CN209670047U - Fabricated construction module - Google Patents

Fabricated construction module Download PDF

Info

Publication number
CN209670047U
CN209670047U CN201822257405.XU CN201822257405U CN209670047U CN 209670047 U CN209670047 U CN 209670047U CN 201822257405 U CN201822257405 U CN 201822257405U CN 209670047 U CN209670047 U CN 209670047U
Authority
CN
China
Prior art keywords
rod iron
wall
exterior wall
beam body
cushion block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822257405.XU
Other languages
Chinese (zh)
Inventor
谢晶晶
蒋学东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Yang Steel Prefabricated Building Technology Co Ltd
Original Assignee
Suzhou Yang Steel Prefabricated Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Yang Steel Prefabricated Building Technology Co Ltd filed Critical Suzhou Yang Steel Prefabricated Building Technology Co Ltd
Priority to CN201822257405.XU priority Critical patent/CN209670047U/en
Application granted granted Critical
Publication of CN209670047U publication Critical patent/CN209670047U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of fabricated construction module, including upper wall, lower layer's wall, several beam bodies, exterior wall and floor, several beam bodies are arranged in parallel and are installed between upper wall and lower layer's wall, the exterior wall and beam body are connected far from one end of upper wall, the floor is installed between adjacent beam body, there is a rod iron in the beam body, this rod iron one end and exterior wall installation connect, the other end is fixedly connected by a cushion block with beam body, the rod iron further comprises the first rod iron and the second rod iron, one end of first rod iron is connect with exterior wall, one end of second rod iron is connect with cushion block, this first rod iron, the respective other end of second rod iron passes through a pair of of connected nut installation connection.Moment of flexure of the utility model when counteracting exterior wall and floor stress in structure avoids use for a long time from the case where structural bending deformation occur, without increasing other supporting members, so that it may expand balcony area.

