CN209686906U - A kind of construction safety device - Google Patents

A kind of construction safety device Download PDF

Info

Publication number
CN209686906U
CN209686906U CN201822004879.3U CN201822004879U CN209686906U CN 209686906 U CN209686906 U CN 209686906U CN 201822004879 U CN201822004879 U CN 201822004879U CN 209686906 U CN209686906 U CN 209686906U
Authority
CN
China
Prior art keywords
fixedly connected
slide bar
protective net
baffle
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822004879.3U
Other languages
Chinese (zh)
Inventor
石艳秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822004879.3U priority Critical patent/CN209686906U/en
Application granted granted Critical
Publication of CN209686906U publication Critical patent/CN209686906U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of construction safety devices, it is related to technical field of building construction, it includes fixed frame, it is linked up with there are three being respectively fixedly connected with the left side of the fixed frame inner wall, the hook is socketed in link, and three links are respectively fixedly connected in the left side of protective net, and the right side of the protective net is respectively fixedly connected with there are two the first fixed plate, first fixed plate is located in the first card slot, and the upper surface of first fixed plate is provided with through-hole.The construction safety device, pass through the mutual cooperation between protective net, second baffle, the second slide bar, the second card slot, handle, thread cap, bearing, threaded post, fixed link, the first sliding sleeve, the first slide bar, the first fixed plate, the first card slot, pull ring, first baffle, through-hole, link and hook, to take out protective net, so that staff completes the disassembly to protective net, to bring conveniently to staff to the replacement of protective net.

