CN209696515U - A kind of emission-control equipment for paint spray booth - Google Patents
A kind of emission-control equipment for paint spray booth Download PDFInfo
- Publication number
- CN209696515U CN209696515U CN201821849433.4U CN201821849433U CN209696515U CN 209696515 U CN209696515 U CN 209696515U CN 201821849433 U CN201821849433 U CN 201821849433U CN 209696515 U CN209696515 U CN 209696515U
- Authority
- CN
- China
- Prior art keywords
- absorption chamber
- absorption
- block
- fixedly installed
- emission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Abstract
The utility model provides a kind of emission-control equipment for paint spray booth, is related to technical field of waste gas treatment.Realize the effect of the multi-absorption of the processing and exhaust gas of paint particle in exhaust gas.This is used for the emission-control equipment of paint spray booth, including absorption plant and cleaning plant, the cleaning plant is located at the side of absorption plant, the absorption plant includes the first absorption chamber, the right side of first absorption chamber is fixedly connected with the second absorption chamber by connecting tube, the inside of first absorption chamber and the second absorption chamber is placed with absorbing liquid, and the left bottom of first absorption chamber is fixedly installed with liquid outlet.This is used for the emission-control equipment of paint spray booth, remain paint particle at the top of filter screen, start hydraulic press, hydraulic press drives hydraulic stem to swing, it drives and is moved left and right far from the movable block of hydraulic press one end along first sliding groove positioned at hydraulic stem, cleaning operation is carried out to the paint particle at the top of filter screen.
Description
Technical field
The utility model relates to technical field of waste gas treatment, are particularly a kind of emission-control equipment for paint spray booth.
Background technique
Metal fixture will carry out paint spraying to metal surface after completing, and prevent the metal layer on metal fixture surface
Be corroded, existing paint spraying carries out generally inside paint spray booth, and paint discharge exhaust gas have paint particle and
Containing many harmful substances, cannot be directly discharged in atmosphere, it is necessary to pass through exhaust-gas treatment.
Traditional waste gas treatment equipment carries out the absorption of exhaust gas generally by activated carbon adsorption block, and active carbon is easy full
With need frequently to carry out to replace activated carbon adsorption block, operate more troublesome, and in exhaust gas therefore a large amount of paint particle can be
The sucking for blocking active carbon, is allowed to fail, influences the efficiency of exhaust-gas treatment, regarding to the issue above it is proposed that a kind of for spraying
The emission-control equipment of japanning room.
Utility model content
Goal of the invention provided by the utility model is to provide a kind of emission-control equipment for paint spray booth, this is used to spray
The emission-control equipment of japanning room realizes the effect of the multi-absorption of the processing and exhaust gas of paint particle in exhaust gas.
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of for the useless of paint spray booth
Flash Gas Compression Skid System, including absorption plant and cleaning plant, the cleaning plant are located at the side of absorption plant.
The absorption plant includes the first absorption chamber, and the right side of first absorption chamber is fixedly connected with the by connecting tube
The inside of two absorption chambers, first absorption chamber and the second absorption chamber is placed with absorbing liquid, the left side bottom of first absorption chamber
Portion is fixedly installed with liquid outlet, and the top right side of second absorption chamber is fixedly installed with inlet, first absorption chamber
Top is fixedly installed with air inlet, and the top left side of second absorption chamber is fixedly installed with gas outlet, first absorption chamber
Inside and be located above absorbing liquid and be fixedly installed with filter screen, the inner wall of first absorption chamber and the right side for being located at filter screen
Side offers sewage draining exit, the top of second absorption chamber and is located in the liquid inlet between gas outlet and is fixedly installed with motor, institute
The bottom for stating motor is fixedly connected with the machine shaft for absorbing chamber outer wall through second, the one end of the machine shaft far from motor
It is fixedly connected with connecting rod, the bottom of the connecting rod is fixedly connected with activated carbon adsorption block.
The cleaning plant includes movable block, and the left side on the left side outer wall of first absorption chamber and positioned at filter screen is solid
Dingan County is equipped with fixed block, is fixedly installed with hydraulic press at the top of the fixed block, the hydraulic press close to the first absorption chamber one
End is fixedly connected with the hydraulic stem for absorbing chamber outer wall through first, and the one end of the hydraulic stem far from hydraulic press is fixed with movable block
Connection, is fixedly installed with first sliding groove on the positive and negative inner wall of first absorption chamber, and the positive and negative two sides of the movable block pass through the
One sliding block is slidably connected with first sliding groove, and the bottom of the movable block is fixedly connected with Clean Brush for cleaning, first absorption chamber
Baffle is fixedly installed in outer right wall and on the right side of filter screen, the baffle offers second by paracentral side and slides
Slot, the second sliding slot are slidably connected by the second sliding block with the collection block being located on the right side of filter screen.