Description

Fabricated construction module
Technical field
The utility model relates to a kind of fabricated construction modules, belong to assembled architecture field.
Background technique
Balcony can make space become abundant, and internal and external exchange is direct, unobscured, and room temperature and sunlight adjust nature spirit It is living, have become the indispensable a part of building.However balcony is no matter on building and pattern handling or even difficulty of construction It is all more complicated than general room, with assembled architecture flourish, how to realize can be easily installed and safety assembled knot Structure module becomes the content of assembled architecture field research.
Summary of the invention
The utility model aim is to provide a kind of fabricated construction module, which counteracts in structure Moment of flexure when exterior wall and floor stress avoids use for a long time from the case where structural bending deformation occur, other without increasing Supporting member, so that it may expand balcony area.
In order to achieve the above objectives, the technical solution adopted in the utility model is: a kind of fabricated construction module, including upper layer Wall, lower layer's wall, several beam bodies, exterior wall and floor, several beam bodies are arranged in parallel and are installed on upper wall under Between layer wall, the exterior wall and beam body are connected far from one end of upper wall, the floor be installed on adjacent beam body it Between;
There is a rod iron, this rod iron one end and exterior wall installation connect, and the other end passes through a cushion block and beam in the beam body Body is fixedly connected, and the cushion block is connected with the end block installation being installed on beam body inner wall;
The rod iron further comprises the first rod iron and the second rod iron, and one end of first rod iron is connect with exterior wall, One end of second rod iron is connect with cushion block, this first rod iron, the respective other end of the second rod iron pass through a pair of of connected nut peace Load connects;
First rod iron has one first flange close to one end of the second rod iron, and second rod iron is close to the first rod iron One end have one second flange.
Further improved scheme is as follows in above-mentioned technical proposal:
1. in above scheme, the beam body is steel pipe.
2. in above scheme, the end block and cushion block are welded to connect.
3. in above scheme, the rod iron is connected through a screw thread with exterior wall.
4. in above scheme, the rod iron passes through the through-hole on cushion block and rod iron end is connected with one and supports with cushion block surface The nut connect.
5. in above scheme, the cushion block is located at upper wall opposite to each other in the side of exterior wall.
6. in above scheme, first rod iron is connected with a bolt, second rod iron close to one end of the second rod iron One end close to the first rod iron is connected with a bolt.
7. in above scheme, the bolt and the first rod iron, the second rod iron are welded to connect.
Since above-mentioned technical proposal is used, the utility model has following advantages and effect compared with prior art:
1. the utility model fabricated construction module, component can be in factory's mass production, and in-site installation side Just quick, construction efficiency is high;In addition, having a rod iron in its beam body, this rod iron one end and exterior wall installation are connected, and the other end is logical It crosses a cushion block to be fixedly connected with beam body, the cushion block is connected with the end block installation being installed on beam body inner wall, by beam body The setting of rod iron, and one end of rod iron is connect with exterior wall, increases prestressing force, counteracted in structure exterior wall and floor by Moment of flexure when power avoids use for a long time from the case where structural bending deformation occur, without increasing other supporting members, so that it may Balcony area is expanded.
2. the utility model fabricated construction module, rod iron further comprises the first rod iron and the second rod iron, described One end of one rod iron is connect with exterior wall, and one end of second rod iron is connect with cushion block, this first rod iron, the second rod iron are respectively The other end pass through a pair of of connected nut installation connection and installed in such a way that two rod irons connect convenient for site operation, and pass through It tightens two rod irons and connects, guarantee that rod iron is tightened, to guarantee the prestressed stabilization applied by rod iron, further Guarantee the integrally-built stability of balcony and safety;In addition, its first rod iron has one first close to one end of the second rod iron Flange, second rod iron have one second flange, the setting of rod iron upper flange, for by two steel close to one end of the first rod iron Stick tightening provides impetus, convenient for manually or using mechanical equipment being tightly connected two rod irons conjunctions.
Detailed description of the invention
Attached drawing 1 is the utility model fabricated construction modular structure schematic diagram;
Attached drawing 2 is the utility model fabricated construction module partial structural diagram;
Attached drawing 3 is the utility model fabricated construction module partial structurtes decomposition diagram;
Attached drawing 4 is the utility model fabricated construction module partial structurtes scheme of installation.
In the figures above: 1, upper wall;2, lower layer's wall;3, beam body;4, exterior wall;5, rod iron;6, cushion block;7, it holds Block;51, the first rod iron;52, the second rod iron;8, to connected nut;91, the first flange;92, the second flange.
Specific embodiment
The utility model is further described below with reference to embodiment:
Embodiment 1: a kind of fabricated construction module, including upper wall 1, lower layer's wall 2, several beam bodies 3, exterior wall 4 And floor, several beam bodies 3 are arranged in parallel and are installed between upper wall 1 and lower layer's wall 2, the exterior wall 4 and beam Body 3 is connected far from one end of upper wall 1, and the floor is installed between adjacent beam body 3;
There is a rod iron 5, this 5 one end of rod iron and the installation of exterior wall 4 connect, and the other end passes through a cushion block 6 in the beam body 3 It is fixedly connected with beam body 3, the cushion block 6 is connected with an end block 7 installation being installed on 3 inner wall of beam body;
The rod iron 5 further comprises the first rod iron 51 and the second rod iron 52, one end of first rod iron 51 and exterior wall Body 4 connects, and one end of second rod iron 52 is connect with cushion block 6, this first rod iron 51, the respective other end of the second rod iron 52 are logical A pair of of the installation of connected nut 8 connection is crossed, first rod iron 51 has one first flange 91 close to one end of the second rod iron 52, described Second rod iron 52 has one second flange 92 close to one end of the first rod iron 51.
Above-mentioned beam body 3 is steel pipe;Above-mentioned end block 7 is welded to connect with cushion block 6;Above-mentioned first rod iron 51 is close to the second rod iron 52 One end be connected with a bolt, above-mentioned second rod iron 52 is connected with a bolt, the end cap of bolt close to one end of the first rod iron 51 Portion is the first flange and the second flange;Above-mentioned bolt and the first rod iron 51, the second rod iron 52 are welded to connect.
Embodiment 2: a kind of fabricated construction module, including upper wall 1, lower layer's wall 2, several beam bodies 3, exterior wall 4 And floor, several beam bodies 3 are arranged in parallel and are installed between upper wall 1 and lower layer's wall 2, the exterior wall 4 and beam Body 3 is connected far from one end of upper wall 1, and the floor is installed between adjacent beam body 3;
There is a rod iron 5, this 5 one end of rod iron and the installation of exterior wall 4 connect, and the other end passes through a cushion block 6 in the beam body 3 It is fixedly connected with beam body 3, the cushion block 6 is connected with an end block 7 installation being installed on 3 inner wall of beam body;
The rod iron 5 further comprises the first rod iron 51 and the second rod iron 52, one end of first rod iron 51 and exterior wall Body 4 connects, and one end of second rod iron 52 is connect with cushion block 6, this first rod iron 51, the respective other end of the second rod iron 52 are logical A pair of of the installation of connected nut 8 connection is crossed, first rod iron 51 has one first flange 91 close to one end of the second rod iron 52, described Second rod iron 52 has one second flange 92 close to one end of the first rod iron 51.
Above-mentioned rod iron 5 is connected through a screw thread with exterior wall 4;Above-mentioned rod iron 5 passes through the through-hole on cushion block 6 and 5 end of rod iron It is connected with a nut abutted with 6 surface of cushion block;Above-mentioned cushion block 6 is located at upper wall 1 opposite to each other in the side of exterior wall 4.
When using above-mentioned fabricated construction module, component can be in factory's mass production, and in-site installation is convenient Fast, construction efficiency is high;In addition, by the setting of rod iron in beam body, and one end of rod iron is connect with exterior wall, increases pre- answer Power, the moment of flexure when counteracting exterior wall and floor stress in structure avoid for a long time using the feelings for structural bending deformation occur Condition, without increasing other supporting members, so that it may expand balcony area.
In addition, installed in such a way that two rod irons connect convenient for site operation, and by two rod irons of tightening and by its Connection, guarantees that rod iron is tightened, to guarantee the prestressed stabilization applied by rod iron, is further ensured that balcony is integrally-built Stability and safety;In addition, the setting of rod iron upper flange, to provide two rod irons tightenings to impetus, convenient for artificial or Two rod iron conjunctions are tightly connected using mechanical equipment.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention. All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it It is interior.

Claims (8)

1. a kind of fabricated construction module, it is characterised in that: including upper wall (1), lower layer's wall (2), several beam bodies (3), Exterior wall (4) and floor, several beam bodies (3) are arranged in parallel and are installed between upper wall (1) and lower layer's wall (2), The exterior wall (4) and beam body (3) are connect far from the one end of upper wall (1), the floor be installed on adjacent beam body (3) it Between;
There are a rod iron (5) in the beam body (3), this rod iron (5) one end and exterior wall (4) installation connect, and the other end passes through one Cushion block (6) is fixedly connected with beam body (3), and the cushion block (6) connects with an end block (7) installation being installed on beam body (3) inner wall;
The rod iron (5) further comprises the first rod iron (51) and the second rod iron (52), one end of first rod iron (51) with Exterior wall (4) connection, one end of second rod iron (52) are connect with cushion block (6), this first rod iron (51), the second rod iron (52) The respective other end passes through a pair of of connected nut (8) and installs connection;
First rod iron (51) has one first flange (91), second rod iron (52) close to the one end of the second rod iron (52) One end close to the first rod iron (51) has one second flange (92).
2. fabricated construction module according to claim 1, it is characterised in that: the beam body (3) is steel pipe.
3. fabricated construction module according to claim 1, it is characterised in that: the end block (7) and cushion block (6) welding connect It connects.
4. fabricated construction module according to claim 1, it is characterised in that: the rod iron (5) and exterior wall (4) pass through spiral shell Line connection.
5. fabricated construction module according to claim 1, it is characterised in that: the rod iron (5) passes through logical on cushion block (6) Hole and rod iron (5) end are connected with a nut abutted with cushion block (6) surface.
6. fabricated construction module according to claim 1, it is characterised in that: the cushion block (6) is located at upper wall (1) phase It carries on the back in the side of exterior wall (4).
7. fabricated construction module according to claim 1, it is characterised in that: first rod iron (51) is close to the second rod iron (52) one end is connected with a bolt, and second rod iron (52) is connected with a bolt close to the one end of the first rod iron (51).
8. fabricated construction module according to claim 7, it is characterised in that: the bolt and the first rod iron (51), second Rod iron (52) is welded to connect.
CN201822257405.XU 2018-12-30 2018-12-30 Fabricated construction module Active CN209670047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822257405.XU CN209670047U (en) 2018-12-30 2018-12-30 Fabricated construction module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822257405.XU CN209670047U (en) 2018-12-30 2018-12-30 Fabricated construction module

Publications (1)

Publication Number Publication Date
CN209670047U true CN209670047U (en) 2019-11-22

Family

ID=68564352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822257405.XU Active CN209670047U (en) 2018-12-30 2018-12-30 Fabricated construction module

Country Status (1)

Country Link
CN (1) CN209670047U (en)

Similar Documents

Publication Publication Date Title
CN108365799B (en) Suspension type flexible photovoltaic support unit and photovoltaic support
CN209670047U (en) Fabricated construction module
CN111705922A (en) Sleeve type connection form capable of realizing conversion of section of strut of prestressed strut steel column
CN209670050U (en) Steel construction assembly type platform
CN103615046B (en) Hyperbolic circular arc wood dome and construction installation method thereof
CN109779002A (en) Overall assembled framework house
CN209670049U (en) High stability overhangs balcony
CN204826849U (en) Glass steel stack is with only shaking device
CN209670051U (en) General module for assembled architecture
CN107119800B (en) A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems
CN216195411U (en) Assembled steel frame structure
CN209670046U (en) Assembled architecture unit
CN209670048U (en) Prefabricated PC overhangs balcony
CN209398928U (en) A kind of fixed bracket of pump line attached wall
CN208518163U (en) A kind of large-span arch steel structure net rack roof
CN209040295U (en) A kind of assembled arthitecutral structure convenient for fast assembling-disassembling
CN107165287A (en) A kind of attachment structure of assembled wall and plate-girder
CN204646890U (en) Photovoltaic bracket multipurpose connects pipe box
CN105672524A (en) No-initial stress adjustable damper embedded part and construction method thereof
CN204942404U (en) A kind of steel strand link
CN207944561U (en) A kind of node connecting structure
CN208235798U (en) Column structure for prefabricated buildings
CN205348745U (en) Reinforcing instrument formula scaffold bearing capacity's connecting piece
CN110206370A (en) One kind is more across the control anti-buckling eccentrically braces structure of power
CN205296985U (en) Can dismantle solar energy covering or awning on a car, boat, etc. room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant