CN209701458U - A kind of water conservancy construction concrete bucket - Google Patents

A kind of water conservancy construction concrete bucket Download PDF

Info

Publication number
CN209701458U
CN209701458U CN201920203916.5U CN201920203916U CN209701458U CN 209701458 U CN209701458 U CN 209701458U CN 201920203916 U CN201920203916 U CN 201920203916U CN 209701458 U CN209701458 U CN 209701458U
Authority
CN
China
Prior art keywords
shell
energy storage
cavity
tank body
storage tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920203916.5U
Other languages
Chinese (zh)
Inventor
李静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Bo Industry Construction Co Ltd
Original Assignee
Zhejiang Bo Industry Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Bo Industry Construction Co Ltd filed Critical Zhejiang Bo Industry Construction Co Ltd
Priority to CN201920203916.5U priority Critical patent/CN209701458U/en
Application granted granted Critical
Publication of CN209701458U publication Critical patent/CN209701458U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of water conservancy construction concrete buckets, belong to concreting outfit technical field, its key points of the technical solution are that including the tank body that lower end offers opening, the tank body is hinged with the capping of opening and closing opening, the tank wall is hinged with the hydraulic cylinder of driving capping, the tank wall is provided with accumulation of energy structure, two five-way electromagnetic valves are connected between the hydraulic cylinder and accumulation of energy structure, the accumulation of energy structure includes energy storage tank, the energy storage tank is divided into two kinds and respectively the first energy storage tank and the second energy storage tank, two energy storage tanks are identical and including shell and the piston being slidably connected in shell, space in shell is separated into the first cavity and the second cavity by the piston, described piston rod one end passes vertically through shell and extends to outside shell, one of fixed company in the shell and piston rod It is connected to tank body, another is fixedly connected with hanging ring, and the utility model has the effect of increasing mobile space.