Preferably, the collection block offers opening close to the side of the first absorption chamber, and the opening for collecting block side is big
It is small equal in magnitude with sewage draining exit.
Preferably, it is contacted at the top of the bottom of the Clean Brush for cleaning and filter screen.
Preferably, the height of the absorbing liquid is greater than the height of connecting tube.
Preferably, the activated carbon adsorption block has multiple, and activated carbon adsorption block is evenly distributed on the bottom of connecting rod.
Preferably, the bottom of the second sliding slot is provided with block.
The utility model provides a kind of emission-control equipment for paint spray booth.Have it is following the utility model has the advantages that
1, the emission-control equipment for being used for paint spray booth is slided by movable block, fixed block, hydraulic press, hydraulic stem, first
Slot, the first sliding block, Clean Brush for cleaning, baffle, second sliding slot, the second sliding block and the joint setting for collecting block, it is residual at the top of filter screen
There are paint particles, start hydraulic press, and hydraulic press drives hydraulic stem to swing, and drive and are located at hydraulic stem far from hydraulic press one end
Movable block moved left and right along first sliding groove, at the top of filter screen paint particle carry out cleaning operation, when movable block bottom
Clean Brush for cleaning when clearing up paint particle on the right side of filter screen, the inside for collecting block is entered by sewage draining exit, when collecting in block
When the paint particle in portion is more, by the connection of the second sliding block and second sliding slot, block will be collected and take out cleaning upwards, cleaned out
It is placed back into original place again afterwards, completes the cleaning operation of paint particle inside exhaust gas.
2, the emission-control equipment for being used for paint spray booth, by the first absorption chamber, the second absorption chamber, connecting tube, absorbing liquid,
The joint setting of filter screen, sewage draining exit, motor, machine shaft, connecting rod and activated carbon adsorption block, when exhaust gas passes through filter screen,
Exhaust gas enters the inside of the second absorption chamber by absorbing liquid, and exhaust gas is absorbed portion in the inside of absorbing liquid, starts motor,
Motor drives connecting rod rotation by machine shaft, drives the moving in rotation for being located at the activated carbon adsorption block of connecting rod bottom, makes
Exhaust gas inside the second absorption chamber is finally discharged by gas outlet using the absorption of activated carbon adsorption block, realizes exhaust gas
Multi-absorption processing, reduce harmful substance in exhaust gas and enter atmosphere, improve the practicability of the device.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model absorption plant schematic diagram;
Fig. 3 is the utility model cleaning plant schematic diagram.
In figure: 1 absorption plant, 101 first absorption chambers, 102 second absorption chambers, 103 connecting tubes, 104 absorbing liquids, 105 go out
Liquid mouth, 106 inlets, 107 air inlets, 108 gas outlets, 109 filter screens, 110 sewage draining exits, 111 motors, 112 machine shafts,
113 connecting rods, 114 activated carbon adsorption blocks, 2 cleaning plants, 201 movable blocks, 202 fixed blocks, 203 hydraulic presses, 204 hydraulic stems,
205 first sliding grooves, 206 first sliding blocks, 207 Clean Brush for cleaning, 208 baffles, 209 second sliding slots, 210 second sliding blocks, 211 are collected
Block.
Specific embodiment
As shown in Figure 1-3, a kind of emission-control equipment for paint spray booth, including absorption plant 1 and cleaning plant 2, clearly
Reason device 2 is located at the side of absorption plant 1.
Absorption plant 1 includes the first absorption chamber 101, and the right side of the first absorption chamber 101 is fixedly connected by connecting tube 103
There is the second absorption chamber 102, the inside of the first absorption chamber 101 and the second absorption chamber 102 is placed with absorbing liquid 104, absorbing liquid 104
Height is greater than the height of connecting tube 103, and the left bottom of the first absorption chamber 101 is fixedly installed with liquid outlet 105, the second absorption chamber
102 top right side is fixedly installed with inlet 106, and the top of the first absorption chamber 101 is fixedly installed with air inlet 107, and second
The top left side of absorption chamber 102 is fixedly installed with gas outlet 108, the inside of the first absorption chamber 101 and is located at the upper of absorbing liquid 104
Side is fixedly installed with filter screen 109, the inner wall of the first absorption chamber 101 and right side opening for being located at filter screen 109 is equipped with sewage draining exit
110, it the top of the second absorption chamber 102 and is located in the liquid inlet between 106 and gas outlet 108 and is fixedly installed with motor 111, motor
111 bottom is fixedly connected with the machine shaft 112 through 102 outer wall of the second absorption chamber, and machine shaft 112 is far from motor 111
One end be fixedly connected with connecting rod 113, the bottom of connecting rod 113 is fixedly connected with activated carbon adsorption block 114, activated carbon adsorption
Block 114 has multiple, and activated carbon adsorption block 114 is evenly distributed on the bottom of connecting rod 113.