Description

A kind of construction safety device
Technical field
The utility model relates to technical field of building construction, specially a kind of construction safety device.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
In high-building construction, protective net is often used, but protective net is easy for later for a long time using the time It is damaged, traditional protective net is pricked on fixed frame using iron wire mostly, so that if protective net damage occurs and needs Staff is just needed to be dismantled when replacement with a series of cumbersome steps, thus to staff to the replacement band of protective net Trouble is carried out.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of construction safety device, solves Construction often uses protective net, but protective net is easy for later for a long time using the time in high-building construction It is damaged, traditional protective net is pricked on fixed frame using iron wire mostly, so that if protective net damage occurs and needs Staff is just needed to be dismantled when replacement with a series of cumbersome steps, thus to staff to the replacement band of protective net The problem of trouble is carried out.
(2) technical solution
To achieve the above objectives, the technical scheme adopted by the utility model is that: a kind of construction safety device, Including fixed frame, the left side of the fixed frame inner wall is respectively fixedly connected with there are three hook, and the hook is socketed in link, And three links are respectively fixedly connected in the left side of protective net, the right side of the protective net is respectively fixedly connected with that there are two the One fixed plate, first fixed plate are located in the first card slot, and the upper surface of first fixed plate is provided with through-hole.
The first slide bar is provided in the through-hole, the lower surface of first slide bar is fixedly connected with pull unit, described First slide bar is socketed in the first sliding sleeve, and the left side of two the first sliding sleeves is fixed with the right side of the same fixed link and connected It connects, the right side of the fixed link is fixedly connected with the left end of threaded post, and the outer surface thread of the threaded post is connected with screw thread Cap.
The outer surface of the thread cap is socketed with bearing, and the bearing is connected to the right side of fixed frame, the thread cap Outer surface offer several the second card slots, the outer surface of the thread cap is connected with handle, the right end of the threaded post with The left side of third fixed plate is fixedly connected.
Preferably, the pull unit includes first baffle, the upper surface of the first baffle respectively with the first spring Bottom end is fixedly connected with the lower surface of the first slide bar, and the lower surface of the first baffle is provided with pull ring.
Preferably, the right side of the fixed frame inner wall is fixedly connected by telescopic rod with the right side of fixed link, described The quantity of telescopic rod is two.
Preferably, the outer surface of first slide bar is socketed with the first spring, and the both ends of first spring are respectively with The lower surface of one sliding sleeve is fixedly connected with the upper surface of first baffle.
Preferably, the right side of the fixed frame is fixedly connected with the left side of the second fixed plate, second fixed plate Upper surface be connected with the second sliding sleeve, be socketed with the second slide bar in second sliding sleeve, the lower surface of second slide bar and the The upper surface of two baffles is fixedly connected, and the top of second slide bar is located in the second card slot.
Preferably, the outer surface of second slide bar is socketed with second spring, and the both ends of the second spring are respectively with The lower surface of two sliding sleeves is fixedly connected with the upper surface of second baffle.
(3) beneficial effect
The utility model has the beneficial effects that:
1, the construction safety device by protective net, second baffle, the second slide bar, the second card slot, turns , thread cap, bearing, threaded post, fixed link, the first sliding sleeve, the first slide bar, the first fixed plate, the first card slot, pull ring, first Mutual cooperation between baffle, through-hole, link and hook, when needing to dismantle protective net, staff is pulled downward on Second baffle inverts handle, so that handle so that second baffle drives the second slide bar to move down and be detached from the second card slot manually Reversion drives thread cap to invert in bearing, so that threaded post is moved to the left under the connection function with thread cap, so that screw thread Column drives fixed link to be moved to the left, so that fixed link drives the first sliding sleeve and the first slide bar to be moved to the left, so that the first slide bar band Dynamic first fixed plate is moved to the left and is detached from the first card slot, and staff stops operating handle, two pull rings is pulled, so that two Pull ring passes through two first baffles respectively and drives two the first slide bars relative movements, so that the first slide bar is detached from through-hole, work at this time Protective net is lifted as personnel, so that three links are separated with three hooks respectively, so that protective net is taken out, so that staff is complete The disassembly of pairs of protective net, to be brought conveniently to staff to the replacement of protective net.
2, the construction safety device is turned by the way that telescopic rod is arranged so as to avoid when staff's rotation When so that handle drive thread cap rotate and drive screw thread and fixed link to turn together in bearing with the rotation of thread cap Dynamic problem.
3, the construction safety device, by second baffle, the second slide bar, second spring, the second sliding sleeve and Mutual cooperation between second card slot, when being installed to protective net, staff unclamps second baffle, so that second spring The elastic force that can use itself pushes the second slide bar to move up in the second sliding sleeve, so that the second slide bar is caught in the second card slot, To which thread cap be fixed, the case where loosening so as to avoid thread cap.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure that the utility model is faced;
Fig. 2 is the structural schematic diagram amplified at the utility model A;