Description

A kind of water conservancy construction concrete bucket
Technical field
The utility model relates to concreting outfit technical fields, more specifically, it relates to which a kind of water conservancy construction is used Concrete bucket.
Background technique
With concrete bucket, the closure door of bottom during lifting is in close state water conservancy construction, in operation, will be mixed Solidifying soil is poured into cage, then needs the opening that will seal up a door, by concrete from the bottom of cage by concreting to required Place.
Currently, the Chinese CN202337487U patent that notification number is discloses the concrete horizontal with blanking guiding device Cage, including concrete horizontal cage, the cage connect material guiding hopper, and material guiding hopper connects blanking skin cylinder.The cage is equipped with Connecting plate, the material guiding hopper are equipped with otic placode, and connecting plate is fixedly connected with otic placode.The material guiding hopper by mostly with bolt and clamping plate with The connection of blanking skin cylinder.The material guiding hopper is conical hopper oval, lower mouth is rounded suitable for reading, is equipped with positioned at edge suitable for reading A pair of of otic placode, the edge Xia Kou are equipped with bolt hole.The blanking skin cylinder is rolled by rubber to be formed, is bolted into circle by multiple Tubular.
When prior art among the above has the following deficiencies: the opening for opening closure door, need to pass through Driven by Hydraulic Cylinder To the opening and closing of opening, for power mechanisms such as the external hydraulic cylinders of driving hydraulic cylinder need of work, so needing efferent duct in cage Connection, problem limited so as to cause the mobile space of cage, and then causing construction inconvenient.
Utility model content
The utility model aim is to provide a kind of water conservancy construction concrete bucket, be mentioned using accumulation of energy structure for hydraulic cylinder For power, the external connecting tube from cage is not needed, and then without limitation on the mobile space of cage, makes to construct more convenient.
The utility model to achieve the goals above, provides following technical solution: a kind of water conservancy construction is hung with concrete Tank offers the tank body of opening including lower end, and the tank body is hinged with the capping of opening and closing opening, and the tank wall is hinged with drive The hydraulic cylinder of dynamic capping, the tank wall are arranged promising hydraulic cylinder and provide the accumulation of energy structure of power, the hydraulic cylinder and accumulation of energy Two five-way electromagnetic valves of control hydraulic cylinder extension are connected between structure, the accumulation of energy structure includes energy storage tank, the accumulation of energy Tank is divided into two kinds and respectively the first energy storage tank and the second energy storage tank, two energy storage tanks it is identical and include shell and Space in shell is separated into the first cavity and the second cavity by the piston being slidably connected in shell, the piston, and described Hydraulic oil is filled in one cavity, described piston rod one end passes vertically through shell and extends to outside shell, the shell and piston One of them in bar is fixedly connected on tank body, another is fixedly connected with hanging ring, and two five-way electromagnetic valves are communicated with four The import of port valve, two five-way electromagnetic valves is connected to the A of four-way valve mouth, and the outlet of two five-way electromagnetic valves is with four The C mouth of port valve is connected to, and the first cavity of first energy storage tank and the second energy storage tank is connected to the B of four-way valve mouth and D mouthfuls respectively, When the A of four-way valve mouth is connected to its D mouthfuls, the B mouth of the four-way valve is connected to C mouthfuls.
By using above-mentioned technical proposal, when being sling cage by the hanging ring of the first energy storage tank, in cage gravity Under, piston and shell Relative sliding are to pressurize to the hydraulic oil in the first cavity, to provide power for hydraulic cylinder, no The external connecting tube from cage is needed, and then without limitation on the mobile space of cage, makes to construct more convenient;Hydraulic cylinder extension row Hydraulic oil out enters in the second energy storage tank, and then next time rises and sling cage by the hanging ring of the second energy storage tank, to reach The purpose of quick accumulation of energy.
The utility model is further arranged to: air bag is provided in the shell, the air bag is located in the first cavity.
By using above-mentioned technical proposal: alleviating impact when cage lifts by crane to the first hydraulic oil, reduction pair using air bag The damage of two five-way electromagnetic valves makes the variation of hydraulic fluid pressure in the first cavity of air pressure quick response in air bag.
The utility model is further arranged to: the shell is fixedly connected with hanging ring, and the piston rod is fixedly connected on tank Body.
By using above-mentioned technical proposal, so that piston be made to be located at the top of shell, hydraulic oil is located at the lower section of piston, subtracts The requirement of leakproofness, reduces difficulty of processing between small piston and interior of shell.
The utility model is further arranged to: the air bag include be fixedly connected on the first cavity inner wall the first film and Second film, the first film and piston contradict, and the hydraulic oil is located at the inner wall formation of the second film and the first cavity In cavity.
By using above-mentioned technical proposal, leakproofness is increased using the first film and the second film, further decreases work The requirement of leakproofness, reduces difficulty of processing between plug and interior of shell.
The utility model is further arranged to: the tank body upper end is cylindrical, and lower end is in truncated cone-shaped.
It is more thorough to draw off concrete out of cage by using above-mentioned technical proposal.
The utility model is further arranged to: the center of circle for covering arc-shaped and its rotation axis and being located at arc, described Tank body lower end is fixedly and coaxially connected the discharge duct communicated therewith, and the discharge duct lower end is in the arc being bonded with capping.
By using above-mentioned technical proposal, makes to cover significantly more efficient closed discharging mouth, reduce the leakage of concrete.
The utility model is further arranged to: the accumulation of energy structure there are two and using the central axis of tank body as symmetry axis Axisymmetricly it is arranged.
By using above-mentioned technical proposal, when lifting, is vertically arranged cage holding, and cage is avoided to tilt.
The utility model is further arranged to: the accumulation of energy structure further includes connecting rod, and the connecting rod is articulated with tank body Shell, the connecting rod both ends delay axially to offer waist-shaped hole, and the shell is fixedly connected with the connection being adapted to waist-shaped hole Axis, the connecting shaft piston rod are vertical.
Under the action of connecting rod, make the second energy storage tank when the work of the first energy storage tank by using above-mentioned technical proposal Shell overcomes the negative pressure of air bag to slide downwards, and hydraulic oil is facilitated to flow into the first cavity of the second energy storage tank.
In conclusion the utility model has the following beneficial effects:
First, under cage gravity, piston and shell are opposite when being sling cage by the hanging ring of the first energy storage tank Sliding, to provide power for hydraulic cylinder, does not need external from cage to pressurize to the hydraulic oil in the first cavity Connecting tube, and then without limitation on the mobile space of cage, make to construct more convenient;The hydraulic oil of hydraulic cylinder extension discharge enters the In two energy storage tanks, then next time rises and is sling cage by the hanging ring of the second energy storage tank, to achieve the purpose that quick accumulation of energy;
Second, alleviate impact to the first hydraulic oil when cage lifts by crane using air bag, reduce to two five-way electromagnetic valves Damage, makes the variation of hydraulic fluid pressure in the first cavity of air pressure quick response in air bag;
Third, energy storage equipment further includes connecting rod, the connecting rod is articulated with tank body shell, and the connecting rod both ends are delayed Waist-shaped hole axially is offered, the shell is fixedly connected with the connecting shaft being adapted to waist-shaped hole, when the work of the first energy storage tank, In Under the action of connecting rod, make the second energy storage tank shell that the negative pressure of air bag be overcome to slide downwards, hydraulic oil is facilitated to flow into the second accumulation of energy In first cavity of tank.
Detailed description of the invention
Fig. 1 is the perspective view of the present embodiment;
Fig. 2 is the structural schematic diagram that the present embodiment is used to show accumulation of energy structure;
Fig. 3 is the sectional view that the present embodiment is used to show energy storage tank.
Appended drawing reference: 1, tank body;2, it covers;3, hydraulic cylinder;4, accumulation of energy structure;5, two five-way electromagnetic valves;6, energy storage tank; 7, connecting rod;8, the first energy storage tank;9, the second energy storage tank;10, shell;11, piston;12, the first cavity;13, the second cavity; 14, piston rod;15, hanging ring;16, air bag;17, the first film;18, the second film;19, four-way valve;20, waist-shaped hole;21, it connects Axis;22, discharge duct.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of water conservancy construction concrete bucket, as shown in Figure 1, including that lower end offers the tank body 1 of opening, opening and closing opening Capping 2, hydraulic cylinder 3 and provide the accumulation of energy structure 4 of power for hydraulic cylinder 3.1 upper end of tank body is cylindrical, and lower end is in truncated cone-shaped. 1 bottom of tank body has been fixedly and coaxially connected discharge duct 22, the open communication of discharge duct 22 and tank body 1.Capping 2 is articulated under tank body 1 End, capping 2 is arc-shaped and its rotation is axially positioned at the center of circle of arc, and 22 lower end of discharge duct is in the arc being bonded with capping 2, is made 2 significantly more efficient closed discharging pipes 22 are covered, the leakage of concrete is reduced.3 one end of hydraulic cylinder is articulated with 1 side wall of tank body, another One end is articulated with capping 2.
As shown in Figures 2 and 3, two five that control hydraulic cylinder 3 stretches are connected between hydraulic cylinder 3 and accumulation of energy structure 4 to lead to Solenoid valve 5.There are two accumulation of energy structures 4 and is axisymmetricly arranged using the central axis of tank body 1 as symmetry axis.Accumulation of energy structure 4 is wrapped Include energy storage tank 6 and connecting rod 7.Energy storage tank 6 is divided to for two kinds and respectively the first energy storage tank 8 and the second energy storage tank 9.Two accumulation of energys Tank 6 is identical and including shell 10 and the piston 11 being slidably connected in shell 10.Shell 10 is cylindrical, piston 11 and outer 10 inner wall of shell adaptation, is separated into the first cavity 12 and the second cavity 13 for the space in shell 10.First cavity 12 is located at shell 10 lower section.11 upper surface of piston is fixedly connected with piston rod 14 vertically, and 14 one end of piston rod passes vertically through shell 10 and prolongs It extends to outside shell 10.Second cavity 13 is communicated with the atmosphere, and piston rod 14 passes through the second cavity 13 and is fixedly connected with tank body 1. Shell 10 is fixedly connected with hanging ring 15.When being sling cage using hanging ring 15, under the effect of gravity, piston 11 and shell 10 are opposite Sliding is to pressurize to the hydraulic oil in the first cavity 12, to provide power for hydraulic cylinder 3, does not need outer from cage It takes in succession, and then without limitation on the mobile space of cage, makes to construct more convenient.
As shown in figure 3, air bag 16 is arranged in shell 10, air bag 16 includes being fixedly connected on the first of 12 inner wall of the first cavity Film 17 and the second film 18.There are gap, the first film 17 and pistons 11 to contradict between the first film 17 and the second film 18, Hydraulic oil is located in the cavity of the inner wall formation of the second film 18 and the first cavity 12.Utilize the first film 17 and the second film 18 Leakproofness is increased, the requirement of leakproofness between 10 inside of piston 11 and shell is further decreased, reduces difficulty of processing.Simultaneously Alleviate impact when cage lifts by crane to hydraulic oil using air bag 16, reduces the damage to two five-way electromagnetic valves 5, make in air bag 16 The first cavity of air pressure quick response 12 in hydraulic fluid pressure variation.
As shown in Fig. 2, two five-way electromagnetic valves 5 are communicated with four-way valve 19, the import of two five-way electromagnetic valves 5 and four-way valve 19 A mouth connection, two outlets of two five-way electromagnetic valves 5 are connected to the C of four-way valve 19 mouth, the first energy storage tank 8 and second First cavity 12 of energy storage tank 9 is connected to the B of four-way valve 19 mouth and D mouthfuls respectively.When the A of four-way valve 19 mouth is connected to its D mouthfuls, The B mouth of four-way valve 19 is connected to C mouthfuls;When the A of four-way valve 19 mouth is connected to its B mouthfuls, the C mouth of four-way valve 19 is connected to D mouthfuls.
As shown in Fig. 2, making the A mouth and its B of four-way valve 19 when slinging cage first with the hanging ring 15 of the first energy storage tank 8 When mouth connection, the C mouth of four-way valve 19 is connected to D mouthfuls, and the hydraulic oil in the first cavity 12 is made to enter two five by four-way valve 19 The import of three-way electromagnetic valve 5, to provide kinetic energy for hydraulic cylinder 3;The hydraulic oil in the oil pocket of 3 compression end of hydraulic cylinder passes through two at this time The outlet of position five-way electromagnetic valve 5 enters the C mouth of four-way valve 19, hence into the first cavity of the second energy storage tank 9 being connected to D mouthfuls In 12.It, will using the hanging ring 15 of the second energy storage tank 6 when the hydraulic oil in the first energy storage tank 8 is not enough to provide driving hydraulic cylinder 3 Cage is sling, and when being connected to the A mouth of four-way valve 19 with its D mouthfuls, the B mouth of four-way valve 19 is connected to C mouthfuls, utilizes the second accumulation of energy Hydraulic oil driving hydraulic cylinder 3 in tank 6.
As shown in Fig. 2, connecting rod 7 is articulated with 1 outer wall of tank body, 7 both ends of connecting rod delay axially to offer waist-shaped hole 20, outside Shell 10 is fixedly connected with the connecting shaft 21 being adapted to waist-shaped hole 20, and connecting shaft 21 is vertical with piston rod 14, and 7 both ends of connecting rod place In in waist-shaped hole 20.When the work of the first energy storage tank 8, under the action of connecting rod 7,6 shell 10 of the second energy storage tank is made to overcome gas The negative pressure of capsule 16 slides downwards, and hydraulic oil is facilitated to flow into the first cavity 12 of the second energy storage tank 6.
The implementation principle of the present embodiment are as follows: when slinging cage first with the hanging ring 15 of the first energy storage tank 8, make four-way valve 19 A mouth when being connected to its B mouthfuls, the C mouth of four-way valve 19 is connected to D mouthfuls, and the hydraulic oil in the first cavity 12 is made to pass through four-way valve 19 Into the import of two five-way electromagnetic valves 5, to provide kinetic energy for hydraulic cylinder 3;Liquid in the oil pocket of 3 compression end of hydraulic cylinder at this time Pressure oil enters the C mouth of four-way valve 19 by the outlet of five-way electromagnetic valve, hence into the of the second energy storage tank 9 being connected to D mouthfuls In one cavity 12.When the hydraulic oil in the first energy storage tank 8 is not enough to provide driving hydraulic cylinder 3, hanging for the second energy storage tank 6 is utilized Ring 15 slings cage, and when being connected to the A mouth of four-way valve 19 with its D mouthfuls, the B mouth of four-way valve 19 is connected to C mouthfuls, utilizes Hydraulic oil driving hydraulic cylinder 3 in two energy storage tanks 6.The external connecting tube from cage is not needed, and then without limitation on the shifting of cage Dynamic space, makes to construct more convenient.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of water conservancy construction concrete bucket, the tank body (1) of opening is offered including lower end, the tank body (1) is hinged with Open and close the capping (2) of opening, the side walls hinged hydraulic cylinder (3) for having driving capping (2) of the tank body (1), it is characterised in that: described Tank body (1) side wall is arranged promising hydraulic cylinder (3) and provides the accumulation of energy structure (4) of power, the hydraulic cylinder (3) and accumulation of energy structure (4) Between be connected with two flexible five-way electromagnetic valves (5) of control hydraulic cylinder (3), the accumulation of energy structure (4) includes energy storage tank (6), The energy storage tank (6) is divided into two kinds and respectively the first energy storage tank (8) and the second energy storage tank (9), two energy storage tanks (6) Identical and include shell (10) and the piston (11) that is slidably connected in shell (10), the piston (11) is by shell (10) Interior space is separated into the first cavity (12) and the second cavity (13), is filled with hydraulic oil, the work in first cavity (12) Plug (11) upper surface is fixedly connected with piston rod (14) vertically, and described piston rod (14) one end passes vertically through shell (10) and prolongs Extend to shell (10) outside, one of them in the shell (10) and piston rod (14) is fixedly connected on tank body (1), another is solid Surely it is connected with hanging ring (15), two five-way electromagnetic valves (5) are communicated with four-way valve (19), two five-way electromagnetic valves (5) Import be connected to the A mouth of four-way valve (19), the outlet of two five-way electromagnetic valves (5) with the C mouth company of four-way valve (19) It is logical, the first cavity (12) of first energy storage tank (8) and the second energy storage tank (9) respectively with the B mouth of four-way valve (19) and D mouthfuls of companies Logical, when the A mouth of four-way valve (19) is connected to its D mouthfuls, the B mouth of the four-way valve (19) is connected to C mouthfuls.
2. a kind of water conservancy construction concrete bucket according to claim 1, it is characterised in that: set in the shell (10) It is equipped with air bag (16), the air bag (16) is located in the first cavity (12).
3. a kind of water conservancy construction concrete bucket according to claim 2, it is characterised in that: the shell (10) is fixed It is connected with hanging ring (15), the piston rod (14) is fixedly connected on tank body (1).
4. a kind of water conservancy construction concrete bucket according to claim 3, it is characterised in that: the air bag (16) includes It is fixedly connected on the first film (17) and the second film (18) of the first cavity (12) inner wall, the first film (17) and piston (11) it contradicts, the hydraulic oil is located in the cavity of the inner wall formation of the second film (18) and the first cavity (12).
5. a kind of water conservancy construction concrete bucket according to claim 4, it is characterised in that: tank body (1) upper end Cylindrical, lower end is in truncated cone-shaped.
6. a kind of water conservancy construction concrete bucket according to claim 5, it is characterised in that: the capping (2) is in arc Shape and its rotation axis are located at the center of circle of arc, and tank body (1) lower end is fixedly and coaxially connected the discharge duct (22) communicated therewith, Discharge duct (22) lower end is in the arc being bonded with capping (2).
7. a kind of water conservancy construction concrete bucket according to claim 6, it is characterised in that: the accumulation of energy structure (4) There are two and be axisymmetricly arranged as symmetry axis using the central axis of tank body (1).
8. a kind of water conservancy construction concrete bucket according to claim 7, it is characterised in that: the accumulation of energy structure (4) It further include connecting rod (7), the connecting rod (7) is articulated with tank body (1) shell (10), and connecting rod (7) both ends are delayed axial It offers waist-shaped hole (20), the shell (10) is fixedly connected with the connecting shaft (21) being adapted to waist-shaped hole (20), the connection Axis (21) piston rod (14) is vertical.
CN201920203916.5U 2019-02-16 2019-02-16 A kind of water conservancy construction concrete bucket Active CN209701458U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920203916.5U CN209701458U (en) 2019-02-16 2019-02-16 A kind of water conservancy construction concrete bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920203916.5U CN209701458U (en) 2019-02-16 2019-02-16 A kind of water conservancy construction concrete bucket