Cleaning plant 2 includes movable block 201, on the left side outer wall of the first absorption chamber 101 and is located at the left side of filter screen 109
Side is fixedly installed with fixed block 202, and the top of fixed block 202 is fixedly installed with hydraulic press 203, and hydraulic press 203 is inhaled close to first
The one end for receiving room 101 is fixedly connected with the hydraulic stem 204 through 101 outer wall of the first absorption chamber, and hydraulic stem 204 is far from hydraulic press
203 one end is fixedly connected with movable block 201, is fixedly installed with first sliding groove 205 on the positive and negative inner wall of the first absorption chamber 101,
The positive and negative two sides of movable block 201 are slidably connected by the first sliding block 206 with first sliding groove 205, and the bottom of movable block 201 is fixed to be connected
It is connected to Clean Brush for cleaning 207, the bottom of Clean Brush for cleaning 207 is contacted with the top of filter screen 109, outside the right side of the first absorption chamber 101
It is fixedly installed with baffle 208 on wall and positioned at the right side of filter screen 109, baffle 208 offers second by paracentral side and slides
Slot 209, the bottom of second sliding slot 209 are provided with block, and second sliding slot 209 is by the second sliding block 210 and is located at 109 right side of filter screen
The collection block 211 of side is slidably connected, and collects block 211 close to the side of the first absorption chamber 101 and offers opening, and collects block 211
The openings of sizes of side is equal in magnitude with sewage draining exit 110.
In use, paint particle rests on the top of filter screen 109, and exhaust gas passes through absorption when exhaust gas passes through filter screen 109
Liquid 104 enters the inside of the second absorption chamber 102, and exhaust gas is absorbed portion in the inside of absorbing liquid 104, starts motor 111,
Motor 111 drives connecting rod 113 to rotate by machine shaft 112, drives the activated carbon adsorption block for being located at 113 bottom of connecting rod
114 moving in rotation, make be located at the second absorption chamber 102 inside exhaust gas using activated carbon adsorption block 114 absorption, finally by
Gas outlet 108 is discharged, and realizes the multi-absorption processing of exhaust gas, paint particle is remained at the top of filter screen 109, starts liquid
Press 203, hydraulic press 203 drive hydraulic stem 204 to swing, and drive and are located at shifting of the hydraulic stem 204 far from 203 one end of hydraulic press
Motion block 201 is moved left and right along first sliding groove 205, is carried out cleaning operation to the paint particle at 109 top of filter screen, is worked as movement
When the Clean Brush for cleaning 207 of 201 bottom of block clears up paint particle to 109 right side of filter screen, passes through sewage draining exit 110 and enter and collect block
211 inside, when collect the paint particle inside block 211 it is more when, by the connection of the second sliding block 210 and second sliding slot 209,
Block 211 will be collected and take out cleaning upwards, be placed back into original place after cleaning out again, complete the cleaning behaviour of paint particle inside exhaust gas
Make.
Claims (6)
1. a kind of emission-control equipment for paint spray booth, including absorption plant (1) and cleaning plant (2), it is characterised in that: institute
State the side that cleaning plant (2) is located at absorption plant (1);
The absorption plant (1) includes the first absorption chamber (101), passes through connecting tube on the right side of first absorption chamber (101)
(103) it is fixedly connected with the second absorption chamber (102), the inside of first absorption chamber (101) and the second absorption chamber (102) is placed
Have absorbing liquid (104), the left bottom of first absorption chamber (101) is fixedly installed with liquid outlet (105), and described second absorbs
The top right side of room (102) is fixedly installed with inlet (106), be fixedly installed at the top of first absorption chamber (101) into
The top left side of port (107), second absorption chamber (102) is fixedly installed with gas outlet (108), first absorption chamber
(101) inside and being located above absorbing liquid (104) is fixedly installed with filter screen (109), first absorption chamber (101)
The inner wall and right side opening for being located at filter screen (109) is equipped with sewage draining exit (110), the top of second absorption chamber (102) and is located at
It is fixedly installed between inlet (106) and gas outlet (108) motor (111), the bottom of the motor (111) is fixedly connected with
Through the machine shaft (112) of the second absorption chamber (102) outer wall, the one end of the machine shaft (112) far from motor (111) is solid
Surely it is connected with connecting rod (113), the bottom of the connecting rod (113) is fixedly connected with activated carbon adsorption block (114);
The cleaning plant (2) includes movable block (201), on the left side outer wall of first absorption chamber (101) and is located at filtering
It is fixedly installed on the left of net (109) fixed block (202), is fixedly installed with hydraulic press at the top of the fixed block (202)
(203), the hydraulic press (203) is fixedly connected with through the first absorption chamber (101) outside close to the one end of the first absorption chamber (101)
The hydraulic stem (204) of wall, the hydraulic stem (204) are fixedly connected far from the one end of hydraulic press (203) with movable block (201), institute
It states and is fixedly installed on the positive and negative inner wall of the first absorption chamber (101) first sliding groove (205), positive and negative the two of the movable block (201)
Side is slidably connected by the first sliding block (206) with first sliding groove (205), and the bottom of the movable block (201) is fixedly connected with clearly
Clean hairbrush (207) in the outer right wall of first absorption chamber (101) and is located on the right side of filter screen (109) and is fixedly installed with
Baffle (208), the baffle (208) offer second sliding slot (209) by paracentral side, and the second sliding slot (209) is logical
It crosses the second sliding block (210) and is slidably connected with the collection block (211) being located on the right side of filter screen (109).
