- CN209670359U CN209670359U CN201920245227.0U CN201920245227U CN209670359U CN 209670359 U CN209670359 U CN 209670359U CN 201920245227 U CN201920245227 U CN 201920245227U CN 209670359 U CN209670359 U CN 209670359U
- Authority
- CN
- China
- Prior art keywords
- cement
- staving
- blanking
- pouring
- cover board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004568 cement Substances 0.000 title claims abstract description 47
- 238000007789 sealing Methods 0.000 claims abstract description 16
- 230000001105 regulatory effect Effects 0.000 claims abstract description 10
- 229910000639 Spring steel Inorganic materials 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 18
- 239000002002 slurry Substances 0.000 description 9
- 238000000034 method Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 235000014820 Galium aparine Nutrition 0.000 description 1
- 240000005702 Galium aparine Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to constructing device technical fields, disclose a kind of cement pail that can pour blanking.The utility model includes staving, the handle being hinged on above staving, and is arranged in the intracorporal sealing regulating of bucket;Staving is enclosed by side wall and bottom plate, and pouring hole is offered on bottom plate, and sealing regulating is arranged above pouring hole;Sealing regulating includes the seal cover board being covered on pouring hole, the lifting rod on seal cover board, and the release link for resetting seal cover board;Release link is arc strut made of spring steel is bent, and one end is connect with side wall inner surfaces, the upper surface connection of the other end and seal cover board.The utility model structure is simple, easy to operate, and construction efficiency is high.
Description
Technical field
The utility model relates to constructing device technical fields, and the cement pail of blanking can be poured more particularly to one kind.
Background technique
Small-sized cement pail is one of the tool often used in building construction process, and construction worker is frequently necessary to make
A small amount of cement slurry is filled with this small-sized cement bucket, until construction location carries out the construction such as some masonry or details closure, or
Person it is simple be used to transport cement slurry to construction location.
Existing cement pail arrangements are fairly simple, also without too many other function and effect, an only pail, only
It can load and transport cement slurry, after reaching construction location, need construction personnel manually by building implements such as cleavers by cement
Slurry, which shovels out, to be come, and is applied to construction location, can not be directly realized by the effect for pouring blanking, and it is poor to use convenience, time-consuming and laborious,
Construction efficiency is low.
Utility model content
It is simple that the utility model provides a kind of structure, easy to operate, the high cement pail for pouring blanking of construction efficiency.
The technical issues of solution is: existing cement pail can only load and transport cement slurry, can not be directly realized by and pour
The effect for building blanking, uses that convenience is poor, and time-consuming and laborious, construction efficiency is low.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model can pour the cement pail of blanking, including staving, the handle being hinged on above staving, and setting
In the intracorporal sealing regulating of bucket;
Staving is enclosed by side wall and bottom plate, and pouring hole is offered on bottom plate, and sealing regulating is arranged in pouring hole
Top;
Sealing regulating includes the seal cover board being covered on pouring hole, the lifting rod on seal cover board, and
Release link for resetting seal cover board;
Release link is arc strut made of spring steel is bent, and one end is connect with side wall inner surfaces, the other end and sealing cover
The upper surface of plate connects.
The utility model can pour the cement pail of blanking, and further, the side wall is connected smoothly with bottom plate, institute
The junction for stating side wall and bottom plate is arc surface.
The utility model can pour the cement pail of blanking, and further, the pouring hole is located at the geometric center of bottom plate
Position.
The utility model can pour the cement pail of blanking, and further, the pouring hole is radius no more than 80mm's
Circular hole, and the diameter of pouring hole is not more than the 2/3 of bottom plate diameter.
The utility model can pour the cement pail of blanking, and further, the lifting rod is arranged perpendicular to seal cover board,
It is arranged higher than staving upper edge, lifting rod top is provided with lifting ring.
The utility model can pour the cement pail of blanking, and further, the corresponding central angle of the release link is 95-
110°。
The utility model can pour the cement pail of blanking, further, described release link one end and side wall top edge
The distance between be not less than staving height 1/3.
The utility model can pour the cement pail of blanking, and further, the quantity of the release link is 1, release link
End and the center of seal cover board connect.
The utility model can pour the cement pail of blanking, and further, the quantity of the release link is at least two, with
The vertical central axes of seal cover board are axial symmetry setting.
The utility model can pour the cement pail of blanking, further, be additionally provided with a pair of of positioning on the outside of the staving
Rope, positioning rope are axial symmetry setting using the vertical central axes of staving, and one end is detachably fixed with side wall, the other end naturally droop to
Below staving.
The utility model can pour the cement pail of blanking compared with prior art, have the following beneficial effects:
The cement pail arrangements that the utility model can pour blanking are simple, covered by the seal cover board that can be automatically reset
On the pouring hole of staving bottom, the opening and closing of pouring hole can be realized at any time, it is easy to use, it controls freely, Ke Yiyou
Direct blanking greatly reduces the workload of constructing operation personnel to construction location in cement pail, time saving and energy saving, improves and applies
Work efficiency rate.