Publications (1)

Publication Number Publication Date
CN209701458U true CN209701458U (en) 2019-11-29

Family

ID=68641669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920203916.5U Active CN209701458U (en) 2019-02-16 2019-02-16 A kind of water conservancy construction concrete bucket

Country Status (1)

Country Link
CN (1) CN209701458U (en)

Similar Documents

Publication Publication Date Title
CN207268681U (en) Pouring pile hole bottom slurry sampler
CN202220340U (en) Underwater concreting conduit
CN206005661U (en) A kind of agricultural novel medicine liquid spray device
CN209701458U (en) A kind of water conservancy construction concrete bucket
CN110080198B (en) Energy-concerving and environment-protective type building rammer
CN201660900U (en) Hydraulic energy storage concrete horizontal tank
CN209640011U (en) A kind of environmental monitoring water-quality sampler
CN212539765U (en) Automatic powder sampling valve
CN208326248U (en) A kind of chemical industry storage tank that discharge port is adjustable
CN215487739U (en) Remove butt joint device for feed bin ejection of compact
CN205708369U (en) A kind of Mobile garbage compression box
JPS581686A (en) Switchgear for gate of packet
CN202911961U (en) Bulk head with double-cone sealing valve
CN109909286B (en) Agricultural soil prosthetic devices
CN207932243U (en) Vehicle-mounted collecting box
CN207226221U (en) Integrated garbage compression box
CN206146316U (en) Mine loading vessel
CN208119903U (en) A kind of groove tank
CN208203224U (en) The adaptive aperture well-flushing piston apparatus of gravity type
CN202157546U (en) Concrete hoisting ash bucket
CN221038153U (en) Water resource sampling Bei Leguan
CN209576452U (en) Agitator for mixed chemical raw material
CN213976083U (en) Vacuum feeding device
CN221031493U (en) Concrete hopper capable of preventing materials from leaking
CN209772026U (en) Glue injection test device