Fig. 3 is the structural schematic diagram amplified at the utility model B;
Fig. 4 is the structural schematic diagram amplified at the utility model C.
In figure: 1 fixed frame, 2 hooks, 3 links, 4 protective nets, 5 first fixed plates, 6 first card slots, 7 through-holes, 8 first are slided Bar, 9 first sliding sleeves, 10 pull unit, 101 first baffles, 102 pull rings, 11 first springs, 12 fixed links, 13 telescopic rods, 14 spiral shells Line column, 15 thread caps, 16 bearings, 17 second card slots, 18 second slide bars, 19 second sliding sleeves, 20 second fixed plates, 21 second gear Plate, 22 second springs, 23 handles, 24 third fixed plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figs 1-4, the utility model provides a kind of technical solution: a kind of construction safety device, packet Fixed frame 1 is included, the left side of 1 inner wall of fixed frame is respectively fixedly connected with there are three hook 2, and hook 2 is socketed in link 3, passes through Setting hook 2 and link 3, so that when link 3 is caught in hook 2, so as to complete the fixation to 4 left side of protective net, thus not Staff is needed to tighten protective net 4 with iron wire and be fixed, thus to staff to the installation side of bringing of protective net 4 Just, and three links 3 are respectively fixedly connected in the left side of protective net 4, there are two the right side of protective net 4 is respectively fixedly connected with First fixed plate 5, the first fixed plate 5 is located in the first card slot 6, by being caught in the first fixed plate 5 in first card slot 6, thus Can complete the fixation to the right side of protective net 4, to facilitate installation of the staff to protective net 4, the first fixed plate 5 it is upper Surface is provided with through-hole 7.
The first slide bar 8 is provided in through-hole 7, by the way that the first slide bar 8 is arranged, so that can be with when threaded post 14 moves left and right The first sliding sleeve 9 and the first slide bar 8 is driven to move left and right by fixed link 12, so that move left and right can band for the first slide bar 8 Dynamic first fixed plate 5 moves left and right, to complete the dismounting and fixation to the first fixed plate 5, the lower surface of the first slide bar 8 is fixed Be connected with pull unit 10, pull unit 10 includes first baffle 101, the upper surface of first baffle 101 respectively with the first spring 11 bottom end is fixedly connected with the lower surface of the first slide bar 8, and the lower surface of first baffle 101 is provided with pull ring 102, passes through setting Pull ring 102, so that staff pulls the first slide bar 8 more convenient by pull ring 102 and first baffle 101, the first 8 sets of slide bar It connects in the first sliding sleeve 9, the outer surface of the first slide bar 8 is socketed with the first spring 11, by the way that the first spring 11 is arranged, so that working as work Make personnel unclamp pull ring 102 when so that the first spring 11 using itself elastic force drive the first slide bar 8 in the first sliding sleeve 9 to Upper movement is simultaneously caught in through-hole 7, to complete fixation to the first fixed plate 5, the both ends of the first spring 11 respectively with the first sliding sleeve 9 Lower surface be fixedly connected with the upper surface of first baffle 101, and the left side of two the first sliding sleeves 9 with the same fixed link 12 right side is fixedly connected, and the right side of 1 inner wall of fixed frame is fixedly connected by telescopic rod 13 with the right side of fixed link 12, The quantity of telescopic rod 13 be two, by be arranged telescopic rod 13, so as to avoid when staff rotate handle 23 when so that turn Rotate and drive screw thread and fixed link 12 to turn together in bearing 16 with the rotation of thread cap 15 23 drive thread caps 15 The right side of dynamic problem, fixed link 12 is fixedly connected with the left end of threaded post 14, and the outer surface thread of threaded post 14 is connected with Thread cap 15.
The outer surface of thread cap 15 is socketed with bearing 16, by the way that bearing 16 is arranged, so that thread cap 15 can be in axis The more stable of 16 interior rotations is held, bearing 16 is connected to the right side of fixed frame 1, and the outer surface of thread cap 15 offers several Second card slot 17, by the way that the second card slot 17 is arranged, so that when the second slide bar 18 is caught in the second card slot 17, it can be to thread cap 15 It is fixed, thus the case where preventing thread cap 15 oneself to loosen, the left side of the right side of fixed frame 1 and the second fixed plate 20 Face is fixedly connected, and the upper surface of the second fixed plate 20 is connected with the second sliding sleeve 19, and the second slide bar 18 is socketed in the second sliding sleeve 19, The lower surface of second slide bar 18 is fixedly connected with the upper surface of second baffle 21, and the top of the second slide bar 18 is located at the second card slot 17 Interior, the outer surface of the second slide bar 18 is socketed with second spring 22, the both ends of second spring 22 following table with the second sliding sleeve 19 respectively Face is fixedly connected with the upper surface of second baffle 21, passes through second baffle 21, the second slide bar 18, second spring 22, the second sliding sleeve 19 and the second mutual cooperation between card slot 17, when being installed to protective net 4, staff unclamps second baffle 21, makes Second spring 22 can use itself elastic force the second slide bar 18 pushed to move up in the second sliding sleeve 19 so that second sliding Bar 18 is caught in the second card slot 17, thus the case where being fixed to thread cap 15, loosening so as to avoid thread cap 15, thread cap 15 outer surface is connected with handle 23, by the way that handle 23 is arranged, so that staff rotates thread cap 15 more by handle 23 Convenient, the right end of threaded post 14 is fixedly connected with the left side of third fixed plate 24.
The operating procedure of the utility model are as follows:
S1, when needing to dismantle protective net 4, staff pulls downward on second baffle 21, so that second baffle 21 the second slide bars 18 of drive move down and are detached from the second card slot 17, invert handle 23 manually, so that the reversion of handle 23 drives spiral shell Line cap 15 inverts in bearing 16 so that threaded post 14 be moved to the left under the connection function of thread cap 15 so that threaded post 14 drive fixed links 12 are moved to the left, so that fixed link 12 drives the first sliding sleeve 9 and the first slide bar 8 to be moved to the left, so that first Slide bar 8 drives the first fixed plate 5 to be moved to the left and be detached from the first card slot 6, and staff stops operating handle 23, pulls two drawings Ring 102, so that two pull rings 102 drive two the first slide bar 8 relative movements by two first baffles 101 respectively, so that the One slide bar 8 is detached from through-hole 7, and staff lifts protective net 4 at this time, so that three links 3 are separated with three hooks 2 respectively, from And protective net 4 is taken out, so that staff completes the disassembly to protective net 4;
S2, when needing to install protective net 4, staff lifts protective net 4, so that three links 3 block respectively Enter three hooks 2, pull two pull rings 102, so that two pull rings 102 drive two the by two first baffles 101 respectively The relative movement of one slide bar 8, puts down protective net 4, unclamps pull ring 102, so that the first spring 11 drives first using the elastic force of itself Slide bar 8 moves up in the first sliding sleeve 9 and is caught in through-hole 7, pulls downward on second baffle 21, so that second baffle 21 drives the Two slide bars 18 move down and are detached from the second card slot 17, rotate forward handle 23 manually, drive thread cap 15 to exist so that handle 23 rotates forward Rotate forward in bearing 16 so that threaded post 14 with move right under the connection function of thread cap 15 so that threaded post 14 drive it is solid Fixed pole 12 moves right, so that fixed link 12 drives the first sliding sleeve 9 and the first slide bar 8 to move right, so that the first slide bar 8 drives First fixed plate 5 moves right and is caught in the first card slot 6, and staff stops operating handle 23 at this time, so as to complete to anti- The installation of protective net 4;
S3, when being installed to protective net 4, staff unclamps second baffle 21, allows second spring 22 sharp The second slide bar 18 is pushed to move up in the second sliding sleeve 19 with the elastic force of itself, so that the second slide bar 18 is caught in the second card slot 17, thus the case where being fixed to thread cap 15, being loosened so as to avoid thread cap 15.
Above-described specific embodiment, to the purpose of this utility model, technical scheme and beneficial effects carried out into One step is described in detail, it should be understood that being not used to limit the foregoing is merely specific embodiment of the present utility model The utility model processed, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done, It should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of construction safety device, including fixed frame (1), it is characterised in that: fixed frame (1) inner wall Left side is respectively fixedly connected with there are three (2) are linked up with, and the hook (2) is socketed in link (3), and three links (3) are respectively It is fixedly connected on the left side of protective net (4), the right side of the protective net (4) is respectively fixedly connected with that there are two the first fixed plates (5), first fixed plate (5) is located in the first card slot (6), and the upper surface of first fixed plate (5) is provided with through-hole (7);
It is provided with the first slide bar (8) in the through-hole (7), the lower surface of first slide bar (8) is fixedly connected with pull unit (10), first slide bar (8) is socketed in the first sliding sleeve (9), and the left side of two the first sliding sleeves (9) with it is same solid The right side of fixed pole (12) is fixedly connected, and the right side of the fixed link (12) is fixedly connected with the left end of threaded post (14), institute The outer surface thread for stating threaded post (14) is connected with thread cap (15);
The outer surface of the thread cap (15) is socketed with bearing (16), and the bearing (16) is connected to the right side of fixed frame (1), The outer surface of the thread cap (15) offers several the second card slots (17), and the outer surface of the thread cap (15), which is connected with, to be turned The right end of (23), the threaded post (14) is fixedly connected with the left side of third fixed plate (24).
2. a kind of construction safety device according to claim 1, it is characterised in that: the pull unit It (10) include first baffle (101), the upper surface of the first baffle (101) bottom end and first with the first spring (11) respectively The lower surface of slide bar (8) is fixedly connected, and the lower surface of the first baffle (101) is provided with pull ring (102).
3. a kind of construction safety device according to claim 1, it is characterised in that: the fixed frame (1) The right side of inner wall is fixedly connected by telescopic rod (13) with the right side of fixed link (12), and the quantity of the telescopic rod (13) is Two.
4. a kind of construction safety device according to claim 2, it is characterised in that: first slide bar (8) outer surface is socketed with the first spring (11), the both ends of first spring (11) lower surface with the first sliding sleeve (9) respectively It is fixedly connected with the upper surface of first baffle (101).
5. a kind of construction safety device according to claim 1, it is characterised in that: the fixed frame (1) Right side be fixedly connected with the left side of the second fixed plate (20), the upper surface of second fixed plate (20) is connected with second Sliding sleeve (19), second sliding sleeve (19) is interior to be socketed with the second slide bar (18), the lower surface and second of second slide bar (18) The upper surface of baffle (21) is fixedly connected, and the top of second slide bar (18) is located in the second card slot (17).
6. a kind of construction safety device according to claim 5, it is characterised in that: second slide bar (18) outer surface is socketed with second spring (22), the both ends of the second spring (22) following table with the second sliding sleeve (19) respectively Face is fixedly connected with the upper surface of second baffle (21).
CN201822004879.3U 2018-12-02 2018-12-02 A kind of construction safety device Expired - Fee Related CN209686906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822004879.3U CN209686906U (en) 2018-12-02 2018-12-02 A kind of construction safety device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822004879.3U CN209686906U (en) 2018-12-02 2018-12-02 A kind of construction safety device

Publications (1)

Publication Number Publication Date
CN209686906U true CN209686906U (en) 2019-11-26

Family

ID=68595448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822004879.3U Expired - Fee Related CN209686906U (en) 2018-12-02 2018-12-02 A kind of construction safety device

Country Status (1)

Country Link
CN (1) CN209686906U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605240A (en) * 2021-07-23 2021-11-05 中铁上海工程局集团有限公司 Assembled bridge construction is with scaffold that has protective structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605240A (en) * 2021-07-23 2021-11-05 中铁上海工程局集团有限公司 Assembled bridge construction is with scaffold that has protective structure

Similar Documents

Publication Publication Date Title
CN209686906U (en) A kind of construction safety device
CN206623032U (en) A kind of rolling mill bearing dismantling device
CN209786629U (en) Auxiliary device for replacing tension glass insulator of power transmission line
CN211198006U (en) Recovery unit of non-woven fabrics leftover bits
CN208485519U (en) A kind of subway work handling device
CN203497960U (en) Plate overturning device for tower crane auxiliary arm
CN204891047U (en) Portable hand formula lift horizontal bar
CN215254364U (en) Scaffold frame securing device
CN207063503U (en) A kind of scaffold
CN206925785U (en) A kind of nut pin locating tool of automatic nut machine
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN207958743U (en) A kind of weaving is with boiling yarn pot
CN208650551U (en) A kind of construction and decoration floor tile provision for disengagement
CN219154502U (en) Transfer device for cleaning aluminum profile
CN221277192U (en) Scaffold convenient to dismantle installation
CN215240736U (en) Engine maintenance is with upset rack
CN208744792U (en) A kind of fastener effect is good and the civil engineering pipe fitting rack that can be recycled
CN209634154U (en) A kind of traditional Chinese Painting pigment apparatus for placing
CN205419259U (en) Wire rope takes turns support
CN203917118U (en) Medicinal material soil impurity scavenge unit
CN204879288U (en) Transition roller elevation adjusting device
CN216138842U (en) Auxiliary device is dismantled to steam turbine cylinder nut
CN217609488U (en) Dislocation drum gear shaft takes out instrument
CN217781779U (en) Hanging basket suspension casting side span cast-in-place section support structure
CN205057453U (en) Beam -pumping unit horse head pin stripper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191126

Termination date: 20211202