CN209670048U - Prefabricated PC overhangs balcony - Google Patents
Prefabricated PC overhangs balcony Download PDFInfo
- Publication number
- CN209670048U CN209670048U CN201822261081.7U CN201822261081U CN209670048U CN 209670048 U CN209670048 U CN 209670048U CN 201822261081 U CN201822261081 U CN 201822261081U CN 209670048 U CN209670048 U CN 209670048U
- Authority
- CN
- China
- Prior art keywords
- rod iron
- turn
- gasket
- exterior wall
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of prefabricated PC overhanging balcony, including upper wall, lower layer's wall, several beam bodies, exterior wall and floor, several beam bodies are arranged in parallel and are installed between upper wall and lower layer's wall, the exterior wall and beam body are connected far from one end of upper wall, the floor is installed between adjacent beam body, there is a gasket between the beam body and exterior wall, the through-hole that the rod iron passes through on gasket is connect with exterior wall, there is a flange part on rod iron between gasket and exterior wall, the gasket further comprises substrate, the first turn-up portion being connect with substrate, second turn-up portion, this first turn-up portion, it the bending in the same direction of second turn-up portion and is arranged in parallel, the both ends of the gasket are respectively provided with a folding ear, several installation through-holes are provided in this folding ear.The utility model is by two rod irons of tightening and connects, and guarantees that rod iron is tightened, to guarantee the prestressed stabilization applied by rod iron, guarantees the integrally-built stability of balcony and safety.
Description
Technical field
The utility model relates to a kind of prefabricated PCs to overhang balcony, belong to assembled architecture field.
Background technique
Balcony can make space become abundant, and internal and external exchange is direct, unobscured, and room temperature and sunlight adjust nature spirit
It is living, have become the indispensable a part of building.However balcony is no matter on building and pattern handling or even difficulty of construction
It is all more complicated than general room, with assembled architecture flourish, how to realize can be easily installed and safety assembled sun
Platform becomes the content of assembled architecture field research.
Summary of the invention
The utility model aim is to provide a kind of prefabricated PC overhanging balcony, and it is logical which overhangs balcony
It crosses two rod irons of tightening and connects, guarantee that rod iron is tightened, to guarantee the prestressed stabilization applied by rod iron, into one
Step guarantees the integrally-built stability of balcony and safety.
In order to achieve the above objectives, the technical solution adopted in the utility model is: a kind of prefabricated PC overhanging balcony, packet
Upper wall, lower layer's wall, several beam bodies, exterior wall and floor are included, several beam bodies are arranged in parallel and are installed on upper walls
Between body and lower layer's wall, the exterior wall and beam body are connected far from one end of upper wall, and the floor is installed on adjacent
Between beam body;
There is a rod iron, this rod iron one end and exterior wall installation connect, and the other end passes through a cushion block and beam in the beam body
Body is fixedly connected, and the cushion block is connected with the end block installation being installed on beam body inner wall;
The rod iron further comprises the first rod iron and the second rod iron, and one end of first rod iron is connect with exterior wall,
One end of second rod iron is connect with cushion block, this first rod iron, the respective other end of the second rod iron pass through a pair of of connected nut peace
Load connects, and first rod iron has one first flange close to one end of the second rod iron, and second rod iron is close to the first rod iron
One end have one second flange;
There is a gasket between the beam body and exterior wall, the through-hole that the rod iron passes through on gasket is connect with exterior wall,
There is a flange part on rod iron between gasket and exterior wall;
The first turn-up portion, the second turn-up portion that the gasket further comprises substrate, connect with substrate, this first flange
It portion, the bending in the same direction of the second turn-up portion and is arranged in parallel, the both ends of the gasket are respectively provided with a folding ear, are provided in this folding ear
Several installation through-holes.
Further improved scheme is as follows in above-mentioned technical proposal:
1. in above scheme, first turn-up portion, the second turn-up portion and substrate are vertically arranged.
2. in above scheme, of same size, and the width of the first turn-up portion of first turn-up portion, the second turn-up portion
Width wallpaper with substrate is 1:5 ~ 12.
3. in above scheme, the folding ear is identical as the bending direction of the first turn-up portion.
4. in above scheme, the length of the gasket and the length of exterior wall are identical.
5. in above scheme, first rod iron is connected with a bolt, second rod iron close to one end of the second rod iron
One end close to the first rod iron is connected with a bolt.
6. in above scheme, the beam body is steel pipe.
7. in above scheme, the end block and cushion block welded connecting and/or the rod iron pass through screw thread with exterior wall and connect
It connects.
8. in above scheme, the rod iron passes through the through-hole on cushion block and rod iron end is connected with one and supports with cushion block surface
The nut connect.
9. in above scheme, the cushion block is located at upper wall opposite to each other in the side of exterior wall.
Since above-mentioned technical proposal is used, the utility model has following advantages and effect compared with prior art:
1. the utility model prefabricated PC overhangs balcony, component can be in factory's mass production, and scene
Quick and easy for installation, construction efficiency is high;In addition, having a rod iron in its beam body, this rod iron one end and exterior wall installation are connected, separately
One end is fixedly connected by a cushion block with beam body, and the cushion block is connected with the end block installation being installed on beam body inner wall, is passed through
The setting of rod iron in beam body, and one end of rod iron is connect with exterior wall, increases prestressing force, counteracted in structure exterior wall and
Moment of flexure when floor stress avoids use for a long time from the case where structural bending deformation occur, without increasing other supporting members,
Balcony area can be expanded.
2. the utility model prefabricated PC overhangs balcony, rod iron further comprises the first rod iron and the second rod iron,
One end of first rod iron is connect with exterior wall, and one end of second rod iron is connect with cushion block, this first rod iron, the second steel
The respective other end of stick passes through a pair of of connected nut installation connection and installs in such a way that two rod irons connect convenient for site operation,
And by two rod irons of tightening and connect, guarantee that rod iron is tightened, thus guarantee the prestressed stabilization applied by rod iron,
It is further ensured that the integrally-built stability of balcony and safety;In addition, its first rod iron has close to one end of the second rod iron
One first flange, second rod iron have one second flange, the setting of rod iron upper flange, to incite somebody to action close to one end of the first rod iron
Two rod iron tightenings provide impetus, convenient for manually or using mechanical equipment being tightly connected two rod irons conjunctions.
3. the utility model prefabricated PC overhangs balcony, there is a gasket, the steel between beam body and exterior wall
The through-hole that stick passes through on gasket is connect with exterior wall, has a flange part, exterior wall on the rod iron between gasket and exterior wall
The setting of internal surface gasket, enhances the stability connected between the mechanical property of Side fascia and rod iron and wallboard, further
Guarantee the stabilization and safety of balcony structure, meanwhile, rod iron and gasket are locked in the setting of rod iron upper flange part, guarantee rod iron
Degrees of tensions, i.e., rod iron provide prestressed stability and uniformity, ensure again the stabilization and safety of balcony structure;
In addition, the first turn-up portion, the second turn-up portion that its gasket further comprises substrate, connect with substrate, this first turn-up portion, second
It turn-up portion bending in the same direction and is arranged in parallel, the both ends of the gasket are respectively provided with a folding ear, are provided with several peaces in this folding ear
Through-hole is filled, gasket turns over the setting of edge, not only enhanced the mechanical property of gasket itself, but also increases gasket component adjacent thereto
Between contact area, guarantee gasket installation stability, to enhance the stability and safety of balcony structure entirety, together
When, gasket both ends roll over ear and installation through-hole setting, then provide convenience the interface connecting with external component for gasket, into
While the connective stability of one step reinforced gasket, possibility is provided for the extension of gasket and the expansion of balcony area.
Detailed description of the invention
Attached drawing 1 is that the utility model prefabricated PC overhangs balcony structure schematic diagram;
Attached drawing 2 is that the utility model prefabricated PC overhangs balcony partial structural diagram;
Attached drawing 3 is that the utility model prefabricated PC overhangs balcony partial structurtes decomposition diagram;
Attached drawing 4 is that the utility model prefabricated PC overhangs balcony partial structurtes scheme of installation;
Attached drawing 5 is that the utility model prefabricated PC overhangs gasket construction schematic diagram in balcony.
In the figures above: 1, upper wall;2, lower layer's wall;3, beam body;4, exterior wall;5, rod iron;51, the first rod iron;
52, the second rod iron;6, cushion block;7, end block;8, to connected nut;91, the first flange;92, the second flange;10, gasket;11, flange
Portion;12, substrate;13, the first turn-up portion;14, the second turn-up portion;15, ear is rolled over;16, installation through-hole.