2. a kind of emission-control equipment for paint spray booth according to claim 1, it is characterised in that: the collection block
(211) side close to the first absorption chamber (101) offers opening, and collects the openings of sizes and sewage draining exit of block (211) side
(110) equal in magnitude.
3. a kind of emission-control equipment for paint spray booth according to claim 1, it is characterised in that: the Clean Brush for cleaning
(207) bottom is contacted with the top of filter screen (109).
4. a kind of emission-control equipment for paint spray booth according to claim 1, it is characterised in that: the absorbing liquid
(104) height is greater than the height of connecting tube (103).
5. a kind of emission-control equipment for paint spray booth according to claim 1, it is characterised in that: the active carbon is inhaled
Have for attached piece (114) multiple, and activated carbon adsorption block (114) is evenly distributed on the bottom of connecting rod (113).
6. a kind of emission-control equipment for paint spray booth according to claim 1, it is characterised in that: the second sliding slot
(209) bottom is provided with block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821849433.4U CN209696515U (en) | 2018-11-09 | 2018-11-09 | A kind of emission-control equipment for paint spray booth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821849433.4U CN209696515U (en) | 2018-11-09 | 2018-11-09 | A kind of emission-control equipment for paint spray booth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209696515U true CN209696515U (en) | 2019-11-29 |
Family
ID=68636342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821849433.4U Active CN209696515U (en) | 2018-11-09 | 2018-11-09 | A kind of emission-control equipment for paint spray booth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209696515U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111589234A (en) * | 2020-05-27 | 2020-08-28 | 成都阿瑜荣商贸有限公司 | Waste gas purification environmental protection equipment |
-
2018
- 2018-11-09 CN CN201821849433.4U patent/CN209696515U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111589234A (en) * | 2020-05-27 | 2020-08-28 | 成都阿瑜荣商贸有限公司 | Waste gas purification environmental protection equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208389613U (en) | A kind of waste gas treatment equipment with self-cleaning function | |
CN116481111A (en) | Intelligent fresh air energy-saving purification device for building construction | |
CN209696515U (en) | A kind of emission-control equipment for paint spray booth | |
CN116392932A (en) | Ecological protection device and method for purifying industrial waste gas | |
CN209612454U (en) | A kind of fountain dedusting deodorizing device | |
CN214635114U (en) | Waste gas purification device capable of filtering and collecting dust | |
CN208320333U (en) | A kind of easy building dust-extraction unit | |
CN109621609A (en) | A kind of coating cloud collection device | |
CN218358086U (en) | Waste gas dust removal filter equipment | |
CN208082774U (en) | A kind of spray room ventilation equipment | |
CN209108880U (en) | A kind of environmental protection purifying equipment | |
CN201361496Y (en) | Automatic oil removing device | |
CN110354601A (en) | A kind of administering method of industrial air pollution object | |
CN109011865A (en) | A kind of VOCs industrial waste gas processing system | |
CN208943777U (en) | A kind of rubber seal production dust treatment device | |
CN213699272U (en) | Based on green exhaust treatment device for construction | |
CN213790689U (en) | Atomizing interception waste gas treatment device | |
CN109621616B (en) | High efficiency coking exhaust treatment device | |
CN112973327A (en) | Fly ash treatment device suitable for waste incineration power plant | |
CN207056215U (en) | A kind of industrial furnace filtrating smoke dust retracting device | |
CN109569153A (en) | A kind of low-cost high-efficiency metal grinding dust removing device | |
CN217247828U (en) | High-efficient cascade cabinet exhaust-gas treatment equipment | |
CN216726479U (en) | Smoke dust treatment device for hand-fired boiler | |
CN213375748U (en) | Energy-concerving and environment-protective organic waste gas treatment device | |
CN216062488U (en) | Dust collecting equipment with reverse cleaning effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |