounting plate, steel nail is provided between mounting plate and mounting groove, the upper end of mounting plate offers injected hole and filling slot perforation connects, regulating device is provided with above filling slot, regulating device includes column spinner, pinch column and movable balls, one end of pinch column extends through the two sides of mounting groove, column spinner activity is fixedly connected through mounting plate with the other end of pinch column, the both ends of column spinner are arranged in movable balls.This kind of Bridge Crack fills clamping device, stable structure, and passes through setting regulating device and mounting groove, can fill and step up to Bridge Crack, repairing effect is good, and crack is avoided to open again.

Description

A kind of Bridge Crack filling clamping device
Technical field
The utility model relates to bridge recovery technique field, specifically a kind of filling clamping device.
Background technique
For bridge after use year after year, its structural behaviour is had much in degeneration slowly Side the problem of damage, the structural crack occurred on bridge is the crack as caused by external load, distribution and width with outside Load is related, and this crack occurs, and implies the possible deficiency of structural bearing capacity or there are other serious problems, active fissure is Fracture width cannot be stablized under existing environment and operating condition, always easily with the stress of structural elements, deformation or environment temperature Degree, humidity variation and when, when the crack closed.
Existing Bridge Crack prosthetic device is in use, cement mortar is simply only poured into crack mostly, newly Priming charge mud can not combine closely with original bridge structure, and crack repairing effect is bad, the shorter time crack of process Can occur again in former helpdesk again, and need fracture maintenance process again, maintenance effect so again and again is not very It is good, can also severe jamming to the normal use of bridge, therefore, for this status, there is an urgent need to develop a kind of Bridge Cracks to fill out Clamping device is filled, to overcome the shortcomings of in currently practical application.
Utility model content
The purpose of this utility model is to provide a kind of Bridge Cracks to fill clamping device, improves the deficiencies in the prior art, It, which can fill Bridge Crack, steps up, and repairing effect is good, and crack is avoided to open again.
The embodiments of the present invention are achieved in that
A kind of Bridge Crack filling clamping device, including bridge and crack, crack are embedded in the upper surface that bridge is arranged in;
Crack has been internally embedded mounting groove, and filling slot is provided in mounting groove, and the top in crack is fixedly connected with installation Plate is provided with steel nail between mounting plate and mounting groove, the upper end of mounting plate offers injected hole and filling slot perforation connects, filling Regulating device is provided with above slot, regulating device includes column spinner, pinch column and movable balls, and one end of pinch column extends through The two sides of mounting groove, column spinner activity are fixedly connected through connecting plate with the other end of pinch column, and movable balls are arranged in column spinner Both ends.
Preferably, the mounting groove and filling slot are set as up-side down triangle, and mounting groove is the filling slot of reinforcing bar material, is filled out It fills in slot filled with fiber mixed mud.
Preferably, the pinch column is set as L shape, and the angle between pinch column and column spinner is 40 ° -60 °.
Preferably, the surface in the crack is provided with one layer of epoxy resin sand pulp layer.
Preferably, resin pouring layer and bitumen layer are successively arranged above the mounting plate.
Preferably, the mounting plate and mounting groove are fixedly connected by steel nail with bridge.
The utility model provides a kind of Bridge Crack filling clamping device, has the advantages that
(1) the utility model provides a kind of Bridge Crack filling clamping device, by the way that regulating device and mounting groove is arranged, Bridge Crack can be filled and be stepped up, repairing effect is good, and crack is avoided to open again.
(2) the utility model has the advantage of the epoxy resin sand pulp layer for being to be coated with can carry out reinforcing company to mounting groove It connects, it is made more to reinforce connection, the mounting groove of triangle increases the support force of mounting groove, keeps it firmer, increases bridge road The service life in face, and contain polypropylene fibre in filling slot in fiber concrete, the anti-permeability performance of concrete is substantially increased, Avoid the appearance in crack.
(3) by being provided with the mounting plate of resin pouring layer and bitumen layer, enhance the robustness of bridge pavement, pinch column with Angle between column spinner, and pinch column is L-shaped setting, can step up when column spinner rises to mounting groove, prevent It opens again in crack.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is the regulating device structural schematic diagram of the utility model.
Fig. 3 is enlarged structure schematic diagram at Figure 1A of the utility model.
In figure: 1- bridge;2- mounting plate;3- regulating device;4- injected hole;5- steel nail;6- mounting groove;7- filling slot;8- Column spinner;9- pinch column;10- movable balls;The crack 11-.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment:
Please refer to Fig. 1 to 3, in the utility model embodiment, a kind of Bridge Crack fills clamping device, including 1 He of bridge Crack 11, crack 11 are embedded in the upper surface that bridge 1 is arranged in, and the surface in crack 11 is provided with one layer of epoxy resin sand pulp layer, lead to Mounting groove 6 can be in reinforcement connection by crossing the epoxy resin sand pulp layer being coated with, it is made more to reinforce connection;
Crack 11 has been internally embedded mounting groove 6, and filling slot 7 is provided in mounting groove 6, and mounting groove 6 and filling slot 7 are set It is set to up-side down triangle, and mounting groove 6 is the filling slot 7 of reinforcing bar material, is filled with fiber mixed mud in filling slot 7, passes through triangle The mounting groove 6 of shape increases the support force of mounting groove 6, keeps it firmer, increase the service life of bridge pavement, and filling slot 7 Contain polypropylene fibre in interior fiber concrete, substantially increase the anti-permeability performance of concrete, avoids the appearance in crack, crack 11 Top be fixedly connected with mounting plate 2, mounting plate 2 is successively arranged resin pouring layer and bitumen layer above, by being provided with resin The mounting plate 2 of pouring layer and bitumen layer enhances the robustness of bridge pavement, is provided with steel nail between mounting plate 2 and mounting groove 6 5, mounting plate 2 and mounting groove 6 are fixedly connected by steel nail 5 with bridge 1, and the upper end of mounting plate 2 offers injected hole 4 and filling slot 7 perforation connections, the top of filling slot 7 are provided with regulating device 3, and regulating device 3 includes column spinner 8, pinch column 9 and movable balls 10, one end of pinch column 9 extends through the two sides of mounting groove 6, and pinch column 9 is set as L shape, and between pinch column 9 and column spinner 8 Angle be 40 ° -60 °, by the angle between pinch column 9 and column spinner 8, and pinch column 9 is L-shaped setting, can revolved Rotary column 8 steps up mounting groove 6 when rising, and prevents crack 12 from opening again, and 8 activity of column spinner is through mounting plate 2 and shrinks The other end of column 9 is fixedly connected, and the both ends of column spinner 8 are arranged in movable balls 10.
Working principle a, firstly, mounting groove 6 is first dug on the crack of bridge 1 11, with iron wire brush brush raked joint mouth, installation Slot 6 is fixed by steel nail 5, and in the crack of bridge 1,11 surrounding applies one layer of epoxy resin sand pulp layer, then out of injected hole 4 Fiber concrete is poured into filling slot 7, avoids the appearance in crack, 3 pairs of inside of regulating device of 6 top of mounting groove add Tightly, by movable balls 10, rotation pulls pinch column 9 to column spinner 8 upwards, tightens to mounting groove 6, last fixed mounting plate 2 Bridge road surface is filled.
To sum up, whole device stable structure, and Bridge Crack can be filled and be stepped up, repairing effect is good, avoids crack again Secondary opening.

Claims (6)

1. a kind of Bridge Crack fills clamping device, including bridge (1) and crack (11), crack (11) insertion is arranged in bridge (1) upper surface;
It is characterized in that, crack (11) have been internally embedded mounting groove (6), filling slot (7), crack are provided in mounting groove (6) (11) top is fixedly connected with mounting plate (2), is provided between mounting plate (2) and mounting groove (6) steel nail (5), mounting plate (2) Upper end offer injected hole (4) and filling slot (7) perforation and connect, be provided with regulating device (3) above filling slot (7);
Regulating device (3) includes column spinner (8), pinch column (9) and movable balls (10), and one end of pinch column (9) extends through peace The two sides of tankage (6), column spinner (8) activity are fixedly connected through mounting plate (2) with the other end of pinch column (9), movable balls (10) it is arranged at the both ends of column spinner (8).
2. Bridge Crack according to claim 1 fills clamping device, which is characterized in that the mounting groove (6) and filling Slot (7) is set as up-side down triangle, and mounting groove (6) is the filling slot (7) of reinforcing bar material, is mixed in filling slot (7) filled with fiber Soil.
3. Bridge Crack according to claim 1 fills clamping device, which is characterized in that the pinch column (9) is set as L Shape, and the angle between pinch column (9) and column spinner (8) is 40 ° -60 °.
4. Bridge Crack according to claim 1 fills clamping device, which is characterized in that the surface of the crack (11) is set It is equipped with one layer of epoxy resin sand pulp layer.
5. Bridge Crack according to claim 1 fills clamping device, which is characterized in that the mounting plate (2) above according to It is secondary to be equipped with resin pouring layer and bitumen layer.
6. Bridge Crack according to claim 1 fills clamping device, which is characterized in that the mounting plate (2) and installation Slot (6) is fixedly connected by steel nail (5) with bridge (1).
CN201822085484.0U 2018-12-12 2018-12-12 A kind of Bridge Crack filling clamping device Expired - Fee Related CN209260588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822085484.0U CN209260588U (en) 2018-12-12 2018-12-12 A kind of Bridge Crack filling clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822085484.0U CN209260588U (en) 2018-12-12 2018-12-12 A kind of Bridge Crack filling clamping device

Publications (1)

Publication Number Publication Date
CN209260588U true CN209260588U (en) 2019-08-16

Family

ID=67563066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822085484.0U Expired - Fee Related CN209260588U (en) 2018-12-12 2018-12-12 A kind of Bridge Crack filling clamping device

Country Status (1)

Country Link
CN (1) CN209260588U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735403A (en) * 2019-10-09 2020-01-31 北京夏都水利工程有限公司 Repair structure for bridge pier cracks and reinforcing method thereof
CN111455879A (en) * 2020-04-17 2020-07-28 赵春旭 Intelligent highway concrete bridge expansion joint transition area repairing structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735403A (en) * 2019-10-09 2020-01-31 北京夏都水利工程有限公司 Repair structure for bridge pier cracks and reinforcing method thereof
CN110735403B (en) * 2019-10-09 2021-03-02 北京夏都水利工程有限公司 Bridge pier crack repairing structure and reinforcing method thereof
CN111455879A (en) * 2020-04-17 2020-07-28 赵春旭 Intelligent highway concrete bridge expansion joint transition area repairing structure and construction method thereof
CN111455879B (en) * 2020-04-17 2020-12-04 赵春旭 Intelligent highway concrete bridge expansion joint transition area repairing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN206553864U (en) A kind of road and bridge crack bracing means
CN209260588U (en) A kind of Bridge Crack filling clamping device
CN207905121U (en) Precast concrete constraint slurry anchor overlaps connection structure
CN109457993A (en) A kind of concrete column restoring and fastening method
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN209482103U (en) A kind of highway pavement crack repairing structure
CN106759563A (en) A kind of device for pile foundation repairing and reinforcing and the construction method using the device
CN112391920B (en) Asphalt pavement local damage impermeability repairing method
CN207211388U (en) The vertical connection structure of precast shear wall
CN208777143U (en) A kind of oblique prestressing force cement concrete cracks repairing structure
CN208649917U (en) A kind of overhanging component bearing capacity stiffening device
CN208649865U (en) A kind of road and bridge crack ruggedized construction
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN206873734U (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN211228129U (en) Prefabricated roof beam hoist and mount hole block structure of assembling of festival section
CN214006188U (en) Prefabricated assembled type non-reinforced concrete beam-plate connecting joint
CN208039079U (en) A kind of road and bridge crack ruggedized construction
CN208266708U (en) A kind of road and bridge crack reparation structure
CN208121551U (en) A kind of assembled device of prefabricated pier shaft and prefabricated bent cap
CN103898839A (en) Bridge supplementary pile preloading consolidation method
CN209308012U (en) The connection structure of bored concrete pile and original base raft plate is mended after a kind of
CN208167443U (en) A kind of Prefabricated Concrete curb structure
CN208830150U (en) A kind of half grout sleeve connection prefabricated assembled FRP tendons material concrete center anticollision barrier
CN221167503U (en) Road and bridge crack reinforced structure
CN208685473U (en) A kind of road and bridge crack reparation fixed structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816