Specific embodiment
The utility model is further described below with reference to embodiment:
Embodiment 1: a kind of prefabricated PC overhangs balcony, including upper wall 1, lower layer's wall 2, several beam bodies 3, outer
Wall 4 and floor, several beam bodies 3 are arranged in parallel and are installed between upper wall 1 and lower layer's wall 2, the exterior wall 4
It is connect with beam body 3 far from one end of upper wall 1, the floor is installed between adjacent beam body 3;
There is a rod iron 5, this 5 one end of rod iron and the installation of exterior wall 4 connect, and the other end passes through a cushion block 6 in the beam body 3
It is fixedly connected with beam body 3, the cushion block 6 is connected with an end block 7 installation being installed on 3 inner wall of beam body;
The rod iron 5 further comprises the first rod iron 51 and the second rod iron 52, one end of first rod iron 51 and exterior wall
Body 4 connects, and one end of second rod iron 52 is connect with cushion block 6, this first rod iron 51, the respective other end of the second rod iron 52 are logical
A pair of of the installation of connected nut 8 connection is crossed, first rod iron 51 has one first flange 91 close to one end of the second rod iron 52, described
Second rod iron 52 has one second flange 92 close to one end of the first rod iron 51;
There is a gasket 10, the rod iron 5 passes through the through-hole and exterior wall on gasket 10 between the beam body 3 and exterior wall 4
Body 4 connects, and has a flange part 11 on the rod iron 5 between gasket 10 and exterior wall 4;
The first turn-up portion 13, the second turn-up portion 14 that the gasket 10 further comprises substrate 12, connect with substrate 12, this
It first turn-up portion 13, the bending in the same direction of the second turn-up portion 14 and is arranged in parallel, the both ends of the gasket 10 are respectively provided with a folding ear
15, this, which is rolled over, is provided with several installation through-holes 16 in ear 15.
Above-mentioned first turn-up portion 13, the second turn-up portion 14 are vertically arranged with substrate 12;Above-mentioned first turn-up portion 13, second turn over
Edge 14 it is of same size, and the width wallpaper of the width of the first turn-up portion 13 and substrate 12 is 1:8;Above-mentioned folding ear 15 and
The bending direction of one turn-up portion 13 is identical;The length of above-mentioned gasket 10 is identical as the length of exterior wall 4;Above-mentioned first rod iron 51 leans on
One end of nearly second rod iron 52 is connected with a bolt, and above-mentioned second rod iron 52 is connected with a spiral shell close to one end of the first rod iron 51
Bolt.
Embodiment 2: a kind of prefabricated PC overhangs balcony, including upper wall 1, lower layer's wall 2, several beam bodies 3, outer
Wall 4 and floor, several beam bodies 3 are arranged in parallel and are installed between upper wall 1 and lower layer's wall 2, the exterior wall 4
It is connect with beam body 3 far from one end of upper wall 1, the floor is installed between adjacent beam body 3;
There is a rod iron 5, this 5 one end of rod iron and the installation of exterior wall 4 connect, and the other end passes through a cushion block 6 in the beam body 3
It is fixedly connected with beam body 3, the cushion block 6 is connected with an end block 7 installation being installed on 3 inner wall of beam body;
The rod iron 5 further comprises the first rod iron 51 and the second rod iron 52, one end of first rod iron 51 and exterior wall
Body 4 connects, and one end of second rod iron 52 is connect with cushion block 6, this first rod iron 51, the respective other end of the second rod iron 52 are logical
A pair of of the installation of connected nut 8 connection is crossed, first rod iron 51 has one first flange 91 close to one end of the second rod iron 52, described
Second rod iron 52 has one second flange 92 close to one end of the first rod iron 51;
There is a gasket 10, the rod iron 5 passes through the through-hole and exterior wall on gasket 10 between the beam body 3 and exterior wall 4
Body 4 connects, and has a flange part 11 on the rod iron 5 between gasket 10 and exterior wall 4;
The first turn-up portion 13, the second turn-up portion 14 that the gasket 10 further comprises substrate 12, connect with substrate 12, this
It first turn-up portion 13, the bending in the same direction of the second turn-up portion 14 and is arranged in parallel, the both ends of the gasket 10 are respectively provided with a folding ear
15, this, which is rolled over, is provided with several installation through-holes 16 in ear 15.