The utility model can not only be used to load construction material, automatic blanking can also be realized, by simply pulling
Lift ring can moving sealed closure plate, realize blanking;When without blanking, it also can be used as common barrel of cement and use, absolutely not
It influences, scene turnover flexibility is good.
The cement pail for pouring blanking of the utility model is described further with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the external structure schematic diagram for the cement pail that the utility model can pour blanking;
Fig. 2 is the schematic diagram of internal structure for the cement pail that the utility model can pour blanking.
Appended drawing reference:
1- staving;11- side wall;12- bottom plate;2- handle;3- pouring hole;4- seal cover board;5- lifting rod;6- lifts ring;
7- release link;8- positioning rope.
Specific embodiment
As depicted in figs. 1 and 2, it includes staving 1 that the utility model, which can pour the cement pail of blanking, is hinged on staving 1
The handle 2 of side, and the sealing regulating being arranged in staving 1.
Staving 1 is enclosed by side wall 11 and bottom plate 12, and side wall 11 is connected smoothly with bottom plate 12, side wall 11 and bottom plate
12 junction is arc surface, and side wall 11 and bottom plate 12 are the stainless steel plate that thickness is not more than 6mm;On the bottom plate 12 of staving 1
Pouring hole 3 is offered, pouring hole 3 is located at the geometric center position of bottom plate 12, and the circular hole of 80mm, and pouring hole are not more than for radius
3 diameter is not more than the 2/3 of 12 diameter of bottom plate.
Sealing regulating is arranged above pouring hole 3, including the seal cover board 4 being covered on pouring hole 3, is located at sealing
Lifting rod 5 on cover board 4, and for by the release link 7 of 4 parking position accuracy of seal cover board;Seal cover board 4 is not less than for thickness
Circular steel plate made of the stainless steel plate of 4mm, the big 40-70mm of the radius of radius ratio pouring hole 3 both may insure and pouring hole 3
The accurate lap seal of bottom plate 12 on periphery, but there are enough channels between side wall 11, for cement slurry blanking;Lifting rod 5 hangs down
Directly it is arranged in seal cover board 4, is highly higher than 1 height at least 100mm of staving, 5 top of lifting rod is provided with lifting ring 6, is convenient for hand
Lifting rises seal cover board 4;Release link 7 is to be not less than arc strut made of the spring steel bending of 6mm, release link 7 one diameter
End is connect with 11 inner surface of side wall, and the other end is connect with the upper surface of seal cover board 4, and the corresponding central angle of release link 7 is 95-
110 °, the distance between 7 one end of release link and 11 top edge of side wall are not less than the 1/3 of 1 height of staving;When the number of release link 7
When amount is 1,7 end of release link is connect with the center of seal cover board 4.
In order to which resetting structure is more stable, the quantity of release link 7 can also be two or more, with the perpendicular of seal cover board 4
It is axial symmetry setting to central axes, in this way when sealing cover with tearing-strip plate 4, seal cover board 4 will not shift, sealing of falling
When, it resets precisely, is not in deviation.
A pair of of positioning rope 8 is additionally provided on the outside of staving 1, positioning rope 8 is arranged by axial symmetry of the vertical central axes of staving 1,
One end is detachably fixed with side wall 11, and the other end is naturally drooped to 1 lower section of staving, is used to help the accurate positionin of staving 1, is avoided
There is deviation in lower discharge position, improves construction precision, reduces difficulty of construction.
The utility model can pour the application method of the cement pail of blanking, specifically includes the following steps:
Step 1: cement slurry is packed into staving 1, it is transported to construction location;
Step 2: staving 1 is placed in right above construction location, lifting ring 6 is pulled up, lifting rod 5 drives seal cover board 4
It lifts, concedes pouring hole 3, the cement slurry in bucket is flowed out from pouring hole 3, directly arrival construction location;
Step 3: seal cover board 4 rebound back original position under the elastic reaction of release link 7 after decontroling lifting ring 6, cover
It on pouring hole 3, is again sealed off and is bonded with bottom plate 12, cement slurry interrupts outflow, completes automatic blanking process;
Step 4: worker carries out subsequent construction manually again.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this
Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this
The various changes and improvements that the technical solution of utility model is made should all fall into the protection that the utility model claims book determines
In range.
Claims (10)
1. the cement pail of blanking can be poured, it is characterised in that: including staving (1), the handle (2) being hinged on above staving (1),
And the sealing regulating being arranged in staving (1);
Staving (1) is enclosed by side wall (11) and bottom plate (12), is offered on bottom plate (12) pouring hole (3), and sealing adjusts dress
It installs above pouring hole (3);
Sealing regulating includes the seal cover board (4) being covered on pouring hole (3), the lifting rod being located on seal cover board (4)
(5), and for the release link (7) that resets seal cover board (4);
Release link (7) is arc strut made of spring steel is bent, and one end is connect with side wall (11) inner surface, the other end and sealing
The upper surface of cover board (4) connects.
2. the cement pail according to claim 1 for pouring blanking, it is characterised in that: the side wall (11) and bottom plate
(12) it is connected smoothly, the junction of the side wall (11) and bottom plate (12) is arc surface.
3. the cement pail according to claim 1 for pouring blanking, it is characterised in that: the pouring hole (3) is located at bottom
The geometric center position of plate (12).
4. the cement pail according to claim 3 for pouring blanking, it is characterised in that: the pouring hole (3) is radius
Circular hole no more than 80mm, and the diameter of pouring hole (3) is not more than the 2/3 of bottom plate (12) diameter.
5. the cement pail according to claim 1 for pouring blanking, it is characterised in that: the lifting rod (5) perpendicular to
Seal cover board (4) setting is higher than staving (1) upper edge and is arranged, and lifting rod (5) top is provided with lifting ring (6).
6. the cement pail according to claim 1 for pouring blanking, it is characterised in that: the release link (7) is corresponding
Central angle is 95-110 °.
7. the cement pail according to claim 1 for pouring blanking, it is characterised in that: described release link (7) one end with
The distance between side wall (11) top edge is not less than the 1/3 of staving (1) height.
8. the cement pail according to claim 1 for pouring blanking, it is characterised in that: the quantity of the release link (7)
It is 1, release link (7) end is connect with the center of seal cover board (4).
9. the cement pail according to claim 1 for pouring blanking, it is characterised in that: the quantity of the release link (7)
It is at least two, is arranged by axial symmetry of the vertical central axes of seal cover board (4).
10. the cement pail according to claim 1 for pouring blanking, it is characterised in that: also set on the outside of the staving (1)
It is equipped with a pair of of positioning rope (8), positioning rope (8) is arranged by axial symmetry of the vertical central axes of staving (1), and one end and side wall (11) can
Disassembly is fixed, and the other end is naturally drooped to staving (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920245227.0U CN209670359U (en) | 2019-02-27 | 2019-02-27 | The cement pail of blanking can be poured |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920245227.0U CN209670359U (en) | 2019-02-27 | 2019-02-27 | The cement pail of blanking can be poured |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209670359U true CN209670359U (en) | 2019-11-22 |
Family
ID=68569895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920245227.0U Expired - Fee Related CN209670359U (en) | 2019-02-27 | 2019-02-27 | The cement pail of blanking can be poured |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209670359U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111733674A (en) * | 2020-08-13 | 2020-10-02 | 黑龙江建筑职业技术学院 | Road maintenance device for cold region |
-
2019
- 2019-02-27 CN CN201920245227.0U patent/CN209670359U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111733674A (en) * | 2020-08-13 | 2020-10-02 | 黑龙江建筑职业技术学院 | Road maintenance device for cold region |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209670359U (en) | The cement pail of blanking can be poured | |
CN210635174U (en) | Movable, lifting and rotating multifunctional chute | |
CN109667271A (en) | A kind of architectural engineering concrete placing installation | |
CN208184217U (en) | A kind of new concrete early stripping formwork system support device | |
CN206521939U (en) | A kind of overhanging down-stayed scaffold | |
CN201835532U (en) | Concrete grouting hopper | |
CN205908013U (en) | Quick ann of shear force wall construction tears typical forms open | |
CN205669215U (en) | The well lid reparation mould pouring installation foundation | |
CN210122264U (en) | Novel emulsion mixing storage device | |
CN208122240U (en) | Construction handling frame | |
CN209353735U (en) | The hanging apparatus of truss element | |
CN208650472U (en) | For making the mold of ash cake | |
CN208825541U (en) | A kind of three mouth of a river ladles being equipped with sliding equipment | |
CN207156155U (en) | Concrete processing Special discharge mechanism | |
CN208711115U (en) | A kind of chromatographic column column cap lifting device | |
CN210710325U (en) | Steel construction hoist device | |
CN214302916U (en) | Longitudinal rib superposed shear wall concrete pouring construction distributing hopper | |
CN218789355U (en) | Portable set device of flowers | |
CN205379858U (en) | Agitator | |
CN204210967U (en) | Lifting mode moves bulk pot | |
CN205976521U (en) | Concrete well -bucket | |
CN207622755U (en) | A kind of spirit level holder | |
CN214996080U (en) | Mortar funnel device | |
CN216949547U (en) | Anti-spilling device in pumping concrete pouring process | |
CN218504888U (en) | Supplementary jar mouth alignment device of unloading |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191122 |