Above-mentioned first turn-up portion 13, the second turn-up portion 14 are vertically arranged with substrate 12;Above-mentioned first turn-up portion 13, second turn over
Edge 14 it is of same size, and the width wallpaper of the width of the first turn-up portion 13 and substrate 12 is 1:10;Above-mentioned beam body 3 is steel
Pipe;Above-mentioned end block 7 is welded to connect with cushion block 6 and/or above-mentioned rod iron 5 is connected through a screw thread with exterior wall 4;Above-mentioned rod iron 5 passes through
Through-hole and 5 end of rod iron on cushion block 6 are connected with a nut abutted with 6 surface of cushion block;Above-mentioned cushion block 6 is located at upper wall 1
Opposite to each other in the side of exterior wall 4.
When overhanging balcony using above-mentioned prefabricated PC, component can be in factory's mass production, and scene is pacified
Fill convenient and efficient, construction efficiency height;In addition, by the setting of rod iron in beam body, and one end of rod iron is connect with exterior wall, is increased
Prestressing force, moment of flexure when counteracting exterior wall and floor stress in structure avoid use for a long time from structural bending change occur
The case where shape, without increasing other supporting members, so that it may expand balcony area;
In addition, installed in such a way that two rod irons connect convenient for site operation, and by two rod irons of tightening and by its
Connection, guarantees that rod iron is tightened, to guarantee the prestressed stabilization applied by rod iron, is further ensured that balcony is integrally-built
Stability and safety;In addition, the setting of rod iron upper flange, to provide two rod irons tightenings to impetus, convenient for artificial or
Two rod iron conjunctions are tightly connected using mechanical equipment;
In addition, the setting of exterior wall inner surface gasket, enhances and connects between the mechanical property of Side fascia and rod iron and wallboard
The stability connect is further ensured that the stabilization and safety of balcony structure, meanwhile, the setting of rod iron upper flange part, by rod iron with
Gasket locking guarantees the degrees of tensions of rod iron, the i.e. prestressed stability and uniformity of rod iron offer, ensures again balcony
The stabilization and safety of structure;
In addition, gasket turns over the setting of edge, the mechanical property of gasket itself has not only been enhanced, but also has increased gasket and its phase
Contact area between adjacent component guarantees the stability of gasket installation, to enhance the stability and peace of balcony structure entirety
Quan Xing, meanwhile, the setting of ear and installation through-hole is rolled at gasket both ends, then connecing of connecting with external component is provided convenience for gasket
Mouthful, while the connective stability for further enhancing gasket, possibility is provided for the extension of gasket and the expansion of balcony area.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique
Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention.
All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it
It is interior.
Claims (10)
1. a kind of prefabricated PC overhangs balcony, it is characterised in that: including upper wall (1), lower layer's wall (2), Ruo Ganliang
Body (3), exterior wall (4) and floor, several beam bodies (3) are arranged in parallel and are installed on upper wall (1) and lower layer's wall (2)
Between, the exterior wall (4) connect with beam body (3) far from the one end of upper wall (1), and the floor is installed on adjacent beam body
(3) between;
There are a rod iron (5) in the beam body (3), this rod iron (5) one end and exterior wall (4) installation connect, and the other end passes through one
Cushion block (6) is fixedly connected with beam body (3), and the cushion block (6) connects with an end block (7) installation being installed on beam body (3) inner wall;
The rod iron (5) further comprises the first rod iron (51) and the second rod iron (52), one end of first rod iron (51) with
Exterior wall (4) connection, one end of second rod iron (52) are connect with cushion block (6), this first rod iron (51), the second rod iron (52)
The respective other end passes through a pair of of connected nut (8) and installs connection, the one end of first rod iron (51) close to the second rod iron (52)
With one first flange (91), second rod iron (52) has one second flange (92) close to the one end of the first rod iron (51);
There are a gasket (10) between the beam body (3) and exterior wall (4), the rod iron (5) passes through the through-hole on gasket (10)
It is connect with exterior wall (4), there are a flange part (11) on the rod iron (5) between gasket (10) and exterior wall (4);
The gasket (10) further comprises substrate (12), the first turn-up portion (13), the second turn-up portion that connect with substrate (12)
(14), this first turn-up portion (13), the second turn-up portion (14) bending and are arranged in parallel in the same direction, the both ends difference of the gasket (10)
With a folding ear (15), several installation through-holes (16) are provided on this folding ear (15).
2. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: first turn-up portion (13), the
Two turn-up portions (14) are vertically arranged with substrate (12).
3. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: first turn-up portion (13), the
Two turn-up portions (14) it is of same size, and the width wallpaper of the width of the first turn-up portion (13) and substrate (12) is 1:5 ~ 12.
4. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: the folding ear (15) is turned over first
The bending direction of edge (13) is identical.
5. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: the length of the gasket (10) and outer
The length of wall (4) is identical.
6. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: first rod iron (51) is close to the
One end of two rod irons (52) is connected with a bolt, and second rod iron (52) is connected with a spiral shell close to the one end of the first rod iron (51)
Bolt.
7. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: the beam body (3) is steel pipe.
8. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: the end block (7) and cushion block (6) are welded
It connects in succession and/or the rod iron (5) is connected through a screw thread with exterior wall (4).
9. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: the rod iron (5) passes through cushion block (6)
On through-hole and rod iron (5) end be connected with a nut abutted with cushion block (6) surface.
10. prefabricated PC overhangs balcony according to claim 1, it is characterised in that: the cushion block (6) is located at upper walls
Body (1) is opposite to each other in the side of exterior wall (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822261081.7U CN209670048U (en) | 2018-12-30 | 2018-12-30 | Prefabricated PC overhangs balcony |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822261081.7U CN209670048U (en) | 2018-12-30 | 2018-12-30 | Prefabricated PC overhangs balcony |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209670048U true CN209670048U (en) | 2019-11-22 |
Family
ID=68564444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822261081.7U Active CN209670048U (en) | 2018-12-30 | 2018-12-30 | Prefabricated PC overhangs balcony |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209670048U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118327137A (en) * | 2024-05-10 | 2024-07-12 | 广东工程职业技术学院 | Outside embedded extension storehouse structure of apartment |
-
2018
- 2018-12-30 CN CN201822261081.7U patent/CN209670048U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118327137A (en) * | 2024-05-10 | 2024-07-12 | 广东工程职业技术学院 | Outside embedded extension storehouse structure of apartment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563494B (en) | A kind of conversion support system for socket joint dish button steel tube frame and construction | |
CN101158195B (en) | Suspended-dome multi-time prestressed construction method | |
CN102782319A (en) | Tower for a wind power station and method for erecting a tower for a wind power station | |
CN209670048U (en) | Prefabricated PC overhangs balcony | |
CN1302188C (en) | Tubular structure and modular building assembly using the same | |
CN204475846U (en) | A kind of conversion support system for socket joint dish button steel tube frame | |
WO2014134859A1 (en) | Pre-stressed steel-concrete composite-type pylon structure | |
CN101200961A (en) | Variable angle connecting overlap-connected components and construction method for ceiling of continuous curve surface | |
CN102021997A (en) | Method for building platform at bottom of suspended scaffold | |
CN209670049U (en) | High stability overhangs balcony | |
CN103046692B (en) | Frame-supporting column with high strength steel bars and super high strength concrete | |
CN208870190U (en) | Assembled arthitecutral structure | |
CN207073275U (en) | Builder's jack fixture and builder's jack | |
CN103452326B (en) | Overlength davit is along way construction method and equipment thereof | |
CN1737288A (en) | Fixing device and building method for outer decorative stone curtain wall of steel pipe truss tower | |
CN209670050U (en) | Steel construction assembly type platform | |
CN209670047U (en) | Fabricated construction module | |
CN102041849A (en) | Double-angle spliced buckling-restrained brace | |
CN102251581B (en) | Steel beam-reinforced concrete floor structure and construction method thereof | |
CN209670051U (en) | General module for assembled architecture | |
CN208700444U (en) | A kind of lattice tower crane attachment anchored platform | |
CN203947637U (en) | A kind of syndeton of Glass Rib | |
CN1224766C (en) | Steel structured dome and its manufacture and installation method | |
CN208718476U (en) | A kind of three towers Y type bracket | |
CN110344579A (en) | A kind of scaffold tripod fastener |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |